COST DATA 33 kV LINES & 33/11 kV SUB-STATIONS 2013-14
COST DATA FOR 33kV LINES AND 33/11kV SUB-STATIONS FOR FY- 2013-14.
1
The cost data for sub-station equipments and material for lines indicates the rates for individual items. The complete estimate for a work shall however be prepared on the basis of actual lay out of the sub-station & other requirements etc.
2
Cost of civil works for lines, sub-station and equipment has not been incorporated which other varies frompreparing place to place. The area & site specific conditions shall be taken intowise account while the estimates.
3
Cost of land for sub-station and lines which comprises of requirement of land excavation is not envisaged in the cost data and will be incorporated in the estimates as er actual re uirements.
4
The estimates for the works/equipments not specifically covered in the cost data shall be prepared by suitably taking into accou nt the estimated cost of the other similar equipments/ works included in the cost data along with suitable modifications and the effect of other relevant factors specific to the works/ e ui ment to be estimated.
5
In case of works awarded on turn-key basis after following the bidding process. The estimates shall be prepared/ revised on the basis of cost as per such awards.
6
The prices are subject to increase or decrease as per IEEMA formula applicable for the basic raw material i.e. steel, copper, aluminium etc.
7
The Service Tax and Labour Cess will be payable extra as admissible.
8
The Labour Rates for erection/manual carriage for the labour hired on daily wages basis in the Scheduled Tribal Areas/ Remote Area/Hard Area as notified by State Government from time to time shall be allowed 25 % enhancement as per the Finance Department's Office Memorandum No. FIN(PR)B(7)-1/95-II dated 17.04.1998. (i)
Abstract of Cost for 33 kV Lines and 33/11 kV Sub-Stations( FY 2013-14) S. No
D e s c ri p t i o n
Un i t
Rate Page No (Rs. Lacs)
1 3 3 k V L IN E A) 33 kV Single Circuit line with 6/1/4.72 mm or 6/1/4.09 ACSR Cond. (Double Pole Structure) with single continuous earth wire on 9 I .75mtr Long . PCCPole(W.L.300Kg.) km 8.42 ii 10 mtr Long . S/T Pole(W.L.300 Kg ) km 10.94 iii 60 %9.75mtr . Long P CC Pole & 40% 10 mtr . Long S /T Pole (W.L.300 Kg ) km 9.42 B) 33 kV Double Circuit line with 6/1/4.72 mm or 6/1/4.09 ACSR cond. with km single continuous earth wire on 11 mtr . Long S/T Pole (W.L.300 Kg ) C) 33 kV Sing le Circu it line with 7/4.26 m m AAAC cond. (Double Pole Structure) with single continuous earth wire on 9 I .75mtr Long . PCCPole(W.L.300Kg.) km ii 10 mtr Long . S/T Pole (W.L.300 Kg ) km iii 60 %9.75mtr . Long P CC Pole & 40% 10 mtr . Long S /T Pole (W.L.300 Kg )
8.02 10.54 km 9.01
D) 33 kV Double Circuit line with 7/4.26 mm AAAC cond. with single continuous earth wire on 11 mtr . Long S/T Pole (W.L.300 Kg )
km
1 1 1 15.34
1A
2 2 2 14.43
2A
2 33/11 kV Sub -St ati ons I
33/11 kV Sub-Stations incorporating common breaker (Vacuum/SF-6 type ) control for transformer
A) 2x0.63 MVA, 33/11 kV Sub-Station (Manned) with 1 nos. 4 out going feeder 2 nos. 5 out going feeder 3 nos. 6 out going feeder 4 nos. 7 out going feeder 5 nos. 8 out going feeder
No. No. No. No. No.
212.04 218.38 224.43 230.77 236.82
3 3 3 3 3
B) 2x1.6 MVA , 33/11 kV Sub-Station (Manned) with 1 nos. 4 out going feeder 2 nos. 5 out going feeder 3 nos. 6 out going feeder 4 nos. 7 out going feeder 5 nos. 8 out going feeder
No. No. No. No. No.
237.44 243.78 249.83 256.17 262.22
4 4 4 4 4
C) 2x3.15 MVA, 33/11 kV Sub-Station (Manned) with 1 nos. 4 out going feeder 2 nos. 5 out going feeder 3 nos. 6 out going feeder 4 nos. 7 out going feeder 5 nos. 8 out going feeder
No. No. No. No. No.
249.68 256.02 262.07 268.42 274.47
6 6 6 6 6
D) 2x0.63 MVA, 33/11 kV Sub-Station (Un-Manned) with 1 nos. 4 out going feeder 2 nos. 5 out going feeder 3 nos. 6 out going feeder 4 nos. 7 out going feeder 5 nos. 8 out going feeder
No. No. No. No. No.
220.14 229.29 238.15 247.31 256.17
18 18 18 18 18
E) 1 2 3 4 5
No. No. No. No. No.
245.54 254.69 263.55 272.70 281.57
19 19 19 19 19
2x1.6 MVA , 33/11 kV Sub-Station (Un-Manned) with nos. 4 out going feeder nos. 5 out going feeder nos. 6 out going feeder nos. 7 out going feeder nos. 8 out going feeder (ii)
F) 1 2 3 4 5
2x3.15 MVA, 33/11 kV Sub-Station (Un-Manned) with nos. 4 out going feeder nos. 5 out going feeder nos. 6 out going feeder nos. 7 out going feeder nos. 8 out going feeder
No. No. No. No. No.
257.79 266.94 275.80 284.95 293.81
21 21 21 21 21
II 33/11 kV Sub-Stations. Incorporating independent breaker (Vacuum/SF-6 type ) control for transformer A) 2x6.3 MVA , 33/11 kV Sub-Station(Manned) with 1 nos. 4 out going feeder 2 nos. 5 out going feeder 3 nos. 6 out going feeder 4 nos. 7 out going feeder 5 nos. 8 out going feeder
No. No. No. No. No.
288.98 295.32 301.38 307.72 313.77
8 8 8 8 8
B) 1x3.15 MVA, 33/11 kV Sub-Station (Manned) with 1 nos. 4 out going feeder
No.
207.70
7
2 3 4 5
No. No. No. No.
214.04 220.10 226.44 232.49
7 7 7 7
C) 1x1.6 MVA 33/11 kV Sub-Station (Manned) with 1 nos. 4 out going feeder 2 nos. 5 out going feeder 3 nos. 6 out going feeder 4 nos. 7 out going feeder 5 nos. 8 out going feeder
No. No. No. No. No.
201.58 207.92 213.97 220.32 226.37
5 5 5 5 5
D) 2x6.3 MVA , 33/11 kV Sub-Station(Un-Manned) with 1 nos. 4 out going feeder 2 nos. 5 out going feeder 3 nos. 6 out going feeder 4 nos. 7 out going feeder 5 nos. 8 out going feeder
No. No. No. No. No.
290.63 299.79 308.65 317.80 326.66
23 23 23 23 23
E) 1 2 3 4 5
1x3.15 MVA, 33/11 kV Sub-Station (Un-Manned) with nos. 4 out going feeder nos. 5 out going feeder nos. 6 out going feeder nos. 7 out going feeder nos. 8 out going feeder
No. No. No. No. No.
212.58 221.73 230.59 239.75 248.61
22 22 22 22 22
F) 1 2 3 4 5
1x1.6 MVA 33/11 kV Sub-Station (Un-Manned) with nos. 4 out going feeder nos. 5 out going feeder nos. 6 out going feeder nos. 7 out going feeder nos. 8 out going feeder
No. No. No. No. No.
206.46 215.61 224.47 233.62 242.48
20 20 20 20 20
nos. 5 out going feeder nos. 6 out going feeder nos. 7 out going feeder nos. 8 out going feeder
3 Termin al equip ment for ea ch of 33 kV out goi ng feede r from Sub -Stat ion (with Vacuum/SF-6 C.B.) where a 33/11 kV where PT's exists. No. 15.21 b3 3/11 kV where PT's do not exists No. 16.26 4 Installation of 11 kV Auto Vo ltage Booster a Out door type 100 Amps rating
No.
5 Installation o f 11 kV A uto Re closu re / line se ctionalizer. a Auto reclosure b Line sectionalizer 6 Installation of 11 kV Shun t Capacito r Bank with rat ing. aMVAR 1.2 b MVAR 1.8 (iii)
13.90 No. No. No. No.
52 52 55
7.14 4.95 7.93 10.72
57 57 60 60
Page -1 Cost Data for Construction of one km of 33 kV Single Circuit (S/C) Double Pole Structures line with ACSR 6/1/4.72 mm Conductor (100 mm2. Eq. for wind pressure Zone upto 150 kg / M 2) on 9.75 mtr./10 mtr. Long PCC Poles, Steel Tubular Poles and 60 % PCC & 40 % ST Poles with single continuous earth w ire S. No.
D e s c r i p t i o no fi t em
IS S. N o . R ES CT D No.
Unit
Q t y R at e Amount in Rs. Rs. PCC S/ T 6% P0C C P o le Pole & 40 % S/ T Poles
1 a b 2 3 4 5 6 7
Material for surveying and stacking of line (1 km) Wooden pegs No. 12 24 288 288 288 Stone pillar/RCC pillars with one wastage No. 7 1124 7868 7868 7868 PCC poles 9.75 mtr. Long (Working.Load. 300 kg) 1678/1978 No. 20 2765 55300 S/T poles,10 mtr.,with pole cap (Working.Load. 300 kg) 2713/1980 No. 20 13033 260660 60 % PCC 40 &%S/T poles No. 20 6872 137444 Muffs No. 20 920 18400 7360 Angleiron2240*65*65*6mmcrossarmforearthwires No. 10 865 8650 8650 8650 M.S. cross bracing set (consisting of one1800x65X65x6 mm- 2 Nos No. 10 2771 27710 27710 27710 and 2700x50x50x6 mm-2 Nos. os M.S Angle irons including clamps and bolts.) 8 M.S.channel ironcrossarm(4000x125x65x6mmfor No. 12 2976 35712 35712 35712 8 Nos. suspension structure=8 Nos. and 2 Nos.for dead end structure each= 4 Nos.) 9 Half clamps No.3 4 133 4522 4522 4522 10 NutsandBoltsofVariousSizes Kg 75 77 5775 5775 5775 11 Stay set complete (2 nos.for suspension structures with No. 15 695 10425 10425 10425 angle & 1 no. dead end with angle) 12 StayWire7/4.00mm(@9.0kgPerStaySet) Kg 135 59 7965 7965 7965 133 3kVPinInsulatorsalongwithPin No. 15 512 7680 7680 7680 ( on 2 Nos. Dead End structure and 3 NosTangent Structure) 14 Three discs insulator suspension string (P-54) No. 27 1250 33750 33750 33750 (on 5 Nos suspension Str. And 2 Nos Dead End Structure) 15 Earth Reel No. 10 19 190 190 190 16 Barbed wire Kg. 80 62 4960 4960 4960 17D angerplate(203X200X1.6mm) No. 10 110 1100 1100 1100 18 HT Earthing set No. 10 1236 12360 12360 12360 19 a b c d e f g 20
Material for 2 nos. road, path/road guarding in 1 km of line PCCpoles8mtr. Long 1678/1978 No. 4 1761 7044 7044 7044 StaysetLT No. 4 596 2384 2384 2384 StayWire7/3.15mm(@6.0kgPerStaySet) kg 24 60 1440 1440 1440 Earthing set No. 2 563 1126 1126 1126 Catenary wire mtr. 30 59 1770 1770 1770 CrossArm(2NosofAngleiron2240*65*65*6mm) No. 2 865 1730 1730 1730 Half clamps No. 2 133 266 266 266 GIwireno.6SWGfor e arthwires ag&wastage 280/1978 kg 155 59 9145 9145 9145 = 1.03 km @ 150 kg/km 21 ACSR6/1/4.72including3%sagandwastage km 3.09 59378 183478 183478 183478 S/To t al 432 638 65 639 8 522 14 2 Storage Charges @ 3.0 % 12979 19692 15664 Contingencies Charges @ 3.0 % 12979 19692 15664 TransportationChargesasperstatement(P-61) 49910 35890 44300 Erectionchargesasperstatement(P-72) 250490 253980 250608 To t al 758 996 98 565 2 848 37 9 Departmental Charges @ 11.0 % 83490 108422 93322 G r an dT o t a l 842 486 1 094 074 941 70 0 S ayR s .I nl a c s 8.42 10.94 9.42
Page-2 Cost Data for Construction of one km of 33 kV Single Circuit (S/C) Double Pole Structures line with AAAC 7/4.26 mm Conductor (100 mm2 Eq. for wind pressure Zone upto 150 kg / M 2) on 9.75 mtr./10 mtr. Long PCC Poles, Steel Tubular Poles and 60 % PCC & 40 % ST Poles with single continuous earth w ire S .D e s c r i p t i o no fi t em No.
Is s . N o . R ES CT D No.
Unit
Q t y R at e Amount in Rs. Rs. PCC S/ T 6% P0C C po l e po le & 40 % S/ T Poles
1 a b 2 3 4 5 6 7
Material for surveying and stacking of 33 KV line (1 km) Wooden pegs No. 12 24 288 288 288 Stone pillar/RCC pillars with one wastage No. 7 1124 7868 7868 7868 PCC poles 9.75 mtr. Long (Working Load 300 kg) 1678/1978 No. 20 2765 55300 S/T poles,10 mtr. with p ole cap (Working Load 300 kg) 2713/1980 No. 20 13033 260660 60 % PCC 40 &%S/T poles No. 20 6872 137444 Muffs No. 20 920 18400 7360 Angleiron2240*65*65*6mmcrossarmforearthwires No. 10 865 8650 8650 8650 M.S. cross bracing set (consisting of one1800x65X65x6 mm- 2 Nos No. 10 2771 27710 27710 27710 and 2700x50x50x6 mm-2 Nos. os M.S Angle irons including clamps and bolts.) 8 M.S.channel ironcrossarm(4000x125x65x6mmfor No. 12 2976 35712 35712 35712 8 Nos. suspension structure=8 Nos. and 2 Nos.for dead end structure each= 4 Nos.) 9 Half clamps No.3 4 133 4522 4522 4522 10 NutsandBoltsofVariousSizes Kg 75 77 5775 5775 5775 11 Stay set complete (2 nos.for suspension structures with No. 15 695 10425 10425 10425 angle & 1 no. dead end with angle) 12 StayWire7/4.00mm(@9.0kgPerStaySet) Kg 135 59 7965 7965 7965 133 3kVPinInsulatorsalongwithPin No. 15 512 7680 7680 7680 ( on 2 Nos. Dead End structure and 3 NosTangent Structure) 14 Three discs insulator suspension string (P-54) No. 27 1250 33750 33750 33750 (on 5 Nos suspension Str. And 2 Nos Dead End Structure) 15E arthreel No. 10 19 190 190 190 16 Barbed wire Kg. 80 62 4960 4960 4960 17 Danger plate No. 10 110 1100 1100 1100 18 HT Earthing set No. 10 1236 12360 12360 12360 19 a b c d e f g 20
Material for 2 nos. road, path/road guarding in 1 km of line PCCpoles8mtr. Long 1678/1978 No. 4 1761 7044 7044 7044 StaysetLT No. 4 596 2384 2384 2384 StayWire7/3.15mm(@6.0kgPerStaySet) kg 24 60 1440 1440 1440 Earthing set No. 4 563 2252 2252 2252 Catenary wire mtr. 30 59 1770 1770 1770 CrossArm(2NosofAngleiron2240*65*65*6mm) No. 2 865 1730 1730 1730 Half clamps No. 2 133 266 266 266 GI wireno. 6 SWGfor earth wire 280/1978 kg 155 59 9145 9145 9145 sag & wastage =1.03 km @ 150 kg/km 21 AAAC7/4.26including3%sagandwastage km 3.09 48001 148323 148323 148323 S/To t al 398 609 62 236 9 488 11 3 Storage Charges @ 3.0 % 11958 18671 14643 Contingencies Charges @ 3.0 % 11958 18671 14643 Transportationchargesasperstatement(P-61) 49600 35570 43990 Erectionchargesasperstatement(P-72) 250490 253980 250608 To t al 7 22 616 94 926 1 811 99 8 Departmental charges @ 11.0 % 79488 104419 89320 G r an dT o t a l 802 103 1 053 680 901 31 8 S ayR s .I nl a c s 8.02 10.54 9.01
Page -1A Cost Data for Construction of one km of 33 KV Double Circuit (D/C) Double Pole Structures line with ACSR 6/1/4.72mm conductor (100 mm2 Equivalent for wind pressure Zone upto 150 kg / M 2) on 11 mtr. Long Steel Tubular Pole with single continuous earth wire S. No.
D e s c r i p t i o no fi t em
IS S. N o . R SE TC D No.
Unit Qt y Rs.
R at e
Amount in Rs. S/ T po le
1 a b 2 3 4 5
Material for surveying and stacking of line (1 km) Wooden pegs No. 12 24 Stone pillar/RCC pillars with one wastage No. 7 1124 S/T poles,11 mtr. with pole cap (Working.Load. 300 kg) 2713/1980 No. 20 15243 Muffs No. 20 920 Angleiron2240*65*65*6mmcrossarmforearthwires No. 10 865 M.S. cross bracing set (consisting of one1800x65X65x6 mm- 2 Nos No. 10 2771 and 2700x50x50x6 mm-2 Nos. os M.S Angle irons including clamps and bolts.) 6 M.S.channelironcrossarm(4000x125x65x6mmfor No. 24 2976 8 Nos. suspension structure=8 Nos. and 2 Nos.for dead end structure each= 4 Nos.) 7 Half clamps No. 58 133 8N uts and Bolts ofVarious Sizes Kg 100 77 9 Stay set complete (2 nos.for suspension structures with No. 15 695 angle & 1 no. dead end with angle) 10S tayWire7/4.00mm(@9.0kgPerStaySet) Kg 135 59 11 33kVPinInsulatorsalongwithPin No. 30 512 ( on 2 Nos. Dead End structure and 3 NosTangent Structure) 12 Three discs insulator suspension string (P-54) No. 54 1250 (on 5 Nos suspension Str. And 2 Nos Dead End Structure) 13E arthreel No. 10 19 14 Barbed wire Kg. 80 62 15 Danger plate No. 10 110 16 HT Earthing set No. 10 1236 17 Material for 2 nos. road, path/road guarding in 1 km of line a PCCpoles8mtr.Long 1678/1978 No. 4 1761 b c d e f g 18
StaysetLT StayWire7/3.15mm(@6.0kgPerStaySet) Earthing set Catenary wire CrossArm(2NosofAngleiron2240*65*65*6mm) Half clamps GIwireno.6SWGfor earthwire sag & wastage =1.03 km @ 150 kg/km 19 ACSR6/1/4.72including3%sagandwastage
No. 4 596 kg 24 60 No.2 563 mtr. 30 62 No. 2 865 No. 2 133 280/1978 kg 155 59 km
288 7868 304860 18400 8650 27710
71424
7714 7700 10425 7965 15360 67500 190 4960 1100 12360 7044 1440
1126 1860 1730 266 9145
6.18 59378
366956 966425
S/Total Storage Charges 3.0 @ % Contingencies Charges @ 3.0 % Transportationchargesasperstatement(P-61) Erectionchargesasperstatement(P-72)
2384
28993
Total Departmental charges @ 11.0 % G r an d To t al S ay R sI.nl a c s
28993 35890 321420 1381721 151989 1 533 710 15.34
Page-2A Cost Data for Construction of one km of 33 KV Double Circuit (D/C) Double Pole Structures line with AAAC 7/4.26 mm conductor (100 mm2 Equivalent for wind pressure Zone upto 150 kg / M 2) on 11 mtr. Long Steel Tubular Pole with single continuous earth wire
S. No.
D e s c r i p t i o no fi t em
Is s . N o . R ESCT D No.
Unit
Qt y Rs.
R at e
Material for surveying and stacking of 33 KV line (1 km) Wooden pegs No. 12 24 Stone pillar/RCC pillars with one wastage No. 7 1124 S/T poles,11 mtr.with pole cap (Working Load 300 kg) 2713/1980 No. 20 15243 Muffs No. 20 920 Angleiron2240*65*65*6mmcrossarmforearthwires No. 10 865 M.S. cross bracing set (consisting of one1800x65X65x6 mm- 2 Nos No. 10 2771 and 2700x50x50x6 mm-2 Nos. os M.S Angle irons including clamps and bolts.) 6 M.S.channelironcrossarm(4000x125x65x6mmfor No. 24 2976 8 Nos. suspension structure=8 Nos. and 2 Nos.for dead end structure each= 4 Nos.) 7 Half clamps No. 58 133 8N uts and Bolts ofVarious Sizes Kg 100 77 9 Stay set complete (2 nos.for suspension structures with No. 15 695 angle & 1 no. dead end with angle) 10S tayWire7/4.00mm(@9.0kgPerStaySet) Kg 135 59 11 33kVPinInsulatorsalongwithPin No. 15 512 ( on 2 Nos. Dead End structure and 3 NosTangent Structure) 12 Three discs insulator suspension string (P-54) No. 54 1250 (on 5 Nos suspension Str. And 2 Nos Dead End Structure) 13E arthReel No. 10 19 14 Barbed wire Kg. 80 62 15 Danger plate No. 10 110 16 HT Earthing set No. 10 1236 17 Material for 2 nos. road, path/road guarding in 1 km of line
Amount in Rs. S t ePeol l e
1 a b 2 3 4 5
a b c d e f g 18
PCCpoles8mtr.Long StaysetLT StayWire7/3.15mm(@6.0kgPerStaySet) Earthing set Catenary wire CrossArm(2NosofAngleiron2240*65*65*6mm) Half clamps GIwireno.6SWGfor earthwire sag & wastage =1.03 km @ 150 kg/km 19 AAAC7/4.26including3%sagandwastage
No. 4 1761 No. 4 596 24 60 No.4 563 mtr. 30 62 No. 2 865 No. 2 133 280/1978 kg 155 59
288 7868 304860 18400 8650 27710
71424
7714 7700 10425 7965 7680 67500 190 4960 1100 12360
1678/1978 kg
km
7044 2384 1440 2252 1860 1730 266 9145
6.18 48001
296646 889561
S/Total Storage Charges 3.0 @ % Contingencies Charges @ 3.0 % Transportationchargesasperstatement(P-61) Erectionchargesasperstatement(P-72)
26687
Total Departmental charges @ 11.0 % G r an d To t al S ay R sI.nl a c s
26687 35570 321420 1299925 142992 1 442 917 14.43
PAGE- 3
Cost of 2x 0.63 MVA, 33 kV Terminal Equipment & Sub-Station (Manned) with 4 to 8 nos. of out going Feeders with Common Breaker ( vacuum/SF6 ) Control for Transformer S . N o.D e sc r i p ti onofi te m
IS S .N o.
Un it
Qt y
Ra te
R E CS t d.N o 1
Cost of Terminal Equipments for 2x 0.63 MVA,33/11 kV Sub-Station
R s.
No.
1
Am ou n tf orS u b - S t a t i onW i thN o.ofou tg oi n gFe e d er s. 4N os.
--
5N os .
7495230
6N os.
7880220
7N os.
8240550
8N os .
8625550
8985890
with 4 to 8 nos. out going feeder excluding the cost of Power Transformer & 11 kV incoming cable (P- 9 to 11) 2
0.63MVA,33/11kVTransformer
3
95mm2.11kVgradecable
2026/1993 7098/1985
No. Mtr
2 100
887500 450
1775000
45000
S / To t a l Storage Charges @ 3.0 %
9 3 1 5 23 0 279457
Contingencies Charges @ 3.0 %
1775000
45000
4539400
Costofcontrolroombuildingasperdetail(P-51)
4376016 Tota l
Departmental charges @ 11.0 %
1 9 1 0 24 6 0 2101271
G r a n d To t a l
2 1 2 0 37 3 0
S a yR s .I nl a c s
2 1 2 .04
1 04 4 5 5 5 0
313367
324177
312900
4702600 4376016
313367 312900
4865900 4376016
1 96 7 3 7 49 2164112 2 18 3 7 8 62 2 1 8 .38
1775000
45000
1 0 0 6 05 5 0 301817
312900
1775000
45000
301817
291007
312900
Erectionchargesasperstatement(P-74)
97 0 0 2 20
291007
279457
Transportationchargesasperstatement(P-61)
1775000
45000
324177 312900
5029100 4376016
2 0 2 1 89 9 9 2224090
5192400 4376016
2 0 79 0 2 9 9
2286933
2 2 4 4 30 8 9 2 2 4.4 3
10 8 0 5 89 0
2 3 07 7 2 3 2 23 0 .7 7
21 3 3 5 55 9
2346912 23 6 8 2 47 1 2 3 6. 82
PAGE-4
Cost of 2x1.6 MVA, 33 kV Terminal Equipment & Sub-Station (Manned) with 4 to 8 nos. of out going Feeders with Common Breaker ( vacuum/SF6 ) Control for Transformer S . N o.D e s c ri p ti onofi t em
IS S .N o.
Un it
Qt y
Ra te
R E CS td .N o 1
Costof TerminalEquipmentsfor2x1.6MVA,33/11kVSubstation
Am ou n tf orS u b - S ta ti onW i t hN o.ofou tg oi n gFe e d er s .
R s.
No.
1
--
4N os .
5N os.
7495230
6N os .
7880220
7N os.
8240550
8N os .
8625550
8985890
with 4 to 8 nos. out going Feeder excluding the cost of Power Transformer & 11 kV incoming cable (P- 9 to 11) 2
1.6MVA,33/11kVTransformer
3
120mm2.11kVgradecable
2026/1993 7098/1985
No. No.
2 100
1963500 516
S /Tota l Storage Charges @ 3.0 %
3927000
51600
1 1 4 7 3 8 30 344215
Contingencies Charges @ 3.0 %
3927000
51600
312900
Erectionchargesasperstatement(P-74)
4376016 To t a l
[email protected]%
355765
21 3 9 0 5 76 2352963
G r a n d To t a l
23 7 4 3 5 39
S a yR s .I nl a cs
2 3 7 .4 4
1 26 0 4 1 5 0
378125
388935
366575
378125 312900
4865900 4376016
2 1 9 61 8 6 6
2415805
5029100 4376016
2 2 50 7 1 1 6
2475783
2 4 3 77 6 7 1 2 43 .7 8
3927000
51600
1 2 21 9 1 5 0
312900
4702600 4376016
3927000 51600
366575
312900
4539400
Costofcontrolroombuildingasperdetail(P-51)
1 1 8 58 8 2 0
355765
344215
Transportationchargesasperstatement(P-61)
3927000
51600
2 4 98 2 8 9 9 2 49 .8 3
388935 312900 5192400
4376016
2 3 07 8 4 1 6
2538626
12 9 6 4 4 90
23 6 2 3 6 76
2598604
2 5 61 7 0 4 2 25 6 .1 7
26 2 2 2 2 80 2 6 2 .22
PAGE-5
Cost of 1x1.6 MVA, Terminal Equipment &Sub-Station (Manned) with 4 to 8nos. out going Feeders with Independent Breaker ( vacuum/SF6 ) Control for Transformer S . N o.D e s c ri p t i onof i te m
IS S .N o.
Un it
Q ty
R at e
Am ou n tf orS u b - S ta ti onW i thN o.ofou tg oi n gFe e d e rs .
RE C S td .N o 1
Costof TerminalEquipments for 1x1.6 MVA,33/11 kV S ub-Station
4 N o s.
No.
1
5 N os.
6421180
6806170
6 N os.
7 N o s.
7166500
8N os.
