Alcatel-Lucent GSM 9100 Compact BTS Indoor/Outdoor Evolution Installation Manual
BTS Document Installation & Dismantling Manual
3BK 17430 3135 RJZZA Ed.03
BLANK PAGE BREAK
Status
RELEASED
Short title All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel-Lucent.
2 / 84
3BK 17430 3135 RJZZA Ed.03
Contents
Contents Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2
Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 Hardware Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.4 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.5 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.6 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.7 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.2 Site-Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.2 Forms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.3 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.4 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Install 9100 Compact BTS Indoor/Outdoor Evolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Before Going On Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 Delivery and Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4 Rack Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.1 Crane Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.2 Manual Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5 Rack Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.1 C1: Case of Steel Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.2 C2: Case of Concrete Foundation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.3 C3: Case of Wall Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.4 C4: Case of Pole Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6 Power Supply and Earth Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.1 Installation of Cables in the Site Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.2 Protective Earth Cable Connection (GND) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.3 Power Cables Connection for AC Variant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.4 Power Cables Connection for DC Variant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6.5 Fit the Mains In Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7 PCM Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.1 Install the PCM Cables in the Cables Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.2 Cables Passing at Rack Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.3 Cables Connection at Rack Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7.4 Other Connection Possibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8 Antenna Jumpers Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8.1 Jumper Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8.2 Connection to the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8.3 Connection to the Feeders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9 Options Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.1 Alarm Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.2 Synchronization Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.10 Finish Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.10.1 Label the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3BK 17430 3135 RJZZA Ed.03
5 7 8 8 10 10 10 10 10 11 12 12 12 13 14 14 17 17 17 19 20 20 20 21 21 23 23 27 28 28 31 35 43 50 51 52 54 56 59 60 60 61 63 67 70 70 71 72 74 74 78 81 81
3 / 84
Contents
2.11
4 / 84
2.10.2 Close the Cable Entry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81 2.10.3 Leave the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82 OUTC Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
3BK 17430 3135 RJZZA Ed.03
Preface
Preface Purpose What’s New
This document describes how to install on site an 9100 Compact BTS Indoor/Outdoor Evolution (CBIE/CBOE) of Alcatel-Lucent BSS.
In Edition 03 The following section were updated: Site-Specific Information (Section 1.2.2) Installation Kits (Section 1.4.1.2). Connection of Optical Fiber PCM cable (Section 2.7.4.3) was added.
In Edition 02 Update for indoor applicability.
In Edition 01 First official release of the document.
Audience
This document is intended for: Installers Site administrators Supervisors Project managers Field service technicians Occasional users.
Assumed Knowledge
You must have a basic understanding of the following: Basic knowledge of Alcatel-Lucent BSS equipment Experience of electrical mounting and cabling.
3BK 17430 3135 RJZZA Ed.03
5 / 84
Preface
6 / 84
3BK 17430 3135 RJZZA Ed.03
1 Overview
1 Overview This section provides general information about the principle of the operation and requirements for the procedure.
3BK 17430 3135 RJZZA Ed.03
7 / 84
1 Overview
1.1 Presentation 1.1.1 Hardware Description 1.1.1.1 Rack Configuration The following figure shows the rack configuration for the 9100 Compact BTS Indoor/Outdoor Evolution installation with an AC variant.
AGX TRM
TRM
AGX
SUMA
System Cooling Fan
Cooling System Air Inlet FANU Heater AC Power Supply
+
HEATER RECTIFIER
+
SR1 SR2 DAC
Figure 1: Example of 9100 Compact BTS Indoor/Outdoor Evolution (CBIE/CBOE) AC Variant 2 Sectors with 1 or 2 TRX
8 / 84
3BK 17430 3135 RJZZA Ed.03
1 Overview
The following figure shows the rack configuration for the 9100 Compact BTS Indoor/Out door Evolution installation with a DC variant.
AGX TRM
TRM
AGX
SUMA
System Cooling Fan
Cooling System Air Inlet FANU Heater SR1 SR2 DAC HEATER
DC Distribution Unit
Figure 2: Example of 9100 Compact BTS Indoor/Outdoor Evolution (CBIE/CBOE) DC Variant 2 Sectors with 1 or 2 TRX
3BK 17430 3135 RJZZA Ed.03
9 / 84
1 Overview
1.1.1.2 Weight and Dimensions The following table gives the overall dimensions with roof overlapping.
CBIE/CBOE
Dimensions (mm)
Average weight (kg)
H= 900
35 empty cabinet
W= 370
70 equipped cabinet
D= 500
1.1.2 Cases The following cases apply: C1: Case of steel construction installation C2: Case of concrete foundation hollow base C3: Case of wall installation C4: Case of pole installation.
