Ribbed slabs are used for long spans with relatively light loads. They are constructed in one of the following ways as described in clause 30 of IS: 456-2000 1. As a series of concrete ribs with t...
Materi SI tentang global bisnis dan kolaborasinya
staad pro and circular slabFull description
123
Slab
zFull description
CCIE Collaboration Troubleshooting
TEKNOLOGI PATI GULADeskripsi lengkap
ccna collaboration bootcampDescripción completa
Slab AS3600 Australian CodeFull description
If your sheet is macro disable then do it enable.This Excel Sheet is The Solution For Different Type of Slab Design.In this Excel Sheet Seen Yellow Cell is the Data that we have to Input Man…Full description
Col olla labo bora rati tion on and and Inn Innov ova ati tion on in a Po s t -Ten s i o n ed Waf f l e Sl Sl ab . Neeta City Shopp hopping ing Centre
Shaun Sullivan
Structural Systems (Northern) Pty Ltd
Introduction Collaborative Effort between Contractor, Consultant & Specialist Contractor
A Solution to your Weighty Weighty Problem … – A Post Tensioned Tensioned Waffle Slab Slab Structural Systems (Northern) Pty Ltd
Project Overview • Extension and refurbishment of the Neeta City Shopping Center, Fairfield • Existing 1st Floor car-park converted to a new Big W Store. • Approx 5800m2 • New Floor 300 to 400mm above the existing car-park floor. • Floor Live Load increased from 3kPa to 5KPa / 10kPa
Structural Systems (Northern) Pty Ltd
Project Constraints • Operating Woolworths supermarket in floor below + carpark over • No space beneath could be used for construction • No significant construction noise during business hours. • Weight of new floor less than slab capacity. • Relatively long spans & falls in carpark
Structural Systems (Northern) Pty Ltd
External Upstand Remained
Kerbs & Planter Upstand Removed
Structural Systems (Northern) Pty Ltd
Existing Risers
Stormwater pipes through slab
Structural Systems (Northern) Pty Ltd
Conforming RC Scheme • New waffle slab composite with existing PT floor Dowels @ 250cts & scabbling existing concrete
Construction Noise • Approx 30,000 Dowels & 8000m of 200wide scabbling • Scabbling and drilling outside business hours. Costly and timely! Night
Local Residents
Day
Woolworths Trading Hours
• Limited time to perform noisy work!
Structural Systems (Northern) Pty Ltd
Night
Local Residents
Alternative PT Scheme • Post-tensioned waffle slab • Isolated from the existing floor surface. • Connection to Existing Columns by Dowels • Temporary IJ to existing columns to allow movement.
Structural Systems (Northern) Pty Ltd
Typical Scheme Details • 200 wide ribs @ 1500 cts • Joint locations reflect existing slab • 90mm thick RC slab between ribs • Pour strips for stressing access • Bond breaker to existing slab
Structural Systems (Northern) Pty Ltd
Structural Systems (Northern) Pty Ltd
Structural Systems (Northern) Pty Ltd
Structural Systems (Northern) Pty Ltd
Core Connections • Bars epoxied into core • Sleeved for movement • 10mm isolation to existing slab
Structural Systems (Northern) Pty Ltd
Why Isolate? • Typical Slab – Columns deflect to accommodate PT force
• As slab is poured directly on existing, columns cannot deflect - posttensioned force ‘lost’
Structural Systems (Northern) Pty Ltd
Column Connections • Column Reinf. Located • Oversized holes cores • Tapered isolation gap (preformed metal mesh) • Grouted at 56 days
Structural Systems (Northern) Pty Ltd
Column Connections
Structural Systems (Northern) Pty Ltd
‘Back of House’ Hanging Load • Wider ribs (extra DL) required in 10KPa area • Unable to prop from below • Load hung from carpark slab over • ‘Reidbar’ threaded reinforcement & plates
Carpark
New Slab Existing Slab Woolworths
Structural Systems (Northern) Pty Ltd
‘Back of House’ Hanging Load
Structural Systems (Northern) Pty Ltd
Hanging Support • Very long span in 10Kpa area • Unable to span with available depth • Room underneath slab not available • Blade column introduced
Structural Systems (Northern) Pty Ltd
Curved Beam • Irregular column grid • Extra concrete and DL required to span • Composite section used similar to RC scheme
Structural Systems (Northern) Pty Ltd
Summary • PT solution eliminated significant amount of construction noise. • Minimal disturbances to existing tenancies • Savings in construction time. • Challenges solved through collaboration of interested parties Thankyou