7551490
7911830
with 4 to 8 nos. out going Feeder excluding the cost of Power Transformer & 11 kV incoming cable (P- 12 to 14) 2
1.6MVA,33/11kVTransformer
3
120mm2.11kVgradecable
2026/1993 7098/1985
No. No.
1 50
1963500 516
1963500
S /Tota l Storage Charges @ 3.0 %
312900
Erectionchargesasperstatement(P-74)
4376016 Tota l
Departmental Charges @ 11 %
87 9 5 4 7 0 263864
1 87 3 1 7 1 4
1997647
2060489
G r a n d To t a l
2 0 1 58 0 7 1
S a yR s .I nl a c s
2 0 1.5 8
286224
2 07 9 2 2 0 3 2 0 7 .9 2
5046200 4376016
1 92 7 6 9 6 4 2120466 2 13 9 7 4 3 0 21 3 .9 7
99 0 1 1 3 0
297034
312900
4882900 4376016
1 8 1 60 4 2 4
9 54 0 7 9 0
286224
274674
1963500 25800
9 15 5 8 0 0
312900
4719600 4376016
1963500 25800
274674
312900
4556400
Costofcontrolroombuildingasperdetail(P-51)
25800
263864
252314
Transportationchargesasperstatement(P-61)
1963500
25800
8 4 1 04 8 0 252314
Contingencies Charges @ 3.0 %
1963500
25800
297034 312900 5209400
4376016 1 9 84 8 3 5 4
2183319 2 2 03 1 6 7 3 22 0 .3 2
2 03 9 3 5 1 4 2243287 2 26 3 6 8 0 1 2 2 6 .3 7
PAGE-6
Cost of 2x3.15 MVA, 33 kV Terminal Equipment & Sub-Station (Manned) with 4 to8 nos. out going Feeders with Common Breaker ( vacuum/SF6 ) Control for Transformer S . N o.D e s c ri p ti onof i te m
IS S .N o.
U n it
Qt y
Ra te
R E CS td .N o 1
Cost of Terminal Equipments for 2x 3.15 MVA,33/11 kV Sub-Station
Rs.
No.
1
--
Am ou n tf orS u b - S ta ti onW i thN o.ofou tg oi n gFe e d e rs . 4N os .
5N os.
7495230
7880220
6N os.
7N os.
8240550
8625550
8N os . 8985890
with 4 to 8 nos. out going Feeder excluding the cost of Power Transf ormer &11 kV incoming cable (P- 9 to 11) 2
3.15MVA,33/11kVTransformer
3
185mm2.11kVgradecable
2026/1992 7098/1985
No. Mtr
2 100
2477323 647
S / To t a l Storage Charges @ 3.0 %
4954646
312900
Erectionchargesasperstatement(P-74)
4539400
Costofcontrolroombuildingasperdetail(P-51)
4376016 To t a l
[email protected]%
386987
G r a n d To t a l
2 4 9 6 8 0 80
S a yR s .I nl a c s
2 4 9 .6 8
1 3 6 44 8 9 6
409347
420157
397797
409347 312900
4865900 4376016
2 3 0 6 50 5 6
2537156
5029100 4376016
2 3 6 10 3 0 6
2597134
2 5 6 0 22 1 2 2 56 .0 2
4954646 64700
1 3 2 59 8 9 6
312900
4702600 4376016
4954646 64700
397797
312900
2 2 4 9 3 7 66 2474314
64700
1 2 8 9 95 6 6
386987
375437
Transportationchargesasperstatement(P-61)
4954646
64700
1 2 5 1 4 5 76 375437
Contingencies Charges @ 3.0 %
4954646
64700
2 6 2 07 4 4 0
420157 312900 5192400
4376016 2 4 1 81 6 0 6
2659977
2 6 2.0 7
1 4 0 05 2 3 6
2 4 7 26 8 6 6
2719955
2 6 8 41 5 8 3 2 68 .4 2
2 7 4 46 8 2 1 27 4 .4 7
PAGE-7
Cost of 1x3.15 MVA, Terminal Equipment & Sub-Station (Manned) with 4 to 8 nos. out going Feeders with Independent Breaker ( vacuum/SF6 ) Control for Transformer S . N o.D e s c ri p ti onof i te m
IS S .N o.
Un it
Qt y
Ra te
Am ou n tf orS u b - S ta ti onW i thN o.ofou tg oi n gFe e d er s .
R E C S td .N o 1
Cost of Terminal Equipments for 1x3.15MVA,33/11 kV Sub-Station
4N o s .
No.
1
--
6421180
5N o s .
6N o s .
7N o s .
8N o s .
6806170
7166500
7551490
7911830
with 4 to 8 nos. out going Feeder excluding the cost of Power Trans former & 11 kV incoming cable (P- 12 to 14) 2
3.15MVA,33/11kVTransformer
3
185mm2.11kVgradecable
2026/1993 7098/1985
No.
No.
1 50
2477323 647
2477323
S /Tota l Storage Charges @ 3.0 %
8 9 30 8 5 3
4556400
Costofcontrolroombuildingasperdetail(P-51)
4376016 To t a l
Departmental charges @ 11.0 %
4719600 4376016
1 8 71 2 0 2 0 2058322
G r a n d To t a l
2 0 77 0 3 4 2
S a yR s .I nl a c s
2 07 .7 0
290285
1 92 8 3 3 1 0
301835
2 14 0 4 4 7 4 2 1 4 .0 4
312645 312900
5046200 4376016
19 8 2 8 5 5 9 2181142
5209400 4376016
2 03 9 9 9 4 9
2243994
22 0 0 9 7 0 1 2 2 0 .1 0
10 4 2 1 5 0 3
312645
312900
4882900 4376016
2121164
1 00 6 1 1 6 3
301835
312900
2477323 32350
96 7 6 1 7 3
290285
312900
2477323 32350
9315843 279475
312900
Erectionchargesasperstatement(P-74)
32350
279475
267926
Transportationchargesasperstatement(P-61)
2477323
32350
267926
Contingencies Charges @ 3.0 %
2477323
32350
2 26 4 3 9 4 3 2 2 6 .4 4
20 9 4 5 1 0 9
2303962 23 2 4 9 0 7 1 2 3 2 .4 9
PAGE-8
Cost of 2x6.3 MVA, 33 kV Terminal Equipment & Sub-Station ( Manned) with 4 to8 nos. out going Feeders and incorporating independent breaker ( vacuum/SF6 ) control for Transformer S . N o.D e sc r ip t i onofi te m
IS S .N o.
U n it
Qt y
R E CS td .N o 1
Cost of Terminal Equipments for 2x 6.3MVA,33/11 kV Sub-Station
R at e Rs.
No.
1
--
Am ou n tf orS u b - S t a ti onW i thN o.ofou tg oi n gFe e d er s. 4N os . 8458840
5N os .
6N os .
8843830
9204160
7N os .
8N os .
9589160
9949500
with 4 to 8 nos. out going Feeder excluding the cost of Power Transformer &11 kV incoming cable (P- 15 to 17) 2
6.3MVA,33/11kVTransformer
3
240mm2.11kVgradecable
2026 7098/1985
No. No.
2 100
3650219 796
7300438
S / To t a l Storage Charges @ 3.0 %
Erectionchargesasperstatement(P-74)
4376016 To t a l
Departmental charges @ 11.0 %
2 6 0 34 5 2 7 2863798
G r a n d To t a l S a yR s .I nl a cs: -
2 8 8 98 3 2 5 2 88 .9 8
1 6 96 9 1 98
509076
519886
497526
509076 312900
4882900 4376016
2 6 60 5 8 16 2926640 2 9 53 2 4 56 29 5 .32
79600
1 65 8 4 19 8
312900
4719600 4376016
7300438
79600
497526
312900
4556400
Costofcontrolroombuildingasperdetail(P-51)
1 6 22 3 8 68 486716
312900
7300438
79600
486716
475166
Transportationchargesasperstatement(P-61)
7300438
79600
1 5 8 38 8 7 8 475166
Contingencies Charges @ 3.0 %
7300438
79600
519886 312900
5046200 4376016
2 71 5 1 06 6 2986617
5209400 4376016
2 7 72 2 4 66
3049471
3 01 3 7 68 3 30 1 .38
1 73 2 9 53 8
3 0 77 1 9 37 30 7 .72
2 82 6 7 62 6
3109439 3 13 7 7 06 5 3 1 3 .77
PAGE-9
Cost of Terminal Equipments for 2x'X' MVA, 33/11kV Sub-Station (Manned) with 4 to 8nos. out going Feedersincorporating Common Breaker ( vacuum/SF6 ) Control for Transformer (excluding cost of power Transformer and 11 kV incoming cables ) S . N o.D e s c ri p ti onofi t em
IS S .N o.
Un it
Qt y
Ra te
R E CS td .N o A)
Am ou n tf orS u b - S ta ti onW i t hN o.ofou tg oi n gFe e d er s .
R s.
4N os .
5N os .
6N os .
7N os .
8N os .
Su b- Stati on Tr an sf orme r 100kVA,33/0.4kVS/Stn,Transformer
No.
1
33kVT/FC&RPanelwithoutDifferentialRelay
No.
2
226242
452484
452484
452484
452484
452484
33kVBusCouplerPanel
No.
1
208101
208101
208101
208101
208101
208101
B)
33 k V Swi tc hgea r Eq ui pm ent
1 2 3
33 kV Feeder Panel
4 5
33kVCT'sSingleUnit 33/11kV,singlephasePT's
6
33kVIsolatorwithE/Blade
7
33kVIsolatorwithoutE/Blade
9921/1992
8
33kVlighteningarrestersmetaloxidetype
55/1987
9
33kVExpulsionDropoutfuseunit
5292/1970
324478
324478
11 k V swi tch gea r and al lie d Eq uip ment
(I)
11 kV panel board with 2 incomer panels with PT's 1
324478
324478
324478
No.
2
268446
536892
536892
536892
536892
536892
2705/1992 3156/1992
No. No.
6 3
30992 26867
185952 80601
185952 80601
185952 80601
185952 80601
185952 80601
9921/1992
No.
1
77886
77886
77886
77886
77886
77886
500556
500556
500556
500556
No. set set
7 5
71508 5371
2
26855 10304
S / Tota(lB:)C)
324478
26855 20608
2 0 8 9 9 35
26855
26855
500556 26855
20608
20608
2 0 89 9 3 5
2 0 89 9 3 5
20 8 9 9 3 5
20608
20608 2 0 8 9 9 35
busbar coupler and following of out going Feeder panels. 1
nos. 4panels set 7of
set
1
2130382
2130382
--
--
--
--
2
nos. 5panels set 8of
set
1
2414049
--
2414049
--
--
--
3
nos. 6panels set 9of
set
1
2697716
--
--
2697716
--
--
4
nos. 7 set 10 of panels
set
1
2981383
--
--
--
2981383
--
5
nos. 8set 11 of panels
set
1
3265050
--
--
--
--
3265050
(II)
11 kV triple pole GO Switch/Is olator without E/ blade for S/S tn with
1
f ol l ow i n gn o.ofou tg oi n gFe e d er nos. 4
13 2 6 /1 97 7 set
2 3 4
4
4582
18328
--
--
--
--
nos. 5 nos. 6 nos. 7
set set set
5 6 7
4582 4582 4582
----
22910 ---
-27492 --
--32074
----
5
nos. 8
set
8
4582
--
--
--
--
36656
PAGE-10 (III) 11 kV LA's Sub- Station Type for S/Stn wit h following no. of out going Feeder 1
nos. 4
No.
12
493
5916
--
--
--
--
2
nos. 5
No.
15
493
--
7395
--
--
--
3
nos. 6
No.
18
493
--
--
8874
--
--
4
nos. 7
No.
21
493
--
--
--
10353
--
5
nos. 8
No.
24
493
--
--
--
--
11832
(IV) 95 mm2, 11kV grade cable for S/Stn with following no. of out going Feeder 1
4nos.
2
nos. 5
mtr. mtr.
200 250
450 450
90000 --
--
--
--
112500
--
--
---
3 4
nos. 6 nos. 7
mtr. mtr.
300 350
450 450
---
---
135000 --
-157500
---
5
nos. 8
mtr.
400
450
--
--
--
--
180000
(V)
11 kV epoxy terminating kits for S/Stn with following no. of out going Feeder
1
nos. 4
No.
4
7074
28296
--
--
--
--
2
nos. 5
No.
5
7074
--
35370
--
--
--
3
nos. 6
No.
6
7074
--
--
42444
--
--
4
nos. 7
No.
7
7074
--
--
--
49518
--
5
nos. 8
No.
8
7074
--
--
--
--
56592
(VI) HT com pound & ot her material in sets f or cable boxe s of panels,S/Stn with following no. of out going Feeder 1
nos. 4
No.
4
2179
8716
--
--
--
--
2
nos. 5
No.
5
2179
--
10895
--
--
--
3
nos. 6
No.
6
2179
--
--
13074
--
--
4
nos. 7
No.
7
2179
--
--
--
15253
--
5
nos. 8
No.
8
2179
--
--
--
--
17432
2 6 0 31 1 9
29 2 46 0 0
S /To t a(lC:)D) 1
Gene ral Eq uipm en t 30 V,100AHLeadAcidBatteryalongwithBatteryCharger
2
30 V DC Distribution Board
3
400V,A.C.distributionswitchgear
2 2 8 16 3 8 34/1984
No. No.
S /To t a(D l :)-
4047/1967
No.
1
108464
1
45736 1
551591
108464 45736 551591 70 5 79 1
108464 45736 551591 7 05 7 91
108464 45736 551591 7 05 7 91
3 24 6 08 1
108464 45736
3 5 67 5 6 2
108464 45736
551591 7 0 57 9 1
551591 7 05 7 91
PAGE-11 E)
Su per st ruct ure & b us ba r
(I)
33kVsuperstructure&busbarasperdetail(P-33)
(II)
11 kV super structure & busbar detail as per for Sub-Station
job
1
613740
613740
613740
613740
613740
613740
with following no. of out going Feeder (P-36) 1
nos. 4
job
1
179850
179850
--
--
--
--
2
nos. 5
job
1
243360
--
243360
--
--
--
3
nos. 6
job
1
282210
--
--
282210
--
--
4
nos. 7
job
1
345720
--
--
--
345720
--
5
nos. 8
job
1
384580
--
--
--
--
384580
S / To t a( E l :)F
Earthingof33kVSub-StationEquipmentsasperdetail(P-38)
G
Yard&colonyfencingasperdetail(P-43)
H
Yardlighteningasperdetail(P-44)
I
ControlandLTpowercablesasperdetail(P-45)
J)
Foundation of :--
1
Transformerasperdetail(P-46)
K
Costoftrenchesasperdetail(P-50)
79 3 59 0 job
S /To t a(lFt oK:)S aR y s:. -
1
job job job
G ra n dTo t a(lAt oK:)-
1
job
job
249550 421090
1 1
126130 93510
2 1
249550 421090 126130 93510
8 57 1 00
8 95 9 50
249550 421090
249550
249550
421090
126130 93510
421090
126130 93510
9 98 3 20 249550
421090
126130 93510
9 5 94 6 0
126130 93510
42720
85440
85440
85440
85440
85440
324080
324080
324080
324080
324080
324080
1 2 9 98 0 0 7 4 9 52 3 2 7 4 9 52 3 0
1 2 9 98 0 0 7 8 8 02 2 3 7 8 8 02 2 0
12 9 98 0 0 82 4 05 5 4
1 29 9 80 0 8 62 5 54 5
82 4 05 5 0
1 2 99 8 0 0 8 9 85 8 8 6
8 62 5 55 0
8 9 85 8 9 0
PAGE-12
Cost of Terminal Equipments for 1x'X' MVA,33/11 kV Sub-Station ( Manned) with 4to 8 nos. out going Feeder incorporating independent Breaker ( vacuum/SF6 ) Control for Transformer (excluding cost of power Transformer and 11 kV incoming cables ) S . N o.D e s c ri p ti onofi te m
IS S .N o.
Un it
Qt y
R at e
Am oun tf orS u b - S ta ti onW i thN o.of outg oi n gFe e d er s.
R E CS t d .N o A)
4N o s.
5N o s .
6N o s .
7N os.
8N o s .
Su b- Sta tion Tra nsform er 1 0 0k V A,3 3 / 0 . 4k VS / S t n ,Tra n s f orm e r
N o.
1
324478
324478
324478
324478
324478
324478
B)
33 k V Swi tc hg ea r Eq ui pm en t
1
33kVT/FC&RPanelwithoutDifferentialRelay
2
33 kV Feeder Panel
3 4
33kVCT'sSingleUnit 33/11kV,singlephasePT's
5
400A33kVIsolatorwithE/Blade
6
400A33kVIsolatorwithoutE/Blade
9921/1992
7
33kVlighteningarrestersmetaloxidetype
55/1987
set
3
5371
16113
16113
16113
16113
16113
8
33kVExpulsionDropoutfuseunit
5292/1970
set
1
10304
10304
10304
10304
10304
10304
No.
1
226242
226242
11 k V swit chg ear and all ied E qui pment
(I)
11 kV p ane l boa rd wit h 1 inc ome r pan el wit h PT' s
226242
226242
226242
1
268446
268446
268446
268446
268446
268446
2705/1992 3156/1992
No. No.
3 3
30992 26867
92976 80601
92976 80601
92976 80601
92976 80601
92976 80601
9921/1992
No.
1
77886
77886
77886
77886
77886
77886
No.
4
71508
286032
S / Tota(lB:)C)
226242
No.
286032
10 5 8 6 00
286032
1 0 5 8 60 0
286032
286032
1 05 8 6 0 0
1 0 5 86 0 0
1 0 5 8 60 0
and following of out going Feeder panels. 1
nos. 4panels set 5of
set
1
2130382
2130382
--
--
--
--
2
nos. 5panels set 6of
set
1
2414049
--
2414049
--
--
--
3
nos. 6panels set 7of
set
1
2697716
--
--
2697716
--
--
4
nos. 7panels set 8of
set
1
2981383
--
--
--
2981383
--
58 nos. panels set 9of
set
1
3265050
--
--
--
--
3265050
(II)
11 kV triple pole GO Switch/I solator withou t E/bla de for S/Stn with f ol l ow i n gn o.ofou tg oi ngFe e d er
1 3 2 6/1 9 7 7
1
nos. 4
No.
4
4582
18328
--
--
--
--
2 3
nos. 5 nos. 6
No. No.
5 6
4582 4582
---
22910 --
-27492
---
---
4
nos. 7
No.
7
4582
--
--
--
32074
--
5
nos. 8
No.
8
4582
--
--
--
--
36656
PAGE-13 (III) 11 kV LA's Sub- Station Type for S/Stn wit h following no. of out going Feeder 1
nos. 4
No.
12
493
5916
--
--
--
--
2
nos. 5
No.
15
493
--
7395
--
--
--
3
nos. 6
No.
18
493
--
--
8874
--
--
4
nos. 7
No.
21
493
--
--
--
10353
--
5
nos. 8
No.
24
493
--
--
--
--
11832
(IV) 95 mm2, 11kV grade cable for S/Stn with following no. of out going Feeder
mtr.
200
450
90000
--
--
1
nos. 4
mtr.
250
450
--
112500
--
2
nos. 5
mtr.
300
450
--
--
3
nos. 6
mtr.
350
450
--
--
4
nos. 7
mtr.
400
450
--
5
8nos.
(V)
--
--
--
--
135000
--
--
--
157500
--
--
--
--
180000
11 kV epoxy terminating kits for S/Stn with following no. of out going Feeder
1
nos. 4
No.
4
7074
28296
--
--
--
--
2
nos. 5
No.
5
7074
--
35370
--
--
--
3
nos. 6
No.
6
7074
--
--
42444
--
--
4
nos. 7
No.
7
7074
--
--
--
49518
--
5
nos. 8
No.
8
7074
--
--
--
--
56592
(VI) HT com pound & ot her material in sets f or cable boxe s of panels,S/Stn with following no. of out going Feeder 1
nos. 4
No.
4
2179
8716
--
--
--
--
2
nos. 5
No.
5
2179
--
10895
--
--
--
3
nos. 6
No.
6
2179
--
--
13074
--
--
4
nos. 7
No.
7
2179
--
--
--
15253
--
5
nos. 8
No.
8
2179
--
--
--
--
17432
2 6 0 31 1 9
29 2 46 0 0
S /To t a(lC:)D)
Gene ral Eq uipm en t
1
30 V,100AHLeadAcidBatteryalongwithBatteryCharger
2
30 V DC Distribution Board
3
400V,A.C.distributionswitchgear
2 2 8 16 3 8 34/1981
No. No.
S /To t a(D l :)-
4047/1967
No.
1
108464
1
45736 1
551591
108464 45736 551591 70 5 79 1
108464 45736 551591 7 05 7 91
108464 45736 551591 7 05 7 91
3 24 6 08 1
108464 45736
3 5 67 5 6 2
108464 45736
551591 7 0 57 9 1
551591 7 05 7 91
PAGE-14 E)
Su per st ruct ure & b us ba r
I
33kVsuperstructure&busbarasperdetail(P-33)
II
11 kV super structure & busbar detail as per for Sub-Station
job
1
613740
1
nos. 4
job
1
179850
2
nos. 5
job
1
243360
3
nos. 6
job
1
4
nos. 7
job
5
nos. 8
job
613740
613740
613740
613740
613740
179850
--
--
--
--
--
243360
--
--
--
282210
--
--
282210
--
--
1
345720
--
--
--
345720
--
1
384580
--
--
--
--
384580
with following no. of out going Feeder (P-36)
S / To t(aE :l-) F
Earthingof33kVSub-StationEquipmentsasperdetail(P-38)
G
Yard&colonyfencingasperdetail(P-43)
H
Yardlighteningasperdetail(P-44)
I
ControlandLTpowercablesasperdetail(P-45)
J)
Foundation of :--
1
Transformerasperdetail(P-46)
K
Costoftrenchesasperdetail(P-50)
79 3 59 0 job
S /To t a(lFt oK:)S aR y s:.-
1
job job job
G ra n dTo t a(lAt oK:)-
1
job
job
249550 421090
1 1
126130 93510
1 1
249550 421090 126130 93510
8 57 1 00
8 95 9 50
249550 421090
249550
249550
421090
126130 93510
421090
126130 93510
998320
249550
421090
126130 93510
959460
126130 93510
42720
42720
42720
42720
42720
42720
324080
324080
324080
324080
324080
324080
1 2 5 70 8 0 6 4 2 11 7 7 6 4 2 11 8 0
1 2 5 70 8 0 6 8 0 61 6 8 6 8 0 61 7 0
12 5 70 8 0 71 6 64 9 9
1 25 7 08 0 7 55 1 49 0
71 6 65 0 0
1 2 57 0 8 0 7 9 11 8 3 1
7 55 1 49 0
7 9 11 8 3 0
PAGE-15
Cost of Terminal Equipments for 2x'X' MVA, 33/11 kV Sub-station (Manned) with 4 to 8 nos. out going Feeders incorporating independent Breaker ( vacuum/SF6 ) control for Transformer (excluding cost of power Transformer and 11 kV incoming cables ) S . N o.D e s c ri p ti onof i te m
IS S .N o.
U n it
Qt y
R E CS t d .N o A)
Ra te
Am ou n tf orS u b - S ta ti onW i thN o.ofou tg oi ngFe e d e rs .
Rs.
4N os .
5N os.
6N os .
7N os .
8N os .
Su b- Sta tio n Tr an sf or me r 100kVA,33/0.4kVS/Stn,Transformer
1180&2026
No.
1
324478
324478
324478
324478
324478
324478
B)
33 k V Swi tc hg ea r & Eq ui pm en t
1
33kVT/FC&RPanelwithDifferentialRelay
No.
2
433807
867614
867614
867614
867614
867614
2
33kVBusCouplerPanel
No.
1
208101
208101
208101
208101
208101
208101
3
33 kV Feeder Panel
4
36kVVacuum/SF-6CircuitBreaker.
5 6
33kVCT'sSingleUnit 33/11kV,singlephasePT's
7
33kVIsolatorwithE/Blade
8
33kVExpulsionDropoutfuseunit
9
33kVIsolatorwithoutE/Blade
10
33kVlighteningarrestersmetaloxidetype
No. 12-/1979 2705/1992 3156/1992
2
No. No. No.
268446 2
536892
254440
6 3
508880
30992 26867
536892
508880
508880
536892
536892
508880
508880
185952 80601
185952 80601
185952 80601
185952 80601
185952 80601
9921
No.
1
77886
77886
77886
77886
77886
77886
55/1987
No.
2
10304
20608
20608
20608
20608
20608
71508
500556
500556
500556
500556
500556
5371
26855
26855
26855
26855
26855
9921 5292/1970
set set
7 5
S / Tot a(lB:)C) I
536892
3013945
3 0 1 39 4 5
3 0 1 39 4 5
3 0 13 9 4 5
11 k V swi tch gea r and al lie d Eq uip men t 11 k V pa nel boa rd wi th 2 inc ome r pa nel s wit h PT's 1 busbar coupler and following out going Feeder panels.
1
nos. 4panels set 7of
set
1
2130382
2130382
--
--
--
--
2
nos. 5panels set 8of
set
1
2414049
--
2414049
--
--
--
3
nos. 6panels set 9of
set
1
2697716
--
--
2697716
--
--
4
nos. 7 set 10 of panels
set
1
2981383
--
--
--
2981383
--
5
nos. 8set 11 of panels
set
1
3265050
--
--
--
--
3265050
II
3 01 3 9 4 5
11 kV triple pole GO Switc h/Isol ator without E/blad e for S/Stn with f ol l ow i n gn o.ofou tgoi n gFe e d e r
3 0 7 0/1 9 8 5
1
nos. 4
set
4
4582
18328
--
--
--
--
2 3
nos. 5 nos. 6
set set
5 6
4582 4582
---
22910 --
-27492
---
---
4
nos. 7
set
7
4582
--
--
--
32074
--
5
nos. 8
set
8
4582
--
--
--
--
36656
PAGE-16 III
11 kV L A's Su b-S tation T ype for S /Stn with following no. of out going Feeder
1
nos. 4
No.
12
493
5916
--
--
--
--
2
nos. 5
No.
15
493
--
7395
--
--
--
3
nos. 6
No.
18
493
--
--
8874
--
--
4
nos. 7
No.
21
493
--
--
--
10353
--
5
nos. 8
No.
24
493
--
--
--
--
11832
IV
95 m m2, 11kV grade cable f or S /St n wit h following no. of out going Feeder
1
nos. 4
mtr.
200
450
90000
--
--
--
--
2
nos. 5
mtr.
250
450
--
112500
--
--
--
3
nos. 6
mtr.
300
450
--
--
135000
--
--
4
nos. 7
mtr.
350
450
--
--
--
157500
--
5
nos. 8
mtr.
400
450
--
--
--
--
180000
V
11 kV ep oxy terminating k its for S/S tn wi th following no. of out going Feeder
1
nos. 4
No.
4
7074
28296
--
--
--
--
2
nos. 5
No.
5
7074
--
35370
--
--
--
3
nos. 6
No.
6
7074
--
--
42444
--
--
4
nos. 7
No.
7
7074
--
--
--
49518
--
5
nos. 8
No.
8
7074
--
--
--
--
56592
VI
HT compound & other material in sets for cable boxes of panels,S/Stn with following no. of out going Feeder
1
nos. 4
No.
4
2179
8716
--
--
--
--
2
nos. 5
No.
5
2179
--
10895
--
--
--
3
nos. 6
No.
6
2179
--
--
13074
--
--
4
nos. 7
No.
7
2179
--
--
--
15253
--
5
nos. 8
No.
8
2179
--
--
--
--
17432
No.
