BTS Installation Guideline for INWI Project
BTS Installation Guideline for INWI Project
Huawei Technologies Co., Ltd. 2015-2-4
Huawei Confidential
Page1, Total 74 ,
BTS Installation Guideline for INWI Project
Document History Date
Version
2009-10-18
V1.0
2009-10-23
V1.1
Changes
Author
Email
First draft issued
Ge Ping
[email protected]
1. Add CPRI cable and jumper connection of DRFU and GRFU
Ge Ping
[email protected]
Ge Ping
[email protected]
2. Add antenna system installation 2009-11-25
V1.2
1.
Add guideline for battery cabinet installation
2.
Add guideline for E1 cable connection for cascade site
3.
Add guideline for alarm cable distribution
2010-1-11
V1.3
1.
Add guideline for CDMA&GSM dual-band antenna installation
Ge Ping
[email protected]
2010-1-13
V1.4
1.
Add guideline for faulty antenna swap
Ge Ping
[email protected]
2010-1-13
V1.5
1.
Add guideline for DBS installation
Ge Ping
[email protected]
2010-3-10
V1.5
1.
Update guideline for DBS installation
Ge Ping
[email protected]
2.
Change WANA to INWI
2010-4-22
V1.6
1.
Add installation guideline for IBBS200T V302
Ge Ping
[email protected]
2010-5-13
V1.7
1.
Add installation guideline for IBBS200T V303
Ge Ping
[email protected]
2010-5-14
V1.8
1.
Add installation guideline for DC power cable connector making for TEC FAN in IBBS200T V303
Ge Ping
[email protected]
2015-2-4
Huawei Confidential
Page2, Total 74 ,
BTS Installation Guideline for INWI Project
Content 1.
Key Principles........................................................................................................................6
2.
Indoor BTS Installation ..........................................................................................................7
3.
2.1.
Overview of Huawei indoor BTS3900...........................................................................7
2.2.
CPRI cable layout (Singal cable between BBU and GRFU/DRFU) .............................7
2.3.
Cable routing of indoor BTS3900 .................................................................................9
2.4.
Fix the redundancy cable on top of the cabinet......................................................... 10
2.5.
All cables should be layout straightly between cable ladder and cabinet ................. 11
2.6.
All power cables and signal cables should be covered by different cable ducts ....... 11
2.7.
DDF installation in the existing transmission cabinet ................................................ 12
2.8.
E1 transmission cable connection for normal sites ................................................... 12
2.9.
E1 transmission cable connection for cascade sites ................................................. 12
2.10.
E1 cable color sequence ........................................................................................... 13
2.11.
Alarm cable connection (From INWI alarm system to BTS) ...................................... 14
2.12.
The antistatic wrist strap should be installed in the BTS cabinet .............................. 15
2.13.
No any document and labels in the back of the cabinet door ................................... 15
2.14.
No any materials in the bottom of BTS ...................................................................... 15
2.15.
Label for power cable ................................................................................................ 16
2.16.
Label for CPRI cable (Singal cable between BBU and GRFU/DRFU) ...................... 17
2.17.
BTS Power on............................................................................................................ 19
2.18.
Deal with the rubbish and clean up the shlelter ......................................................... 20
Outdoor BTS Installation .....................................................................................................21 3.1.
Overview of Huawei outdoor BTS3900A ................................................................... 21
3.2.
CPRI cable layout (Singal cable between BBU and GRFU/DRFU) .......................... 22
3.3.
Cable routing of outdoor BTS3900A.......................................................................... 22
3.4.
PGND cable connection for outdoor BTS3900A ....................................................... 25
3.5.
All power cable and signal cable should be protected with metal pipe ..................... 26
3.6.
DDF installation in the existing transmission cabinet ................................................ 27
3.7.
E1 transmission cable connection for normal sites ................................................... 27
3.8.
E1 transmission cable connection for cascade sites ................................................. 27
3.9.
E1 cable color sequence ........................................................................................... 28
3.10.
Alarm cable connection (From INWI alarm system to BTS) ...................................... 30
3.11.
The antistatic wrist strap should be installed in the BTS cabinet .............................. 31
3.12.
No any materials in the bottom of APM30 ................................................................. 31
2015-2-4
Huawei Confidential
Page3, Total 74 ,
BTS Installation Guideline for INWI Project
4.
5.
6.
3.13.
Make waterprof of the outdoor cabinets .................................................................... 32
3.14.
Label for power cable ................................................................................................ 33
3.15.
Label for CPRI cable (Singal cable between BBU and GRFU/DRFU) ...................... 33
3.16.
BTS Power on............................................................................................................ 33
3.17.
Deal with the rubbish and clean up the sites ............................................................. 35
3.18.
IBBS200 (Big Battery Cabinet) installation ................................................................ 36
3.19.
IBBS200T (Small Battery Cabinet) installation .......................................................... 43
3.20.
IBBS200T V302 (Small Battery Cabinet) installation ................................................ 45
3.21.
IBBS200T V303 (Small Battery Cabinet) installation ................................................ 48
DBS Installation ...................................................................................................................54 4.1.
Overview of Huawei DBS3900 .................................................................................. 54
4.2.
BBU installation (for scenario 1&2, BBU in APM30) ................................................. 56
4.3.
DC power cable conection (for scenario 1&2, BBU in APM30) ................................. 56
4.4.
BBU installation (for scenario 3, BBU in transmission cabinet) ................................. 57
4.5.
DC power cable conection (for scenario 3, BBU in transmission cabinet) ................ 57
4.6.
