GBTS and NodeB BTS3900A/BTS3900
BTS AND NODEB HARDWARE INSTALLATION ACCEPTANCE PROTOCOL
A. SITE INFORMATION Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 1 of 11
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
Site ID
103555
Site Name
CISOMANG PANGLEJAR
BSC / RNC Area
CIRANJANG
BTS / Node B type
Subcontractor Company
BTS3900A □ Single 2G 2G/3G PT. PAS ADITAMA
Subcontractor Supervisor
Wahyu Adhidarma
Configuration
□ Single 3G
□ Co-located
Installation started date Installation finished date
Type of BTS/NodeB □ Roof Top (outdoor/indoor) ____________ □ Green field (outdoor/indoor) Outdoor Type of BTS/NodeB □ BTS3900A □ BTS3900 Type of Deployment □ Swap Site □ New Deployment
B. EQUIPMENT BTS and NodeB Hardware on Main Rack
Quantity
Hardware in Power/Battery Rack
1. BBU3900
1. DCDU
2. GTMU (2G)
2. Junction Box
3. WMPT (3G)
3. EMUA ( CMUA )
4. WBBP (3G)
4. Battery
5. UBFA
5. Fan Box
6. UPEU
6. FMUA (For BTS3900A Only)
7. UEIU
7. PSU
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 2 of 11
Quantity
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
8. UELP
8. PMU
9. GRFU (2G)
9. PDU
10. DRFU (2G) 11. WRFU (3G) 12. MRFU (3G) 13. Fan
C. HARDWARE INSTALLATION CHECK ITEMS 1. Installation of Equipment No
Check content
1
The racks/cabinets firmly fixed on its base (bracket) after it is installed.
2
Make sure the doors and door lock are working properly.
3
The parts of the rack should not be distorted and not affecting the equipment appearance.
4
The RF cable connector needs to be installed perfectly.
5
The fan should be tightened with screws so that its installation is firm.
6
Cables should be tiled with uniform spacing and moderate tightness. Cable ties should be tied in a tidy way.
7
The board can be plugged and unplugged smoothly. Its panel screws should have appropriate tightness if they exist.
8
The jumpers are properly connected according to the sector and master/diversity relation, and are routed in a neat way.
9
The alarm box should be correctly installed according to design requirements. Its panel should be clean without any obvious scratches.
10
The connection of alarm cable should be correct and reliable (check when an external alarm box exits).
11
Battery installed as described with correct polarity
12
The cable connection of storage battery cabinet should be correct and reliable (check when an external storage battery exits).
YE S
NO
N/ A
YE S
NO
N/ A
2. Installation of Antenna and Feeder Cable No 1
Check content Waterproof and sealed measures for all outdoor jumpers and feeder cables should be correctly adopted according to specifications.
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 3 of 11
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
2 3 4
The feeder cables should not have obvious bending and twisting and bare copper appearance. The connector of feeder cable is made in a standard way without any loose connection. The connection between antenna support and tower should be reliable and firm. The connection between antenna and its support should also be reliable and firm.
5
The azimuth and tilt angle of the installed antenna must accord with design specifications.
6
The antennas mechanical down tilt angles should be correct.
7
When a feeder window is installed on the top of building to lead the feeder cable into the room, it must be sealed well.
8 9 10
The jumpers are properly connected according to the sector and master/diversity relation, and are routed in a neat way. The labels of communication cables, feeder cables and jumper should be stuck and tied according to specifications. The labels should be arranged in an orderly way with same direction. The jumper of the antenna should be tied along the rail of the support to the steel frame of the power.
11
Jumper cable must connect tightly with the connector of the board (RFU)
12
The labels of the antenna system can be easily identified. The color rings are stuck correctly according to the requirements.
3. Power cable and Grounding Rule No
YE S
Check content
1
Each power cable or ground cable should be a whole section of copper core cable without any connector in between.
2
When making copper lugs at the two ends of a power cable or ground cable, they should be soldered or crimped firmly.
3
Check all bottom grounding are correctly terminated
4
The front door of cabinet should be connected to the grounding bolt of the door on the rack by the deliveried or purchased cable.
5
Check number/location of feeder grounding kits
6
The functions of power supply and fan are normal.
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 4 of 11
NO
N/ A
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
7
The labels of power cable and ground cable are filled in and stuck correctly and reliably.
8
The color of distributed power cables and ground cables should conform to the shipment, or satisfy requirements of the customer.
4. Others No
Check content
YES
1
The installation tools accord with the antistatic requirements.
2
Check that all installation and packing materials have been removed from the site
3
The equipment room should be neatness and tidy. Discarded packing materials should be cleaned. Spare parts should be arranged in a tidy way after installation.
NO
N/A
D. ELECTRICAL CHECK Type of Deployment □ Swap Site (Not Available for Swap Site) □ New Deployment
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 5 of 11
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
No
Check content
YES
1.
Make sure the power cable from the power distribution panel to power rack installed correctly
2.