1
108464
108464
S /To t a(lC:)-
D)
Gene ral Eq uipm en t
1
30 V,100AHLeadAcidBatteryalongwithBatteryCharger
2
30 V DC Distribution Board
3
400V,A.C.distributionswitchgear
2 2 8 16 3 8 34/1984
No. S /To t a(D l :)-
4047/1967
No.
1
45736 1
551591
45736 551591 70 5 79 1
2 6 0 31 1 9 108464 45736 551591 7 05 7 91
29 2 46 0 0 108464
45736 551591 7 05 7 91
3 24 6 08 1 108464 45736
3 5 67 5 6 2
108464 45736
551591 7 0 57 9 1
551591 7 05 7 91
PAGE-17 E)
Su per st ruct ure & b us ba r
I
33kVsuperstructure&busbarasperdetail(P-33)
II
11 kV super structure & busbar detail as per for Sub-Station
job
1
613740
1
nos. 4
job
1
179850
2
nos. 5
job
1
243360
3
nos. 6
job
1
4
nos. 7
job
5
nos. 8
job
613740
613740
613740
613740
613740
179850
--
--
--
--
--
243360
--
--
--
282210
--
--
282210
--
--
1
345720
--
--
--
345720
--
1
384580
--
--
--
--
384580
with following no. of out going Feeder (P-36)
S / To t a( E l :)F
Earthingof33kVSub-StationEquipmentsasperdetail(P-38)
G
Yard&colonyfencingasperdetail(P-43)
H
Yardlighteningasperdetail(P-44)
I
ControlandLTpowercablesasperdetail(P-45)
J)
Foundation of :--
1
Transformerasperdetail(P-46)
2
Circuit breaker (P-47)
K
Costoftrenchesasperdetail(P-50)
79 3 59 0 job
1
job job job
421090 1
93510 2
job S /To t a(lFt oK:)G ra n dTo t a(lAt oK:)S aR y s:.-
126130
1
job job
249550
1
42720 2
1
19800 324080
249550 421090 126130 93510 85440 39600 324080 1 3 3 94 0 0 8 4 5 88 4 2 8 4 5 88 4 0
8 57 1 00
8 95 9 50
249550 421090
249550
249550
421090
126130 93510
9 5 94 6 0
421090
126130
85440 39600 324080 1 3 3 94 0 0 8 8 4 38 3 3 8 8 4 38 3 0
93510
85440
126130 93510
85440
39600
85440
39600
324080
324080
13 3 94 0 0 92 0 41 6 4
249550 421090
126130
93510
9 98 3 20
39600 324080
1 3 3 94 0 0 9 58 9 15 5
92 0 41 6 0
1 3 39 4 0 0 9 9 49 4 9 6
9 58 9 16 0
9 9 49 5 0 0
PAGE- 18
Cost of 2x 0.63 MVA, 33 kV Terminal Equipment & Sub-Station (Un-Manned) with 4 to 8 nos. of out going Feeders with Common Breaker ( vacuum/SF6 ) Control for Transformer S . N o.D e sc r i pt i onof i te m
IS S .N o.
Un it
Q ty
R ECS td .N o 1
Cost of Terminal Equipments for 2x 0.63 MVA,33/11 kV Sub-Station
Ra te Rs.
No.
1
--
Am o u n t f o r S u b - S t a t i o n W i t h N o . o f o u t g o i n g F e e d e r s . 4N os .
5N os.
8998840
6N os .
9622610
10221720
7N os .
8N os.
10845490
11444610
with 4 to 8 nos. out going Feeder excluding the cost of Power Transformer & 11 kV incoming cable (P- 24 to 26) 2
0.63MVA,33/11kVTransformer
3
95mm2.11kVgradecable
2026/1993 7098/1985
No. Mtr
2
100
887500 450
1775000
S / T ot a l Storage Charges @ 3.0 %
324565
Contingencies Charges @ 3.0 %
1775000
45000
1775000
45000
1775000
45000
45000
1 08 1 88 4 0 11 4 42 6 10 1 20 4 17 2 0 343278 361252 379965
324565
343278
361252
12 6 65 4 90 397938
379965
Transportationchargesasperstatement(P-61)
312900
312900
312900
312900
Erectionchargesasperstatement(P-74)
4539400
4702600
4865900
5029100
Costofcontrolroombuildingasperdetail(P-51)
3512344 Tota l
Departmental Charges @ 11.0 %
3512344
1 98 3 26 1 4 2181588
G ra n d Tot al
2 20 1 42 0 2
S a yR s.I nl a cs
2 20 .1 4
3512344
20 6 57 0 11 2272271 22 9 29 2 82 22 9. 29
1775000
45000
3512344
2 14 5 53 6 7 2360090 2 38 1 54 5 8 23 8 .1 5
1 3 26 4 61 0
397938 312900 5192400 3512344
22 2 79 7 63 2450774 2 47 3 05 3 7 2 47 .3 1
2 3 07 8 13 1
2538594 2 5 61 6 72 5 2 5 6.1 7
PAGE-19
Cost of 2x1.6 MVA, 33 kV Terminal Equipment & Sub-Station (Un-Manned) with 4 to 8 nos. of out going Feeders with Common Breaker ( vacuum/SF6 ) Control for Transformer S. N o.D e s cr i p ti onof i t em
I SS . N o.
Un it
Qty
R E CS td .N o 1
Cost of Terminal Equipments for 2x1.6 MVA,33/11 kV Sub-Station
R at e R s.
No.
1
--
Am o u n t f o r S u b - S t a t i o n W i t h N o . o f o u t g o i n g F e e d e r s . 4N os .
5N os.
8998840
9622610
6N os .
7N os .
10221720
10845490
8N os . 11444610
with 4 to 8 nos. out going Feeder excluding the cost of Power Tr ansformer & 11 kV incoming cable (P- 24 to 26) 2
1.6MVA,33/11kVTransformer
3
120mm2.11kVgradecable
2026/1993 7098/1985
No. No.
2
100
1963500 516
S /Tota l Storage Charges @ 3.0 % Contingencies Charges @ 3.0 %
3927000 51600
3927000
3927000
51600
12 9 77 4 40
3927000
51600
13 6 01 2 10
3927000
51600 1 42 0 03 2 0
51600
1 48 2 40 9 0
15 4 23 2 1 0
389323 408036 426010 444723 462696 389323 408036 426010 444723 462696
Transportationchargesasperstatement(P-61)
312900
312900
312900
312900
Erectionchargesasperstatement(P-74)
4539400
4702600
4865900
5029100
Costofcontrolroombuildingasperdetail(P-51)
3512344 Tot al
[email protected]%
3512344
22 1 20 7 30 2433280
3512344
22 9 45 1 26
2523964
G r a n d T ot a l
24 5 54 0 10
S a yR s .I nla c s
24 5 .54
25 4 69 0 90 25 4. 69
3512344
2 37 4 34 8 4
2611783
312900 5192400 3512344
2 45 6 78 8 0
2702467
2 63 5 52 6 7 2 63 .5 5
2 7 27 0 34 7 2 7 2.7 0
25 3 66 2 4 6
2790287 28 1 56 5 3 3 28 1 .5 7
PAGE-20
Cost of 1x1.6 MVA, Terminal Equipment & Sub-Station (Un-Manned) with 4 to 8 nos. out going Feeders with Independent Breaker ( vacuum/SF6 ) Control for Transformer S. N o.D e s cr i p t i onof i te m
I S S . N o.
U nit
Qt y
Ra te
R E CS t d.N o 1
Cost of Terminal Equipments for 1x1.6 MVA,33/11 kV Sub-Station
Am o u n t f o r S u b - S t a t i o n W i t h N o . o f o u t g o i n g F e e d e r s . 4N os .
No.
1
7650540
5N os .
6N os .
7N os.
8274310
8873430
9497200
8N os.
10096320
with 4 to 8 nos. out going Feeder excluding the cost of Power Transformer & 11 kV incoming cable (P- 27 to 29) 2
1.6MVA,33/11kVTransformer
3
120mm2.11kVgradecable
2026/1993 7098/1985
No. No.
1 50
1963500 516
S/ Tot a l
Storage Charges @ 3.0 % Contingencies Charges @ 3.0 %
1963500 25800
1963500
1963500
25800
9 63 9 84 0
1963500
25800
1 0 26 3 61 0
1963500
25800 1 08 6 27 3 0
25800 1 1 48 6 5 00
1 20 8 5 62 0
289195 307908 325882 344595 362569 289195 307908 325882 344595 362569
Transportationchargesasperstatement(P-61)
312900
312900
312900
312900
Erectionchargesasperstatement(P-74)
4556400
4719600
4882900
5046200
Costofcontrolroombuildingasperdetail(P-51)
3512344 To t a l
Departmental Charges @ 11.0 %
3512344
3512344
1 8 59 9 87 4
1 9 42 4 27 1
2045986
2136670
Gr a nd Tota l
2 0 64 5 86 0
Sa yR s .I nl a c s
2 0 6.4 6
2 1 56 0 94 1 2 1 5. 61
3512344
2 02 2 26 3 8
2224490 2 24 4 71 2 8 2 24 .4 7
312900 5209400 3512344
2 1 04 7 1 34
2315185 2 3 36 2 3 19 2 3 3. 62
2 18 4 5 40 1
2402994 2 42 4 8 39 5 2 4 2.4 8
PAGE-21
Cost of 2x3.15 MVA, 33 kV Terminal Equipment & Sub-Station (Un-Manned) with 4 to 8 nos. out going Feeders with Common Breaker ( vacuum/SF6 ) Control for Transformer S. N o.D e s cr i p t i onof i t e m
IS S .N o.
Un it
Qty
R E CSt d .N o 1
Cost of Terminal Equipments for 2x 3.15 MVA,33/11 kV Sub-Station
R at e R s.
No.
1
--
A m o u n t f o rS u b - S t a t i o n W i t h N o . o f o u t g o i n g F e e d e r s . 4N os . 8998840
5N os .
6N os .
9622610
10221720
7N os .
8N os.
10845490
11444610
with 4 to 8 nos. out going Feeder excluding the cost of Power Transformer &11 kV incoming cable (P- 24 to 26) 2
3.15MVA,33/11kVTransformer
3
185mm2.11kVgradecable
2026/1992 7098/1985
No. Mtr
2
100
2477323 647
S / T ot a l Storage Charges @ 3.0 % Contingencies Charges @ 3.0 %
4954646 64700
4954646
4954646
64700
14 0 18 1 8 6
4954646
64700
14 6 41 9 56
4954646
64700 1 5 24 1 06 6
64700
1 5 86 4 83 6
1 6 46 3 95 6
420546 439259 457232 475945 493919 420546 439259 457232 475945 493919
Transportationchargesasperstatement(P-61)
312900
312900
312900
312900
Erectionchargesasperstatement(P-74)
4539400
4702600
4865900
5029100
Costofcontrolroombuildingasperdetail(P-51)
3512344 Tota l
[email protected]%
3512344
23 2 23 9 2 1 2554631
3512344
24 0 48 3 17
2645315
G r a n d To t a l
25 7 78 5 5 2
S a yR s .I nl a c s
25 7 .79
26 6 93 6 32 26 6 .94
3512344
2 4 84 6 67 4
2733134
312900 5192400 3512344
2 5 67 1 07 0
2823818
2 7 57 9 80 8 2 7 5.8 0
28 4 94 8 88 28 4 .95
2 6 46 9 43 7
2911638 2 9 38 1 07 5 2 9 3.8 1
PAGE-22
Cost of 1x3.15 MVA, Terminal Equipment & Sub-Station (Un-Manned) with 4 to 8 nos. out going Feeders with Independent Breaker ( vacuum/SF6 ) Control for Transformer S. N o.D e s cr i p t i onof i t e m
IS S .N o.
Un it
Qt y
R at e
R ECS td .N o 1
Costof Terminal Equipments for 1x3.15MVA,33/11 kV Sub-Station
No.
1
--
Am o u n t f o r S u b - S t a t i o n W i t h N o . o f o u t g o i n g F e e d e r s . 4N os .
5N os .
6N os .
7650540
8274310
8873430
7N os .
8N os .
9497200
10096320
with 4 to 8 nos. out going Feeder excluding the cost of Power Transformer & 11 kV incoming cable (P- 27 to 29) 2
3.15MVA,33/11kVTransformer
3
185mm2.11kVgradecable
2026/1993 7098/1985
No. No.
1 50
2477323 647
S /Tota l
Storage Charges @ 3.0 % Contingencies Charges @ 3.0 %
2477323 32350
2477323
2477323
32350
1 01 6 0 21 3
2477323
32350
1 07 8 39 8 3
2477323
32350 11 3 83 1 0 3
32350 1 20 0 6 87 3
12 6 05 9 9 3
304806 323519 341493 360206 378180 304806 323519 341493 360206 378180
Transportationchargesasperstatement(P-61)
312900
312900
312900
312900
Erectionchargesasperstatement(P-74)
4556400
4719600
4882900
5046200
Costofcontrolroombuildingasperdetail(P-51)
3512344 Tot al
Departmental Charges @ 11.0 %
3512344
3512344
1 91 5 1 47 0
1 99 7 58 6 6
2106662
2197345
G r a n d T ot a l
2 12 5 8 13 2
S a yR s .I nl a c s
2 12 .5 8
2 21 7 32 1 1 2 21 .7 3
3512344
20 7 74 2 3 3
2285166 23 0 59 3 9 9 23 0 .59
312900 5209400 3512344
2 15 9 8 72 9
2375860 2 39 7 4 58 9 2 3 9.7 5
22 3 96 9 9 7
2463670 24 8 60 6 6 7 24 8 .6 1
PAGE-23
Cost of 2x6.3 MVA, 33 kV Terminal Equipment & Sub-Station ( Un-Manned) with 4 to 8 nos. out going Feeders and incorporating independent breaker ( vacuum/SF6 ) control for Transformer S . N o.D e s cr i pt i onof i t em
I SS . N o.
U nit
Q ty
R E CS td .N o 1
Cost of Terminal Equipments for 2x 6.3MVA,33/11 kV Sub-Station
R at e R s.
No.
1
--
Am o u n t f o r S u b - S t a t i o n W i t h N o . o f o u t g o i n g F e e d e r s . 4N os . 9413970
5N os . 10037740
6N os.
7N os .
10636850
11260620
8N os. 11859740
with 4 to 8 nos. out going Feeder excluding the cost of Power Transformer & 11 kV incoming cable (P- 30 to 32) 2
6.3MVA,33/11kVTransformer
3
240mm2.11kVgradecable Storage Charges @ 3.0 %
2026 7098/1985
No. No.
2 100
3650219 796
S/ Tota l
Contingencies Charges @ 3.0 %
7300438 79600
7300438
7300438
79600
7300438
79600
522533
540507
559220
Transportationchargesasperstatement(P-61)
312900
312900
312900
312900
Erectionchargesasperstatement(P-74)
4556400
4719600
4882900
5046200
3512344 To t a l
[email protected]%
79600
1 67 9 40 08 1 74 1 77 78 18 0 16 88 8 1 86 4 06 58 503820 522533 540507 559220 577193 503820
Costofcontrolroombuildingasperdetail(P-51)
7300438
79600
3512344
2 61 8 32 92 2880162
3512344
2 70 0 76 89
2970846
G r a n d To t a l
2 90 6 34 55
Sa yR s .I nl a cs
2 90 .63
27 8 06 04 5
3058665
2 99 7 85 34 2 99 .79
3512344
312900 5209400 3512344
2 86 3 05 41
3149360
30 8 64 71 0 30 8. 65
19 2 39 77 8
577193
3 17 7 99 01 3 17 .8 0
29 4 28 80 9
3237169 32 6 65 97 8 32 6. 66
PAGE-24
Cost of Terminal Equipments for 2x'X' MVA, 33/11 kV Sub-Station(Un-Manned) with 4 to 8 nos. out going Feeders incorporating Common Breaker ( vacuum/SF6 ) Control for Transformer (excluding cost of power Transformer and 11 kV incoming cables ) S.No .D es cr ip tio no fit e m
IS S.N o .
U n it
Qty
Ra t e
R ECSt d .No A)
Amou n tf o rSub - Sta t io nW ithN o .o f o utg o ingF e ed e rs .
Rs .
4No s .
5N os .
6N os .
7No s .
8N o s .
Sub-Station Transf ormer 100kVA,33/0.4kVS/Stn,Transformer
No.
1
324478
324478
324478
324478
324478
324478
B)
33 kV Switchgear Equipment
1
36kVVacuum/SF-6CircuitBreaker.
2
33kVT/FC&RPanelwithoutDifferentialRelay
No.
2
226242
452484
452484
452484
452484
452484
3
33kVBusCouplerPanel
No.
1
208101
208101
208101
208101
208101
208101
4
33 kV Feeder Panel
5
33kVCT'sSingleUnit
6
12-/1979
No.
2
254440
508880
508880
508880
508880
508880
No.
2
268446
536892
536892
536892
536892
536892
2705/1992
No.
6
30992
185952
185952
185952
185952
185952
33/11kV,singlephasePT's
3156/1992
No.
3
26867
80601
80601
80601
80601
80601
7
400A33kVIsolatorwithE/Blade(Motorised)
9921/1992
No.
1
77886
77886
77886
77886
77886
77886
8
400A33kVIsolatorwithoutE/Blade(Motorised)
9
33kVlighteningarrestersmetaloxidetype
55/1987
set
5
5371
26855
26855
26855
26855
26855
10
33kVExpulsionDropoutfuseunit
5292/1970
set
2
10304
20608
20608
20608
20608
20608
C)
S/T o t a(lB:)11 kV s wit chgear a nd al lied Eq uipment
(I)
11 kV panel board with 2 incomer panels with PT's 1
9921/1992
No.
7
71508
500556
500556
2 5 98 8 1 5
500556
25 9 8 81 5
500556
25 9 8 81 5
500556
25 9 8 81 5
2 59 8 8 15
Busbar coupler and following of out going Feeder panels. 1
nos. 4panels set 7of
set
1
2130382
2130382
--
--
--
--
2
nos. 5panels set 8of
set
1
2414049
--
2414049
--
--
--
3
nos. 6panels set 9of
set
1
2697716
--
--
2697716
--
--
4
nos. 7 set 10 of panels
set
1
2981383
--
--
--
2981383
--
3265050
--
--
--
--
3265050
5 nos. 8set 11 of panels set 1 (II) 11 kV tripl e pole GO Swit ch/Isolator witho ut E/blade for S/S tn with f o llo w in gn o .o fo u tgo in gF ee d er 1 3 26 / 1 97 7 1
nos. 4
set
4
4582
18328
--
--
--
--
2
nos. 5
set
5
4582
--
22910
--
--
--
3
nos. 6
set
6
4582
--
--
27492
--
--
4
nos. 7 nos.
set se
7
4582
---
---
---
32074 --
--
PAGE-25 (III) 11 kV LA's Sub-S tation Type for S /Stn wi th 1 2 3 4 5
following no. of out going Feeder nos. 4 nos. 5 nos. 6 nos. 7 nos. 8
No. No. No. No. No.
12 15 18 21 24
493 493 493 493 493
5916 -----
-7395 ----
--8874 ---
---10353 --
----11832
(IV) 95 mm2, 11kV grade cable for S/Stn with following no. of out going Feeder 1
4nos.
2
nos. 5
mtr.
250
450
--
112500
--
3
nos. 6
mtr.
300
450
--
--
4
nos. 7
mtr.
350
450
--
--
5
nos. 8
mtr.
400
450
--
(V)
mtr.
200
450
90000
--
--
--
--
--
--
135000
--
--
--
157500
--
--
--
--
180000
11 kV epoxy terminating kits for S/Stn with following no. of out going Feeder
1
nos. 4
No.
4
7074
28296
--
--
--
--
2
nos. 5
No.
5
7074
--
35370
--
--
--
3
nos. 6
No.
6
7074
--
--
42444
--
--
4
nos. 7
No.
7
7074
--
--
--
49518
--
5
nos. 8
No.
8
7074
--
--
--
--
56592
(VI) HT comp ound & oth er material in s ets for ca ble box es of panels,S/Stn with following no. of out going Feeder 1
nos. 4
No.
4
2179
8716
--
--
--
--
2
nos. 5
No.
5
2179
--
10895
--
--
--
3
nos. 6
No.
6
2179
--
--
13074
--
--
4
nos. 7
No.
7
2179
--
--
--
15253
--
No.
8
2179
--
--
--
--
17432
5 nos. 8 (VII) 12 KV vacuum/SF-6 Circuit Breaker. 1
nos. 4
No.
4
238781
955124
--
--
--
--
2
nos. 5
No.
5
238781
--
1193905
--
--
--
3 4
nos. 6 nos. 7
No. No.
6 7
238781 238781
---
---
1432686 --
-1671467
---
5
nos. 8
No.
8
238781
--
--
--
--
1910248
43 57 28 6
4 9 17 54 8
S / To t a(lC:)-
3 23 67 62
3 79 70 24
54 77 81 0
PAGE-26 D)
Ge neral Eq uipment
1
30V,100AHLeadAcidBatteryalongwithBatteryCharger
2
30 V DC Distribution Board
3
400V,A.C.distributionswitchgear
34/1984
No.
1
No. 4047/1967
108464
1
45736
No.
1
551591
S / To t a( D l :)E)
108464
108464
45736
108464
45736
551591
551591
70 57 91
108464
45736
45736
551591
70 57 91
108464 45736
551591
70 57 91
551591
70 57 91
70 57 91
Su per St ructure & Bu sb ar
(I)
33kVsuperstructure&busbarasperdetail(P-33)
(II)
11 kV super structure & busbar detail as per for Sub-Station
job
1
613740
613740
613740
613740
613740
613740
with following no. of out going Feeder (P-36) 1
nos. 4
job
1
179850
179850
--
--
--
--
2
nos. 5
job
1
243360
--
243360
--
--
--
3
nos. 6
job
1
282210
--
--
282210
--
--
4 5
nos. 7 nos. 8
job job
1 1
345720 384580
---
---
---
345720 --
-384580
S /T ot a( E l :)F
Earthingof33kVSub-StationEquipmentsasperdetail(P-38)
G
Yard&colonyfencingasperdetail(P-43)
H
Yardlighteningasperdetail(P-44)
I
ControlandLTpowercablesasperdetail(P-45)
J)
Foundation of :--
1
Transformerasperdetail(P-46)
2
Circuit breaker (P-47)
K
Costoftrenchesasperdetail(P-50)
79 35 90 job
1
job job job
421090 1
93510 2
job S /T o t a(lFt oK:)G r an dTo t a(l At oK): S ay R s .: -
126130
1
job job
249550
1
42720 2
1
19800 324080
85 71 00
249550
249550
421090
421090
126130 93510
89 59 50 249550 421090
126130 93510
85440 39600 324080 1 33 94 00 8 99 88 36 8 99 88 40
126130 93510
85440
85440
39600 324080
95 94 60 249550 421090 126130
93510
1 33 94 00 9 62 26 08 9 62 26 10
249550 421090 126130 93510
85440
39600 324080
99 83 20
85440
39600 324080
39600 324080
13 39 40 0
1 3 39 40 0
13 39 40 0
1 02 21 72 0
1 08 45 49 2
1 14 44 61 4
1 02 21 72 0
1 08 45 49 0
1 14 44 61 0
PAGE-27
Cost of Terminal Equipments for 1x'X' MVA, 33/11 kV Sub-Station ( Un-Manned) with 4 to 8 nos. out going Feeder incorporating independent Breaker ( vacuum/SF6 ) Control for Transformer (excluding cost of power Transformer and 11 kV incoming cables ) S. N o.D e s cr i p ti onof i t em
I S S . N o.
U nit
Qt y
R at e
R E CS t d.N o A)
Am o u n t f o r S u b - S t a t i o n W i t h N o . o f o u t g o i n g F e e d e r s . 4N os .
5N os .
6N os .
7N os .
8N os.
Sub-S tat ion Tra nsfor mer 1 0 0k V A,3 3 / 0 . 4k VS / S t n,Tr a n s f or m er
N o.
1
324478
324478
324478
324478
324478
324478
B)
33 k V Swi tch ge ar E quip ment
1
36kVVacuum/SF-6CircuitBreaker.
2
33kVT/FC&RPanelwithoutDifferentialRelay
3
33 kV Feeder Panel
4
33kVCT'sSingleUnit
5
33/11kV,singlephasePT's
3156/1992
No.
3
26867
80601
80601
80601
80601
80601
6
400A33kVIsolatorwithE/Blade (Motorised)
9921/1992
No.
1
77886
77886
77886
77886
77886
77886
7
400A33kVIsolatorwithoutE/Blade(Motorised)
9921/1992
8
33kVlighteningarrestersmetaloxidetype
55/1987
set
3
5371
16113
16113
16113
16113
16113
9
33kVExpulsionDropoutfuseunit
5292/1970
set
1
10304
10304
10304
10304
10304
10304
12-/1979
No. No.
2705/1992
1 1
254440 226242
254440 226242
11 kV s witc hgear an d all ied E quipment
(I)
11 kV p anel boa rd wit h 1 inc omer pan el wit h PT' s
254440 226242
254440 226242
254440 226242
No.
1
268446
268446
268446
268446
268446
268446
No.
3
30992
92976
92976
92976
92976
92976
No.
4
71508
286032
S / Tot a(lB:)C)
254440 226242
286032
13 1 30 4 0
286032
13 1 30 4 0
286032
1 31 3 04 0
286032
1 3 13 0 4 0
1 3 13 0 40
and following of out going Feeder panels. 1
nos. 4panels set 5of
set
1
2130382
2130382
--
--
--
--
2
nos. 5panels set 6of
set
1
2414049
--
2414049
--
--
--
3
nos. 6panels set 7of
set
1
2697716
--
--
2697716
--
--
4
nos. 7panels set 8of
set
1
2981383
--
--
--
2981383
--
3265050
--
--
--
--
3265050
5 nos. 8panels set 9of set 1 (II) 11 kV triple pole G O Switch /Isola tor witho ut E/bl ade for S/Stn with f ol l ow i n gn o.ofou tg oi n gFe ed e r 1 3 26 /19 7 7 1
nos. 4
No.
4
4582
18328
--
--
--
--
2 3 4 5
nos. 5 nos. 6 nos. 7 nos. 8
No. No. No. No.
5 6 7 8
4582 4582 4582 4582
-----
22910 ----
-27492 ---
--32074 --
---36656
PAGE-28 (III) 11 kV LA's Sub-S tation Type for S /Stn wi th following no. of out going Feeder 1 2 3 4
nos. 4 nos. 5 nos. 6 nos. 7
No. No. No. No.
12 15 18 21
493 493 493 493
5916 ----
-7395 ---
--8874 --
---10353
-----
5
nos. 8
No.
24
493
--
--
--
--
11832
(IV) 95 mm2, 11kV grade cable for S/Stn with following no. of out going Feeder 1
nos. 4
mtr.
200
450
90000
--
--
--
--
2
nos. 5
mtr.
250
450
--
112500
--
--
--
3 4
nos. 6 nos. 7
mtr. mtr.
300 350
450 450
---
---
135000 --
-157500
---
5
nos. 8
mtr.
400
450
--
--
--
--
180000
(V)
11 kV epoxy terminating kits for S/Stn with following no. of out going Feeder
1
nos. 4
No.
4
7074
28296
--
--
--
--
2
nos. 5
No.
5
7074
--
35370
--
--
--
3
nos. 6
No.
6
7074
--
--
42444
--
--
4
nos. 7
No.
7
7074
--
--
--
49518
--
5
nos. 8
No.
8
7074
--
--
--
--
56592
(VI) HT comp ound & oth er material in s ets for ca ble box es of panels,S/Stn with following no. of out going Feeder 1
nos. 4
No.