DC power cable and CPRI cable in RRU .................................................................. 58
4.7.
Outside cables of RRU .............................................................................................. 59
4.8.
Keep necessary operation space between RRUs ..................................................... 59
4.9.
Battery installation for DBS3900................................................................................ 60
4.10.
Alarm cable connection (From INWI alarm system to BTS) ...................................... 61
Antenna System Installation ...............................................................................................62 5.1.
Install the antenna according to the IO parameters .................................................. 62
5.2.
Keep at least 1 meter distance between GSM and CDMA antennas ....................... 63
5.3.
Install the grounding cables for antennas .................................................................. 63
5.4.
Install the feeder clamps 1 pcs/ meter ....................................................................... 64
5.5.
Install the grounding cables for feeders .................................................................... 64
5.6.
Make waterproof to all outside conenctors ................................................................ 65
5.7.
Make labels for jumpers and feeders ........................................................................ 66
5.8.
Reserve spare space in cable tray for 3G in future ................................................... 67
5.9.
Reserve spare space in feeder window for 3G in future ........................................... 67
5.10.
Install CDMA&GSM dual-band (Bi-technology) antenna........................................... 68
5.11.
GSM antenna swap for faulty antenna with high VSWR ........................................... 69
BTS Integration ...................................................................................................................70 6.1.
Hardware Ready for Integration ................................................................................ 70
2015-2-4
Huawei Confidential
Page4, Total 74 ,
BTS Installation Guideline for INWI Project
6.2.
Transmission Ready for Integration........................................................................... 70
6.3.
Hardware and Transmission Ready for Integration ................................................... 71
6.4.
BTS Integration .......................................................................................................... 71
6.5.
Tools and Materials for Site Engineer for BTS Integration ........................................ 72
6.6.
BSC Engineer for BTS Integration............................................................................. 72
6.7.
Possible Problem for BTS Integration and Solution .................................................. 72
6.8.
BTS Integration Status Check ................................................................................... 74
2015-2-4
Huawei Confidential
Page5, Total 74 ,
BTS Installation Guideline for INWI Project
1. Key Principles 1. Before you enter the site, please call INWI NOC(529000800/529000604); 2. Before you leave the site, please call INWI NOC(529000800/529000604); 3. Before leaving the indoor site, please check the air conditioner is working normal and the light already power off; 4. If there is any action which will cause the site down, please inform and discuss with Huawei and INWI. The dangerous action should get approval from Huawei and INWI before implementation;
2015-2-4
Huawei Confidential
Page6, Total 74 ,
BTS Installation Guideline for INWI Project
2. Indoor BTS Installation 2.1. Overview of Huawei indoor BTS3900
900M S111
900M S222~S555
900M&1800M
2.2. CPRI cable layout ayout (Singal cable between BBU and GRFU/DRFU)
900M
900M &1800M 1800M
Notes: Only connect CPRI cable to down CPRI port (Not up CPRI port)!
2015-2-4
Huawei Confidential
Page7, Total 74 ,
BTS Installation Guideline for INWI Project
DRFU
GRFU
CPRI cable to BBU
CPRI cable to BBU
Notes: Only connect CPRI cable to down CPRI port (Not up CPRI port)!
2015-2-4
Huawei Confidential
Page8, Total 74 ,
BTS Installation Guideline for INWI Project
2.3. Cable routing of indoor BTS3900
2015-2-4
Huawei Confidential
Page9, Total 74 ,
BTS Installation Guideline for INWI Project
2.4. Fix the redundancy cable on top of the cabinet
E1 Cable
Alarm Cable
Power Cable
2015-2-4
Huawei Confidential
Page10, Total 74 ,
BTS Installation Guideline for INWI Project
2.5. All cables should be layout straightly between cable ladder and cabinet without any loop or angle
2.6. All power cables and signal cables should be covered by different cable ducts Cable duct for
Cable duct for
DC power cable
E1 cable and alarm cable
2015-2-4
Huawei Confidential
Page11, Total 74 ,
BTS Installation Guideline for INWI Project
2.7. DDF installation in the existing transmission cabinet Huawei