1.1.3 Options The following additional equipment can be installed: Alarm cables Synchronization cables.
1.1.4 Initial State To begin installation the following materials are delivered and packed on site: Rack Installation Kits Additional Equipment.
1.1.5 Final State After installation: Rack is fixed to the floor Subracks are switched OFF Equipment is ready for commissioning.
1.1.6 Restrictions None.
10 / 84
3BK 17430 3135 RJZZA Ed.03
1 Overview
1.1.7 Grouped Task Sequence Before going on site
Before you start
Delivery and checks
Rack transportation
Rack positioning
Power supply and Earth cables installation
PCM cables installation
Antenna jumpers installation
Options installation
Finish installation
3BK 17430 3135 RJZZA Ed.03
11 / 84
1 Overview
1.2 Preparation 1.2.1 Prerequisites Before to begin installation check that: The site is conform to safety rules of General Wiring Handbook The site is ready to receive the rack, according to the SPP 67 The equipment is delivered on site with associated installation kits. Note: The site feeders are not mandatory installed before starting of operation.
1.2.2 Site-Specific Information These information are necessary to start installation: Address and access to the site (key holder) Grounding plate location Customer power supply cabinet location Fuse breakers location in customer power supply cabinet Antenna feeders connection and information (if needed) Rack precise location Final configuration to be installed Number of alarms to be connected (if the case) Alarm terminal blocks location Type of rack to be installed Type of power supply, AC or DC Type of rack fixation (steel construction or concrete construction) PCM connection type (terminal blocks) Abis transmission type (electrical or optical) In case of electrical, PCM cable impedance (120-ohm or 75-ohm) Synchronization configuration (if the case) Optional equipment to be installed.
12 / 84
3BK 17430 3135 RJZZA Ed.03
1 Overview
1.3 Scheduling In order to avoid safety problem on site, the equipment must be installed by a team of 2 installers minimum. The following table gives the duration for the basic tasks. Task
Duration 1st person in mn
Duration 2nd person in mn
Before Going On Site
20
20
Before You Start
30
30
Delivery and Checks
20
20
Rack Transportation (1)
-
-
Rack Positioning (Section 2.5)
20
20
Power Supply and Earth Cables Installation
20
20
PCM Cables Installation
20
-
Antenna Jumpers Installation
20
20
Finish Installation
10
10
Total without optional tasks
160
140
(1)
: Transportation time to final location depending of the site. Mandatory 2 people for manual transport of disassembled equipment.
The following table gives the duration for the optional tasks and additional equipment installation.
3BK 17430 3135 RJZZA Ed.03
Optional Tasks
Duration 1st person in mn
Duration 2nd person in mn
Alarm Cables Installation
15
-
Synchronization Cables Installation
-
30
13 / 84
1 Overview
1.4 Resources 1.4.1 Tools 1.4.1.1 Hardware Tools The following table is used to check, at base, the availability of the required tools. Refer to Tools Catalogue for content checking. Name
Reference
Calibration
Basic set of tools
OUT 001
No
Tightening tool for antenna jumpers 3BK 25050 AA
OUT 003
No
BTS Outdoor specific tools
OUT 007
No
Dynamometric tools
OUT 011
Yes
1.4.1.2 Installation Kits The following table is used to check, on site, the mandatory or optional delivery item kits. The used symbols are: ◊ = mandatory kit # = technical choice kit ∇ = customer option kit. Kits
Mnemo
Reference
Qty
◊
Basic kit CBIE/CBOE
3BK 26431 ABAA
1
#
Wall mounting kit for CBIE/CBOE
3BK 28943 AAAA
1/if neede
#
Floor mounting kit for CBIE/CBOE
3BK 28944 AAAA
1/if neede
#
Pole mounting kit for CBIE/CBOE