4
2179
8716
--
--
--
--
2
nos. 5
No.
5
2179
--
10895
--
--
--
3
nos. 6
No.
6
2179
--
--
13074
--
--
4
nos. 7
No.
7
2179
--
--
--
15253
--
No.
8
2179
--
--
--
--
17432
5 nos. 8 (VII) 12 KV vacuum/SF-6 Circuit Breaker 1
nos. 4
No.
4
238781
955124
--
--
--
--
2
nos. 5
No.
5
238781
--
1193905
--
--
--
3 4
nos. 6 nos. 7
No. No.
6 7
238781 238781
---
---
1432686 --
-1671467
---
5
nos. 8
No.
8
238781
--
--
1910248
43 57 28 6
4 9 17 54 8
S / To t a(lC:)-
-3 23 67 62
-3 79 70 24
54 77 81 0
PAGE-29 D)
Ge neral Eq uipment
1
30V,100AHLeadAcidBatteryalongwithBatteryCharger
2
30 V DC Distribution Board
3
400V,A.C.distributionswitchgear
34/1984
No. No.
4047/1967
1
108464
1
45736
No.
1
551591
S / To t a( D l :)E)
108464 45736 551591 70 57 91
108464
108464
45736
45736
551591
108464
108464
45736
45736
551591
70 57 91
551591
70 57 91
551591
70 57 91
7 05 79 1
Su per St ructure & Bu sb ar
I
33kVsuperstructure&busbarasperdetail(P-33)
II
11 kV super structure & busbar detail as per for Sub-Station
job
1
613740
613740
613740
613740
613740
613740
1
nos. 4
job
1
179850
179850
--
--
--
--
2
nos. 5
job
1
243360
--
243360
--
--
--
3
nos. 6
job
1
282210
--
--
282210
--
--
4 5
nos. 7 nos. 8
job job
1 1
345720 384580
---
---
---
345720 --
-384580
with following no. of out going Feeder (P-36)
S /T ot a( E l :)F
Earthingof33kVSub-StationEquipmentsasperdetail(P-38)
G
Yard&colonyfencingasperdetail(P-43)
H
Yardlighteningasperdetail(P-44)
I
ControlandLTpowercablesasperdetail(P-45)
J)
Foundation of :--
1
Transformerasperdetail(P-46)
2
Circuit breaker (P-47)
K
Costoftrenchesasperdetail(P-50)
79 35 90 job
1
job job job
421090 1
93510 1
job S /T o t a(lFt oK:)G r an dTo t a(lAt oK): S aR y s:.-
126130
1
job job
249550
1
42720 1
1
19800 324080
249550 421090 126130 93510 42720 19800 324080 1 27 68 80 7 65 05 41 7 65 05 40
85 71 00
89 59 50
249550 421090
249550 421090
126130 93510
95 94 60 249550 421090
126130 93510
42720 19800 324080 1 27 68 80 8 27 43 13 8 27 43 10
249550 421090
126130 93510
42720
126130 93510
42720
19800 324080
99 83 20
19800 324080
12 76 88 0 88 73 42 5 88 73 43 0
1 2 76 88 0 9 4 97 19 7 9 4 97 20 0
42720 19800 324080 12 76 88 0 1 00 96 31 9 1 00 96 32 0
PAGE-30
Cost of Terminal Equipments for 2x'X' MVA, 33/11 kV Sub-station (Un-Manned) with 4 to 8 nos. out going Feeders incorporating independent Breaker ( vacuum/SF6 ) control for Transformer (excluding cost of power Transformer and 11 kV incoming cables ) S. N o.D e s cr i p t i onof i te m
I S S. N o.
U n it
Q ty
R E CS t d .N o A)
R at e R s.
100kVA,33/0.4kVS/Stn,Transformer
1180&2026
No.
1
33 k V Swi tc hgea r & Eq uipm ent
1
36kVVacuum/SF-6CircuitBreaker.
2
33kVT/FC&RPanelwithDifferentialRelay
No.
2
3
33kVBusCouplerPanel
No.
1
4
33 kV Feeder Panel
5 6
33kVCT'sSingleUnit 33/11kV,singlephasePT's
7
33kVIsolatorwithE/Blade (Motorised)
8
33kVExpulsionDropoutfuseunit
9
33kVIsolatorwithoutE/Blade (Motorised)
10
33kVlighteningarrestersmetaloxidetype
12-/1979
No.
324478 2
324478
6N os .
7N os .
8N os .
254440
324478
508880
324478
508880
324478
508880
324478
508880
508880
433807
867614
867614
867614
867614
867614
208101
208101
208101
208101
208101
208101
No.
2
268446
536892
536892
536892
536892
536892
No. No.
6 3
30992 26867
185952 80601
185952 80601
185952 80601
185952 80601
185952 80601
9921
No.
1
77886
77886
77886
77886
77886
77886
55/1987
No.
2
10304
20608
20608
20608
20608
20608
2705/1992 3156/1992
9921 5292/1970
set set
7 5
71508
500556
500556
500556
500556
500556
5371
26855
26855
26855
26855
26855
S /Tot a(lB:)-
I
5N os .
Su b- Stati on Tr ansform er
B)
C)
Am o u n t f o r S u b - S t a t i o n W i t h N o . o f o u t g o i n g F e e d e r s . 4N os .
3 0 1 39 4 5
30 1 39 4 5
3 0 13 9 45
3 01 3 94 5
3 01 3 94 5
11 k V swi tch gea r an d all ied E quipment 11 k V pa nel boa rd w ith 2 incomer pa nel s wi th PT's 1 Busbar coupler and following out going Feeder panels.
1
nos. 4panels set 7of
set
1
2130382
2130382
--
--
--
--
2
nos. 5panels set 8of
set
1
2414049
--
2414049
--
--
--
3
nos. 6panels set 9of
set
1
2697716
--
--
2697716
--
--
4
nos. 7 set 10 of panels
set
1
2981383
--
--
--
2981383
--
3265050
--
--
--
--
3265050
5 nos. 8set 11 of panels set 1 II 11 kV triple pole GO Switch/Is olator without E/bla de for S/Stn with f ol l ow i n gn o.of ou tg oi n gFee d er 3 0 70 /1 98 5 1
nos. 4
set
4
4582
18328
--
--
--
--
2
nos. 5
set
5
4582
--
22910
--
--
--
3
nos. 6
set
6
4582
--
--
27492
--
--
4 5
nos. 7 nos. 8
set set
7 8
4582 4582
---
---
---
32074 --
-36656
PAGE-31 III
11 kV L A's Sub -St ation Ty pe fo r S/S tn wit h following no. of out going Feeder
1
nos. 4
No.
12
493
5916
--
--
--
--
2
nos. 5
No.
15
493
--
7395
--
--
--
3
nos. 6
No.
18
493
--
--
8874
--
--
4
nos. 7
No.
21
493
--
--
--
10353
--
5
nos. 8
No.
24
493
--
--
--
--
11832
IV
95 m m2, 11 kV g rade cable for S /Stn wit h following no. of out going Feeder
1
nos. 4
mtr.
200
450
90000
--
--
--
--
2
nos. 5
mtr.
250
450
--
112500
--
--
--
3
nos. 6
mtr.
300
450
--
--
135000
--
--
4 5
nos. 7 nos. 8
mtr. mtr.
350 400
450 450
---
---
---
157500 --
-180000
V
11 k V ep oxy terminating kits for S/S tn wi th following no. of out going Feeder
1 2
nos. 4 nos. 5
No. No.
4 5
7074 7074
28296 --
-35370
---
3
nos. 6
No.
6
7074
--
--
4
nos. 7
No.
7
7074
--
--
5
nos. 8
No.
8
7074
--
VI
---
---
42444
--
--
--
49518
--
--
--
--
56592
HT compound & other material in sets for cable boxes of panels,S/Stn with following no. of out going Feeder
1
nos. 4
No.
4
2179
8716
--
--
--
--
2
nos. 5
No.
5
2179
--
10895
--
--
--
3 4
nos. 6 nos. 7
No. No.
6 7
2179 2179
---
---
13074 --
-15253
---
No.
8
2179
--
--
--
--
17432
5 nos. 8 (VII) 12 KV vacuum/SF-6 Circuit Breaker. 1 nos. 4 2 nos. 5 3 nos. 6
No. No. No.
4 5 6
238781 238781 238781
955124 ---
-1193905 --
--1432686
----
----
4
nos. 7
No.
7
238781
--
--
--
1671467
--
5
nos. 8
No.
8
238781
--
--
--
--
1910248
43 57 28 6
4 9 17 54 8
S / To t a(lC:)-
3 23 67 62
3 79 70 24
54 77 81 0
PAGE-32 D)
Ge neral Eq uipment
1
30V,100AHLeadAcidBatteryalongwithBatteryCharger
2
30 V DC Distribution Board
3
400V,A.C.distributionswitchgear
34/1984
No.
1
No.
108464
1
No.
45736 1
551591
S / To t a( D l :)E)
108464
108464
45736
108464
45736
551591
551591
70 57 91
108464
45736
45736
551591
70 57 91
108464 45736
551591
70 57 91
551591
70 57 91
70 57 91
Su per St ructure & Bu sb ar
I
33kVsuperstructure&busbarasperdetail(P-33)
II
11 kV super structure & busbar detail as per for Sub-Station
job
1
613740
1
nos. 4
job
1
179850
2
nos. 5
job
1
243360
3
nos. 6
job
1
4 5
nos. 7 nos. 8
job job
1 1
613740
613740
613740
613740
613740
179850
--
--
--
--
--
243360
--
--
--
282210
--
--
282210
--
--
345720 384580
---
---
---
345720 --
-384580
with following no. of out going Feeder (P-36)
S /T ot a( E l :)F
Earthingof33kVSub-StationEquipmentsasperdetail(P-38)
G
Yard&colonyfencingasperdetail(P-43)
H
Yardlighteningasperdetail(P-44)
I
ControlandLTpowercablesasperdetail(P-45)
J)
Foundation of :--
1
Transformerasperdetail(P-46)
2
Circuit breaker (P-47)
K
Costoftrenchesasperdetail(P-50)
79 35 90 job
1
job job job
421090 1
93510 2
job S /T o t a(lFt oK:)G r an dTo t a(l At oK): Sa y Rs:.-
126130
1
job job
249550
1
42720 2
1
19800 324080
85 71 00
249550
249550
421090
421090
126130 93510
89 59 50
126130 93510
85440 39600 324080 1 33 94 00 9 41 39 66 9 41 39 70
249550 421090 126130 93510
85440
85440
39600 324080
95 94 60 249550 421090 126130
93510
249550 421090 126130 93510
85440
39600 324080
99 83 20
85440
39600 324080
39600 324080
1 33 94 00
13 39 40 0
1 3 39 40 0
13 39 40 0
1 00 37 73 8
1 06 36 85 0
1 12 60 62 2
1 18 59 74 4
1 00 37 74 0
1 06 36 85 0
1 12 60 62 0
1 18 59 74 0
PAGE-33
33 KV super structure and bus-bar for 33/11 kV or 33/22 KV S/Stn. S.N o.
D e s cr ip t io no fit e m
U n it
A.
S U P ER S T R U C T U R E
1
R.S. Joists, size 10,000x225x150mm 12 supports I.e.(12x10x33.9)=4068kgsay4.07MT
2
Qty
MT
R a t e( R s .)
4.07
56800
Am o u n t ( R s . )
231176
R.S.Joists, size 4200x225x150mm supports for lightening arrester differential CT's (6x33.9x4.2)=854kgsay.854MT
MT
0.854
56800
48507
3
FoundationofR.S.joistssupportsasperdetailp-37
job
18
6130
110340
4 a)
M.S. channel iron 125x65mm, X-arm @13.1 kg/mtr. At 5% wastage for bus-bar,isolators,LA's,transformer etc.
I
9150 mm long
=9 no. I.e. 1098.14 kg
II
4725 mm long
=14 no. I.e. 882.11 kg
III
750 mm long Total
b) 5 a)
=2 no. I.e. 20.00 kg =25no.I.e.2000.25kg=2MT
MT
2
56800
Add % 5workshop charges on item a) 4
113600 5680
M.S.angle iron 65x65 X-arm @ 5.8 kg/mtr &5% wastage for
MT
0.07
56800
3806
body supports belt of station transformer b)
Add 5% w/shop charge on item a) 5
190
Nuts&BoltswithWashersoffsizes
Kg
60
77
4620
S /T o(:tA -a)l B.
5179 19
B U S - B AR
I
3discinsulatorstensionstringcompletewithfittingp-54
II
ACSR conductor 100 mm2 at 10 % wastage (8x4.5+1x3.5)x3x1.1=130.35say130mtr.
No. mtr.
51
1347
130
68697
59
7670
For jumpers at 2 mtr. average 25setsI.e.2x3x25x1.1=165mtr. III
Tee connections
IV
clamps PG
mtr. No. No.
165
59
9735
24 42
209 112
S/T o:(t-Ba)l T o(tA a+ l:B -)
5016 4704 958 22 6137 41
Say Rs .
6 1 3 7 4 0 .0 0
PAGE-34
11 kV Super Structure & Busbar for 33/11 kV Sub-Station. S .N o .
D e s cr ip t io no fit e m
U n it
Qty
R a t e( R s .) Rs
A
Amo u n tf o ro u tg o in gF e e d e ro f 4n o .
5n o .
--
--
6n o .
7n o .
8n o .
SUPPORTS 1
Steel tubular pole 10 M long for:--
a nos. 4 out going Feeder
No.
4
13033
52132
--
--
b
nos. 5out going Feeder
No.
6
13033
--
78198
--
--
--
c
nos. 6out going Feeder
No.
6
13033
--
--
78198
--
--
d
nos. 7 out going Feeder
No.
8
13033
--
--
--
104264
--
e
nos. 8out going Feeder
No.
8
13033
--
--
--
--
104264
2
St ee l t ub ular po le 9 M lon g f or :- -
a nos. 4out going Feeder
No.
1
9536
9536
--
--
--
--
b
nos. 5out going Feeder
No.
1
9536
--
9536
--
--
--
c
nos. 6out going Feeder
No.
2
9536
--
--
19072
--
--
d
nos. 7out going Feeder
No.
2
9536
--
--
--
19072
--
e
nos. 8out going Feeder
No.
3
9536
--
--
--
--
28608
3
RC C m u f f s & c o n cre t in g t h er e o f
a nos. 4out going Feeder
No.
5
920
4600
--
--
--
--
b
nos. 5out going Feeder
No.
7
920
--
6440
--
--
--
c
nos. 6out going Feeder
No.
8
920
--
--
7360
--
--
d
nos. 7out going Feeder
No.
10
920
--
--
--
9200
--
e
nos. 8out going Feeder
No.
11
920
--
--
--
--
10120
S /T o t a( A l :)B 1
6 6268
9417 4
104 630
13 2536
--
--
CROSS ARMS 3.75 long M.S. ch an ne l iro n 1 00 X5 0X 6 mm 9.56kg/mtr. Cross arms for Sub-Station With
a nos. 4 out going Feeder
No.
30
2036
61080
--
--
b
nos. 5out going Feeder
No.
38
2036
--
77368
--
--
--
c d
nos. 6out going Feeder nos. 7 out going Feeder
No. No.
46 54
2036 2036
---
---
93656 --
-109944
---
e
nos. 8out going Feeder
No.
62
2036
--
--
--
--
126232
1429 92
PAGE-35 2
3.75 long M.S. angle iron 50X50X6 mm 4.5 kg/mtr. Cross arms for Sub-Station With
a nos. 4out going Feeder
No.
16
959
15344
--
--
--
--
b
nos. 5out going Feeder
No.
20
959
--
19180
--
--
--
c
nos. 6out going Feeder
No.
24
959
--
--
23016
--
--
d
nos. 7out going Feeder
No.
28
959
--
--
--
26852
--
e
nos. 8out going Feeder
No.
32
959
--
--
--
--
30688
3
M.S. half clamps wit h nut s & bolts f or S/St n w it h
a nos. 4out going Feeder
No.
48
210
10080
--
--
--
--
b
nos. 5out going Feeder
No.
64
210
--
13440
--
--
--
c
nos. 6out going Feeder
No.
80
210
--
--
16800
--
--
d
nos. 7out going Feeder
No.
96
210
--
--
--
20160
--
e
nos. 8out going Feeder
No.
112
210
--
--
--
--
23520
C 1.
BUS - BAR
S /T o t a(lB:)-
8 65 04
1 09 98 8
13 3 47 2
15 69 56
Single insulators tension string for S/Stn with a nos. 4out going Feeder
No.
6
975
5850
--
--
--
--
b
5&6 nos. out going Feeder
No.
12
975
--
11700
11700
--
--
c
7&8 nos. out going Feeder
No.
18
975
--
--
--
17550
17550
2
AC S R C O NDUC T OR For bus-bars
a nos. 4out going Feeder
Mtr
23
59
1357
--
--
--
--
b
5&6 nos. out going Feeder
Mtr
46
59
--
2714
2714
--
--
c
7&8 nos. out going Feeder
Mtr
69
59
--
--
--
4071
4071
For jumpers & 6 sets of jumpers at 2.5 mtr. Average per Feeder for a nos. 4out going Feeder
Mtr
180
59
10620
--
--
--
--
b
nos. 5out going Feeder
Mtr
225
59
--
13275
--
--
--
c
nos. 6out going Feeder
Mtr
270
59
--
--
15930
--
--
d
nos. 7out going Feeder
Mtr
315
59
--
--
--
18585
--
e
nos. 8out going Feeder
Mtr
360
59
--
--
--
--
21240
18 04 40
PAGE-36 3
11 k V pi n in sulato rs w it h pi n & h elically fo rm ed f it ti ngs
a nos. 4out going Feeder
No.
14
105
1470
--
--
--
--
b
nos. 5out going Feeder
No.
17
105
--
1785
--
--
--
c
nos. 6out going Feeder
No.
20
105
--
--
2100
--
--
d
nos. 7out going Feeder
No.
23
105
--
--
--
2415
--
e
nos. 8out going Feeder
No.
26
105
--
--
--
--
2730
4
C LAM P S
a nos. 4out going Feeder
No.
36
216
7776
--
--
--
--
b
nos. 5out going Feeder
No.
45
216
--
9720
--
--
--
c
nos. 6out going Feeder
No.
54
216
--
--
11664
--
--
d
nos. 7out going Feeder
No.
63
216
--
--
--
13608
--
e
nos. 8out going Feeder
No.
72
216
--
--
--
--
15552
3 91 94
4 41 08
S /T o t a( C l: -)
2 70 73
T ot a(lA+ B+ C) : S ayRs .
56 22 9
6 11 43
17 98 45
2 43 35 6
28 2 21 0
34 57 21
3 84 57 5
17 98 50
2 43 36 0
28 2 21 0
34 57 20
3 84 58 0
PAGE-37
Foundation of R.S. joists as per drawing no. HPSEB-154 S .N o .
D e s cr ip t io no fit e m
1 i)
Round 12 mm dia =
U n it
Qty
R a t e( R s .) Amo u n t ( R s .)
0.925x2x4+0.625x2x4+0.4x2x4+1.927x4x3 =44.804 mtr Adding 10 % wastage =49.28 mtr or 43.61 kg ii)
Round 8 mm dia = 2x8x0.8+2x4x0.46+2x4x0.23+2x4x0.1 =17.52 mtr. after adding 10% wastage =19.2 mtr. Or 7.52 kg Total(i+ii) 51.13 = say 52 kg
2 i) ii)
kg
52
M.S. plate 225x160x10mm for top & bottom of R.S. joists supports I.e. 2x2.84 =5.68kg
57
2964
kg
5.68
57
324
kg
1.35
57
77
Angle iron 50x50x6mm supports at the bottom of 2x0.15x4.5=1.35kg
3
M.S.16mmdiafoundationboltswithwashersandnutsetc.
4
R.C.C. 1:2:4=(1.155x0.96x0.08)+2(0.4x0.35x0.325)
No.
4
77
308
.+2(0.35x0.208x0.205)+2(0.8x0.11x0.095)+2(1.72x0.205 x0.065)+2(0.517x0.05x0.045)=0.091+0.091+0.04+0.017 .+0.046+0.002=0.287
mtr. :T - otal R sS . ay
0.287
8577
2462 6134 6130
PAGE-38
Schedule of cost for Earthing of 33/11 kV or 33/22 kV Sub-Station With indoor type of switchgear S . N o . D e s cr i p t i o n oift e m
U n it
Qty
Rate
Am o u n t
Rs. 1
Costof materialforearthmatlayingasperdetail P -40
2
Earthing of 33 kV yard & equipment & 22 kV or 11kV
A.
For 3 no. Transformer earthing at 3 points (body & neutral) at
B
For 3 sets of LA's at 20 mtr each 3x20x2x1.05=126 mtr.
C
For 4 nos. 33 kV super structure at 20 mtr each 4x2x20x1.05 =168 mtr.
D
For 2 nos. VCB & CT body earthing at 10 mtr. Each
E
For earthing of 22 k V or 11kV super structure 80 mtr each
No
1
207300.00
207300.00
panels M.S. flat 20x60mm,wt. 1.2 kg/mtr. At 5% wastage 10 mtr. Each (3x3x10) 1.05=94.5 mtr.
(2x10)2x1.05 F
For earthing of 22 k V or 11kV super structure 15 mtr each 2x15x1.05 =31.5 mtr. Total(A+B+C+D+E+F)=542mtr,650kg=0.65MT
3
Weldingofrisersandcorrosionprotection@5%of2
4
GIwireno.6SWGforscreeningetc.
5
Eye block for screening
MT
0.65
56800.00
36920.00 1846.00
kg No
25 30
59.00
1475.00 67.00
2010.00
T o: -t a l
2 4 9 5 5 1 .0 0
S Rasy.
2 4 9 5 5 0 .0 0
PAGE-39
Schedule of cost and material Earthing Electrode (pipe type) ( refer REC Construction Std. J-2 ) S . N o. D e s c r i p t i o n oifte m 1
U nit
G.I.Pipe50mmdiawithholesof16mmdiaat150mm
No
Qt y
R at e
3
Am o u n t
R s.
Rs.
923.00
2769.00
from centre to centre for 2 mtr. D istance from bottom. 2
Workshop charges % 5item on no. 1
3
M.S.plates150x150x6mmfortwoconnection
138.45
4
50x6mmM.S.flatconnectionwiththemattomat
5
Nuts&boltsgalvanized16mmdia,50mmlong
6
Chequredplatecover500x500x6mmI.e.11.8kg T:o-ta l :S R - asy.
Kg Kg
1.13 4.8
Kg
0.5 Kg
57.00 57.00 77.00
11.8
81.00
64.41 273.60 38.50 955.80 42 39.7 6 42 40.0 0
PAGE-40
E 1.3 Schedule of cost & material for layout of Earthmat at 33/11 kV or 33/22 kV Sub-Station
S . N o . D es cr i p t io n oift em
U nit
Qty
Ra te
Am o u n t
Rs. 1
Rs.
M.S. flat 50x6 mm for ground mat including 5% wastage & weighing 2.4 kg/mtr. 2(37x10+27x5)x1.05=1060.5 mtr. or2545.2kgsay2.55MT
MT
2
EarthingpipeelectrodeasperdetailNo.E.1.2.
3
20 mm round, 3 mtr. Long & weighing 2.47 kg/mtr. 4 no.
4
electrode4x3x2.47=29.64kg,say30kg Weldingetc.ofpoints@5%onaboveitems To: t-a l SR :a-sy.
No.
Kg
2.55 12
30
56800.00 4240.00
57.00
144840.00 50880.00
1710.00 9871.50 2 07 301 .50 2 07 300 .00
PAGE-41
E 1.1 Extension Earthing of Equipments for 33 kV out going feeder S .N o . D e s c r ip t io n oift em
U n it
Qty
Rate
Amo u n t
Rs . 1
M.S. flat 20x6 mm weighting 1.2 kg/mtr at 10% wastage
a
For each set of LA's at 20 mtr each 20x2x1.1=44 mtr.
b
Structure at 20 mtr each 20x2x1.1= 44 mtr.
c
For 1 no. VCB & set of CT's body earthing at 10 mtr.
Rs .
each 2x10x2x1.1 =44 mtr. Totala+b+c=132mtr.Or158kgsay0.16MT d 2
Weldingofriserandcorrosionprotection@5%ofabove G.I.Wireno,6SWGforscreening
3
Eye block for screening
MT kg
10 No.
To : -ta l SR : -asy.
0.16
56800.00 59.00
6
67.00
9088.00 454.40 590.00 402.00 1 0 5 3 4 .4 0 1 0 5 3 0 .0 0
PAGE-42
Super structure for 33 kV bay for 1 no. out going feeder C.I.3(Extension) for each 33 kV VCB 33 kV super structure and busbar controlled tapping for each outgoing 33kV feeder from existing 33 kV line S . N o. D e s c r i p t i o n oift em
U nit
Qt y
Rat e
Am o u n t
Rs. A.
SU PER S TRU CTUR E
1
R.S. Joists, size 10,000x225x150=746kg say 0 .75 MT 37.3kg/mt2no.supportsI.e.(2x10x37.3)MT
2
MT
FoundationofR.S.joistssupportsasperdetailP-37
Rs.
0.75
56800.00
job
2
6130.00
12260.00
42600.00
MT
0.55
56800.00
31240.00
3 a) M.S. channel iron 125x65x6mm, X-arm @ 12.1 kg/mtr At 5% wastage for bus-bar,isolators,LA's,transformer etc. I 4650 mm long II 3725 mm long Total
=7 no. I.e. 447.73 kg =2 no. I.e. 102.47 kg =9no.I.e.550.20=0.55MT
b)A dd 5% workshopchargesonitem3a) 4
MT
M.S.nutsandbolts(offsize)withwashers
1562.00 Kg
25
77.00
S/ Tot(a :A-l) B.
1925.00 89 58 7.0 0
B U S - B AR
I
3 disc insulatorstensionstring completewith fitting P-54
II
3 disc suspension tension string complete with fitting P-54
III
ACSR conductor 100 mm2 at 10 % wastage
a
for busbar
b
For jumpers at 2 mtr. average
No.
6
No.
1347.00 3
1250.00
8082.00 3750.00
3.5x3x1.1 =11.55 mtr. 9 sets I.e. 2x3x9x1.1=59.4 mtr. Total(a+b)=70.95mtr.Say71mtr. cP
clamps G
mtr.
71 No.
S / Tot(a :B-l) Tot(aAl +B : -) SR :a-sy.
59.00 21
112.00
4189.00 2352.00 18 37 3.0 0 1 07 96 0.00 1 07 96 0.00
PAGE-43
Schedule of cost & material for 33kV y ard and colony fencing of 33/11 kVor 33/22 kV Sub-Station S . N o . D e s c r ip t io n oift e m
U n it
Qty
Rate
Am o u n t
Rs. A)
Expende d met al fe ncing aro und s witc hyard
1
M.S. angle iron 65x65x6 mm, 3 M long supports 0.6 M
Rs .
bent outwards at top & to contain 3 strands of barbed wire 0.4 mtr. Sagged and concreted in ground and 2 mtr. Vertical for gauge fencing. Supports required at every 2 mtr. For 127 mtr. Periphery of switchyard 64 nos. 2
No.
Expended metal at 10 % wastage 1.1x127x2=279.4
64
Sq. mtr.