Huawei alarm
E1 DDF
DDF
3 holes
3 holes
2.8. E1 transmission cable connection for normal sites Huawei BBU (GTMU)
Huawei E1 DDF
Huawei Responsible
INWI IDU
INWI DDF Huawei Responsible
INWI Responsible
2.9. E1 transmission cable connection for cascade sites Huawei BBU (GTMU)
Huawei Responsible
2015-2-4
Huawei E1 DDF
INWI DDF Huawei Responsible
Huawei Confidential
INWI IDU to up hop INWI IDU to next hop
INWI Responsible
Page12, Total 74 ,
BTS Installation Guideline for INWI Project
2.10. E1 cable color sequence E1 No.1 E1
No.2 E1
No.3 E1
No.4 E1
2015-2-4
PIN X.19 X.20 X.1 X.2 X.21 X.22 X.3 X.4 X.23 X.24 X.5 X.6 X.25 X.26 X.7 X.8
Wire Color gray white blue white blue red orange white orange red green white green red brown white
Remarks TX+ TXRX+ RXTX+ TXRX+ RXTX+ TXRX+ RXTX+ TXRX+ RX-
Huawei Confidential
Huawei E1 DDF port 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Page13, Total 74 ,
BTS Installation Guideline for INWI Project
2.11. Alarm cable connection (From INWI alarm system to BTS) Huawei BBU (UPEU)
Huawei Alarm DDF
Huawei Responsible
INWI Alarm System
INWI Responsible
Huawei alarm DDF
Huawei E1 DDF
Alarm cable distribution in UPEU Alarm DDF DCDU
FAN
The alarm label should be printed and sticked on the DDF
Label for Alarm DDF.xls
2015-2-4
Huawei Confidential
Page14, Total 74 ,
BTS Installation Guideline for INWI Project
2.12. The antistatic wrist strap should be installed in the BTS cabinet
2.13. No any document and labels in the back of the cabinet door
2.14. No any materials in the bottom of BTS
2015-2-4
Huawei Confidential
Page15, Total 74 ,
BTS Installation Guideline for INWI Project
2.15. Label for power cable
Label in the bottom of BTS
Label in the top of the BTS
Label in INWI power cabinet
2015-2-4
Huawei Confidential
Page16, Total 74 ,
BTS Installation Guideline for INWI Project
2.16. Label for CPRI cable (Singal cable between BBU and GRFU/DRFU) CPRI lable in BBU side:
CPRI lable in GRFU/DRFU side:
2015-2-4
Huawei Confidential
Page17, Total 74 ,
BTS Installation Guideline for INWI Project
2015-2-4
Huawei Confidential
Page18, Total 74 ,
BTS Installation Guideline for INWI Project
2.17. BTS Power on 1. When should we power on BTS? 1.1. For new sites, the BTS should be power on after hardware installation; 1.2. For the sites which already installed, please power on the BTS when you enter the sites for clean up/ pre-acceptance/ acceptance with INWI. 2. Measure input voltage before power on BTS and record the voltage value. The input voltage of the indoor BTS should be between -44V DC~-57V DC; The input voltage of the outdoor BTS should be between 180V AC~260V AC; 3. If the voltage is out of the range, please record the problem and inform your PM to ask INWI to solve the rectifier problem. 4. Indoor BTS power on sequence: 1) Switch on the switch for 2G BTS in INWI power cabinet; 2) Switch on FAN; 3) Switch on BBU; 4) Switch on UPEU (in BBU); 5) Switch on GRFU/DRFU; DCDU01 in BTS3900 cabinet:
5. Indoor BTS power off sequence: 1) Switch off GRFU/DRFU; 2) Switch off UPEU (in BBU); 3) Switch off BBU; 4) Switch off FAN; 5) Switch off the switch for 2G BTS in INWI power cabinet;
2015-2-4
Huawei Confidential
Page19, Total 74 ,
BTS Installation Guideline for INWI Project
2.18. Deal with the rubbish and clean up the shlelter
2015-2-4
Huawei Confidential
Page20, Total 74 ,
BTS Installation Guideline for INWI Project
3. Outdoor door BTS Installation 3.1. Overview of Huawei outdoor BTS3900A
900M S111
2015-2-4
900M S222~S555
Huawei Confidential
900M&1800M
Page21, Total 74 ,
BTS Installation Guideline for INWI Project
3.2. CPRI cable layout (Singal cable between BBU and GRFU/DRFU)
900M
900M &1800M
Notes: Only connect CPRI cable to down CPRI port (Not up CPRI port)!
3.3. Cable routing of outdoor BTS3900A Cable holes at the bottom of the BTS cabinet (RFC):
2015-2-4
Huawei Confidential
Page22, Total 74 ,
BTS Installation Guideline for INWI Project
No.
Item
Description
1
Left cable trough
AC power cables, PGND cables and AC power cables from battery cabinet to APM30
2
Right cable trough
Battery power cable, E1 cables, alarm cable from battery cabinet to APM30
3
Cable hole for Jumpers
1/2” Jumpers
4
Reserved cable hole
CPRI cables and monitoring signal cable between two BTS.
Cable holes at the bottom of the power cabinet (APM30):
No.
Description
1
AC power cables and PGND cables
2
CPRI cables between BTS cabinet and APM30 cabinet
3
DC power cable from PDU to DCDU (Already connected before delivery)
4
Battery power cable,E1 cables, alarm cable from battery cabinet to APM30
The jumper holes can only used for jumpers:
2015-2-4
Huawei Confidential
Page23, Total 74 ,
BTS Installation Guideline for INWI Project
Wrong connection of AC cable/PGND cable/battery cables.
2015-2-4
Huawei Confidential
Page24, Total 74 ,
BTS Installation Guideline for INWI Project
3.4. PGND cable connection for outdoor BTS3900A
The PGND cable from battery cabinet should be connected to the grounding bar in APM30 cabinet.