3BK 28945 AAAA
1/if neede
#
Transportation bolts
1AD 09973 0001
4/installation team
#
Antenna jumper cable (1m)
BLF1
3BK 05360 BAAA
2/AN
#
Antenna jumper cable (2m)
BLF2
3BK 05360 CAAA
2/AN
#
Antenna jumper cable (3m)
BLF3
3BK 05360 DAAA
2/AN
#
120-ohm PCM cable (8 pairs L907/4)
CA120S8
3BK 08965 AAAA
100 m roll
3BK 08965 ABAA
250 m roll
14 / 84
3BK 17430 3135 RJZZA Ed.03
1 Overview
#
◊
Kits
Mnemo
Reference
Qty
75-ohm PCM Cable (8 coax FLEX3/8)
CACOAX8
3BK 25241 AAAA
100 m roll
3BK 25241 ABAA
250 m roll
PC25YG1D 3BK 08957 BAAA
100 m roll
3BK 08957 BBAA
250 m roll
PC05B5
3BK 08938 AAAA
reel
PC16BL1D
3BK 26923 AAAA
100 m roll
3BK 26923 ABAA
250 m roll
3BK 08937 BAAA
100 m roll
3BK 08937 BBAA
250 m roll
GND Yellow/Green cable 1 x 16 mm
2
◊
AC 230 Volts power cable 3 x 1.5 mm2
#
DC -48V power cable 1x 10 mm blue
#
2
DC 0V power cable 1x 10 mm2 black
PC16B1D
∇
Clock Synchronization cable (10 m)
OCC33
3BK 08304 AA
1
∇
Clock Synchronization cable (10 m)
OCC23
3BK 08303 AA
2
∇
Alarm cable 8 pairs (L907/4)
CA120S8
3BK 08965 AAAA
100 m roll
3BK 08965 ABAA
250 m roll
∇
Mechanical part for 24 terminal blocks
MP24
1AD 02843 0001
1
∇
Labels for 24 terminal blocks
LAB
1AD 02853 0001
1
∇
CAD Terminal block
JS10
1AB 06634 0011
4
∇
DDF wall fixation kit
FKW
1AD 02844 0002
1
∇
DDF rack fixation kit
FKR
1AD 02845 0001
1
#
120-ohm jumper for DDF (1 pair L904/1)
CA120S
3BK 08941 AAAA
100 m roll
3BK 08941 ABAA
250 m roll
3BK 08939 AAAA
100 m roll
3BK 08939 ABAA
250 m roll
#
75-ohm jumper for DDF (1 coax FLEX3)
CACOAX1
∇
Terminal block 75 Ohm 8 BNC connectors
1AD 03371 0009
For BNC links
∇
Terminal block 75 Ohm for 1.6-5.6 connectors
1AD 03371 0010
For 1.6-5.6 links
∇
BNCm connector for Flex 3
1AB 00642 0011
2/jumper cable Flex 3
∇
1.6-5.6 connector for Flex 3
1AB 02546 0013
2/jumper cable Flex 3
∇
Specific heat shrinking sheat for Flex 3
1AC 00330 0002
8/CBIE/CBOE
◊
Shims for levelling (1 Set for 10 racks)
3BK 26159 AAAA
1/10 CBIE/CBOE
3BK 17430 3135 RJZZA Ed.03
ST75
15 / 84
1 Overview
Kits
Mnemo
Reference
∇
Cable Optical fiber LC-LC 2SM 15m
849122239
∇
Cable Optical fiber LC-LC 2SM 30m
849125380
∇
Cable Optical fiber LC-LC 2SM 50m
849122247
∇
Cable Optical fiber LC-LC 2SM 70m
849123591
∇
Cable Optical fiber LC-LC 2SM 85m
849125398
∇
Cable Optical fiber LC-LC 2SM 100m
849123609
∇
Cable Optical fiber LC-LC 2SM 150m
849125406
∇
Cable Optical fiber LC-LC 2SM 200m
849125414
∇
Cable Optical fiber LC-LC 2SM 250m
849125422
∇
Cable Optical fiber LC-LC 2SM 300m
849125430
∇
Cable Optical fiber LC-LC 2MM 5m
849125513
∇
Cable Optical fiber LC-LC 2MM 15m
849122270
∇
Cable Optical fiber LC-LC 2MM 30m
849125521
∇
Cable Optical fiber LC-LC 2MM 50m
849122288
∇
Cable Optical fiber LC-LC 2MM 70m
849123633
∇
Cable Optical fiber LC-LC 2MM 85m
849125539
∇
Cable Optical fiber LC-LC 2MM 100m
849123641
∇
Cable Optical fiber LC-LC 2MM 150m
849125547
∇
Cable Optical fiber LC-LC 2MM 200m
849125554
∇
Cable Optical fiber LC-LC 2MM 250m
849125562
∇
Cable Optical fiber LC-LC 2MM 300m
849125570
∇
SFP MOD 1000BASE-LX10
1AB 18728 0029
∇
SFP MOD S-16.1
1AB 19467 0019
∇
SFP MOD S-16.1
1AB 19467 0018
∇
SFP MOD 1000BASE-SX
1AB 18728 0063
∇
SFP MOD I-16.1
1AB 18728 0064
∇
SFP MOD S-16.1
1AB 18728 0065
∇
SFP MOD L-16.1
1AB 18728 0066
16 / 84
Qty
3BK 17430 3135 RJZZA Ed.03
1 Overview
1.4.2 Forms You must have the following forms: BSS Site Premises Inspection Form (post handover) 8BL 00704 0016 DRBRA Site Premises Inspection Form (CEL) 8BL 00704 0015 DRBRA
1.4.3 Supplies Installer or subcontractor must supply: One set of sleeves to fit at each end of cables (PCM, Alarm, Power, ...) One set of screws, nuts and washers to connect power cables to Site Power Box and to Earth Plate One set of terminal lugs for power cables.