1390.00
88960.00
280
896.00
0.126
58889.00
250880.00
say 280 sq. mtr. 3
G.I. Wire no. 6 SWG 6 strand all along the periphery to
MT
7420.01
hold the metal 10% wastage I.e. 1.1x127x6=833.2 M @ 0.150 kg/mtr =125.73 kg or 0.126 MT 4
Angleiron stayswitheye hooksetc.for 20%of supports
set
13
5
Cementetc.for concreting of supports&angleironstays
bag
90
6
Barbedwire3strandsof127mtrat10%wastage
kg
1243.00 348.00
84
5350.00
31320.00
62.00
5208.00
1.1x3x127=419 mtr. =84 kg S/T o(tA a l)
3 8 9 1 3 8 .0 1
B)
Gat e at colony & switch yard en tra nce
a
Gate cost of masonry
No.
3
b
M.S.angle iron 65x65x6 mm2 gates,1.5x2.5 mtr.Each
Sq.mtr.
7.5
2083.00
6249.00
824.00
6180.00
grill works 2 no. I.e. 2x1.5x2.5 = 7.5 sq.mtr. c
Wicket gate
No.
1
3549.00
3549.00 15978.00
C o so n2tfog.a t es: T o t(aAl+B : -) S Rasy.
3 1 9 5 6 .0 0 4 2 1 0 9 4 .0 1 4 2 1 0 9 0 .0 0
PAGE-44
Schedule of cost of yard lighting for 33/11 kV or 33/22 kV Sub-Station or 22 kV control point S. N o.
D e sc r i pt i onofi te m
1
8 mtr, 100 mm dia GI pipe poles for yard lighting
2
Mercury vapour lamp fittings
3
GIpipebracketformurcuryvapourlamp
4
Post Erection for gate
5
Clamps forGI pipe bracket
6
Undergroundcable16mm2foryardlighting
7 8
PVC cable size 6 mm2 for connecting mercury vapour lamp supply Junction box
U nit
Q ty
No. No. No. No. No. Mtr Mtr No.
5 17
R a te( R s. ) 4116.00
20580.00
4269.00
72573.00
459.00
7803.00
17 4 34 220 75 11
Am o u n t
1009.00 133.00
4036.00 4522.00
69.00 10.00 62.00
15180.00 750.00 682.00
To:t-a l
12 61 26 .00
S Rasy.
12 61 30 .00
PAGE-45
I. 1.2 Schedule of cost and control cable for 33/11 kV or 33/22 kV Sub-Station using 22 kV indoor type switchgear. (Refer P-53) S . N o . D es cr ip t i o noift e m
Unit
L e n gt h
Ra t e
Am ou n t
Rs. 1
2x2.5mm2screenedcontrolcable
Mtr.
605
2
4x2.5mm2screenedcontrolcable
Mtr.
3
12x2.5mm2screenedcontrolcable
Mtr.
4
3.5core95mm2aluminiumcablesuitablefor415V,AC
Mtr.
Rs.
49.00
29645.00
300
85.00
25500.00
125
233.00
55
168.00
29125.00 9240.00
To:t-a l
93510.00
R Ss a.y
93510.00
PAGE-46
Foundation of each of 33/11 kV or 33/22 kV Transformer (refer 33kV Sub-station standard layout) S .N o . D e s c r ip t io n oift e m
U n it
Qty
R at e
Amo u n t
Rs . 1
PCC1:4:8=3.8X1.8X0.25=1.026mm3
2
RCC1 :2:4=(3.5X1.5X0.2)-2(1.4X0.325X0.175)-(1.4X0.39
m3
1.026
m3
Rs .
2629.00
0.837
2697.35
8577.00
7178.95
X0.175)+2(0.68X0.35X0.175)=0.837 3
M.S. round 12mm dia 230 mm center to center at 18%
kg
73
57.00
4161.00
wastage (21x1.5+3.5x7x2)+(0.68x7x6x7x0.2)1.1=81.31 say 80 mtr. Or 72.9 kg, say 73 kg 4
M.S.rails133.8kg/mtr.2no.1.8mtr.Inlength 2x1.5x133.8=401.4 say 402 kg
5
M.Sangleironslapper75x75x8mm,2nos.of1.75mtr
kg
402
kg
57.00
31.2
57.00
22914.00 1778.40
length 1.75x2x8.9= 31.15 kg say 31.2 kg 6
M.S.angleiron65x65x6mmsupportsalongtheM.S.
kg
23.1
57.00
1316.70
rails 2x1.5x7.7=23.1 kg 7
GIdrainpipe100mmdia2mtrlong
8
Stoppers for Transformer wheels & horing of M.S. rails
mtr
2 L.S.
1029.00
2058.00 613.00
& angle iron with stoppers. To : -ta l
4 2 7 1 7 .0 0
R Ss a.y
4 2 7 2 0 .0 0
PAGE-47
I.1.2 Foundation of each of 33 kV or 22 kV CB (outdoor type) - [33kV Sub-station Standard layout] S . N o . D e s cr i p t i o n oift e m
U n it
Qty
Ra t e
Am o u n t
R s. 1
RCC1:2:4(2.3x1.75x0.05)+(2.2x1.65x0.5)=2.016m3
2
M.S.round12mmdiaat10%wastage
m3 kg
44
2.016 57.00
8577.00
R s. 17291.23
2508.00
1.1(10x1.65+8x2.2+5x4x0.6)=48.51 M =43.17 kg say 44 To : -t a l
19 7 9 9. 0 0
R Ss a.y
19 8 0 0. 0 0
PAGE-48
Schedule of cost of construction of 1 mtr. of OB Type Trench with cover . S. N o . D e s c r ip t i o n oift e m
U n it
1
PCC1:5:10=(1.13x0.075x1)=0.085m3
2
PCC1:2:4=(0.075x0.25x1)+(0.025x0.25x1)+
m3
Qty
Ra t e
0.085
Am o u n t
Rs.
Rs .
2895.00
246.08
m3
0.021
4718.00
99.08
m3
0.068
7559.00
514.01
3866.00
1163.67
80.00
6.80
0.5(22/7x0.05x0.05)=0.021 m3 3
RCC1:2:4=2(0.09x0.24x1)+(0.04x0.5x1)+ 0.043+0.025 =0.068
4
Brick Masonary1:6=2(0.24x0.6x1)+(0.25x0.05x1)=0.301 m3
5
10mmcementplasterincementmortar 1:4(22/7x0.05x1)+(0.25x1)=0.085 m2
6
M.S.round6mmdiaforat10%wastage=
m3 m2 kg
0.301
0.085 2.9
57.00
165.30
1.1(8x0.73+6x1) =13.02 mtr =2.9 kg 7
Angleiron40x40x6mmat10%wastage=0.49x3=
kg
5.15
57.00
293.55
1.47 mtr. Or 5.15 kg T:o- ta l RSsa.y
2 4 8 8 .4 8 2 4 9 0 .0 0
PAGE-49
Schedule of cost of construction of 1 mtr. of OC Type Trench with cover. S .N o . D e s c r ip t io n oift em
U n it
Qt y
Ra t e
Amo u n t
Rs. 1
PCC1:5:10=(0.98x0.075x1)=0.074m3
2
PCC 1:2:4=2( 0.025x0.175x1)+0.5(0.05x0.175x1)=0.018
3
RCC1:2:4=2(0.09x0.24x1)+(0.05x0.35x1)=0.061
4
BrickMasonry1:6=2(0.24x0.21x1)=0.101m3
5
10mmcementplasterincementmortar1:4=
m3
0.074
m3
0.018
m3
0.061
m3 m2
214.23
4718.00
84.92
8577.00
0.101 0.364
Rs.
2895.00
523.20
3866.00 80.00
390.47 29.12
(0.152+0.152)x1=0.864 m2 6
M.S.round6mmdiafor at10%wastage= 1.1(8x0.59+6x1) =11.792 mtr =2.64 kg
7
Angleiron40x40x6mm, 8.3mmlong=2.01kg T:o- t a l RSsa.y
kg
2.64 kg
2.01
57.00 57.00
150.48 114.57 1 5 0 6 .9 9 1 5 1 0 .0 0
PAGE-50
Cost of Trenches in 33/11 kV or 33/22 kV Sub-Station S. N o. D esc r ip ti onoifte m
U n it
L en g t h
R at e
Am o u n t
R s. 1
ConstructionofOBtypeofTrenchintheyardand
R s.
Mtr
91.4
2490.00
227586.00
Mtr
63.9
1510.00
96489.00
control room 2
ConstructionofOCtypeofTrenchintheyardand control room To: t-a l
32 407 5.00
S Rasy.
32 408 0.00
PAGE-51
Switch Room & Control Room Building of 33/11kV or 33/22 kV Sub-Station or 33 kV control point S. N o.
D e sc ri p t ionofi te m
1
Un it
2
A)
Ma nn ed Sub- Station
1
Sub-Station Building/ Control Room of 120 sq. mtr Covered Area
2
Cost ofLand (tentative)
Qt y
3
Sq. mtr Sq. mtr
Rate
4
120
Am o u n t
E l e ct r i ca l
R s.
R s.
s er vi c e
S t or a g e
Am o u n t
5
6
7
8
9
18376
7000
2205120
255.0
110256
T ot a l
275640
1785000
: - Tota l B)
Un -Ma nned Sub-S ta tio n
1
Sub-Station Building/ Control Room of 80 sq. mtr Covered Area
2
Cost of Land (tentative )
4 37 60 1 6
Sq. mtr Sq. mtr
: - Tota l
2591016
1785000
7000
80
18376 255.0
1470080 1785000
73504
183760
1727344
1785000 3 51 23 4 4
PAGE-52
TERMINAL EQUIPMENT AND ALLIED MATERIAL FOR EACH OF 33 kV OUTGOING FEEDER S.N o . D e s cr ip t io no ift e m
Is s .N o .
U n it
Qty
R a t e( R s .)
Amount for 33/11 kV S/Stn. on which PT already PT not Installed installed
REC STD No. A)
33 kV e qu ip men t
1
36kVVacuumC.B.
2
33kVcontrolandrelaypanel
3
33/11kV, single phase PT's
4
33kVmulticore,multiratioCT's
5
33kV isolator withE/Blade
6
33kVisolatorwithoutE/Blade
7
33kVlighteningarrestersmetaloxidetype
B
33 kV su per st ructure & b usb ar ext ension as pe r deta il P -42
job
1
107960
107960
107960
C
Ext ens ion of e art hin g etc. as pe r detail P-41
job
1
10530
10530
10530
D
Foun dation of cir cuit bre ake r as p er de tail P-47
job
1
19800
19800
19800
E
Additiona l co ntr ol ca bles core 4 2.5 mm2, 2x76 M core 22.5 mm2, 2x76 M 12 core 2.5 mm2, 2x76 M
F
12-/1979
No.
1
No. 3156 2705
No.
16/1981
Mtr Mtr Mtr
1
152 76
85 49
76 Mtr
Tren ch O.B. t ype (ad dition al ) as pe r det ail P-4 8
92976
77886
2
set
233 9
92976
77886
77886
71508
143016
143016
5371
5371
5371
12920 3724
12920 3724
17708 2490 31116
Contingencies Charges @ 3.0 %
22410
238070
Transportation charges as per statement P-63
32820 Total Grand Total Say Rs in lacs
150734
22410 11 17788
33534 31116
Erection charges as per detail P-75
Departmental Charges @ 11.0 %
17708 10371 87
S/Total Storage Charges 3.0 % @
268446 80601
30992 1
set
254440
268446
26867
3
set
52/1987
254440
268446
3
set
52/1964&
254440
1
33534
247040 32820 13703 08 161119
14 64715
15210 42
16 25834
1 5 .2 1
1 6 .2 6
PAGE-53 I.1.1.(a) CONTROL CABLE SCHEDULE FOR 33/11 kV OR 33/22 kV S/STN. WITH COMMON BREAKER CONTROL (Note this cable schedule is strictly for preparation of cost data, exact cable schedule be had as per site requirements from quarter concerned)
S .No .N am eo fc ir cu it
1
3-p h, 400 volt St n. Transformer supply
2
F ro m
Station
To
LT:ACBoard
transformer
Ind icat ion circuit
P ur po s e
Length in mtrs.
Tocarrysupplyfrom
2x2.5
4x 2.5
12x2.5
3.5 x95
mm2
mm2
mm2
mm2
--
--
--
50
transformertoctrl.room
I1
33kVcontrolpanel
I2
33 kV control panel
--do--
65
--
--
--
I2
33 kV control panel
--do--
56
--
--
--
I5
33 kV control panel
--do--
52
--
--
--
I6
33 kV control panel
--do--
47
--
--
--
I7
33 kV control panel
--do--
57
--
--
--
VCB
33kVcontrolpanel
Carryisolatorpositionindication
Tocarryindicationtocarry
70
--
--
--
72
--
--
--
circuit healthy check 3
AC c ir cu it
VCB
ACcontrolboard
VCB
Control panel
VCB(CT's) 33kVdiff.CT's D.C.Board D.C.Board 4
Em ergency light ing
D.C. Board
controlBoard controlBoard33kV controlBoard 11/22kVcontrolBoard light points
TochangeMOCBspring
--
Trip close
72 --
--
72
---
--
Metering,protection
--
--
72
--
Differentialprotection
--
55
--
--
Supplytotherelay
--
--do--
--
15
--
--
--
25
--
200
--
--
--
S u b - T ot a l: 10% as wastage of above T ot a l: S ay( Mt r s )
5 47
2 71
11 2
50
54.7
27.1
11.2
5
6 01 .7
29 8. 1
12 3. 2
6 05
3 00
12 5
55 55
PAGE-54
Analysis for 1 disc insulator, 2 disc insulator, 3 disc insulator Tension/ Suspension, Strain Strings S .N o . D e s c r ip t io n
u n it
Q t y R a t eR ( s .)
Amount ( In Rs.) 1 disc insulator String 2 disc in sulator Str ing T e n s io n
S u s p e n s io n
T e n s io n
S u s p e n s io n
3 dis c ins ulator S tring T e n s io n S u s p e n s io n
1
Disc insu lato r 90 KN
I
For disc 1 insulator String
No.
1
186.00
186.00
186.00
--
--
--
II
For disc 2 insulator String
No.
2
186.00
--
--
372.00
372.00
--
--
III
For disc 3 insulator String
No.
3
186.00
--
--
--
--
558.00
558.00
--
--
2
Eye socke t ball cleaves
I
For disc 1 insulator String
Set
1
135.00
135.00
135.00
--
--
--
II
For disc 2 insulator String
Set
1
135.00
--
--
135.00
135.00
--
--
III
For disc 3 insulator String
Set
1
135.00
--
--
--
--
135.00
135.00
3
Bend s ta ple se t/ ch ain link
No.
1
177.00
177.00
177.00
177.00
177.00
177.00
177.00
4
Dead end clamp f or 65 mm2 Cu -eq . Co ndu ctor
No.
1
477.00
477.00
--
477.00
--
477.00
--
5
Sus pension cla mps f or 65 mm 2 Cu- eq. C ond uct or No.
1
380.00
--
380.00
--
380.00
--
380.00
8 7 8. 00
1 1 6 1 .0 0
1 0 6 4 .0 0
T o t a:l-
9 7 5. 0 0
1 3 4 7 .0 0
1 2 5 0 .0 0
PAGE-55
Cost of installation of 11 kV Auto Voltage Booster S.N o.
D e s c r i p t io n
A)
EQ U IP M EN T
1
11 kV 1-Phase auto voltage booster outdoor type
U n it
Qty
No.
Rate
1
Am o u n t
Rs.
Rs.
1010103
1010103
100 Amps( set of 2 for 10% booster) 2
11kVG.Oswitchverticaltype200Amps(4826/77)
3
11 kV D.O. fuse unit (5792/70)
4
11 kV substation type LA's 0/70) (
B)
No.
1
No.
1
No.
3
4582 1717 493
4582 1717 1479
S ub-Total
10 17881 77800
S ub-Total
10 95681
11 kV fo ur pole s tr uctur e as per de ta il P- 56 Storage Charges @ 3.0 %
32870
Contingencies Charges @ 3.0 %
32870
Erection charges as per detail P-76
81680
Transportationchargesasperstatement P-61
11330 T o t al
12 54432
T o t al
13 92419
Departmental Charges @ 11.0 %
137988
LesscostofdismantledmaterialasperdetailP-59
-1950 G r a nT do t a l S aR yilsna cs
13 90469 1 3 .9 0
PAGE-56
Material cost of 4 Pole Structure on 11 kV line for installation of Auto Voltage Booster S .N o .
D e s cr i p t i o n oift em
Is s .N o .
U n it
Qt y
R at e
REC STD No. 1
Steel tubular pole mtr 9 long
2
Channel Iron 2400x100x50x6 mm
2713/80
I
For line & four pole structure =6 nos.
II
For G.O. switch & G.O. fuse unit =4 nos.
III
For foundation of Auto voltage booster =6 nos.
3
Half clamps with nuts bolts &
No
nos. 16total = 4
4
No
9536
16
No
6
11kVpininsulatorswithsidetie.Alongwith
3./71 G-2/1975
No
G-2/1973
Set
1862
8
No
20848
133
No
11kVstraininsulatorcompletewithfittings
Rs. 38144
1303
14
--do-Full
5
Amo u n t
Rs.
216
6
1728
975
6
5850
105
630
helically formed fittings. 7
Stay set complete with guy grip
8
Earthing set complete
9
Danger plate
10
Barbed wire
11
Set of jumpers with PG clamps (each of 3 nos.)
I-1/1972
5
3475
3
1236
3708
No
2
110
220
10
62.00
Kg Set
695
Set
2
357
620 714
T o t al R s . Sa y
77799 77800
PAGE-57
Cost of installation of 1 no. 11 kV 3 ph, Auto Reclosure / 11kV Sectionalizer S .N o .
De s cr ip t ioo nitfe m
U n it
Q ty
R a te
Amount(Rs.)
Rs.
11 kVAuto-
11 kV3-ph line
reclosure 1
11 kV 3-ph auto reclosure
2
11 3-ph kV , sectionalizer
3
S/Stn kV 11type LA's
4
Materialcostfordoublepolesstructure bedasperdetailP-58
Storage Charges @ 3.0 %
No.
1
No.
497254
1
No.
310709
3 No.
493 1
40520
310709
1479
1479
40520
S u b - T o t al
Contingencies Charges @ 3.0 % Erection Charges as per detail P-76
40520
53 9 2 5 3 16178
3 52 7 0 8 10581
16178
10581
62110
Transportation Charges as per statement P-61
62110
11330 Total
Departmental Charges @ 11.0 %
11330 64 5 0 4 8
70955 Total
LesscostofdismantledmaterialasperdetailP-59 SaR yis lna cs
4 47 3 1 0
49204 71 6 0 0 3
-1950 G r a nT do t al
Sectionalizer
497254
4 96 5 1 5
-1950 71 4 0 5 3 7 .1 4 1
4 94 5 6 5 4 .9 4 6
PAGE-58
Material cost of Double Pole Structure on 11 kV l ine for installation of Voltage Booster/ Auto line sectionalizer S . N o.
D e s c r i p t i on oifte m
I s s . N o.
U nit
Q ty
Rat e
REC STD No. 1
Steel tubular poles mtr 9 long
2
Channelironcrossarm(2400x100x50mmx6mm)
2713/80
3
Angle iron bracing set (750x50x50x6mm)
4
Channel iron cross arm (980x100x50x6mm)
5
11kVstraininsulatorscompletewithfittings
6 7
Stay set complete with guy trip Earthing set complete
8 9
No.
2
9536
No.
4
No.
G-2/1976 T-1/1972
5212 384
532
6
Set
19072
192
2
No.
Rs.
1303
2
No. 3./71
Am o u n t
Rs.
1064
975
5
5850
695
3475
Set
2
1236
2472
Danger plate
No.
2
110
220
Barbed wire
Kg
8
62.00
10
M.S. half clamps with nuts bolts &
No.
11
M.S. Full clamps with nuts bolts &
12
SetofjumperswithPGclamps(eachsetof3no.)
No. Set
2 6 2
133 216 357
496 266 1296 714.00
Total :R s. S a y
40521.00 4 05 20
PAGE-59
Credit for Material to be Dismantled S .N o .
D e s c r ip t io n
U nit
Qty
Rate
Am o u n t
Rs. 1
mtr 9 long PCC poles
No.
2
AngleIronbracingset(750x50x50mm)
3
ChannelIroncrossarm(1500x100x50mm)
4
11kVpininsulator&sidetiewithpinA/whelicallyformed
1
No.
1
No. No.
Rs.
2141(1-0.3x15)= 1178 383(1-0.3x15)= 1
3
816(1-0.3x15)= 105(1-0.3x15)=
211
1178 211
449
58
449 174
fitting 5
Top Clamp
No.
1
71(1-0.3x15)=
39
39
T o t a l: Less 5% dismantling charges
2051 -102.55
Total:R s .Sa y
1948.45 19 5 0 . 00
Page- 60
Cost of installation of 11 kV Shunt Capacitor Bank S .N o . 1
D e s c r ip t io n
U n it
Qty
Rate
Amount(Rs.)
Rs .
1 .2M VAR
1 .8M VAR
11 kV Shunt Capacitor Bank along with Series Reactor
a MVAR 1.2
No.
1
628328
628328
-----
b MVAR 1.8
No.
1
865012
----
865012
Su b -T o t a l Storage Charges @ 3.0 % Contingencies Charges @ 3.0 % Erection charges as per detail P-70 Transportation charges45.00x2(76+33)
38600
SaR yils n acs
18850
25950
38600
9810
7 1 4 4 38 78588
Grand Total
86 5 0 1 2 25950
9810
T o ta l Departmental Charges @ 11.0 %
6 2 8 3 28 18850
96 5 3 2 3
106185 7 9 3 0 26
7 .9 3
1 07 1 5 0 8 1 0 .7 2
PAGE-61
Abstract of Transportation Charges S .N o . D e s c r ip t io n
U n it
Ro ad
Ma nua l
Tr an sp or ta tion 1
U n lo a d in g&
Tr an sp or ta tion
Total
St acking o f ma te rial
3 3 k V li n e m a t e r ia l a
Co ndu ct or size ACSR 6/ 1/4.72 mm I PCC On poles
Km
15840
34070
--
49910
II On steel tubular poles
Km
15840
20050
--
35890
III On 60% PCC 40% & S/T poles
b
Km
15840
28460
--
44300
Co nd ucto r si ze A AAC 7/ 4.26 mm I PCC On poles
Km
15840
33760
--
49600
II On steel tubular poles
Km
15840
19730
--
35570
III On 60% PCC 40% & S/T poles 2 . IM a t e r ia lf o r3 3 /1 1k VS u b - S t a t io n( M a n n e d ) II M a t e r ia lf o r3 3 /1 1k VS u b - S t a t io n( U n - M a n n e d ) III M a t e r iafl o r3 3 /1 1k VT e r m in aE l q u ip m e n t IV M a t e r iaflo r1 1k Va u t oVo lt a g eB o o s t e r / Sectionalizer/ Autoreclosure
Km
15840 N o. N o. N o. N o.
28150
--
297 000
--
297 000 108 00
530 x30= 15 900 --
280 80
---
43990
530 x30= 15 900 53 0x3= 47 40 53 0x1= 53 0
31 2900 31 2900 3 2820 1 1330
PAGE-62
Transportation Charges for 33 kV line and 33/11 kV Sub-Station Average distance of divisional store to central stores (Km) = Ave r a g eo u tt u r no fd e p a r t m e n t a lt r u c kinR s .Pe rKm=
77.00 4 5 .0 0
Transportation charges for 1 km of 33 kV line material Average distance of divisional store to central stores (Km) =
77.00
Average lead distance from Divisional store to site of work (Km) =
11.00
Line material of 1 km of 33 kV line length requires 2tripoftruck,sototaljourneyoftruck=(77+11)x2x2= Average out turn of Departmental truck in Rs. Per Km =
352.00 45.00
Transportationchargesforitemoflinematerial( 352x45.00)=
15840.00 S a yR s=.
1 5 8 4 0 .0 0
Transportation charges for 33/11 kV Sub-Station (Manned) Average distance of central store to Divisional store (Km) =
77.00
Average lead distance from Divisional store to site of work in Kms =
33.00
Carriage of material for 1 no. 33/11 kV Sub-Station requires 30tripsoftruck,thereforetotaljourneyoftruck(30x2(77+33))=
6600.00
Transportation Charges for 1no. 33/11kV Sub-Station material (6600x45.00) = S a yR s= .
297000.00 2 9 7 0 0 0 .0 0
Transportation charges for 33/11 kV Sub-Station (Un-Manned) Average distance of central store to Divisional store (Km) =
77.00
Average lead distance from Divisional store to site of work in Kms =
33.00
Carriage of material for 1 no. 33/11 kV Sub-Station requires 30tripsoftruck,thereforetotaljourneyoftruck(30x2(77+33))=
6600.00
Transportation Charges for 1no. 33/11kV Sub-Station material (6600x45.00) = Say Rs.=
297000.00 297000.00
PAGE-63
Transportation Charges for Terminal Equipment and 11 kV auto voltage booster/ line sectionalizer/ auto reclosure Transportation charges for T erminal Equipment 1
Average distance from central store to Divisional store
2
Average lead distance from Divisional store to site of work
=
3
Carriage of material for 1 no. Terminal Equipment (3 trips); Total
4
Average out turn of truck
5
Transportation charges for 1 set Terminal Equipment
77 kms = 27 kms
=
3x2 ( 77+27) =624
=
Rs. 45.00 per Km =
Rs. 624x45.00
Say Rs.=
28080
Transportation charges for 11 kV auto voltage booster/11 kV line sectionalizer/ 11kV auto reclosure 1
Average distance from Central store to Divisional store =
77 Kms
2
Average lead distance from Divisional store to 33/11 kV Sub-Station site =
33 Kms
3
Average lead distance from 33/11 kV, Sub-Station site to site of installation of 11 kV auto voltage booster/ 11 kV line sectionalizer/11kV auto reclosure=
4
Totaljourneyoftruck(1trip)=
5
Average out turn of truck =
6
Transportation charges for 1 no. 11kV auto voltage booster
10 Kms 1x2(77+33+10)=240 Rs. 45.00 per Km
/11kVsectionalizer/11kVautoreclosure=
Rs.240x45.00 Say Rs.=
10800.00
PAGE-64
Average Distance from Divisional Store to Site of Work Sr.
N a me oS f u b - S t at i o n
No.
O p e r a t in g D i vn .
33 kV T a p p in g
t oD ivnS . tore
Po in ta t Bassi
Distance from divisional store to Su b - St a t io n( Km)
1
Chauntra
Joginder Nagar
2
Chowari
Dalhousie
Lahru
45
40+5 (line length)
3
Sandole
Sarkaghat
Jaisinghpur
40
35+7 (line length)
Total :-
15
3 3k VT a p p in gP o in t( km )
100
Aver ag e dist an ce of Su b- Statio n Fr om Division al st or e
=
10 0/3=33 .33 Say 33 Kms
Aver ag e dist an ce for ca rr iage of 1 km of 33 kV line mate rial Aver ag e dist an ce for ca rr iage of Te rminal Eq uipmen ts
= =
32 /3 = 10.66 Say 11 Kms 80 /3= 26.6 6 Say 27 Kms
5+20 (line length)
80+32 (line length)
R e ma r k s
PAGE-65
ANALYSIS OF WORKING DAYS IN THE YEAR No. of Days S .N O
D E S CR I P TI O N
1 2 3 4 5 6
TOTAL NO. OF DAYS IN A YEAR SUNDAY HOLIDAYS EARNED LEAVE CASUAL LEAVE GAZZETED HOLIDAYS (RELIGIOUS, NATIONAL, LOCAL) WORKING DAYS LOST DUE TO UNFORSEEN CIRCUMSTANCES I.e. HEAVY RAINS, ROAD BLOCKADE, SNOWFALL AND NON AVAILABILITY OF MATERIAL ETC.