2015-2-4
Huawei Confidential
Page25, Total 74 ,
BTS Installation Guideline for INWI Project
3.5. All power cable and signal cable should be protected with metal pipe
Metal pipe for AC power cable
Metal pipe for E1 and alarm cable
2015-2-4
Huawei Confidential
Page26, Total 74 ,
BTS Installation Guideline for INWI Project
3.6. DDF installation in the existing transmission cabinet
Huawei DDF Rack
3 holes
3.7. E1 transmission cable connection for normal sites Huawei BBU (GTMU)
Huawei E1 DDF
Huawei Responsible
INWI IDU
INWI DDF Huawei Responsible
INWI Responsible
3.8. E1 transmission cable connection for cascade sites Huawei BBU (GTMU)
Huawei Responsible
2015-2-4
Huawei E1 DDF
INWI DDF Huawei Responsible
Huawei Confidential
INWI IDU to up hop INWI IDU to next hop
INWI Responsible
Page27, Total 74 ,
BTS Installation Guideline for INWI Project
3.9. E1 cable color sequence E1 No.1 E1
No.2 E1
No.3 E1
No.4 E1
2015-2-4
PIN X.19 X.20 X.1 X.2 X.21 X.22 X.3 X.4 X.23 X.24 X.5 X.6 X.25 X.26 X.7 X.8
Wire Color gray white blue white blue red orange white orange red green white green red brown white
Remarks TX+ TXRX+ RXTX+ TXRX+ RXTX+ TXRX+ RXTX+ TXRX+ RX-
Huawei Confidential
Huawei E1 DDF port 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Page28, Total 74 ,
BTS Installation Guideline for INWI Project
The E1 cable should be grounded in the APM30 cabinet:
Metal shielding layer (25 mm)
E1 cable from IDU
E1 lighting-protection From MW IDU E1 grounding clip
To GTMU
E1 grounding clip
2015-2-4
Huawei Confidential
Page29, Total 74 ,
BTS Installation Guideline for INWI Project
3.10. Alarm cable connection (From INWI alarm system to BTS) Huawei BBU (UPEU)
Huawei Alarm DDF
Huawei Responsible
INWI Alarm System
INWI Responsible
Huawei alarm DDF
Huawei E1 DDF
Alarm cable distribution in UPEU Alarm DDF
HPMI in APM30
FMUA in BTS cabinet
2015-2-4
Huawei Confidential
The alarm label should be printed and sticked on the DDF
Label for Alarm DDF.xls
Page30, Total 74 ,
BTS Installation Guideline for INWI Project
3.11. The antistatic wrist strap should be installed in the BTS cabinet
3.12. No any materials in the bottom of APM30
2015-2-4
Huawei Confidential
Page31, Total 74 ,
BTS Installation Guideline for INWI Project
3.13. Make waterprof of the outdoor cabinets
Make waterproof of the 2
Make waterproof of the 2
cable holes of each cabinet
cable holes of each cabinet
2015-2-4
Huawei Confidential
Page32, Total 74 ,
BTS Installation Guideline for INWI Project
3.14. Label for power cable
Label in INWI power cabinet
3.15. Label for CPRI cable (Singal cable between BBU and GRFU/DRFU) Same standard with the indoor BTS
3.16. BTS Power on 1. When should we power on BTS? 1.1. For new sites, the BTS should be power on after hardware installation; 1.2. For the sites which already installed, please power on the BTS when you enter the sites for clean up/ pre-acceptance/ acceptance with INWI. 2. Measure input voltage before power on BTS and record the voltage value. The input voltage of the outdoor BTS should be between 180V AC~260V AC; 3. If the voltage is out of the range, please record the problem and inform your PM to ask INWI to solve the rectifier problem. 4. Outdoor BTS power on sequence: 1) Switch on the switch for 2G BTS in INWI power cabinet; 2) Switch on AC Main in APM30; 3) Switch on SW9 (DCDU0), SW8 (DCDU1), SW5 (BBU), SW4 (HEUA); 4) Switch on UPEU (in BBU); 5) Switch on FMUA (in BTS cabinet); 6) Switch on GRFU/DRFU (in BTS cabinet); 7) Switch on Battery after battery installation; 2015-2-4
Huawei Confidential
Page33, Total 74 ,
BTS Installation Guideline for INWI Project
Battery Switch Switch 0~9 AC Main
DC power switch 0~9 in APM30: Switch
Switch Name
Operation
SW9
DCDU0 (30A)
Need to switch on
SW8
DCDU1 (30A)
Need to switch on
SW7
SPARE5 (30A)
SW6
SPARE4 (30A)
SW5
BBU (12A)
Need to switch on
SW4
HEUA (12A)
Need to switch on
SW3
SPARE3 (4A)
SW2
SPARE2 (4A)
SW1
SPARE1 (4A)
SW0
SPARE0 (4A)
5. Outdoor BTS power off sequence: 1) Switch off Battery; 2) Switch off GRFU/DRFU (in BTS cabinet); 3) Switch off FMUA (in BTS cabinet); 4) Switch off UPEU (in BBU); 5) Switch off SW9 (DCDU0), SW8 (DCDU1), SW5 (BBU), SW4 (HEUA); 6) Switch off AC Main in APM30; 7) Switch off the switch for 2G BTS in INWI power cabinet; 2015-2-4
Huawei Confidential
Page34, Total 74 ,
BTS Installation Guideline for INWI Project
3.17. Deal with the rubbish and clean up the sites
2015-2-4
Huawei Confidential
Page35, Total 74 ,
BTS Installation Guideline for INWI Project
3.18. IBBS200 (Big Battery Batt Cabinet) installation Scenario 1: Have extra space for Huawei battery space Install Huawei battery cabinet in extra place. Battery layout in the battery cabinet:
Huawei Battery Group 2 Huawei Battery Group 1 Power cable connection of scenario 1:
Huawei Battery Group 2
Huawei Battery Group 1
2015-2-4
Huawei Confidential
Page36, Total 74 ,
BTS Installation Guideline for INWI Project
Scenario 2: No extra space for Huawei battery space
Dismantle ZTE battery cabinet and install install Huawei battery cabinet in original place. The ZTE battery and power cable will be reused. The ZTE battery cabinet can be removed as rubbish. Battery layout in the battery cabinet: Huawei Battery Group 2 Huawei Battery Group 1 ZTE Battery Group 2 ZTE Battery Group 1
2015-2-4
Huawei Confidential
Page37, Total 74 ,
BTS Installation Guideline for INWI Project
Power cable connection of scenario 2:
Huawei Battery Group 2
Huawei Battery Group 1
ZTE Battery Group 2
ZTE Battery Group 1
Huawei battery cabinet installation after swap ZTE battery cabinet:
2015-2-4
Huawei Confidential
Page38, Total 74 ,
BTS Installation Guideline for INWI Project
ZTE battery cabinet dismantling and Huawei battery installation steps: 1) Check the AC power and battery is working normally ly for ZTE BTS; 2) Switch off ZTE battery attery from ZTE BTS cabinet; 3) Dismantle ismantle ZTE battery and battery cabinet; 4) Install Huawei battery cabinet; cabinet 5) Remove the battery switch from layer1 to layer3 in Huawei battery cabinet; 6) Disconnect the RTN (+) power cable (red color) between two copper wiring bars (between layer2 and layer3); layer3) 7) Disconnect the NEG (-48V) power cable (black color) between two copper wiring bars (between layer2 and layer3); layer3) 8) Install ZTE battery and connect power cable to ZTE BTS; 9) Install Huawei battery and connect power cable to Huawei BTS; BTS Notes: There is no battery switch in ZTE battery cabinet. The switch for battery is in ZTE BTS cabinet.