1.4.4 Applicable Documents You need the following GSM documents to complete this scenario: Applicable Notification List (3DF 00462 0004 AAAGA) Catalogue of Instruction Operation for GSM (3DF 00300 0004 UAZZA) IO 78 - 9100 BTS Radio Configurations for Antenna Supervision (3DF 00300 0078 UAZZA) Tools Catalogue for field activity for GSM (3BK 20458 0001 RJZZA) BSS Methods Handbook (3BK 17430 0002 RJZZA) Installation Manual Generic Completion Check List for GSM (3BK 17200 0002 QZZZA) General Wiring handbook for GSM (3BK 17160 0001 RJZZA) Installation Method of DDF for BSS Equipment (3DF 00435 0033 RJZZA) 9100 BTS Hardware Description (3BK 21242 AAAA TQZZA) Site Premise Inspection Form (8BL 00704 0015 DRBRA) Site Preparation Specifications 9100 Compact BTS Outdoor Evolution (CBOE) 8BL 00704 0084 DRZZA Site Preparation Specifications 9100 Compact BTS Indoor Evolution (CBIE) 8BL 00704 0086 DRZZA
3BK 17430 3135 RJZZA Ed.03
17 / 84
1 Overview
18 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2 Install 9100 Compact BTS Indoor/Outdoor Evolution Install 9100 Compact BTS Indoor/Outdoor Evolution section presents all the checks needed before starting the installation, and all detailed tasks to be performed on site.
3BK 17430 3135 RJZZA Ed.03
19 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.1 Before Going On Site Before going on site, you must check that the following information and supplies are available: The customer has been informed of the: Date and time Site name and address Purpose of the operation. All Prerequisites (Section 1.2.1) are fulfilled Personnel is available and ready for operation (see Scheduling (Section 1.3)) Site-Specific Information (Section 1.2.2) is available and ready for operation All Hardware Tools (Section 1.4.1.1) and Supplies (Section 1.4.3) are available and ready for operation Applicable Documents (Section 1.4.4) are available.
2.2 Before You Start 2.2.1 Checks On arrival at site, before you start, perform the following operations: Check that all Prerequisites (Section 1.2.1) are fulfilled Check applicable notifications and operating instructions (refer to Catalogue of Technical and Logistic Information (ITL-PRO) and Catalogue of Instruction Operation (IO)) Check that all Hardware Tools (Section 1.4.1.1) and Supplies (Section 1.4.3) are available and ready for operation Check that safety precautions have been taken in accordance with the safety instructions described in the General Wiring Handbook Check if any Cases (Section 1.1.2) and Options (Section 1.1.3) apply Complete the header field of the CCL Complete the Site Premises Inspection Form (CEL) Check that the resistance of the antistatic wrist strap is greater than 1M . Connect the anti-static wrist strap to the rack earth.
20 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.2.2 Required Knowledge You must be familiar with the following: The safety rules and precautions given in the General Wiring Handbook How to document faults and anomalies, as described in the BSS Methods Handbook How to complete the Site Premises Inspection Form (CEL).
2.3 Delivery and Checks For personal and equipment safety, it is important that: During any kind of transportation the door must be closed At door open the door restrainer must be latched.
