PS1 (1+0.08) 1.33 x q Adm PS2 (1+0.08) A2 = q Ad m
A1 =
190 + 15.2 1.33 x 2 x 10 145 + 11.6 2 x 10
= =
=
7.71 m²
=
7.83 m²
Tomamos el mayor: Lx= 2.80 m 7.83 m² Ly= 2.80 m
DETERMINANDO LA CARGA PUNTUAL ULTIMA
Pu = 1.4 x Pm + 1.7 x Pv = 1.4 x 85 + 1.7 x 60 = 221 Tn Pu = 1.25 x ( Pm + Pv ) + Ps = 1.25 x (85 + 60) + 45 = 226.25Tn Pu = 0.9 x ( Pm) + Ps = 0.9 x (85) + 45 = 121.5Tn
Tomar el Mayor: Pu =226.250 Tn
DETERMINANDO LA CARGA ULTIMA
Q u=
Pu A
=
226.25 2.8 x 2.8
=
28.858 Tn/m²
DISEÑO POR PUNZONAMIENTO:
226.25-(d + 40)x(d + 40)x28.858=0.85x1.06 √175x10x(4d+2x40+2x40)xd d= 0.48 m Aproximamos el peralte (h) igual a 0.6m entonces considerando el recubrimiento y el diametro del Acero; d sera igual a 0.51 m VERIFICANDO POR CORTE:
0.53 x √175 x 10 x 0.51 x 2.8 = 100.31Tn 28.858 x 2.8 (1.2-0.51) = 65.502 Tn 0.85 Vc > Vu (Cumple)
MOMENTO ULTIMO:
28.858 x 1.2² x 2.8 2
=
58.178 Tn.m
DETERMINANDO EL REFUERZO:
a (cm) 10.22 3.38 3.14 3.13 3.13
As (cm²) 33.47 31.15 31.08 31.08 31.08
DETERMINANDO EL REFUERZO MINIMO:
As min = 0.0018 x 51.1 x 280 = 25.75 cm² Tomamos: As= 31.08 cm² S= 26 cm 11 Ø 3/4" @ 0.26 GRUPO EDIFIC