2015-2-4
Huawei Confidential
Page39, Total 74 ,
BTS Installation Guideline for INWI Project
Battery installation check 1) Measure the battery voltage and make sure the value is -48V to -54V; 2) Switch on battery in battery cabinet and APM30;
Battery Switch in APM30
Battery Switch in battery cabinet
3) Swith off the AC power to check if the battery is working normally or not; 4) After the check, switch on the AC power finally. Do the same test for ZTE battery installation to check the ZTE battery is working normally.
2015-2-4
Huawei Confidential
Page40, Total 74 ,
BTS Installation Guideline for INWI Project
Temperature emperature sensor connection in battery cabinet Connect battery temperature sensor to RTN+ connector in Huawei uawei battery group 1.
Alarm larm cable connection from battery cabinet to APM30 Temperature alarm cable connection (orange white); white) Door alarm cable connection (green white); white) Temperature alarm and door alarm cable connection in battery cabinetion: cabinetion To sensor
To sensor
Orange
White
White hite
Green
White
Orange range Green White
To APM30
2015-2-4
To APM30
Huawei Confidential
Page41, Total 74 ,
BTS Installation Guideline for INWI Project
Temperature alarm and door alarm cable connection in APM30 cabinet:
Temperature alarm cable
Door alarm cable
After the alarm cable installation, please contact BSC engineer to confirm the door open alarm of battery cabinet. Name
ID
Position
BTS Integration Hotline
0000001
BTS Integration Hotline
Mobile-Phone No. INWI
Email
IAM
0646117035
If the BTS integration hotline is busy, you can also contact with the following BSC engineers: EN NAQI Abdelilah WX22053 BSC Engineer for Integration 0646117029 0662120789
2015-2-4
Huawei Confidential
[email protected]
Page42, Total 74 ,
BTS Installation Guideline for INWI Project
3.19. IBBS200T (Small Battery Cabinet) installation There are 2 hardware versions of BTS3900A and IBBS200T: V302 and V303. 1) IBBS200T(V302) using 25mm battery power cable with OT terminal; 2) IBBS200T(V303) using16mm battery power cable with special connector; BTS3900A (V302) and IBBS200T (V302)
2015-2-4
Huawei Confidential
Page43, Total 74 ,
BTS Installation Guideline for INWI Project
BTS3900A (V303) and an IBBS200T (V303)
2015-2-4
Huawei Confidential
Page44, Total 74 ,
BTS Installation Guideline for INWI Project
3.20. IBBS200T V302 (Small Battery Cabinet) installation
BTS3900A V302
IBBS200T V302
2015-2-4
Huawei Confidential
Page45, Total 74 ,
BTS Installation Guideline for INWI Project
Battery power cable connection:
Not used for INWI project
Not used for INWI project
2015-2-4
Huawei Confidential
Page46, Total 74 ,
BTS Installation Guideline for INWI Project
Alarm cable connection:
After the alarm cable installation, please contact BTS integration hotline to confirm the door open alarm of battery cabinet. 2015-2-4
Huawei Confidential
Page47, Total 74 ,
BTS Installation Guideline for INWI Project
3.21. IBBS200T V303 (Small Battery Cabinet) installation
BTS3900A V303
IBBS200T V303
2015-2-4
Huawei Confidential
Page48, Total 74 ,
BTS Installation Guideline for INWI Project
Battery power cable connection:
Battery cable connector in APM30H cabinet:
2015-2-4
Battery cable connector in IBBS200T cabinet:
Huawei Confidential
Page49, Total 74 ,
BTS Installation Guideline for INWI Project
TEC FAN power cable connection:
Connection point for TEC FAN power cable in IBBS200T
Connection point for battery power cable in IBBS200T
2015-2-4
Huawei Confidential
Page50, Total 74 ,
BTS Installation Guideline for INWI Project
Make TEC FAN power cable connector: The DC power cable for TEC FAN should be made in site.