1
2
Az N°3 320° Baie AR G2_SBTS _O_120 L H
P
1,200,601,20 L P H
AV 430
3
4
1. Unpack the equipment 2. Check the delivery and report any damage to the carrier delivery note
3BK 17430 3135 RJZZA Ed.03
21 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
3. Report on CCL: Factory serial number Cabinet serial number
4. Identify the final location of the rack.
22 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.4 Rack Transportation 2.4.1 Crane Transportation Do not try to lift the cabinet by the roof with crane hooks! The roof must be dismantled in order to lift the cabinet with eyebolts.
2.4.1.1 Dismantle the Roof To prepare the rack: 1. Remove the screws fixing the roof
2. Push the roof to the back
3. Lift the roof and remove it.
3BK 17430 3135 RJZZA Ed.03
23 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.4.1.2 Crane Transportation Nr
Materials
Reference
Kit
1
Crane transportation bolts
1AD 09973 0001
-
Crane transportation: 1. At the top of the BTS remove the screws (1) (See Figure 3 ) Do not remove the rail (2), it is used during crane transportation.
1
2
Figure 3: Eyebolt Screwing Position 2. Attach the four eyebolts ( inner diameter: 26 mm, thickness :16 mm) to the rack.
Figure 4: Eyebolts
24 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
1234567890 1234567890 Figure 5: Crane Transportation For craning the rack: 3. Check that direction of pull [alpha] = minimum 60. The choice of straps (slings), hooks and crane are under responsibility of subcontractor (See Figure 5 ). 4. After reaching the final position disconnect the straps and replace the eyebolts with the screws (1). Do not remove the rail (2) (See Figure 3 ).
2.4.1.3 Close the Roof To close the roof: 1. Put the roof on the top of the BTS.
3BK 17430 3135 RJZZA Ed.03
25 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Make sure the guiding pins are in the foreseen holes.
3. Pull the roof to the front.
4. Fix the roof with the screws
H 13
26 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.4.2 Manual Transportation Cabinet can be lifted and carried manually at top hood along its reinforced side edges.
Cabinet must not be lifted at top hood front and back edge!
Figure 6: Manual Transportation With Straps
Figure 7: Manual Transportation Using the Handles
Figure 8: With Pallet Handling
3BK 17430 3135 RJZZA Ed.03
27 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.5 Rack Positioning 2.5.1 C1: Case of Steel Construction Nr
Materials
Reference
Kit
1
Screw HM10 x 30
1AD 00050 0048
Floor mounting kit
2
Spring washer M10
1AD 00507 0014
3
Plain washer M10
1AD 0087 0120
4
Nut HM10
1AD 0019 70046
5
Shims for leveling 1-2 mm thick
3BK 26159 AAAA
3BK 28944 AAAA
SHIMS
To fix the rack on steel construction: 1. Drill the steel construction. Holes must be positioned as described in the following figure. Back
481 mm
337 mm
260 mm Front
Figure 9: Drilling Scheme
28 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Position the rack on the steel construction.
3BK 17430 3135 RJZZA Ed.03
29 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
3. Fix the rack to the steel construction (1, 2, 3, 4 of Figure 10 ). Do not tighten the screws. 1
3
123 123
2 4
Figure 10: Fix the Rack In case of uneven steel construction, check and correct if necessary the antiparallelism between front and back of BTS. It is important that there is no difference in the slope angles that can twist the rack. 4. If necessary insert shims under the CBIE/CBOE support the rack weight. 5. Tighten the screws to fix the rack.
30 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.5.2 C2: Case of Concrete Foundation Nr
Materials
Reference
Kit
1
Screw HM10 x 30
1AD 00050 0048
Floor mounting kit
2
Nut HM10
1AD 00197 0046
3
Plain washer M10
1AD 00087 0120
4
Spring washer M10
1AD 00507 0014
5
Screw HM10 x 70
1AD 00050 0050
6
CBIE/CBOE profile steel
-
7
Shims for leveling 1-2 mm thick
3BK 26159 AAAA
3BK 28944 AAAA
SHIMS
To fix the rack on concrete floor: 1. Mark on the floor the position of the fixing points as shown in the following figure.
3BK 17430 3135 RJZZA Ed.03
31 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Drill the fixing holes (4 holes) (See Figure 11 ) 13 mm
75 mm
Figure 11: Holes Specifications 3. Place the profile steel on the concrete floor. 4. Using the M10 screws fix the steel profile to the ground.