7
TOTAL WORKING DAYS IN A YEAR = 365-(52+30+12+24+10) =
8
TOTALWORKINGDAYSINAMONTH = 237/12=
A S . N oD e s c r i pt i o n 1 2 3 4 5 6 7 8 9 10 11 12 13 14
365 52 30 12 24 10
237 20
Details of labour cost per day P a yp e r d a y P a yp e r d a y F o re ma n L i n em a n PB-3 PB-2 10900-34800 6400-20200 22850.00 13300.00 4550.00 3050.00 19728.00 11772.00 250.00 250.00 138.00 138.00 250.00 250.00 300.00 300.00 140.00 140.00 1000.00 800.00 0.00 100.00 0.00 50.00
Pay Band ScaleofPay AverageBasicpay GradePay DA @ 72% (On Basic+Grade Pay) CompensatoryAll. ElectricityAll. MedicalAllowance ConveyanceAll. WashingAll. House Rent Risk Allowance DangerAllowance TA for 7 day a month Foreman@Rs160/-perday 1120.00
--
P a yp e r d a y AL / m a n PB-1 5100-10680 7890.00 1700.00 6904.80 250.00 110.00 250.00 150.00 140.00 700.00 50.00 50.00 --
P a yp e r d a y T/m a t e PB-1 5100-10680 7890.00 1550.00 6796.80 250.00 110.00 250.00 150.00 140.00 500.00 30.00 50.00 --
L/Man @ Rs 160/per day -1120.00 --ALM @ Rs 130/- per day --910.00 -T/mate @Rs 130/-per day ---910.00 Total:50326.00 31270.00 19104.80 18626.80 Totalworkingdaysinamonth 20.00 20.00 20.00 20.00 PayperdayRs. 2516.30 1563.50 955.24 931.34 Say for 2013-14 Rs. 2 5 1 6 . 0 0 15 64.00 9 5 5 .0 0 9 3 1 .0 0
Per day working wages for Beldar
B 1 2 3 4 5 6 7
Dailywages(Rs.) No. of Sundays in a year No. of festival Holidays No.ofpaidholidaysinayearI.e.15thAug, 2nd Oct & 26th Jan No.ofCasualLeaveinaYear No.ofEarnedLeaveinaYear Deduction of working hours lost due to unforeseen circumstances I.e. heavy rains, snow falls, road blockages & non availability of material.
= =
150 52 days 11days 3days
= = = =
12days 20days 10 days
=
Total working day in a year
=
365-(52+11+3+12+20+10) = 257 days
Actual wages of Beldar per day
=
150x365/257 = 213.04
Say with escalation of 10%for 2013-14 (Rs.)
=
2 3 4 .0 0
Abstract for Manual Carriage S r. No.
De s c r i p t i o n
1
2 Manual carriage of material for 1 km of 33 kV line Assuming avrg lead distance of 1 km from road head Steel poles 10 M long PCC poles M.S. cross arms, bracing sets insulators nuts & bolts Etc.
1 2 3 4 a b c
For em an @ Rs . 251 6. 00 No. of No w ag es days 3 4 5
L / Ma n @ R s . 1 5 6 4 . 0 0 No. of w ages days 6 7 8
No
AL M@ Rs . 9 55. 00 T /m at e @Rs . 9 31. 00 Bel dar @ Rs . 2 34. 00 No. of No. of No. of No w age s No w ages No wages days days days 9 10 11 12 13 14 15 16 1
---
---
---
---
---
---
---
---
---
--
--
--
--
--
--
--
--
--
Stay set complete with stay wire --ACSR 6/1/ 4.72 cond. -AAAC 7/4.26 mm -GI wire 6 SWG -Total for S/P (ACSR 6/1/4.72) -(AAAC 7/4.26) -or PCC poles (ACSR 6/1/4.72) -(AAAC 7/4.26) Manual carriage for 1 km line with PCC poles Say Rs Manual carriage for 1 km line with S/T SRasy. poles
--------= Rs
----------------ACSR6/1/4.09= 34070 34 070 20045 20 050
---------
------------------------=A AAC7/4.26mm= 33758 337 60 19733 197 30
---------
=
1 1
6 9
5586 8379
9 14
6 9
8424. 19656
1
1
931
-1 1 ------
-1 1 ------
0 931 931 0 7448 7448 10241 10241
11
1
1716.
5 9 7 2 -----
0.75 1 1 1.5 -----
585.0 1404. 1092. 468.0 12597 12285 23829 23517
Detailed analysis of Labour Rates for 33 kV line with 6/1/4.72 mm ACSR/ AAAC 7/4.26 SR. No.
D e s c r i p t io n
1
2
Fo re ma n @ of R s. 25 16 .0 0
3
A) Surv eying & S tacking (33 k V lin e) aP reliminary,actualsurveyingprofiling & final survey of 1 km of line b Stacking km of 1of line work -cC amp shifting T o t:a-l
1
6
Erec tion of dou ble PC C pol e stru ctu re Digging pits of -Erectionoftwopolestructure 1 DrillingofpolesinX-armscrossbracing -FixingofX-armstringinsul.Crossbracing 1 Fixingofbarbedwiredangerplateetc. -Filling of pits ramming & -Painting of steel cross arms etc. -T o: -t a l
C)
Er e ct io no fd o u b leS /Tp o les t r u ct u r e (As per head "B" for PCC (9.75 M) Placingoftemplates&filling ofconcrete painting poles of T o:t-a l
0 0.5 --
No
5
6
No. of days 7
2
2 1258 163 54
6 2 2 --
No
8
9
18768
6256 0.5 --
ALM @ of R s. 95 5.00
wages
--
T/ ma te @ of R s. 93 1.00
No. of wages days 10 11
--
--1564 -2658 8 --
0 0 --
12
---
-0
14
--
6 2
0 --
0
No. of days 16
15
6 6
--
0
Be ld ar @ of R s. 23 No
wages
0
---
0 --
No. of days 13
No
wages
8424.00
2808.00 6 0.5 ---
1
42
9064.00 702.00 11 934
S a yR s .
-0.25 -0.5 ----
--
0 -629 -0 -1258 1 0 -0 -0 -1 887
0 .7 5
--
--
1 887
0
--
--
--
0
0 0
-0.5 ----
-1
0 782 0 0
1 1 1 --
0
--
-782
0 .5
--
0 1 887
--
---
--
D) Erection of double PCC pole structure (Dead End) a (9.75Mdead , end)asperS/headB -0.75 1887 b Fixingofadditionalcross-armsfordead 1 0.25 629 end, 3 no. addl. String insulator dead end clamp only
cP T o ainting of arm :t-a lcross
L/Ma n @ of R s. 15 64 .00
wages
15096
-1 --
B) a b c d e f g
a b
No. of days 4
No
782
0
--
-0.25 0.125 0.5 0.25 ---
0 1 238.75 2 119.38 2 477.5 1 238.75 1 0 1 0 -1 0 7 4 .4
1 0.25 0.125 0.5 0.25 0.5 --
--
--
--
--
--
--
0
1 0 7 4 .4
0
--
1
--
0.5 1
782 0.25
2 5 1 6 --
--
--
391
--
0
1
1 1 7 3 --
465.5
0 -1 0 7 4 .4
782
--
0.5
1074.4 -0.25 238.75
--
931 6 0.6667 936.00 465.5 12 0.25 702.00 2 232.75 --0.00 35 465.5 --0.00 298 232.75 1 0.25 58.50 530 465.5 4 0.5 468.00 933 0 2 0.5 234.00 234.0 2793 2 3 9 8 .5 0 S a yR s . -2793 --2 3 9 8 .5
--
-1
0 1 3 1 3 .1--
2 0 2 3 2 5 8 .5
2793 -0.25 232.75
--
0
0.5 0.5
---
1 3 0 2 5 .8
--
234.00 699. 234.00 2 8 6 6 .5 0 S a yR s .
2398.50 8934.8 0.00 1
0.125
29.252 4 2 7 .29 75 S a yR s .
E)
a b
F a b
c
Erec tion of dou ble po le S/ T pole s (Dea d End) structure (dead end 9.75 M long) As per sub head (C) -As per item b+c of S/head (D) -T o t:a -l Ea rt hing of 33 kV line Digging pit of Fixingofearthred,clampearthwireand connecting to the structure Fillingofthepit with material&earth To : -t a l
---
--
1887 -629 -2 5 1 6 .0 0
--
0
--
--
0
--
--
0
---
--
0
782 391
--
--1 173
0
1
0.5
782
--
--
0
---
-1 -782
1074.4 -238.75 -1 3 1 3 .1 3
--
0
0.5
477.5
--
0
---
---
1 4 7 7 .5
3258.5 -232.75 -3 4 9 1 .3
--
0
--
0
0.25
232.75
--
6 2
6 2 3 2 .7 5
2866.50 98 29.25 1520 2 8 9 5 .7 S a yR s .
--
1 0.5 0.25
1404.008 234.00 1493.5 351.00
583.75 1 9 8 9 .0 0 S a yR s .
1 G aD b c d
2 Erection of sta y set of 3 3 kV l ines igging pit of Fillingofstay rod, itstemplateetc. Filling of the pit Nuzzlingofstayrod,anditslighting To : -t al
H I 1 a b
Fi xi ngo fjum p er s( 1s e t)f o r33k Vl in e S tlrk (io i3 n kV nf3 m e)g 1ionfg GI wire LayingofGIwire Strainingandsagging
3 --1
1
0. 25
1
3 aD Earthing igging pits of (s) 2 no. b Fixingofearthrod,earthwire&conn. cF illing pits of d Stringingofcatenarywire&fillingwith poles & earth connections To:t-al
34 1. 5
0.125 0.375
1 0
0
2
1
7
-0.125 -0.125
1
8
9
0 -195.5 -0 -195.5 -391
0 . 25
1 1 --
---
0. 5
--
0
2 20 .7 5
--
--
10 --
11 0
--
12 1
0
---
0 .2 5
1 1
16 2
13
14
2 0.5 --
--
--
0
--
1 --
0
1 0
1.25 6
--
-0.125
0
--
--
-0.4 --
--
0
---
-1
1 60 3. 1
0.25 -1
4
0
0 0 .5
0.125 0.375
5
0 9 31
0 10
146.25 438.75
0.00 0. 5 S ayRs .
4 58
0.625 1163.8 12 0.625 1755.00 0.625 1163.8 10 0.625 1462 0.875 1629.3 12 0.875 2457.00 0.875 1629.3 10 0.875 2047 0 --0.00 2519 -2 79 3. 00 --4 21 2 S ayRs . --2 79 3. 00 --1 57 S ayRs .
33 42 . 50
0 382 0
0.25 --
0 195.5
2387.5 0 1 .7 5 33 42 .5
5
0.625 1193.8 2 0.625 1193.8 2 2 0.625 1193.8 2 2 0.625 1193.8 2 0.5 955.00 ----33 42 . 50 --
1
391
16
0.25 234.00 -0.00 51 0.25 234.00 4 -0.00 4 46 8. 00 S ayRs . 1 0. 25 39 .0 0 76 0. 00
0.125 232.75 0.375 698.25
2
2
1
0
2
2
--
0
-0.25
0
0 625.6 --
391 --
--
0
0
0.25 --
0.125 238.75 0.375 716.25
2
54 74
-0.4 --
1
2
0.625 1955 0.625 1955 0.625 1955 0.625 1955 1564.00 2 -54 74 --
1
0
---
2
195.5 586.5
15
0.25 232.75 4 -0 -0.25 232.75 4 0.125 116.38 -58 1. 88
-0 0 0
1
1955 2 1 . 75 27 37
--
0
---
2
--
0 --
--
2
--
---
1.25
3
0 0
--
--
1
0 --
--
0.125 0.375
1
31 45
---
--
1
12 58
--
---
--
314.5 943.5
0.625 1572.5 0.625 1572.5 0.625 1572.5 0.625 1572.5 0 2 -31 45
1
Tot aA l AAC7 /4 .2 6m m Road p ath st ream e tc. Erection of 2 no. PCC poles 8 M long Digging pits of Erection of poles illing pits of ramming & Erection of 2 no. stay sets (LT) Digging of pits Fixingofstayrod,nuzzling&tightening Filling of pits
6
SRasy.
2 a
J) 1 a b cF 2 a b c
5
-0 -0.125 314.5 1 -0 -0.125 171 1 48 5. 5
1
c Binding with insulator Tot a: -l 100 m m2 33 kV ( SC ) l ine LayingofconductorACSR (AAAC) b StrainingandsaggingACSR (AAAC) c Windingwithinsul.fixingofbirdguards Tot aA l C S R6/ 1/ 4. 7 2m m
4
0 238.75 0
-0 238.75 0 119.38
-0.125
--
-0.4
2 --
-1 -1 1
-1 --
97 8. 88
0
0 744.8 1
0.333333 10.33 -0.00 -0.33333 310.33
6 4 1
0.33334 68.00 0.6667 624.00 234.00 234
6 -2
0.33333 310.33 6 -0.00 -0.33333 310.33 1 -0.00 4
0.3333 468.00 0.00 62 0.5 234.00 0.25
-1 0.125
351.00 0.00 62 234.00 117.00 4
1 98 6. 13
2 73 0. 0 S ayRs .
Detailed analysis of Labour Charges for 33/11 kV Sub-Station SR. Description No . 1 I a b c d e f g
II a b c
III
2 Laying of earth material rods & pipe Excavation for laying earth metal at 0.75M depth (37xM)= 22nos. & (25x1) LayingfaultweldingErectionearthriser &painting other treatment after welding. Digging of M 3deep pits for solid earth -rods of Mat ( 4 no.)
1
Er ecti on of R .S . jo is ts 10000x225x150 mm Digging pit of ErectionofR.S.10000x225x150mm with muff complete etc. Filling pit of T:o-tal
0.5
1
--
0 1
0
1
--
--
--
-1
-0.5
--
--
1
0 1258 0 1 258 0.25
-1
-1
1
1
-1
-1
0
--
1564 0
--
0 2516 2 516
0 1
-1
--
0
955
18 768
--
-1
-0.5
--
--
0
--
--
---
---
1
1
-1
-1
391
0 0 1564 156 4
0 1564 156 4
--
4 775
0 477. 5 --
-1
-1
1
1
-1
-1
0
2
2808.00 1
5
5586
--
8
8394.00
1170.00
3
1955 1
221
468.00 2987.00 11232.00 11232.00 1
11
--
4212.00
7722.00
--
-S ayRs .
6205 22692.0
5 569
0.5 0.5
465.5 465.5
5 6
0.5 0.5
585.00 702.00
--
--
0
5
0.25
292.50 15 79. 50 S ayRs . 0.25 117.0 S ayRs .
931 1
0 1 955 1 955 1 1 910
955
2
6
28080.00 36
3
1 1
0
0 955
6
0
6
6
0
3
0 477.5
0 0.25
---
2
--
0 0
--
20
2793
5586
--
0
---
1
--
--
5586
3 6
955
--
6
1
1
1
--
T/mate @ of R s. 931.00 Beldar @ of R s. 23 No. of No. of wages No wages days days 12 13 14 15 16 1
No
1
2865
---
629
0 2516 2516 5 032
1
0
3 --
9384
--
--
1
1564
3
1132 2
ALM @ of R s. 955.00 No. of w ages days 9 10 11
No
--
4692
1
2
--
1
1
0
1564
3 --
2516
--
1
1
---
L/Man @ of R s. 1564.00 No. of w ag es days 6 7 8
No
1
7548
--
Erection of each cross arms of various sizes including drilling of pole&fixing clamps etc.
Foundation of transf ormer Digging pit of PRCCmasonryfoundationincluding filling of pit & laying of rail etc. T o: -tal
1258
3
Fixing of solid earth rods with earth mat -Digging of 3.15 M deep earth pit for 11 no. -pipe type electrodes for earthing Fixingofpipetypeelectrodeswithearth 1 mat Fillingofearthexcavateditema,b&d -filling of item c, e, to be done with charcoal & salt preparation of demanded pits for later treatment for pipe T ota: -l
IV Foundation of VCB aD igging pit of bP CC masonry foundation c Erection of steel structure T o:t-al V a b
Foreman @ of R s. 2516.00 No. of No w ages days 3 4 5
1 1
0.25
0.25 1 1
1 1
232.75
232.75 3 931 6 931 -209 4. 8
931 931 1 862
12 10
2
2
--
0.25 1
175.50 1404.00 0.00 5 15 79. 50 S ayRs .
1 1
2808.003 2340.00 8 51 48. 00 S ayRs .
1
2
3
VI Laying o f tre nches (p er Mt rs.) a Earth excavation b trench lining etc. T:o- t al
--
4
-0.5
1
5
6
0 1258 12 58
VII Erection of 1 se t of B us b ar
1
VIII Installation of isolator
2
0.875
IX
Installation of Lightening Arrestors
1
X
Installation of PT 's (s ingle p hase)
XI
Installation o f D.O . fus e uni t
--
-0.5
1
0.66667 1677.33
7
8
9
0 782 782
10
--
--
--
11
12
0 0 0
--
--
13
-0.5
1
14
0 465.5 46 5. 5
15
3
0.6667 468.00 0.5 351.00 81 9. 00 S ayRs . -0.0 S ayRs . 0.875 819 S ayRs . -0.0 S ayRs .
3
--
--
0
1
0.667
636.67
2
0.66667
1241.3
--
4403
4
0.875
5474
4
0.875
3342.5
--
--
0
4
0.375
943.5
1
0.375
586.5
--
--
0
1
0.375
349.13
--
1
0.375
943.5
2
0.375
1173
--
--
0
2
0.375
698.25
2
1
0.75
1887
1
0.75
1173
2
0.75
1432.5
2
0.75
1396.5
--
XII Installation & commissioning of power tr an s f or mn (e1iron.cl ud indge hydra t io n)
3
5
37740
3
5
23460
3
5
14325
3
5
13965
18 S aRys .
XIII Installation of S/Stn tr ansformer
3
4
30192
3
4
18768
3
4
11460
3
4
11172
12
XIV Installation of VCB with CT 11 kV voltage boo slki1 tsn V e1ee rc ti o nal i z e r
3
2
15096
3
2
9384
3
2
5730
3
2
5586 6 SRasy.
XV Erection of 1 set of ju mper inclu. PG clam ps
1
0.25
629
1
0.25
391
1
0.25
238.75
1
0.25
232.75
--
XVI Connection set
1
0.25
629
1
0.25
391
1
0.25
238.75
1
0.25
232.75
--
XVII Installation of 11 kV incoming panel
3
5
37740
3
5
23460
3
6
17190
--
--
0
6
XVIII Laying of control cable
2
3
15096
2
3
9384
2
3
5730
2
3
5586
--
XIX Installation of 11 kV out g oing feeder cbop uuo a sprnlelr
3
5
37740
3
5
23460
3
6
17190
--
--
XX a b c
Laying of power cable (per no. of 50M) Digging earth of Laying of cable in bricks &sand 1 Filling earth of T:o - tal
XXI Connecting the c able ends to ca ble ekpi too xrybox
--
-0.75
--
0
2
--
1887 --
1 0 18 87
0.75
3774
-0.75
--
0
2
--
1173 --
-0 11 73
0.75
2346
---
--
0
--
0
--
--
0
---
--
0
--
8 0
0.5 0.75 0.5
0
0
2
0.75
1396.5 RsS.ay
--
175 0.0 4212 9 37 0
0.5 1404 S ayRs . 2 2808 3 86 00 .0 0
6
4
0.375 S ayRs . -S ayRs . 1
-0.0 S ayRs . -0.0 S ayRs . 1 1404 S ayRs . -0.0 S ayRs . 1 1404 7 97 90 .0 0
8
0 --
0
--
0 RSsa.y
16
936.00 1404.00 446 468.00 2 80 8. 00 S ayRs .
-7 520 . 00
0.0
1
2
3
XXII Installation of Stn. a Batterysetwithtricklecharger&rectifier. bA .C. control board c Fire fighting equipment To:t-al
4
5 2 --
XXIII Yard lighting
c
Fillingthepit&muffingofangleiron support ixing barbed of wire T:o - tal
2 --
3
XXIV Erection of yard fencing ( 1 Mtr) a Digging pit of b Erection ofangleiron supports
dF
4
----
---
6604.5
0 0 1 0
2 --
3
8
-0.75
4105.5
0 1173 782
--
9
31280 4 6256 2 0 -3 753 6 0.875
0.5 --
0
7
5
-1
0 --
6
50320 4 10064 2 0 -60 38 4 0.875
---
5
1
5 2 --
3
-1
0 19 55
12
--
0 -0.5
3
---
477.5 -16 71 .3
13
--
2506.9
0 716.25
477.5 0.5
11
19100 -3820 -0 1 229 20 0.875
-0.75 0.5
1
10
--
2443.9
0 0 2 0
2808.00 103 1404.002 351.00 4 56 3. S ayRs . 0.25 1053 S ayRs .
1 0.5
18
0.5 0.75 0.5
1 0
16
2
2 2
0 --
15
6 0 6 465.5 3 46 5. 5
0.875
---
14
234.00 351.00
234.00 0.5
1493.
117.00 93 6. 00
PAGE-67
al D/C 19 42288.00 9064.00 3524.00 54876.00 54880.00 1867.00 2035.25 704.25 4708.00 530.00 933.50 468.00 11246.00 11250.00
699.50 234.00 9868.38 9870.00 8934.88 1491.50
29.25 10455.63 10460.00
9868.38 1520.75 11389.13 11390.00 8398.00 1493.50 583.75 3481.25 3480.00
PAGE-68 19 466.75 510.00 466.75 482.88 1926.38 1930.00 1526.5 1520.00 1127.75 3383.25 4342.50 8853.50 8850.00 7640.00 7347.50 8807.50 8398.00 2519.00 18966.50 18970.00 18264.50 18260.00
468.00 2376.40 234.00 778.33 629.75 544.33 661.33 629.75 544.33 431.88 7298.11 7300.00
PAGE-72
Erection/ Labour charges for construction of 1 km of 33 kV line on 9.75/10 M long Double Pole Structure with ACSR 6/1/4.72 mm Conductor with single continuous earth wire . S.N o.
Description
Qty.
Unit
Ra te( Rs .)
Refer S/head
1 Surveying & stacking of line
A
2E rection of PCC Pole structure( susp)
1
B
3E rection of S/T Pole structure( susp)
No.
4
No.
D E
7 Erectionof60%PCC&40%S/TPolestructure(deadend)
2 2
--
54880
No.
4
--
5 ErectionofPCCPolestructure(Deadend) 6 Erection ofS/T Pole structure(dead end)
Km
4
C
4 Erectionof60%PCC&40%S/TPolestructure(susp)
S/C
54880
8930
11250
9870
9870
PCC Poles
54880
S/T Poles
54880
No.
40% S/T+ S/T Poles 60 % PCC (D/C) Poles
54880
54880
35720
45000 39480
39480
9306 No. No.
2
Amou n t( inRs .)
D/C
37224
10460 11390
10460 11390
20920
20920 22780
22780
10832
21664
STAY SET COMPLETE One suspension structure with angle
=5 no.
Two dead end with angle
=10 no. Total
=11 no.
8 Earthingoflineateveryalternatestructure 9 Roadpathstreamcrossingguarding(avrg2no./km) 10 Stringingoftelephone&earthwire(GINo.6SWG) 11)IS tringingof100mm26/1/4.72mmor6/1/4.09 ACSRcond. II Stringingof100mm27/4.26mm AAACcond. 12 Making jumpers
G
15
F
3
J
2
I)1 I)2
3 H
No. 2
7300
8850 18260 Set
18970 1520
T ot a l
28950 10440
56910
56910
1520
2 50 49 0
14600
26550
26550
56910
54780
56910
54780
1520
25 39 80
28950 10440
14600
26550
54780
28950 10440
14600
26550
18260 760
28950 10440 14600
8850
18970
No.
1930 3480
7300
No. 3
1930 3480
No.
3
I)2
No. No.
54780
1520
2 50 60 8
3040
32 14 20
PAGE-73
Erection charges for 33/11 kV Sub-Station with common/ independent breaker control of Transformer S.N o.
1 2
Description
S/head
U nit
I
No.
Laying of e art h mat, e arth ing ro d & pipe s Erection of s upe r str uct ure & b usbar
33/11 kV Sub-Station with Rate (Rs.) C o m m o n B r e ak e r co n t r o l Independent Breaker of Transformer control of Transformer Qty Am o u n t( Rs .) Qty Am o u n t 110110.00
1
110110
1
110110
a Erection of R.S. joists
II
No.
4246.00
18
76428
18
76428
b Erection of cross arms
III
No.
1370.00
29
39730
29
39730
c Erection T-set of
XV
d Erection of Jumper sets eE rection of one set of bus bar 3 Erection of fo un da tion s
No.
XVI
No.
VII
a Power Transformer b Circuit breaker (VCB)
fS
17880
2
24100
2
24100
No.
12180.00
1
12180
1
12180
Mtrs.
3320.00
155.3
515596
155.3
515596
No. No.
X
No.
XI
No.
14040.00
38600.00
3
1
73000.00
1
g Power Transformer h 11 kV incoming panel with PT's
XII
No. 93700.00 79790.00 2
2
No.
XIX
1
8970 5890
1
38600
79790
1
73000
2
187400 159580
2
11kV bus coupler
j
11 kV out going panels
XIX
No.
79790.00
N
70180N
N
70180N
5 6 7
Laying of cont rol cab les set (fo r 50 M) Laying o f powe r cab les s et (f or 50 M ) Connecting the power ca ble to cable for epoxy
XVIII XX XXI
Set Set No.
35800.00 5870.00 7520.00
12 2+N 2(2+N)
429600 10300+5150N 26520+13260N
12 2+N 2(2+N)
429600 0300+5150 6520+13260
XXII XXIV XXIII
No. No. No.
125870.00 4562.25 16710.00
1 378 1
125870 1724530.5 16710
1 378 1
125870 1724530.5 16710
+
3 9 0 3 33 4 . 5
T otal
79790.00
3
I
8 Installation of Sub-Station auxiliaries 9 Erection fe ncin g 10 Erection of yard lightin g
No.
16920
1
73000 187400 159580
126360
9
8970 5890 38600
No.
9
16920
1
XIII
32040
112320
9
tation Transformer XVII
9
8
1880.00 2990.00 5890.00
No.
XIV
32040
17880
12050.00
VIII
9
40230
12
3560.00
IX
c PT's (1-phase) d D.O. fuse unit
12
27
No.
a Isolators
e Circuit Breaker V/SF6 ( CB)withCT's
1490.00
37250
V VI
b Lightening Arresters
25
No.
IV
c Laying of trenches 4 Ins tallat ion of equ ipm ent
1490.00
1 00 7 0 0 N
+
3 8 8 6 3 1 4 .5
1
100700 N
79790
10300 30080 15040
PAGE-74
Erection of 11 kV yard for 4 feeder, therefore N no. feeder .No
D e s cr i p t i o n
R EF
aE rection of structures b Erection of cross arms c Erection ofset ofBusbar
Un it
II
Ra t e ( Rs .)
No.
III
No.
VII
5
1370.00
No.
3560.00
Amount (Rs.)
Qty
4246.00
21230.00
40
54800.00
1
3560.00
dE rection of jumpers
XV
No.
1490.00
24
35760.00
e Erectionofisolators
VIII
No.
14040.00
8
112320.00
fE
IX
rection of LA's
No.
1880.00
12
22560.00
Su b - T o ta l:Erection Charges for Single feeder = Sub-Total / 4 = Say Rs.
2 5 0 2 3 0 .0 0
62557.5 62 560.00
Erection Charges for N feeder = N x Sub-Total /4 = 54930.00 x N Erection Charges for 33/11 kV sub-station with common breaker control of Transformer 4n o s .