Load 3 for TEC FAN
2015-2-4
Huawei Confidential
Page51, Total 74 ,
BTS Installation Guideline for INWI Project
2015-2-4
Huawei Confidential
Page52, Total 74 ,
BTS Installation Guideline for INWI Project
Alarm cable connection:
Alarm cable in IBBS200T cabinet (Ethernet cable, RJ45 connector):
After the alarm cable installation, please contact BTS integration hotline to confirm the door open alarm of battery cabinet. 2015-2-4
Huawei Confidential
Page53, Total 74 ,
BTS Installation Guideline for INWI Project
4. DBS Installation 4.1. Overview of Huawei DBS3900 For all DBS sites, the site survey should be performed with INWI maintenance engineers before equipment delivery and installation. During the site survey, the installation strategy (install BBU in APM30 or transmission cabinet)/space requirement/power requirement and cable connection should be confirmed and agreed with INWI maintenance engineers.
TSSR for DBS3900 Instalaltion
Scenario 1: BBU in APM30 (on the ground), RRU in tower or Pole (3 Poles) APM30H V303 RRU1 RRU2 RRU3
2015-2-4
Huawei Confidential
Page54, Total 74 ,
BTS Installation Guideline for INWI Project
Scenario 2: BBU in APM30 (on the tower), RRU in tower or Pole (1 Pole)
APM30 Cabinet
Scenario 3: BBU in transmission cabinet, RRU in tower or pole
BBU in transmission cabinet
2015-2-4
Huawei Confidential
Page55, Total 74 ,
BTS Installation Guideline for INWI Project
4.2. BBU installation (for scenario 1&2, BBU in APM30)
4.3. DC power cable conection (for scenario 1&2, BBU in APM30)
DC power cable for RRU1 DC power cable for HPMI DC power cable for BBU DC power cable for RRU2
DC power cable for RRU3
2015-2-4
Huawei Confidential
Page56, Total 74 ,
BTS Installation Guideline for INWI Project
4.4. BBU installation (for scenario 3, BBU in transmission cabinet)
4.5. DC power cable conection (for scenario 3, BBU in transmission cabinet) If the BBU was installed in the transmission cabinet (no APM30), the DC power switch for BBU and RRU should be provided by INWI in the transmission cabinet or DC power cabinet. DC Switch for BBU (5A~10A) DC Switch for RRU (10A~20A)
2015-2-4
1 DC switch for BBU 1 DC switch for 1 RRU (3 switchs for 3 RRUs)
Huawei Confidential
Page57, Total 74 ,
BTS Installation Guideline for INWI Project
4.6. DC power cable and CPRI cable in RRU
CPRI_W
CPRI Cable to BBU
DC Power Cable
2015-2-4
Huawei Confidential
Page58, Total 74 ,
BTS Installation Guideline for INWI Project
4.7. Outside cables of RRU
Jumpers
CPRI Cable
RRU DC Power Cable Grounding Cable
4.8. Keep necessary operation space between RRUs
2015-2-4
Huawei Confidential
Page59, Total 74 ,
BTS Installation Guideline for INWI Project
4.9. Battery installation for DBS3900 Please refer to 3.22 IBBS200T V303 (Small Battery Cabinet) installation Remark: IBBS200T can be installed with APM30H stackable:
2015-2-4
Huawei Confidential
Page60, Total 74 ,
BTS Installation Guideline for INWI Project
4.10. Alarm cable connection (From INWI alarm system to BTS) Huawei BBU (UPEU)
Huawei Alarm DDF
Huawei Responsible
INWI Alarm System
INWI Responsible
Huawei alarm DDF
Huawei E1 DDF
Alarm cable distribution in UPEU HPMI in APM30 Alarm DDF
The alarm label should be printed and sticked on the DDF
(if there is APM30)
Label for Alarm DDF.xls
2015-2-4
Huawei Confidential
Page61, Total 74 ,
BTS Installation Guideline for INWI Project
5. Antenna System Installation 5.1. Install the antenna according to the IO parameters Design Sector 3 AZ (Azimuth)
HMA TER (Antenna to roof)
HMA SOL (Antenna to ground)
230
8.8
31.3
Antenna 3
Electrical Tilt
Mechanical Tilt
H. Building Pylône (m)
Mast (m)
Agisson DXX-824-960 1710-2170-6565-17.5i18i-MM
4
4
22.5
9
1. Mechanical Tilt
2. Electrical Tilt
2015-2-4
Huawei Confidential
Page62, Total 74 ,
BTS Installation Guideline for INWI Project
5.2. Keep at least 1 meter distance between GSM and CDMA antennas
≧1 meter
5.3. Install the grounding cables for antennas
About 2.5m between antenna and ground bar
2015-2-4
Huawei Confidential
Page63, Total 74 ,
BTS Installation Guideline for INWI Project
5.4. Install the feeder clamps 1 pcs/ meter
1m 1m 1m 1m
5.5. Install the grounding cables for feeders If the feeder is between 10m~40m, 3 points of cable grounding: Top of the tower/Tri-pole/ pole/ Guyed mast; Bottom of the tower/Tri-pole/ tower/Tri Guyed mast; Outside of feeder window; window If the feeder is more than 40m, 4 points of cable grounding: Top of the tower/Tri-pole/ pole/ Guyed mast; Middle of the tower/Tri-pole/ tower/Tri Guyed mast; Bottom of the tower/Tri-pole/ tower/Tri Guyed mast; Outside of feeder window; window
Top of the tower/Tri-pole/ pole/ Guyed mast
2015-2-4
Middle of the tower/Tri-pole/ tower/Tri Guyed mast
Huawei Confidential
Page64, Total 74 ,
BTS Installation Guideline for INWI Project
Bottom of the tower/Tri-pole/ Guyed mast
Outside of feeder window
5.6. Make waterproof to all outside conenctors
2015-2-4
Huawei Confidential
Page65, Total 74 ,