32 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
5. Place the rack on the steel profiles and align the fixing holes.
6. Fix the rack to the steel profiles. Do not tighten the screws. 1
3
123 123
2 4
Figure 12: Fix the Rack In case of uneven steel construction, check and correct if necessary the antiparallelism between front and back of BTS. It is important that there is no difference in the slope angles that can twist the cabinet. 7. If necessary insert shims under the CBIE/CBOE to support the rack weight.
3BK 17430 3135 RJZZA Ed.03
33 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8. Tighten the fixing screws.
34 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.5.3 C3: Case of Wall Installation Nr
Materials
Reference
Kit
1
Screw HM10 x 70
1AD 00050 0050
Wall mounting kit
Expansion plug M10 x 60
1AD 02655 0001
2
Screw HM8 x 20
1AD 00050 0044
3
Plain washer M8
1AD 00087 0126
4
Spring washer M8
1AD 00507 0025
5
Screw M10 x 30
1AD 00050 0048
6
Spring washer M10
1AD 00507 0014
7
Plain washer M10
1AD 00087 0120
8
Nut HM10
1AD 00197 0046
9
90 support
2
10
Straight support
2
11
Wall support
1
12
Cabinet support
1
13
CBIE/CBOE wall drilling template
1
3BK 28943 AAAA
To keep mounting reliability of the rack, the wall to be fixed must be concrete wall.
3BK 17430 3135 RJZZA Ed.03
35 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
1. Use the following drawing to mark the position of the fixation holes on the wall.
36 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Check that the holes are distributed as described in the following figure.
3. Drill the holes.
3BK 17430 3135 RJZZA Ed.03
37 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
4. Identify the component parts of the support. Two pieces of each part are needed to build the support.
5. Build up the support by connecting the parts using the screws, nuts and washers.
38 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
6. Install the bracket on the rack left side wall, upper part.
7. Install the other bracket on the wall and fix it using three upper holes.
3BK 17430 3135 RJZZA Ed.03
39 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8. Install the support components on the wall and fix it with the provided screws.
9. Lift the rack and place it on the supports.
10. Remove the roof.
40 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
11. Fix the rack to the support, upper part.
12. Fix the rack to the support, lower part.
3BK 17430 3135 RJZZA Ed.03
41 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
13. Install the roof.
42 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.5.4 C4: Case of Pole Installation Nr
Materials
Reference
Kit
1
Screw HM10 x 280
1AD 11792 0001
Pole mounting kit
2
Screw HM8 x 20
1AD 00050 0044
3
Plain washer M8
1AD 00087 0126
4
Spring washer M8
1AD 00507 0025
5
Screw M10 x 30
1AD 00050 0048
6
Spring washer M10
1AD 00507 0014
7
Plain washer M10
1AD 00087 0120
8
Nut HM10
1AD 00197 0046
9
90 support
-
10
Straight support
-
11
Pole support
-
12
Cabinet support
-
13
Fixation bracket
-
3BK 17430 3135 RJZZA Ed.03
3BK 28945 AAAA
43 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
To install the CBIE/CBOE rack on a pole: 1. Identify the items used for pole fixation. Six brackets are delivered.
Figure 13: Pole Fixation Bracket 2. Attach the upper mounting plate to one bracket.
3. On the pole mark the position for the fixation brackets. 4. Install the upper mounting plate on the pole. Use a torque of 47 Nm when tightening the support to the pole.
44 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
5. Identify the component parts of the support. Two 90 supports and four straight supports are needed to build the support.
6. Build up the support by connecting the parts using the screws, nuts and washers.
Help: Use items 5, 6, 7 and 8 from materials table to connect the support components.
3BK 17430 3135 RJZZA Ed.03
45 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
7. Attach two brackets on the support.
46 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8. Install the lower support on the pole. Use a torque of 47 Nm when tightening the support to the pole.
3BK 17430 3135 RJZZA Ed.03
47 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
9. Install the bracket on the rack left side wall, upper part.
Help: Use items 2, 3 and 4 from materials table to fix the bracket.