Measure the AC voltage on power rack available. Number of Phases : 3
NO
N/A
BTS Power Rack
Nominal values 380Vac (A), 220Vac (B), 0Vac (C)
A
L1-L2 : _______V AC
L1-L3 :________V AC
L2-L3 :________ V AC
304-456V AC
B
L1-N : ________V AC
L2-N :_________V AC
L3-N : _________V AC
181-279V AC
C
N-PGND: _0,35_ V AC
0 V AC
NodeB Power rack
Nominal values 380Vac (A), 220Vac (B), 0Vac (C)
A
L1-L2: ________V AC
L1-L3: ________V AC
L2-L3: ________V AC
304-456V AC
B
L1-N: ________V AC
L2-N: ________V AC
L3-N: ________V AC
181-279V AC
C
N-PGND: ______V AC
3.
0 VAC
Measures the DC voltage on base and extension racks available : _______V DC (-40 to -60V DC)
Remarks: If 2G and 3G is combine cabinet, the power check only applies to BTS Power Rack.
E. ANTENNA AND FEEDERS INFORMATION 2G Antennas and Feeders Sector
Antenna Type *
Height
Direction
Mech Tilt
Elect Tilt
Cell 0 Cell 1 Cell 2 * put checkmark if applicable
Cell 0
Cell 1
Cell 2
Feeder Type Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 6 of 11
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
Feeder Length Indoor Jumper Cable Length (m) Outdoor Jumper Cable Length (m)
3G Antennas and Feeders Sector
Antenna Type *
Height
Direction
Mech Tilt
Elec Tilt
Cell 0 Cell 1 Cell 2 * put checkmark if applicable
Cell 0
Cell 1
Cell 2
Feeder Type Feeder Length Indoor Jumper Cable Length (m) Outdoor Jumper Cable Length (m)
F. VSWR MEASUREMENT
2G Measurement
Feeder Length (m)
VSWR (<1.4 feeder length >50m) (<1.3 feeder length <50m) VSWR
Cell 0
Cell 1
Cell 2
Frequency [ MHz ]
Distance-to-Fault ( <1.05) VSWR
Distance (m)
Ant 0 Ant 1 Ant 0 Ant 1 Ant 0 Ant 1
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 7 of 11
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
3G Measurement
Cell 0
Cell 1
Cell 2
Feeder Length (m)
VSWR (<1.4 feeder length >50m) (<1.3 feeder length <50m) VSWR
Frequency [ MHz ]
Distance-to-Fault ( <1.05) VSWR
Distance (m)
Ant 0 Ant 1 Ant 0 Ant 1 Ant 0 Ant 1
G. SITE CLEANING No
Check content
YES
1.
All rubbish in area Installation cleaned
2.
The rest of materials sent back to warehouse and inform person in charge
3.
The site area/container keys should be available and secure.
NO
N/A
H. HANDOVER DOCUMENTS Yes
No
NA
□ □ □
Is the equipment inventory at the site in hard and soft copy? (Attached with DN or PO)
I. SITE PHOTO CHECKLIST □ □ □ □ □ □ □ □ □ □ □
Front view of Site or Building Front view of Cabinet (2G and 3G) - door closed Front view of Cabinet (2G and 3G) - door open Battery Installed : 1. Series connection, 2. (+) cable=Black (-)cable=Blue PCM Cable braid connected to ground PCM and Alarm Cable installed to DDF GSM / UMTS Antenna installed properly : Cell 0 GSM / UMTS Antenna installed properly : Cell 1 GSM / UMTS Antenna installed properly : Cell 2 GSM / UMTS Antenna direction (covered area) view: Cell 0 GSM / UMTS Antenna direction (covered area) view: Cell 1
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 8 of 11
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
□ □ □ □ □ □ □
GSM / UMTS Antenna direction (covered area) view: Cell 2 Feeder Cable laying straight on the runway and labeled Feeder Jumper installed properly and labeled Antenna Cable Jumper installed properly and sealed by rubber tape. Grounding Kit installed properly to ground bar. Tower/ Pole structure KWH and ACPDB panel
J. CONCLUSION SUMMARY Yes
No
□
□
NA
□
Does the inspection indicate that Commissioning can start?
K. FINAL DECISION □ Accepted
□ Conditionally accepted
□ Rejected
L. Punch List BTS Hardware Installation ATP Site ID
103555
Site Name
CISOMANG PANGLEJAR
Cosmetic
Minor
Description
Major
Item No.
Severity
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 9 of 11
Date to be cleared
Responsible Group*
Date Cleared**
Supervisor
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
* CME, Implementation ** Date when deficiency cleared
Name
:
Date
:
Subcontractor
PT. Huawei Tech Investment
Managed Services
-------------------------------
-------------------------------
-------------------------------
-------------------------------
-------------------------------
-------------------------------
M. SIGNATURES
Performed By :
Name Date
Subcontractor
PT. Huawei Tech Investment
Managed Services
---------------------------------
---------------------------------
---------------------------------
---------------------------------
---------------------------------
---------------------------------
PT. Huawei Tech Investment
Managed Services
Approved By : Subcontractor
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 10 of 11
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released
Name Date
---------------------------------
---------------------------------
---------------------------------
---------------------------------
---------------------------------
---------------------------------
Revision number: 01 Date of issue: Dec 15, 2009
References: M14. Conditional Acceptance
Page 11 of 11
Document Title : INSTALLATION ATP FOR BTS & NODE B Document number : 103555/MEGA/Batch 3A/ 11-11.1 Release status: Released