Home
Add Document
Sign In
Register
Hirarc Lifting
Home
Hirarc Lifting
hazard identification, risk assessment, risk control...
Author:
Mohd Zulhaidy
64 downloads
1329 Views
52KB Size
Report
DOWNLOAD .PDF
Recommend Documents
Hirarc Lifting 2
hazard identification, risk assessment, risk controlFull description
HIRARC
HirarcFull description
HIRARC
SafetyFull description
HIRARC
HIRARC
HIRARC
HIRARCFull description
HIRARC Warehouse
wfq3qgtFull description
HIRARC Guidelines
HIRARC A.docx
HIRARC Tool.xls
Hirarc Form
An example of hirarc form for the subject of OSHA. Sample for assignment.
Hirarc Excavation
heFull description
Hirarc Form Fork Lift
OSHA subjectDeskripsi lengkap
HIRARC Piling Work
hirarc pilingFull description
HIRARC 2008.pdf
Mao Wpa Hirarc
HIRARC Table Arc Welding
OSHADeskripsi lengkap
81154769-Contoh-HIRARC
Contoh-HIRARC-OHSAS 18001
contoh hirarc berdasarkan ohsas 18001
10 Damansara HIRARC
Lifting Lugs
Full description
Lifting Design
Lifting Rigging
Lifting Lug
Lifting Lug Stress
Lifting-Plan.pdf
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL Name of Job :
Department : LIFTING WORK
Prepared By :
Transporting of lifting machinery
Mobilization/ unloading machinery/ material
Approved By :
CONSTRUCTION
HAZARD IDENTIFICATION Job Activity
Checked By :-
Hazard
Hazard Character
Recommended Action/Additional Control
RISK ASSESSMENT Current Risk Control
Probability
Severit y
Ris k
2
2
4
Additional control shall be proposed when necessary
Traffic collision.
Minor damage (No or less disruption, repair cost > RM1,000 and < RM10,000)
Provide experience driver with legal driving licence; Provide trafficman.
Machinery breakdown.
Minor damage (No or less disruption, repair cost > RM1,000 and < RM10,000)
Regular maintenance and servicing.
3
2
6
Briefing By SHO on safety awareness. Additional control shall be made if necessary.
Equipment/machinery falling onto public vehicle/road.
Minor damage (No or less disruption, repair cost > RM1,000 and < RM10,000)
To securely tighten up equipment/machinery before transporting; Provide warning signage.
2
2
4
Additional control shall be proposed when necessary
Body injuries while handling or secure equipment/ machinery for transporting.
First aid cases/medical treatment (M.C between 1 to 3 days),
Provide safe working procedure; Training on machinery handling; Close supervision.
2
2
4
Additional control shall be proposed when necessary
Physical injuries caused by fall/hit by moving object during lifting process.
Fatality or permanent disability or irreversible illness
Worker wear gloves and hard hat; Signalman monitored lifting process; Close supervision.
10
Briefing By SHO on safety awareness. Additional control shall be made if necessary.
Crane cable slipped or break during the lifting process.
Fatality or permanent disability or irreversible illness
Provide a proper PMA certificate; Signalman monitored lifting process; Close supervision.
2
5
10
Briefing By SHO on safety awareness. Additional control shall be made if necessary.
Damage to road surface due to crane sitting.
Minor damage (No or less disruption, repair cost > RM1,000 and < RM10,000)
Proper use of outrigger pad; Use of support platform.
3
2
6
Briefing By SHO on safety awareness. Additional control shall be made if necessary.
Struck by moving object due to unstable ground or mishandling.
Fatality or permanent disability or irreversible illness
Provide safe working procedure; Signalman monitored lifting process; Provide barrier and signage, Closed supervision.
10
Briefing By SHO on safety awareness. Additional control shall be made if necessary.
2
2
5
5
×
Report "Hirarc Lifting"
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
×
Sign In
Email
Password
Remember me
Forgot password?
Sign In
Our partners will collect data and use cookies for ad personalization and measurement.
Learn how we and our ad partner Google, collect and use data
.
Agree & close