Nice and detailed explanation about " Local File Inclusion" and "Remote File Inclusion", how to attack and prevent provided by Duckademy.Descripción completa
Test (Rfi)Descripción completa
checklistDescripción completa
Checklist
ChecklistDescripción completa
hhDescription complète
Full description
DescripciónDescripción completa
N/ADescrição completa
Descripción completa
CHECK LIST FOR BTS SITES 10/09/2008
SITE ENGINEERING
1 (5)
TELECOM IMPLEMENTATION INSPECTION REPORT SITE ID: ........................ SITE NAME: ................................................Date Of Visit: ....................... SITE ADDRESS: ………………… …………………………………… ……………………………………… …………………….. ..
Document number: ............................
Guard Name and contact No. Date of submission of Report:…………………………………. Notation: S.No .
Correctly installed / Acceptable
Not correct
Infrastructure
Check point
1
Radio Site
GBT GBT
RTT
2
ID/OD/POLE/WAL L
INDOOR POLE
3
Shelter
Buildg. Height (Mtrs/floor)
POLE OUTDOOR
WALL
Equipment Room Floor
Chain Pulley required
4
Space For Equipments (Sharing sites)
Space available for BTS
Space Available for TRSM Rack
5
Floor
Levelled
6
Door
Sealing
7
ID LADDER
ID LADDER INSTALLED
8
Lighting
No. of fittings
9
Earthing system
No of Pits with Chamber prepared
Antistatic Mat
Antistatic grounding
Locking
≥
2
SPACE ON EXISTING LADDER
Operational
P Sockets operational
Earthpits are interconnected
DG,DG-N,Tower,Shelter DG,DG-N,Tow er,Shelter are conneted to EP Earthing Values – EP1 10
Earthing Bus Bars
EGB under feeder entry
EP2
EP3
Connected to BODY EarthPIT
Ohms
CHECK LIST FOR BTS SITES 10/09/2008
SITE ENGINEERING
IGB under feeder entry
Connected with Eqpt earthpit
EMP BUS BAR
11
PIU/ACDB
2 (5)
,Connected With EGB ???
PIU/ACDB Installed
POWER TERMINATION AT PIU/ACDB
PIU/ACDB commissioned
12
Mains Incomer
Mains available
13
DC Power Availability
DC Power Available
Energy Meter Installed
MCB available for BTS& TRSM
14
DG
DG installed
DG Commissioned
15
Air-conditioning
Installed
16
WFT
Size of opening made for WFT
Sealing around AC units
AC’s are comm..
No of Openings made
Openings are properly sealed 17
Tower
GBT
RTT
Tower Height
No of Platforms & height
Tower Painting
18
Type
Tower Type
19
Cable ladder (OD)
Vertical Cable tray installed
Horizontal Cable tray installed
Space available on Vertical/Horizontal tray
20
Cable Ladder lengths
Length of Vertcal ladder(above HCT till antenna mount) Length of HCT ladder
21
Lightening Protection
Lightening Rod
in mtrs. LA connected to Earthpit
in mtrs.
CHECK LIST FOR BTS SITES 10/09/2008
SITE ENGINEERING
22
Aviation Light
23
Cable Inlet
24
Antenna Mount
Installation
3 (5)
COMMISSIONED
For Power & Signal Cables
GSM antenna mount Installed
Antenna Mount for MW at near end
Antenna Mount for MW at Far End
25
GSM antenna Mount hts.(as per TND)
Height of GSM Mount1
Mount-2
26
GSM antenna Mount hts.(existing)
Height of GSM Mount-1
Mount-2
Mount-3
27
MW Antenna Mount ht. (as per TND)
Height of MW-1 Mount-1
MW-2
MW-3
28
MW Antenna Mount ht. (Existing)
Height of MW-1 Mount-1
29
GSM antenna Azimuth(As per TND)
GSM Mount-1
30
GSM antenna Azimuth (existing)
GSM Mount-1
31
MW Antenna Azimuth(As per TND)
MW -1
32
MW Antenna Azimuth (Existing)
MW-1
Mount-3
MW-2
MW-3
Mount-2
MW-2
MW-4
Mount-3
Mount-2
MW-2
MW-3
Mount-3
MW-3
MW-3
MW-4
MW-4
SITE ENGINEERING
CHECK LIST FOR BTS SITES 10/09/2008
4 (5)
Problems / Comments (Refer to applicable activity Sl. No.) _______________________________________________________________ ___________________ __________________________________________________________________________________ __________________________________________________________________________________
Site Engineer Name & Signature: Name::………………………...
Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)