BTS Installation Guideline for INWI Project
5.7. Make labels for jumpers and feeders Antenna Jumper to antenna side Antenna Jumper to feeder side Feeder close to antenna Feeder close to antenna
Feeder outside of feeder window Feeder outside of feeder window Feeder window Feeder inside of feeder window BTS Jumper to feeder side
BTS Jumper to BTS side
2015-2-4
Huawei Confidential
Page66, Total 74 ,
BTS Installation Guideline for INWI Project
5.8. Reserve spare space in cable tray for 3G in future
2G 3G
5.9. Reserve spare space in feeder window for 3G in future
3G 2G
2015-2-4
Huawei Confidential
Page67, Total 74 ,
BTS Installation Guideline for INWI Project
5.10. Install CDMA&GSM dual-band (Bi-technology) antenna Connectors in CDMA&GSM antenna (View from Back face of the antenna) Connector in antenna bottom Jumer from BTS
+45
-45
+45
-45
CDMA TX
CDMA RX
GSM TX
GSM RX
Stand Operation Procedure: Start Time
End Time
9:30
9:30
9:30
13:00
12:30
13:00
14:00
14:05
Power off CDMA BTS
14:05
14:10
VSWR test for existing CDMA sectors
14:10
14:30
Connect CDMA feeder to CDMA filter
14:30
15:30
15:30
17:30
VSWR test for new CDMA sectors (△≤0.1)
17:30
17:45
VSWR test for new GSM sectors (≤1.4)
17:45
18:00
18:00
18:30
Power on CDMA BTS
18:30
18:35
Power on GSM BTS
18:30
18:35
On-tower Activity
In-site Activity Before enter the site, contact with INWI NOC
Install new feeder for GSM BTS
Dismantle and delivery CDMA antenna from tower to site (sector by sector)
Install GSM filter and connect to GSM BTS (if GSM filter is needed for this site) Install CDMA filter Connect GSM feeder to GSM filter (if GSM filter is needed for this site) Contact with INWI NOC before power off CDMA BTS
OMC Activity Be informed site enter
Be informed CDMA BTS will be power off
Delivery and install new CDMA&GSM dual-band antennas from site to tower (sector by sector) Check Mechanical tilt and electrical tilt
Troubleshooting if there is any VSWR problem Make waterproof for new antenna/jumper connectors
Contact with INWI NOC after power on CDMA BTS
Alarm monitor for CDMA BTS
18:35
18:40
Contact with Huawei BTS integration hotline after power on GSM BTS
Alarm monitor for GSM BTS
18:40
18:45
Packing CDMA antennas with existing GSM packing materials
18:45
19:45
Site cleaning
19:45
20:00
Troubleshooting if there is any BTS alarm
2015-2-4
Huawei Confidential
Page68, Total 74 ,
BTS Installation Guideline for INWI Project
Contact with INWI NOC before leaving the site
Leaving approval
20:00
Delivery CDMA antenna to subcontractor's warehouse
20:00
20:00
Notes: INWI NOC: 529000800/529000604 Huawei BTS integration hotline: 0646117035
5.11. GSM antenna swap for faulty antenna with high VSWR Stand Operation Procedure: Start Time
End Time
Enter the site Unpack the materials
9:30 9:30
9:30 10:00
Record the Bar Code of new antenna (sector by sector)
9:30
10:00
Power off GRFU/DRFU
10:00
10:00
Dismantle and delivery old GSM antenna from tower to site (sector by sector)
10:00
11:00
Delivery and install new GSM antennas from site to tower (sector by sector)
11:00
12:30
12:30
12:40
12:40
12:50
12:50
13:00
13:00
13:15
13:15
13:15
13:15
13:25
13:25
13:30
On-tower Activity
Check distance between GSM and CDMA antenna (≥1m) Check antenna Azimuth and Height Check Mechanical tilt and Electrical tilt
In-site Activity
OMC Activity
VSWR test for new GSM sectors (≤ 1.4) Troubleshooting if there is any VSWR problem
Make waterproof for new antenna/jumper connectors Power on GRFU/DRFU After 10 minutes, contact with INWI NOC/Huawei BTS integration hotline to check the alarm Troubleshooting if there is any BTS alarm Site cleaning
Alarm monitor for GSM BTS
Delivery swapped GSM antenna to subcontractor's warehouse
Notes: INWI NOC: 529000800/529000604 Huawei BTS integration hotline: 0646117035 2015-2-4
Huawei Confidential
Page69, Total 74 ,
BTS Installation Guideline for INWI Project
6. BTS Integration 6.1. Hardware Ready for Integration BTS was installed (with GRFU/DRFU); E1 cable was connected from BTS to INWI DDF; BTS was power on;
6.2. Transmission Ready for Integration BSC engineer perform the loop test with INWI the check the E1 link from Microwave IDU to BSC Soft-loop from INWI IDU to Huawei BSC
Huawei
Huawei
BTS
INWI
E1 DDF
DDF
INWI
INWI
IDU
ADM
Huawei
Huawei
INWI
Responsible
Responsible
Responsible
INWI ODF Huawei BSC
BTS Site
2015-2-4
Huawei Confidential
BSC POP
Page70, Total 74 ,
BTS Installation Guideline for INWI Project
6.3. Hardware and Transmission Ready for Integration 1. BTS was installed (with GRFU/DRFU); 2. E1 cable was connected from BTS to INWI DDF; 3. BTS was power on; 4. E1 loop test was done by INWI&Huawei and the E1 link from IDU to BSC is OK;
6.4. BTS Integration If the BTS is power on and E1 connection is done without problem, the BTS can be integrated automatically. If the BTS can’t be integrated, site engineer should visit the sites for troubleshooting. For example, the following sites need to be visited for integration: No.