5n os .
6n o s .
7n o s .
Total 4539354.5 4702615 4865875 Sa yR s
4 53 9 4 0 0
4 7 02 6 0 0 4 8 6 59 0 0
5029135 5 02 9 1 0 0
8n o s . 5192395 51 9 2 4 0 0
Erection Charges for 33/11 kV Sub-Station with Independent control of Transformer 4n o s . Total
4556375
Sa yR s
4 55 6 4 0 0
5n os .
6n os .
4719635 4882895 4 7 19 6 0 0 4 8 8 29 0 0
7n o s .
8n o s .
5046155
5209415
5 04 6 2 0 0
52 0 9 4 0 0
PAGE-75
Erection Charges for Terminal Equipment & Allied Material for each of 33 kV out going Feeder
S.N De s cr ip tio n o.
Ref e r S/head
A Earthing
I (e+f)
BF oundation of VCB
Qty
Job
IV
C LayingoftrenchesO.B.type D Layingofcontrolcables(setof50M)
Un it
1
Job
VI XVIII
1
Amount for 33/11 kV S/Stn PT's already PT's not installed installed
Ra t e (Rs.) 17437.00 12180.00
M
9
3320.00
50M
76
35800.00
17437.00
17437.00
12180.00
12180.00
29880.00 54416.00
29880.00 54416.00
E Erection of super structures aE rection of R.S. joists
II
Job
2
4246.00
8492.00
8492.00
b Erectionofcrossarms
III
Job
9
1370.00
12330.00
12330.00
c ErectionofJumpersets d Erectionofasetofbusbar
XV VII
Job Job
9 1
1490.00 13410.00 13410.00 3560.00 3560.00 3560.00
Erection of equipment II
VIII
Job
3
14040.00
42120.00
II LA's
solator
IX
Job
3
1880.00
5640.00
III PT's
X
IV CircuitbreakerwithCT's&CRpanels
XIV
Job Job
3 1
42120.00 5640.00
2990.00 38600.00
8970.00 38600.00
38600.00
T o t al
2 3 8 0 6 5 .0 0
2 4 70 35 . 00
Sa y Rs .
2 3 8 0 7 0 .0 0
2 4 70 40 . 00
PAGE-76
Erection Charges for 11 kV Auto voltage Booster/Sectionalizer/ Auto reclosure S. No .
D e s c r ip t i o n
Refer S/head RE Cost SI Cost Data Data
U n it
Qty
Ra te Am o u n t Rs . lia nku ek Vt1 V o1 1 volta ge
Am o u n t sectio na lizer
b oo s t er 1 ErectionofDoublePCCPolesStructures(9M) 2 ErectionofSinglePole(9M)includingfixingofX-arms insulator of cross bracing set etc. 3)a PreparationofPlatformStructure 3)b Erection ofPlatform 4 Erection GO of switch
S/headA-3 S/head A-1 & A-3(b)
5529
1
3771
r e cl o s u r e
5529 3771
3771
No.
1
2808
2808
2808
S/head C 6
No.
1
2425
2424.5
2424.5
No.
1
14040
14040
VIII IX
6 Erection of Jumpers (set) 8 Installationof11kVvoltagebooster/linesectionalizer/
No.
1
S/headC3
5 Erection LA's of 7 Erection D.O. of fuse unit
No.
XV XI
No. No. No.
XIV
3 2 1
No.
1880 1490 5890
1
38600
5640
5640
2980 5890
2980 5890
38600
38600
11 kV auto reclosure Total
8 16 8 2
6 21 13
Sa yRs .
8 16 8 0
6 21 10
PAGE-77 ANALYSIS Page --1
Construction of 1 km of 33 kV line with ACSR (100 mm sqr. Al. equivalent) conductor on 9.75 mtr./10 mtr. long PCC/Steel Tubular or 60 % PCC & 40 % S/T Pole (Double pole structures) with single continuous earth wire Sr D e s cr i p t i o n No 1 Angleiron2240*65*65*6mmcrossarmforearthwires(2.24*6.8*Rs.56.8) 2
U n it No.
Qty
1
Am o u n t (Rs.)
865
M.S. cross bracing set (consisting of 1800x65X65x6 mm- 2 Nos and 2700x50x50x6 mm-2 Nos. of M.S Angle Irons including clamps and bolts.) (1.8*6.8*56.8*2+2.7*4.5*56.8*2)
3
No.
M.S. channel iron cross arm consisting of 4000x125x65x6 mm
1
No.
2771
1
2976
(4*13.1*56.8) ANALYSIS Page --34 A
CROSS ARMS
1
3.75longM.S.channeliron100X50X6mm9.56kg/mtr.CrossarmsforS/Stn.
2
3.75longM.S.angleiron50X50X6mm4.5kg/mtr.CrossarmsforS/Stn.
B
CLAMPS
3
M.S. half clamps with nuts & bolts for S/Stn
No
1
133
4
M.S. full clamps with nuts & bolts for S/Stn
No
1
216
No.
1
No.
2036
1
959
PAGE-78 ANALYSIS Page --43 A) Expended metal fencing around switchyard 1
M.S.angleiron65x65x6mm,3Mlomgsupports0.6Mbentoutwardsattop
No.
1
1390
& to contain 3 strands of barbed wire 0.4 mtr. sagged and concreted in ground and 2 mtr. Vertical for gauge fencing.(3.6*6.8)*Rs.56.8+((3.6*6.8)*Rs.56.8)*0%=979 2
Supportsrequiredatevery2mtr.For127mtr.Peripheryo fswitchyard64nos.
No.
1
1236
(3.2*6.8)*Rs.56.8+((3.2*6.8)*Rs.56.8)*0% Rates on HPSSR 2009 1
P/LCC 1:4:8 (1 cement 4 sand 8 graded stone aggregate 40mm normal size ) in foundation/pludg
cmt
2629
item 09130000 P151 2
P/LCC 1:5:10 (1 cement 5 sand 10 graded stone aggregate 40mm normal size ) in foundation/pludg
cmt
2366
cmt
3629
cmt
8577
item 09150000 P151 3
P/LCC 1:2:4 (1 cement 2 sand 10 graded stone aggregate 40mm normal size )in foundation/pludg item 0920010 P152
4
RCC 1:2:4(1 cement 2 sand 10 graded stone aggregate 40mm normal size ) in foundation/pludg item 09380100 P157
5
1st class brick Masonry 1:6 item 010010901 P165
6
cmt
3340
10MM cement Plaster 1:6 17046040 item P345
7(TYPE) B Trench O 8 (TYPE) CTrench O
cmt cmt cmt
62 1128 916
PAGE-79 ANALYSIS Page --43 A) Expended metal fencing around switchyard 1
M.S. angle iron 65x65x6 mm, 3 M long supports 0.6 M bent outwards at top &
No.
1
1390
to contain 3 strands of barbed wire 0.4 mtr. Sagged and concreted in ground and 2 mtr. Vertical for gauge fencing.(3.6*6.8)*Rs.56.8+((3.6*6.8)*Rs.56.8)*0% 2
Supportsrequiredatevery2mtr.For127mtr.Peripheryofswitchyard64nos.
No.
1
1236
(3.2*6.8)*Rs.56.8+((3.2*6.8)*Rs.56.8)*0% (B) Gate at colony & switchyard entrance. Gate cost of masonry M.S angle iron 65x65x6mm gates, 1.5x2.5 mtr. Each grill works 2 No. I.e. 2x1.5x2.5sq. mtr. W icket gate. ((8*6.8)*Rs.56.8+((8*6.8)*Rs.56.8)*0%)*2
Sq.Mtr.
Gatecostof masonry
No.
1 1
2083
((1.5*0.6)*1.21*1.1*1399)*3 Expendedmetalat10%wastage 1.1x127x2=279.4say280Sqmtr
Sq.Mtr.
824
693
STATEMENT SHOWING RATES OF EQUIPMENTS/MATERIAL FOR THE COST DATA 2013-14 S. No .
S UPPL IER
P.O .NO .& DAT E
D ES C R IP T IO N
QT Y
U N IT
RAT E
1
2
3
4
5
6
7
A STEEL TUB ULAR POLES :1 M/SJindalIndustriesLtd. I 605, Madam Bhikaji Cama Bhawan 11, Bhikaji Cama Place New Delhi-110066
CE(MM)-I-STP(Jindal)-TE-11/2011 8MTRS L-32-Adll-8091-8148 Dt.11.05.2012 T o ta l
9600
CE(MM)-I-STP(Jindal)-TE-11/2011 L-33-23662-91 Dt.21.12.12
1340 1 34 0
9MTRS
850
T o ta l
85 0
10
484.91
6546.66
No.
600
T o ta l CE(MM)-II-STP/Gaurang/TE-05/12 -L-12-16788-844 dated 11.9.2012.
89
4707.91
No.
T o ta l
10MTRS
2 M/SGaurangProductsPvt.Ltd., I Plot No.-10, South Side of GT Road Bulanshahar Road Gaziabad (UP).
S AL E F & I, U N T AX/ V AT L O ADING Ent arTyax CHARG ES
268.91
205.00
5440
9 60 0
9MTRS
II
No.
E.D Ed u . Ce s s
674.31
6546.66
No.
9336.53
374.92
674.31
318.00
374.92
961.66
1
318.00
536.68
520.00
6
60 0
8MTRS
2055
T o ta l
No.
5332.50
659.09
309.50
211.21
1338
2 05 5
. 9MTRS
13444
T o ta l
1 34 4 4
10MTRS
1081
T o ta l
253
T o ta l CE(MM)-II-STP-ElectroSteel -TE-11/2011-L-33-14343-394 Dt.15.11.2011
9MTRS
850
No.
T o ta l
B PCC Poles 4 M/SFarmFreshFoodsPvt.Ltd. I Batamandi, Poanta Sahib, Paonta Shahib, Sirmour (HP)-173025
T o ta l
CE(MM)-XI-PCCPoles-FarmFresh -09/2011-L-21-11760-82 Dt.29.09.2011
432.20
358.00
1
No.
10629.45
1313.80
619.08
492.00
1
No.
11583.38
1431.70
674.52
532.00
3
7417.79
0.00
296.71
199.39
67268
85 0 600
T o ta l M 8 T RS L O NG M9T R LS O NG 1 M0T RLSO NG M 1 1T R LS O NG
916.26
25 3
10MTRS
Av e r a gR e a to eSf t e eTlub ulaPro les
7413.16
1 08 1
11MTRS
3 M/SElectroSteelsIndia I Near Truck Union, G.T. road Damtal,Kangra(HP)
No.
No.
10603.27
0.00
424.13
327.48
6
60 0 1 16 5 5
T o ta l T o ta l T o ta l
8Mtrs(W/L200Kg)
1 64 8 4 2 28 1 25 3
506
No
T o ta l 8Mtrs(W/L200Kg) T o ta l
1505.00
75.25
206.67
904181.5
50 6 87
No 87
1505.00
75.25
227.18
157
1
2
3
4
5
8Mtrs(W/L200Kg)
130
No
T ot al II
CE(MM)-XI-PCCPoles-FarmFresh -09/2011-L-21 (AO)-26511-521 Dt.27.03.2012
8Mtrs(W/L200Kg)
202
No
T ot al 35
52
T ot al
CE(MM)XI-PCCPoles-KCI -09/2011-L-20(AO-26522-532 Dt. 27.03.2012 6 M/SDeepConcreteProducts I
Vill. Malpur, P.O. Baddi, The. Nalagarh Distt.Solan(HP)-173205
CE(MM)-XI-PCCPoles-Deep ,-09/2011-L-18-11695-11742 Dt.2 9.09.2011
499
200
CE(MM)-XI-PCCPoles-Deep
8Mtrs(W/L200Kg)
No
1505.00
75.25
227.18
1790.00
89.50
80.00
1790.00
89.50
80.00
1415.00
70.75
200.00
No
1415.00
70.75
90.00
80
No
1415.00
70.75
140.00
760
T ot al
182
No
1715.00
85.75
250.00
15
1715.00
85.75
150.00
2
2275.00
113.75
200.00
5
2275.00
113.75
170.00
2
1415.00
70.75
200.00
1415.00
70.75
170.00
76 0 104
No 10 4
230
No 23 0
100
No 10 0
43
T ot al 8Mtrs(W/L200Kg)
39
80
No
,-09/2011-L-18 (AO)-11695-26472 -509 dated 27.03.2012
9777
11 13
T ot al II
227.18
1113
T ot al 9.75Mtrs(W/L173kg)
75.25
3
10 8
T ot al
9.75Mtrs(W/L173kg)
1505.00
No
T ot al 9Mtrs(W/L180kg)
No
No
108
T ot al 9Mtrs(W/L180kg)
206.67
20 0
T ot al 8Mtrs(W/L200Kg)
75.25
49 9
T ot al 8Mtrs(W/L200Kg)
227.18
1505.00
No
T ot al 8Mtrs(W/L200Kg)
75.25
52
T ot al 9Mtrs(W/L180kg)
10
35
8Mtrs(W/L200Kg)
9Mtrs(W/L180kg)
1505.00
89
20 2
T ot al
CE(MM)XI-PCCPoles-KCI -09/2011-L-20-11783-99 Dt. 29.09.2011
7
13 0
8Mtrs(W/L200Kg)
5 M/SKreativeConcreteIndustries I VPO, Lodhwan, Tehsil Nurpur Distt.Kangra(HP)
6
43 82
No 82
1
2
3
4
5
8Mtrs(W/L200Kg)
100
No
T ot a l 170
195
241
32
No
T ot a l
140.00
1415.00
70.75
200.00
1415.00
70.75
200.00
1415.00
70.75
140.00
32
9Mtrs(W/L180kg)
304
No
T ot a l
1715.00
85.75
250.00
6
1715.00
85.75
150.00
8
1715.00
85.75
100.00
7
1715.00
85.75
230.00
2
1715.00
85.75
100.00
3
1715.00
85.75
280.00
2
1455.00
72.75
65.00
20
304
9Mtrs(W/L180kg)
42
No
T ot a l
42
9Mtrs(W/L180kg)
371
No
T ot a l
371
9Mtrs(W/L180kg)
131
No
T ot a l
131
9Mtrs(W/L180kg)
20
No
T ot a l
20
9Mtrs(W/L180kg)
126
No
T ot a l
126
8Mtrs
1257 T ot a l
No 125 7
8Mtrs
503
T ot a l
No
1455.00
72.75
65.00
503
T ot a l
493 6 T ot a l T ot a l
3
70.75
241
8Mtrs(W/L200Kg)
2
1415.00
No
T ot a l
1
70.00
195
8Mtrs(W/L200Kg)
M 8 T RSLO NG M9T R LO S NG 9.M 7 5T R LS O NG
70.75
No
T ot a l
Aver agR e ato ePf CCP ol es
10
170
8Mtrs(W/L200Kg)
CE(MM)XI-PCCPoles-KBI -09/2011-L-19(AO)-26501-510 Dt. 27.03.2012
89
1415.00
No
T ot a l
CE(MM)XI-PCCPoles-KBI -09/2011-L-19-11743-59 Dt. 29.09.2011
7
100
8Mtrs(W/L200Kg)
7 M/SK.B.Industries I Vill. Chachelli, Ind. Area Defence Road, P.O. Sujanpur (PB)-145023
6
255 7 330
4
5
6
7
89
10
C G.I. WIRE/BARBED WIRE/STAY WIRE 7 M/S Bajrang Wire Products(India) (P) Ltd. CE (MM)/IV:-GMS-07/2011)-L-15 ISS 280/1978 & ISS 4826/1979 GI wire I E-762(A),RoadNo.9F-1V.K.I Area 9092-9144Dt.30.08.11 6SWG5.0mm 23.83 Jaipur-302013, Rajsthan, India T ot al 8SWG4.0mm
MT
119.4
ISS 280/1978 & ISS 4826/1979 GI wire 6SWG5.0mm 9.532
MT
46750.00
7424.46
1638.70
7305.34
7345.05
1638.70
MT
46750.00
7424.46
1638.70
51.17
T ot al
MT
14.00
T ot al
56097
52355.95
2627.80
250.00
MT
52907.76
2655.39
250.00
14 . 00
ISS 280/1978 & ISS 4826/19379(2001-06) GI wire 6SWG5.0mm 4.08 MT T ot al
52079.97
2614.00
250.00
22
4 . 08
8SWG4.0mm
20.46
T ot al
MT
52355.95
2627.80
250.00
52907.76
2655.39
250.00
20 . 46
10SWG3.15mm
5.60
T ot al
MT 5 . 60
KM
47 . 65 KM KM
23 8. 7 9 65 . 38
ISS 2141/1992/2006 & 4826/1979(2001-06) 7/4.00mm 84.831 T ot al
3
250.00
51 . 17
10SWG3.15mm
CE (MM)/IV:GSS-10/2011 -L-13-8017-8066 dt. 16.08.2011
2614.00
10 . 21
8SWG4.0mm
8S W G S1W 0G
52
46250.00
CE (MM)/IV:-GMS-07/2011)-L-16 ISS 280/1978 & ISS 4826/19379(2001-06) GI wire 9145-65Dt.30.08.11 6SWG5.0mm 10.21 MT 52079.97
S6W G
1638.63
13 . 08
T ot al
2
1638.70
46000.00
MT
13.08
T ot al
1
7345.05
47 . 76
10SWG3.15mm
9 M/S Himachal Wire Industries (P) Ltd. I G.T.Road,DamtalDistt.Kangra(HP)
MT
47.76
T ot al
Av e r a g Reaw G ot efiIr e
46250.00
9 . 53
8SWG4.0mm
CE (MM)/IV:-GMS-(AO)-07/2011) 24150-82Dt.27.02.12
130931
32 . 70
T ot al
II
MT
32.7
T ot al
8 M/S Himachal Wire Industries (P) Ltd. I G.T.Road,DamtalDistt.Kangra(HP)
1638.63
11 9. 4 0
10SWG3.15mm
CE (MM)/IV:-GMS-(AO)-07/2011 L-24128-49Dt.27.02.12
7305.34
23 . 83
T ot al
II
46000.00
MT
53460.00
2146.40
250.00
4738
84 . 83 4
5
6
7
89
10
7/3.15mm
129.671
T ot al
CE (MM)/IV:GSS-17/2010 -L-42(AO)-10353-385 dt. 14.9.11
ISS 2141/1992/2006 & 4826/1979(2001-06) 7/4.00mm 53.708
ISS 2141/1992/2006 & 4826/1979(2001-06) 7/4.00mm 33.93
7 / 4. 0m 0m
2Cx6mm2
2Cx10mm2
2Cx6mm2
30.00
7371.47
Kms.
10375.03
Kms.
Kms.
105.00
250.00
0.00
417.07
1140.00
0.00
595.75
2020.00
24980.00
0.00
1411.50
3920.00
7761.00
0.00
390.55
170.00
2
Kms.
11940.00
0.00
600.75
300.00
Kms.
17910.00
0.00
903.00
500.00
Kms.
18844.76
0.00
949.74
500.00
10 5. 0 0 15.00 15 . 00
2Cx16 m m2
70.00
T ot al
70 . 00
T ot al
78 0. 0 0 T ot al T ot al T ot al
3
2186.00
30 . 00
T ot al
2
250.00
30 . 00
2Cx16mm2
1
2146.40
54450.00
Kms.
30
T ot al
P V2 Cx 6m m 2 P V2C x 10m m 2 P V2C x 16m m 2 P V2C x 25m m 2
250.00
25 0. 0 0
2Cx10mm2
Aver a gR eatoeTf wiC norPeV C
53460.00
MT
250
T ot al
CE(MM)/XII/TE-5/2011-15343-75 Dated 13.08.2012
2560.00
75 0. 0 0
T ot al
II
MT
750.00
T ot al
CE(MM)/XII/TE-5/2011-5634-53 Dated07.07.11
51000.00
22 3. 8 9
2Cx25mm2
13 M/sHimachalAluminium&Conductors I GTRoad,VPOMohtli Distt. Kangra (HP)
250.00
17 2. 4 7
T ot al CE(MM)/XII/TE-11/2012-15376-408 Dt.13.08.2012
2510.00
40 . 20
7 / 3. 1m5m
12 M/sPreetiIndustries I VillageKamli,Parwanoo, District Solan (HP)
MT
40.2
T ot al
CE(MM)/XII/TE-11/2012-15310-42 Dt.13.08.2012
50000.00
33 . 93
7/3.15mm
D PV C T WIN CORE 11 M/sShaanAluminiumCompany, I VillageKamli,Parwanoo, District Solan (HP)
250.00
54 . 01
T ot al
S t aW y ir e
MT
54.014
T ot al
Aver a gR eatoe Sft aW y ir e
2186.00
53 . 71
7/3.15mm
CE (MM)/IV:GSS-10/2011 (AO) -L-16-23460-91 dt. 14.02.2012
54450.00
12 9. 6 7
T ot al
II
MT
35 5. 0 0 85 . 00 30 . 00 4
5
6
7
89
10
E 3. 5 CORE P VC 14 M/sRajeshEnterprises,F-274 I
CE(MM)/XII:3.5CCable-14/2010
Sector-3, SIDC Industrial Area
L-21- (A)-3837-3898
Bhavana,NewDelhi-39
Dt02.06.2011
4Cx16mm2
10.00
T ot al
23.00
T ot al
31.00
T ot al
10.00
T ot al
1591.20
4
Kms.
41512.80
4363.08
2336.15
1747.20
Kms.
51861.60
5450.76
2918.54
2048.40
Kms.
73735.20
7749.72
4149.49
2494.80
Kms. 100254.00
10536.90
10 . 00
3.5Cx70mm2
16.00
T ot al
5641.85
3846.00
16 . 00
3.5Cx95mm2
23.00
T ot al
Kms. 131418.00
13812.30
7395.62
4482.00
Kms. 177632.45
18669.53
9996.35
5425.15
Kms. 201231.24
21149.81
11324.39
6106.76
Kms. 253300.60
26622.37
14254.60
8769.00
Kms. 338003.57
35524.86
19021.32
10498.03
23 . 00
3.5Cx120mm2
9.00
T ot al
9 . 00
3.5Cx150 m m2
4.00
T ot al
4 . 00
3.5Cx185mm2
8.00
T ot al
8 . 00
3.5Cx240mm2
10.00
T ot al
10 . 00
3.5Cx300mm2
8.00
T ot al
8 . 00
T ot al
Kms. 376530.13
39915.03
21371.98
18194.40
10 . 00 T ot al T ot al T ot al T ot al T ot al T ot al T ot al T ot al T ot al T ot al
3
1905.98
31 . 00
3.5Cx50 m m2
1 2 F 3-Core XLPE Cables and HT & LT AB Cables 15 11/22/33 kV XLPE Cables
3559.68
23 . 00
3.5Cx35mm2
PVC 4Cx1 6m m 2 P V3C. 5 Cx 25m m 2 P V3C. 5 Cx 35m m 2 P V3C. 5 Cx 50m m 2 P V3C. 5 Cx 70m m 2 P V3C. 5 Cx 95m m 2 P V3C. 5 Cx 120 m m 2 P V3C. 5 Cx 150 m m 2 P V3C. 5 Cx 185 m m 2 P V3C. 5 Cx 240 m m 2 P V3C. 5 Cx 300 m m 2
33868.80
10 . 00
3.5Cx25mm2
Aver a gR e ato e3f. 5c orP e VC
Kms.
23 . 00 31 . 00 10 . 00 16 . 00 23 . 00 9 . 00 4 . 00 8 . 00 10 . 00 8 . 00
4
5
6
7
89
10
I
M/s TirupatiPlastomatics Pvt.Ltd. B-141 (9A), Road No. 09-D Vishwa Karma Industrial Area. Jaipur (Raj)-302013
No.HPSEBL/CE(MM)/II-XLPE&AB Cables/TE-33/2011/L-01/6939-68 dated 26.04.2012
3Cx95mm2(11kV)
1.00
T ot al
1.25
T ot al
1.00
T ot al
53224.43
23279.69
10334.84
Kms. 635786.00
65485.96
28642.71
12715.00
Kms. 741340.00
76358.02
33398.01
14826.00
Kms. 966465.00
99545.90
43540.12
19329.30
0. 7 5
3Cx95mm2(22kV)
0.25
T ot al
Kms. 514323.00
52975.27
23325.01
15429.69
0. 2 5
3Cx120mm2(33kV)
1.00
T ot al
3
Kms. 516742.00
0.75
T ot al
2
8239.66
1. 7 5
3Cx400mm2(11kV)
1
18560.20
1.75
T ot al
CE(MM)/IV-TE-1/2011-INS-L-08 (A)-19516-19551 Dt. 10.01.2012.
42434.25
1. 0 0
3Cx300mm2(11kV)
G PIN/DISC INSULATORS 17 M/s BathindaCeramics(P)Ltd. I Village Jodhpur, Romana Dabali Road Bathinda (Pb)
4
5. 2 5
3Cx240mm2(11kV)
3Cx95 mm2 (11 kV) 3Cx120 mm2 (11 kV) 3Cx185 mm2 (11 kV) 3Cx240 mm2 (11 kV) 3Cx300 mm2 (11 kV) 3Cx400 mm2 (11 kV) 3Cx95 mm2 (22 kV) 3Cx185 mm2 (22 kV) 3Cx120mm2 (33 kV)
7192.00
Kms. 411983.00
5.25
T ot al
Average Rate of XLPE Cables
16200.44
1. 2 5
3Cx185mm2(11kV)
No.HPSEBL/CE(MM)/II-XLPE&AB Cables/TE-33/2011/L-02/6939-68 dated 26.04.2012
37039.11
1. 0 0
3Cx120mm2(11kV)
16 M/sRaviCablesLimited I 302, A kruti T rade Centre, M IDC Andheri East Mimbai-400093
Kms. 359603.00
Kms. 719125.00
74069.88
32612.97
21573.75
1. 0 0
3Cx185mm2(22kV)
1.50
Kms. 652364.00
T ot al
1. 5 0
T ot al T ot al T ot al T ot al T ot al T ot al T ot al T ot al T ot al
1. 0 0 1. 2 5 5. 2 5 1. 0 0 1. 7 5 0. 7 5 0. 2 5 1. 5 0 1. 0 0
11kVPin InsulatorwithPin (C.D. 230 mm) T ot al
13200
62.00
37657.52
6.80
2.94
41640.00
11
9.00
106
1 320 0
11kVPin InsulatorwithPin (C.D. 320 mm) T ot al
2000
22kVPinInsulatorwithPin (C.D. 430 mm) T ot al
2600
Nos.
74.00
8.14
3.52
12.25
1
162.00
17.51
7.58
23.00
5
200 0 Nos. 260 0
4
22kVPinInsulatorwithPin
Nos.
67190.00
200
5
6
Nos.
190.00
7
89
20.39
10
8.83
26.00
4
(C.D. 560 mm) T ot a l
2 00
33kVPinInsulatorwithPin (C.D. 840 mm)
200
Nos.
T ot a l 18 M/sDagaCeramicsPvt.Ltd. I First Floor Labhu Ji ka Katla, Bikaner (Raj)
CE(MM)/IV-TE-1/2011-INS-L-07 (A)- 19552-19597 Dt. 10.01.2012.
CE(MM)/IV-TE-9/2012-INS-L-10 -16021-16063 Dt. 28.08.2012.
11kVDisc.Insulator45KN(B&S) (C.D. 280 mm) T ot a l
10000
11 kV Pin Insulator with Pin 320 mm 22 kV Pin Insulator with Pin 430 mm 22 kV Pin Insulator with Pin 560 mm 33 kV Pin Insulator with Pin 840 mm 11 kV Disc Insulator 45 KN 280 mm 11 kV Disc Insulator 45 KN 320 mm
Nos.