48 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
10. Lift the rack on the lower support and attach it to the support with the provided screws, nuts and washers.
11. Fix the rack to the upper mounting plate using the provided screws, nuts and washers.
3BK 17430 3135 RJZZA Ed.03
49 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6 Power Supply and Earth Cables Installation This section describes the procedure to : Install cables in the cable tray Connect protective Earth cable Connect 230 volts mains power supply cables for AC variant Connect 48 volts mains power supply cables for DC variant Test the power supply installation. Before making any electrical connections to the rack, ensure that the safety instructions are applied: The electrical power supply is disconnected. Ensure all switches or fuses devoted to the new RACK into the site connection box are powered OFF. Due to high leakage current, the protective EARTH must be connected to the equipment before AC power cable connection. The terminals of the wires, for all the conductive cables (AC, DC and ground) are well tightened, this is very important to avoid damage of the equipment.
50 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.1 Installation of Cables in the Site Cable Way Nr
Material
Reference
Kit
1
Tie wraps
1AD 00414 0006
Basic kit
2
GND cable Y/G in 100m roll
3BK 08957 BAAA
-
GND cable Y/G in 250m roll
3BK 08957 BBAA
AC 230V power cable
3BK 08938 AAAA
3
1
-
2
1m
3
5
4
6
To install the cables in the cable way: 1. Install Yellow / green cable in power compartment of cable tray (lug at BTS side) 2. Install power cables in power compartment of cable tray 3. Attach cables with plastic tie wraps 4. Cut the cables at good length 5. Fit a lug on earth cable at site side 6. Connect the earth cable at the site earth plate.
3BK 17430 3135 RJZZA Ed.03
51 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.2 Protective Earth Cable Connection (GND) Nr
Material
Reference
Kit
1
Lug ring crimp
1AB 03205 0060
Basic kit
2
Tie wraps
1AD 00414 0006
Basic kit
To install the protective earth cable: 1. Crimp a [empty ] 8 terminal lug at RACK side and crimp an adapted lug at site extremity of GND cable
2. Make a label and connect the GND cable to the site earth plate (Example BTS 3 of site)
BTS
52 / 84
3
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
3. Remove the screws fixing the cable entry cover plate (A) then remove the cover plate.
Cover Plate for Cable Entry
4. Connect earth cable to the grounding stud (8mm).
3BK 17430 3135 RJZZA Ed.03
53 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.3 Power Cables Connection for AC Variant 2.6.3.1 AC 230V Mains Power Supply Connection Nr
Material
Reference
Kit
1
Wire terminal
1AB 05067 0005
Basic kit
2
Tie wraps
1AD 00414 0006
To connect the wires: 1. Cut the cable at the good length. 2. Put a shrink sleeve at each end of cable. 3. Fit a wire terminal on each wire of the cable.
Figure 14: Fit the Wire Terminals 4. Pass the cable through the grommet in the AC Mains In protection cover. 5. Connect the wires to the connectors on the LPFC ( begin with the green/yellow wire). Do not fit back yet the cover, because you have to check the voltage first !
Figure 15: Connect the AC Cable to the Equipment 6. Connect the AC mains cable to the site power supply box.
54 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.3.2 AC Power Supply Testing
AC 230V N
P
2
1
N
P
V
N
4
3
V
P
5
N
P
6
7
To test the power supply: 1. At site power cabinet: check if 230 V fuse breakers are switched OFF. 2. At rack side: using an ohmmeter, check that there is no short circuit between phase and neutral. 3. At rack side: do the same test between protective earth (green / yellow wire) and each 230 V wire. 4. At site power cabinet: switch ON the 230 V fuse breakers. 5. At rack side: check that the 230 V voltage between phase and neutral is present. 6. At rack side: using phase tester, check that the phase wire is connected at good connection point. 7. At site power cabinet: switch OFF the fuse breakers.
3BK 17430 3135 RJZZA Ed.03
55 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.4 Power Cables Connection for DC Variant 2.6.4.1 DC Power Supply Connection Nr
Material
1
Lug, hole
6 mm for 10 mm2 GND cable
Reference
Kit
1AB 032050022
Basic kit
To connect the DC power supply: 1. Prepare the head of the DC cable.
16mm
2. Put a shrink sleeve at the end of each cable.
3. Fit wire terminal at the end of each wire.
6
4. Run the -48 V DC power cable through the hole in the rubber protective cap, connect it to the DC In filter and attach it to the rack using cable ties.