BSC
Site ID
Hardware Filter TR Actived TR Loop Test by TR Ready Hardware for and TR Installation Installation by INWI INWI&Huawei and Power Integration Ready for on Integration
Integration
3
CAS_BSC1 CAS-1099
2009-9-5
2009-9-30 2009-9-3
2009-9-24
2009-10-3 2009-10-3
Need visit
5
CAS_BSC1 CAS-1080
2009-9-7
2009-10-1 2009-9-3
2009-10-6
2009-10-6 2009-10-6
Need visit
12 CAS_BSC1 CAS-1083
2009-9-6
2009-9-30 2009-9-3
2009-9-25
2009-9-25 2009-9-25
Need visit
15 CAS_BSC1 CAS-1120
2009-8-5
2009-9-20 2009-9-25
2009-10-8
2009-10-8 2009-10-3
Need visit
26 CAS_BSC1 CAS-1167 2009-7-22 2009-9-26 2009-9-3
2009-10-6
2009-10-6 2009-10-6
Need visit
27 CAS_BSC1 CAS-1102
2009-9-30 2009-9-3
2009-9-25
2009-9-25 2009-9-25
Need visit
28 CAS_BSC1 CAS-1037 2009-9-15 2009-9-30 2009-9-3
2009-9-24
2009-10-3 2009-10-3
Need visit
30 CAS_BSC1 CAS-1047
2009-9-5
2009-9-30 2009-9-3
2009-10-3
2009-10-3 2009-10-3
Need visit
31 CAS_BSC1 CAS-1039
2009-9-5
2009-9-24 2009-9-3
2009-9-26
2009-10-3 2009-10-3
Need visit
2015-2-4
2009-9-5
Huawei Confidential
Page71, Total 74 ,
BTS Installation Guideline for INWI Project
6.5. Tools and Materials for Site Engineer for BTS Integration When you go to the sites, please take necessary tools and materials and try to close the installation problem in sites. Do not just record and report the problem. 1) Master Key for sites; 2) Multimeter; 3) Krone E1 connection tool; 4) E1 cable (20 meters); 5) E1 loop cable; 6) Key for Indoor BTS3900; 7) Key for outdoor BTS3900A; 8) Key for the outdoor transmission cabinet; 9) DC power cable and connectors (10 meters); 10) AC power cable and connectors (10 meters);
6.6. BSC Engineer for BTS Integration When you enter the sites for BTS integration, please call BTS Integration Hotline to check the BTS integration status with BSC engineer: Mobile-Phone No.
Name
ID
Position
BTS Integration Hotline
0000001
BTS Integration Hotline
INWI
Email
IAM
0646117035
If the BTS integration hotline is busy, you can also contact with the following BSC engineers: EN NAQI Abdelilah WX22053 BSC Engineer for Integration 0646117029 0662120789
[email protected]
6.7. Possible Problem for BTS Integration and Solution No
Problem
Solution
1
Access problem (Owner refuse)
Contact with INWI deployment engineer
2
Access problem (No suitable key)
Contact with INWI deployment engineer
3
Access problem (Lock was broken)
Use screw driver for help
2015-2-4
Huawei Confidential
Page72, Total 74 ,
BTS Installation Guideline for INWI Project
No
Problem
Solution
4
BTS didn’t power on
Power on BTS
5
E1 cable didn’t be connected from BTS Connect E1 cable to INWI DDF
6
E1 cable connection mistake;
Reconnect E1 cable
7
GRFU/DRFU board didn’t be installed
Record the problem and inform RPM
8
Transmission problem
Physic loop from Huawei DDF to BSC to check INWI transmission from IDU to BSC; (BSC engineer will check status) Physic loop from Huawei DDF to BTS to check the E1 cable connection; (If the LIU0 LED light is off, the E1 cable connection is OK)
9
INWI didn’t connect E1 cable from IDU Contact INWI deployment engineer for to INWI DDF help and connect the E1 cable by ourself
10
INWI didn’t remark TX/RX in INWI DDF Contact INWI deployment engineer for help and connect the E1 cable by ourself
11
[Outdoor] INWI didn’t connect AC Record the problem and inform INWI power cable from TGBT to the fuse (for deployment engineer and Huawei RPM 2G BTS)
12
[Outdoor] INWI didn’t provide AC power Connect the AC power cable by ourself cable from fuse (for 2G BTS) to BTS
13
[Outdoor] INWI outdoor power doesn’t Record the problem and inform INWI work deployment engineer and Huawei RPM
14
[Outdoor] No key for INWI outdoor Contact with INWI deployment engineer transmission cabinet
2015-2-4
Huawei Confidential
Page73, Total 74 ,
BTS Installation Guideline for INWI Project
6.8. BTS Integration Status Check 1. If the LIU0 LED light is off, that means the transmission to BTS is OK,
LIU0 light should be off
2. Also please check with BSC engineer that if he can see the BTS in BSC. If the BTS can be monitored in BSC, the BTS is integrated successfully! 3. Check if there is any alarm of the BTS in site. All the LED lights should be off or green. No any red light.
4. Check with BSC engineer if there is any alarm of the BTS in BSC.
2015-2-4