1600
38.00
160.00
3.20
11.20
174
Nos.
160.00
3.20
11.20
16 0 0
11kVComopsitInsulator45KN(B&S) Ploymeric Suspension Type T ot a l
11 kV Pin Insulator with Pin 230 mm
17.80
1 0 00 0
2000
Nos.
118.50
15.02
6.81
20 0 0
11kVComopsitInsulator45KN(B&S) Ploymeric Tension Type T ot a l Average Rate of Pin Insulators Disc Insulator
41.20
2 00
11kVDisc.Insulator45KN(B&S) (C.D. 320 mm) T ot a l 19 M/sLamerPower&InfrastructurePvt.. I Ltd. 2nd Floor, Masjid Moth, Near Uday Park, New Delhi-49.
381.00
1000
Nos.
118.50
15.02
6.81
10 0 0
T ot a l T ot a l
1 3 20 0 20 0 0
T ot a l T ot a l T ot a l T ot a l T ot a l
26 0 0 2 00 2 00 1 0 00 0 16 0 0
T ot a l T ot a l
20 0 0 10 0 0
11 kV Composit Insulator 45 KN Suspension Tension
H LIG HTEN ING AR RES TOR (L A's) 20 M/s Raychem RPGLtd.,401-406 I Viswa Sadan-9, Distt. Centre Jankpuri-new Delhi-110058
II
9kV,5KAPolymericTypeHousing for 11 kV T ot a l
HPSEBL/CE(MM)/II-35/2011 -LA (Addl.)/2012-L-04(AO)-23477 -521 Dated 17.12.2012.
Av e r agRea tA oL ef
1
HPSEBL/CE(MM)/II-35/2011 -LA-L-04-10771-10817 Dated 26.06.2012.
k9V ,K5A 1k,1M Veta Olx ide T ot a l 1k8VK , 5A 22 , kM Ve tO alx ide
2
I G . O . S W ITC H 21 M/sGovindWires I Plot No. 5-B Industrial area MehatpurDistt.Una(HP)-174315
6157
No.
400.00
41.2
8.82
9.98
28
61 5 7
18kV,5KAPolymericTypeHousing for 22 kV T ot a l
1602
9kV,5KAPolymericTypeHousing for 11 kV T ot a l
2463
18kV,5KAPolymericTypeHousing for 22 kV T ot a l
641
No.
685.00
70.555
15.11
14.33
400.00
41.2
8.82
9.98
685.00
70.555
15.11
14.33
16 0 2
No. 24 6 3 No. 6 41
86 2 0 T ot a l
3 CE(MM)-II-GOS-GOV-18/2011-L24(AO)/11254-76 dated 07.02.12
22 4 3
4 11kV,400A,TriplePole, Gang Operated, Outdoor Type SingleThrow,SingleBreak
5 400
No.
6 3921.90
7
89 196.1
10 157.00
1
II M/sAmritInsulators,Pvt.Ltd. Plot No 33-34, Phase-III, Industrial Area TahliwalDistt.Una(HP) Aver a gReato G efS Ow it ch
CE(MM)-II-GOS-Amrit-18/2011-L23(AO)/-5479-524 dated12.04.12
1k1G VS Ow it ch G k2 SV O 2w it ch
22kV,400A,TriplePole, Gang Operated, O utdoor Type SingleThrow,SingleBreak
T ot al
92
No.
5524.40
759.6
166.00
593
4 00 T ot al
92
J CURRENT AND POTENTIAL TRANSFORMERS: 22 M/S Floral Electrical Pvt. Ltd. CE(MM)/VII: CT-PT/2012-L-11 I 223, W.K. Road, Opp. Shiv Lok 16434-54 D t. 31.08.2012 Meerut-250001 (UP) i) ii) iii) iv) v)
i) ii) iii) iv) v) vi) vii) viii) ix)
11 kV/110 V CT-PT Combined Unit Outdoor, Oil Immersed, Class .5 Consisting of Three CT on R,Y and B & 1 No. 11 kV/1 10/5 A 50 Nos 15/5 A 76 Nos 25/5 A 54 Nos 50/5 A 35 Nos 100/5 A 40 Nos Total 255 21500.00 212.42 400.00 T ot a l 2 55 21 500 . 00
15 kV/110 V CT-PT Combined Unit Outdoor, Oil Immersed, Class .5 Consisting of Three CT on R,Y and B & 1 No. 22 kV/1 30/5 A 1 Nos 50/5 A 3 Nos 50/1 A 1 Nos 100/5 A 2 Nos 100/1A 1 Nos 200/5 A 2 Nos 100-50/5 A 1 Nos 100-50/1 A 1 Nos 300-50/5 A 2 Nos Total 14 21500.00 212.42 400.00 T ot a l
i) ii) iii) iv) v) vi)
14
33 kV/110 V CT-PT Combined Unit Outdoor, Oil Immersed, Class .5 Consisting of Three CT on R,Y and B & 1 No. 33 kV/1 50/1 A 1 Nos 75/1 A 4 Nos 100/1 A 9 Nos 100/5 A 1 200/1 A 2 100-50/1 A 1 Total 18 37300.00 373.00 1500.00 T ot a l
Aver a gR e ato eCf T a sn d PT s
1k 1V CT - P T Com bined Un i t
T ot a l
22 kV CT - PC Tom bineUdnit 33 kC VT - PC Tom bineUdnit
K XLPE Cable Termination Kits 23 M/s Nardev Singh Kanwar & Sons I VPO Bela, Tehsil Nadaun Disst. Hamirpur(HP)
SE(Op) Una PO No. 260614/DSJ /2011-9201-09 dated 02.12.2011
2
3
18
37 300 . 00
2 55 T ot a l T ot a l
18
14
Heat Shrinkable Outdoor Type Termination Kit for 33 kV XLPE Cable Confirming to ISS of Size 1x400 mm2 3 No.6 T ot al
1
21 500 . 00
975.00
3 4
5
6
Heat Shrinkable Outdoor Type Termination Kit for 11 kV XLPE Cable Confirming to ISS of Size 3x240 mm2 4 No.
7
6600.00
89
10
T ot al He aSthr inka blO eut dooTrype T er m inat ioKnit
1x4 0m 0 m32k3V 3x2 4m0m1k21V
L St ay Se t HT /L T 24 M/sRuhaniIndustries,PlotNo.51 I Industrial Area Focal Point Naya Nanglal, Distt. Ropar (Pb)
T ot al T ot al
4 3 4
SE(Op)UnaPONo.260614/DSJ HTStaySet /2011-13852-60 dated 23.2.2012
150 T ot al
II
25 M/sAeriElectricals&EngineeringWorks I 56 Industrial Area, Mehatpuu The & Distt. Una(HP)
SE(Op)UnaPONo.260614/PCA HTStaySet /2012-9073-81 dated 10.10.2012
M M.S Nuts and Bolts 26 M/sRuhaniIndustries,PlotNo.51 I Industrial Area Focal Point Naya Nanglal, Distt. Ropar (Pb) M/sAeriElectricals&EngineeringWorks 56 Industrial Area, Mehatpuu The & Distt. Una(HP)
SE(Op)UnaPONo.260614/PCA /2012-12177-85 dated 21.01.13
93636.00
No.
545.00
10.9
995
No.
640.00
32
99456.0
1.42
36210.00
14 8 29 8
T ot al
SE(Op)UnaPONo.260614/PCA /2012-12168-76 dated 21.01.13
12.24
17 9 148
T ot al SLS tT aeyt
Ave ra grea toeM fB S oltw s itN hu t s Off Sizes of IS: 1363/1992
179
T ot al H STtS a ye t
612.00 15 0
SE(Op) Una PONo. 260614/PCA LTStay Set /2012-9388-96 dated 18.10.2012 T ot al
HT / L STtS ayet
No.
HexagonalMSBoltswithNutsof Off Sizes of IS: 1363/1992 T ot al HexagonalMSBoltswithNutsof Off Sizes of IS: 1363/1992 T ot al
T ot al
17 9
500
kg
71.00 50 0
880
kg
69.00 88 0
13 80
Kg
3.45
63756.
STATEMENT SHOWING RATES OF EQUIPMENTS/MATERIAL FOR THE COST DATA S. NO
S U P P L IER
1
2
P.O .N O& .D AT E
D ES C R IP T IO N
3
A CURREN T AND POTENTIAL TRANSFORMERS: 1 M/s Heptecare Power Industries HPSEBL/SED/SSD-289(Heptacare) I Pvt. Ltd.A-9/10 Udyog Puram, 2010-777-808 Dt. 23.05.2011 Partappur,Meerut-2501303
QTY
U N IT
5
67
4
R AT E
E.D
8
Ed u . C es s
SAL E T A X / V AT
9
10
F L CH
33 kV Single Phase Outdoor Type, Live tank design, Oil Immersed, Self Cooled, CT along with Bimetatic Terminal Conn CTs 200-100/0.577-1-1-1A 6 Nos 25000.00 2575.00 551.50 1000 300-150/0.577-1-1-1A 9 Nos 25500.00 2626.50 562.53 10 400-200/0.577-1-1-1A 9 Nos 24000.00 2472.00 529.44 10 T o t al
24
7 4 5 0 0 .0 0
33 kV Electromagnetic Single Phase Outdoor Type, Live tank design, Oil Immersed, Self Cooled, Hermatically Sealed VT along PT 36/ 3KV /110/ 3-110/ 3- 11 15 Nos 21392.00 2203.38 471.91 1000.00 T o t al A v er a gR e ato eC f Ts an d PTs ap s esr u p p lo y r d eN r o& 12.
3k 3V CTS s in g lU e nit 3k 3V PTS s in g lU e nit
T o t al T o t al
15
2 1 3 9 2 .0 0
24 15
B 36KV VACUUM CIRCUIT BREAKERS 2 M/S Crompton Greaves Ltd: I Vandhana Building, 11 Tolstoy Marg, New Delhi-011-23324360
HPSEBL/SED/SSD-275/2010CGL/2010-4238-70 Dt. 30.11.10
Additional Purchase order have been placed during 12.07.2011 as such same PO has been considered for the Cost data 2013-14.
3 6KV VAC U U M C IR C U IT B R EA K ER S
3k6 1V250 A, 2 5 K A B r e a k i n g C a p a ci t y
C ISOL ATOR S 3 M/S Faraday Electricals Pvt. I Ltd. H-1016 road No.-14 V.K.I.A, Jaipur-302013
HPSEBL/SE(D)ES/SSD-269 FEPL/10-2600-2638 Dt. 19.08.10.
Additional Purchase order have been placed during 07.07.2011 as such same PO has been considered for the Cost data 2013-14.
1. 36KV, 1250A,25KA breaking capacity VCB suitable for 3Ph auto reclosing complete with Gang operating machenism Auxilary Switches interlock Control Cabinet Multicore Cable terminal connectors & Accessories etc. 14 No. 175000 18025.00 3860.50 8 Fabricated Hot Dip galvanised steel supporting structure including foundation bolts including CT Mounting structure 14 No. 9500 978.50 209.57 1 2. Mandatory spares for normal operation: Tripping i. Coils 9 No. 1000 103.00 22.06 50.0 ii. Closing Coils 9 No. 1000 103.00 22.06 50.0 iii. Auxilary switch 1 No. 1500 154.50 33.09 50.0 iv. Vacuum interuptor a/w chamber and supporting insulator 4 No. 58000 5974.00 1279.48 1 T o t al 14 T o t al
14
1. 36KV, 800A, double break, isolators triple pole, group operated, manually operated outdoor type,without Earthing swit conforming to IS:9921 without solid core insulators and support structures. 50 Set 26400 2131.85 560.08 1000 2. 36KV, 800A, double break, isolators triple pole, group operated, manually operated outdoor type,with Earthing sw itch, conforming to IS:9921 without solid core insulators and support structures. 17 Set 31900.00 2575.99 676.76 1 3. Stack of 36KV solid core insulators for above creepage 1116 mm (9 no.Per set) 67 Set 17050.00 6 4. Support structure for above 2 Nos. 11550.00 932.69 245.03 1 Sub Total 5. Mandatory spares for 36KV isolators a) Isolator Blades for main contacts 2
Nos.
600.00
48.45
12.73
100.94
26.52
72.68
19.09
b) Female contacts Assy. for above 2 Nos. 1250.00 c) Bearings for central rotating post(Top& Bottem) per p ole 2 Nos. 900.00
1
2
3
4
5
67
8
9
10
2
Nos.
750.00
60.56
15.91
2
Nos.
750.00
60.56
15.91
d) Pair of 6 NO : 6NC Aux. contacts e) Isolator blades for Earthing switch f) 36KV solid core insulators 8 Nos. 1770.00 Su b T o tal Isolators without Earth blade Total 50 Isolators with Earth blade Total 17 Stack 36KV of solid core insulator Total 67 Support structure for above Total 2 Spares Total Is o lat o rsw it h ou tE ar t hb ladew i t hS t ackof36K Vs ol idco rein s u lat o rsS up p o rts t ru ct u reandS p ares Is o lat o rsw it hE ar t hb ladew i t hS t ackof36K Vs ol idco rein s u lat o rsS up p o rts t ru ct u reandS p ares D 33/11KV & 33/22 k V Power TRA NSFORMER: No. HPSEB/DDSS/SSD4 M/s Fatehpuria Transformers & 284/10-FTS/11-7317-45 I Switchgears (Pvt.) Ltd ,13, Jaipura Mansion, Tholia Circle dated 31.03.11 MIRoad,Jaipur-302001
6.3 MVA, 33/11 kV, ONAN Cooled , Oil imersed, Copper wound, Outdoor type,with winding connection Delta-Star, having Nos 12 2945000 SPARES: a)36KVHVbushingcompletewithmetalparts 2 Nos 2500 b) 12KV LV bushing complete with metal parts 2 Nos 1250 c) Complete set of baskets 2 Sets 5000 d) Spare winding Limb for HV & LV e) Buchholz Relay
1 1
Sets Nos
Total Type Test and special test: a) Heat Run Test b)LighteningImpulsevoltagewithstandTest
500000 5000 35862500
3693837.5
250000
Total (Test Charges)
275750
791126.75
25750
(Servic
(i/c Service tax)
3.15 MVA, 33/11kV, ONAN Cooled , Oil imersed, Copper wound, Outdoor type,with winding connection Delta-Star, having Nos 6 1980000 SPARES: a) 36KV HV bushing complete with metal parts 1 Nos 2500 b) 12KV LV bushing complete with metal parts 1 Nos 1250 c) Complete set of baskets 1 Sets 5000 d) Spare winding Limb for HV & LV
1
Sets
250000
1
Nos
5000
e) Buchholz Relay Any other spares Total Type Test and special test: a) Heat Run Test b)LighteningImpulsevoltagewithstandTest Total (Test Charges) 5 M/s Fatehpuria Transformers & I Switchgears (Pvt.) Ltd ,13, Jaipura Mansion, Tholia Circle MIRoad,Jaipur-302001
No. HPSEB/DDSS/SSD284/10-FTS (Addl.)/11-4278-96 dated 13.12.11
12143750
1250806.3
250000 280900
267891.125
30900
(Servic
(i/c Service tax)
6.3 MVA, 33/11 kV, ONAN Cooled , Oil imersed, Copper wound, Outdoor type,with winding connection Delta-Star, having Nos 2 2945000 SPARES: a)36KVHVbushingcompletewithmetalparts 1 Nos 2500
1
2
3
4
5
67
8
b) 12KV LV bushing complete with metal parts 1 Nos c) Complete set of baskets 1 Sets Total
9
10
1250 5000 5898750
607571.3
130126.425
Type Test and special test: a) Heat Run Test b)LighteningImpulsevoltagewithstandTest
0
0
Total (Test Charges)
0
(Service
(i/c Servicetax)
3.15 MVA, 33/11kV, ONAN Cooled , Oil im ersed, Copper wound, Outdoor type,with winding connection Delta-Star, having v Nos 4 1980000 SPARES: a) 36KV HV bushing complete with metal parts 1 Nos b) 12KV LV bushing complete with metal parts 1 Nos c) Complete set of baskets 1 Sets Total Type Test and special test: a) Heat Run Test b)LighteningImpulsevoltagewithstandTest
2500 1250 5000 7928750
0
Total (Test Charges) 6 M/s PME Transformers B-10 & 11 I Surajpur-C, Greater Noida-201306
No. HPSEB/DDSS/SSD284/10-PME/10-139-54 dated 07.04.2011
816661.3
174908.225
30900 0
(Service
(i/c Servicetax)
10.0 MVA, 33/11 kV, ONAN Cooled , Oil imersed, Copper wound, Outdoor type,with winding connection Delta-Star, having Nos 3 3614384 SPARES: a) 36KV HV bushing complete with metal parts 2 Nos 2500 b) 12KV LV bushing complete with metal parts 2 Nos 2000 c) Complete set of baskets 1 Sets 22000 d) Spare winding Limb for HV & LV 1 Sets 525000 e) Buchholz Relay 1 Nos 5000 f) WTI 1 Nos 7500 g) OTI
1
Total Type Test and special test:
Nos
7500 11419151
1176172.5
251906.468
a) Heat Run Test b)LighteningImpulsevoltagewithstandTest c) tan delta test
3.1M 5 V3 A3/1k1V 6.M 3VA 3,3/ 1k1V 10M . 0V A 33, /1k1V
T o tal
309375 10
T o tal T o tal
34375
25000
Total (Test Charges) Av eragR e atoe3f3/1k1V Po w eTrr an s f o rm er
250000
14 3
(i/c Service tax)
(Servic
1
2
3
E Lightening Arre stors 7 M/s Reychem RPG Ltd. I 1107-1112, 11th Floor, Vishwa Deep Building, Distt. Centre
4
No. HPSEB/SEES/SSD287/10-Raychem/11-1515-43
5
30 kV Surge Arrestor
67
8
9
10
30 kV, Single Phase, Voltage Coordinated, Station Class, Zinc Oxide, Gapless, out
dated 23.06.2011
21
No.
4009.5
0
551
4
Jankapuri, New Delhi 110058 T o t al
21
18 kV Surge Arrestor
40 0 9. 5 0
18 kV, Single Phase, Voltage Coordinated, Station Class, Zinc Oxide, Gapless, out 27
T o t al Av e r a g Reat e
3 KL0fV3 A o3 k V r kfK 2 L1 V o2A V 8r
T o t al T o t al
F 33KV CONTROL & RELAY PANEL: 8 M/s EASUN Rayrolle Limited HPSEBL/SED-291/10(ER)/11-1023-54 I 98,SIPCOTIndustrialComplex, Dated01.06.2011. Hosur-635126 Chennai (TN)
No.
27
3069
0
422
30 6 9
21 27
33KV Simplex Type Transformer C&R Pannels without Differencial & with Ref Relay & with inbult LBB relay 5 No. 183000 18849 4036.98 T o t al
5
5200
1 83 0 00 . 0 0
33KV Simplex Type Transformer C&R Pannels with seprate Differencial & with Ref Relay & with inbult LBB relay 2 No. 355000 36565 7831.3 T o t al
2
3 55 0 00 . 0 0
33KV SimplexType Bus Cuupler Pannelswith inbult LBB relay 2 No. 168000 T o t al
2
7
Av erageR at eoC f o n t roal nd RelaPyan els
33kVT / FPan n ew l it h o uD t if fR . e l ay 3k3T V/P Fan n ewl itD hi fR f .e l a y
T o t al T o t al
3k3B V uC s o u p lePrann el 3k3F VeedePran nel 2k2F VeedePran nel G 12KV INDOO R SWITCHG EAR PANEL BOARDS. 9 M/s Electrotechnica switchgear Pvt. No. HPSEBL/SED/SSD-292/2011 I Ltd. 1/5 A Raja Basata Roy Road -1970-83 dated 16.07.2011 Kolkata-700026
7
4809.08
22454
4809.08
2 18 0 00 . 0 0
5 2 2
7 7
1250 Amp. 12.5 KA Pannel Board comprising 03 Panel Board of 01 No T/F Panel, 01BusCuppler 1 set 01 No. Outgoing Feeder 11Panel Board of 02 No T/F Panel, 01BusCuppler 1 08 No. Outgoing Feeder 01 Panel Board of 1No.OutgoingFeeder
22454
2 18 0 00 . 0 0
22 KV SimplexType Feeder Pannels with inbult LBB relay 7 No. 218000 T o t al
3706.08
1 68 0 00 . 0 0
33KV SimplexType Feeder Pannels with inbult LBB relay 7 No. 218000 T o t al
17304
1
set
set
692000.00
71276.00
15265.52
1500
2535000.00
261105.00
55922.10
55
235000.00
24205.00
5184.10
50
1
2
3
4
5
P an eBlo ard
H Cont rol Ca bles 10 M/s Satellite Cables (P) Ltd. I A-36, Rajouri Garden, Ring Road New Delhi
1000.00
103.00
22.06
15
b) Closing Coil
1
No.
1000.00
103.00
22.06
15
1
No.
24000.00
2472.00
529.44
3
1 1
No. No. No. No.
12000.00 12000.00 12000.00 12000.00
1236.00 1236.00 1236.00 1236.00
264.72 264.72 264.72 264.72
1 1
No.
32000.00
3296.00
705.92
48
No.
13000.00
1339.00
286.78
1
1 1
15 Total T o t al
1
b) Closing Coil c) Vacuum Interrupter d) C.T. of Metering AC-0.5 I. 300-150/1-1-1 A I. 200-100/1-1-1 A
T o t al T o t al
1 1
T o t al T o t al
1 1
III. 100-50/1-1-1A IV. 60-30/1-1-1A e) Voltage transformer 11000/ 3 /110/ 3-110/ 3-110 V e) TVM
T o t al T o t al T o t al Total T o t al
1 1 1
HPSEBL/SEDS/Setellite/SSD-304/ 2012-4398-4418 dated 06.11.2012
1
1.1 kV, PVC, HR-FRLS Cpper Control cables (Un-screened) 2Cx2.5mm2 4Cx2.5mm2 7Cx2.5mm2 10Cx2.5mm2 12Cx2.5mm2 16Cx2.5mm2 19Cx2.5mm2 2Cx4.0mm2 4Cx4.0mm2 10Cx4.0mm2 7Cx6.0mm2 10Cx6.0mm2
Average Rate of Control Cables (un-screened) of various Sizes
2Cx2.5 mm2 4Cx2.5 mm2 7Cx2.5 mm2 10Cx2.5 mm2 12Cx2.5 mm2 16Cx2.5 mm2 19Cx2.5 mm2 2Cx4.0 mm2 4Cx4.0 mm2 10Cx4.0 mm2 7Cx6.0 mm2 10Cx6.0 mm2
10
No.
To t a( 1lP5an el)
S pares iv) Spares a) Tripping Coil
9
1
e)Voltagetransformer 1 11000/ 3 /110/ 3-110/ 3-110 V e)TVM 1
S w i t ch g ea r P a n n e l Bo a r d As per Supply Order NO. 5
8
Spares a) Tripping Coil
c)VacuumInterrupter d) C.T. of Metering AC-0.5 I.300-150/1-1-1A I.200-100/1-1-1A III.100-50/1-1-1A IV.60-30/1-1-1A
Av eragR eatoe 1k f2IVn d o or
67
km km km km km km km km km km km km
4.4 4.60 8.00 0.50 9.10 1.20 8.80 3.10 11.70 3.70
km km km km km km km km km km
39335.67 68896.08 111874.95 160073.10 188694.99 246087.27 289497.78 58291.20 103313.43 246911.94
4861.89 8515.56 13827.74 19785.04 23322.70 30416.39 35781.93 7204.79 12769.54 30518.32
441.98 774.12 1257.03 1798.58 2120.18 2765.04 3252.80 654.96 1160.83 2774.30
1 1 2 3 4 4 1 1 4
1.90 1.1
km km
248107.86 123885.63
30666.13 15312.26
2787.74 1391.98
4 2
4.40 4.60 8.00 0.50 9.10 1.20 8.80 3.10 1 1. 70 3.70 1.90 1.10
1 2 I Battery/Battery Chargers/DCDB 11 M/s Azure Multitrade & Vanjiya Pvt. I Ltd., 231, Tribhbvan Complex,, Ishwar Nagar, Mathura Road, New Delhi-110065
3
4
5
67
8
9
10
HPSEBL/SEES/SSD-288/10 (AZURE)/11 220 V, 200 AH Lead Acid Stationary, Battery consisting of 110 No. 200 AH Tubular -1265-89 dated 14.06.2011 Sealed Cells (each 2V) in hard rubber/Polypropylene container etc. & accessories 3
Nos
T o tal
3
278300
28664.90
6139.298
2 7 83 0 0 . 0 0
30 V, 100 AH Lead Acid Stationary, Battery consisting of 15 No. 100 AH Tubular Sealed Cells (each2V) in hard rubber/Polypropylene container etc. & accessories 6 T o tal 12 M/s JVV Electrotech Pvt. Ltd. I A-68 Adhyapak Nagar, Nafjagarh Road, Nangoli, New Delhi-110041
HPSEBL/SEES/SSD-288/10(JVV)/111290-1315 dated 14.06.2011.
Nos
6
22080.0
2274.24
487.0848
22 0 8 0. 00
220 V Battery Charger suitable for 220V-200 AH Battery Bank Comprising of float & Boost Chargers 4
Set
Spares
4 T o t alw i tS par es
135037.5 Set
4
16450.0
2700.75
1400 329.00
1 5 14 8 7 . 5 0
30 V Battery Charger suitable for 30V-100 AH Battery Bank Comprising of float & Boost Chargers 6 Set 57037.5 1140.75 Spares
6 T o t alw i tS par es
Set
6
1
30 V DCDB suitable for 30V-100 AH Battery Bank 4 Set T o tal
Av erag eR at eBat t ery/Bat t ery C h a r g er s / DC DB
22V 200 ,A0B Hat t ery 31 V00A , 0H Ba t t e r y 2 20VBat t eryC har ger 3B V0at t erCyh arger D 2V 20DB C DV 3 C0DB
No No Set Set Set Set
4 3 6 4 6 1 4
329.00
73 4 8 7. 50
220 V DCDB suitable for 220V-200 AH Battery Bank 1 Set T o tal
16450.0
50017.5
1000.35
50 0 1 7. 50
40462.5 40 4 6 2. 50
809.25
ANALYSIS OF STEEL RATES (As per Steel world.com Statistics website:-www.steelworld.com ) Sr. No.
1
2
3
De s c r i p t i o n
An g l e I r o n 50x50x6mm 75x75x6mm J oi s t s 125x70mm 200x100mm MS Channels 75x40x6mm 150x75x6mm
Rat e( R sP sM e . rT ) Jan-12
Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Dec-12
Am ouinnt Rs per MT Dec-12 (Average)
44130 44270
44550 44830
45250 45430
48380 47800
47330 46750
47580 46990
47580 46990
47330 46680
46810 46500
46740 46500
46740 46500
45410 44820
46485.83 46171.67
44830 44830
45080 45080
45430 45430
48560 48910
47510 48030
47510 47680
47510 47680
47160 47400
47160 47400
47160 47400
47160 47400
46630 46810
46808.33 47004.17
45200 45280
45440 45460
45790 45810
50400 49690
49350 48810
49180 48810
49180 48810
48830 48460
48830 48460
48830 48460
48830 48460
48300 47590
48180.00 47841.67
Average Rate per MT VAT @4%= Transportation @ 5%= Total = Entry Tax @ 3% = Grand Total =
47081.94 1883.28 2354.10 51319.32 1539.58 52858.90
Say Rs. (Per MT) = 53000.00 Say Rs. (Per MT) with 7.18 % Hike =56800.00