56 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
5. Connect the 0V DC cable to the M6 grounding bolt and attach it to the rack using cable ties.
BTS(x)
6. Connect and label the DC mains cable to the primary DC power supply.
3BK 17430 3135 RJZZA Ed.03
57 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.4.2 DC Power Supply Testing
DC − 48V
0V − 48V 2
1
V
3
0V − 48V
5
4
6
To test the DC power supply: 1. At side power cabinet, check if fuse breakers are switched OFF. 2. At rack side, using a multimeter, check if there is no short-circuit between -48V filter and 0V stud. 3. At side power cabinet, switch ON the fuse breakers. 4. At rack side, verify if the voltage between -48V filter and 0V stud is about -48 Volts DC nominal. Check carefully the polarity. 5. At site power cabinet, switch OFF the fuse breakers. 6. At rack side, using a multimeter, verify if the -48V is switched OFF. Fit the rubber cap to the -48V terminal.
58 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.5 Fit the Mains In Cover To fit the cover: 1. Place the cover at the good position. 2. Fix the cover with the screws (See Figure 16 ). 3. Attach the cables to the cable way using cable ties and allow sufficient length of wires to avoid traction at terminals.
Figure 16: Fit the Mains In Cover
3BK 17430 3135 RJZZA Ed.03
59 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7 PCM Cables Installation This chapter describes the procedure to: Install PCM cables in site cable tray Connect PCM cables to the rack.
2.7.1 Install the PCM Cables in the Cables Way Nr
Material
Reference
Kit
1
Label
3BK 08062 ADAA
Basic kit
2
Tie wraps
1AD 00414 0006
3
PCM cable L907/4 (120 ohm) 100 m roll
3BK 08965 AAAA
PCM cable L907/4 (120 ohm) 250 m roll or
3BK 08965 ABAA
FLEX 3/8 (75 ohm) 100 m roll
3BK 25241 AAAA
FLEX 3/8 (75 ohm) 250 m roll
3BK 25241 ABAA
Installation kit
1m
2
1
3
4
is
Ab
2
is 1
Ab
5
To install the cables in the cable way: 1. Install cables in PCM compartment of cable tray. 2. Attach cables with plastic tie wraps. 3. Mark cables with a marker. 4. Cut cables at good length. 5. Label cable with supplied labels.
60 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.2 Cables Passing at Rack Side To pass the cables at rack side: 1. Strip the cable at cable gland level. 2. Pass the cables through the cable gland and attach them to the rack. 3. Tighten the gland on the cable.
15 mm
15 mm
1
3BK 17430 3135 RJZZA Ed.03
2
61 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
4. Identify the Abis connectors on OUTC board.
4
Abis (screwing)
Abis KRONE (inserting)
5
5. Pass the cables toward the OUTC board.
62 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.3 Cables Connection at Rack Side During installation it is mandatory to use the right tool for each terminal block. The references for the insertion tools are: 1AD 03221 0001 for Krone 1AD 01604 0001 for Nexans.
2.7.3.1 Case of L907/ 4 - 120 Ohm Cable The following figure shows the L907/4 cable structure.
Quad 1 grey/white
purple/blue
grey/yellow
purple/white
Quad 4
Quad 2
grey/green
purple/brown
purple/red
grey/black
Quad 3 Figure 17: L907/4 Cable The following table gives the wires color, connecting position and signal. Color
KRONE connector
Signal
Quad 1
white
8
Abis1/TX
(output high level signal going toward BSC)
grey
8
Abis1/TX
blue
6
Abis2/TX
violet
6
Abis2/TX
3BK 17430 3135 RJZZA Ed.03
63 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
Color
KRONE connector
Signal
Quad 2
yellow
7
Abis1/RX
(input low level signal coming from BSC)
grey
7
Abis1/RX
brown
5
Abis2/RX
violet
5
Abis2/RX
Quad 3 & 4 not used Table 1: Wires Color, Position and Signals
150 mm
1
2
3
4
Sleeve
OUTC 8 1
1
TX
2
8
RX
3
TX
4
RX
5
RX
TX
6
RX
7
TX
1
8
8
1
5
6
To connect the L907/4 cable: 1. Remove the PCM lightening protection from KRONE connector of OUTC board 2. Prepare head of L907/4 cable 3. Fit a sleeve to end of cable 4. Insert the L 907/4 wires using mandatory KRONE original tool 5. Fit the lightening protection to the KRONE connector 6. Squeeze the cable braid in the metallic clamp.
64 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.3.2 Case of FLEX3/8 - 75 Ohm Coaxial Cable The following table gives the wires connecting position and signal. Coaxial 1
KRONE connector Abis 1 (TX)
8 -braid 8 -inner conductor
2
Abis 1 (RX)
7 - braid 7 - inner conductor
3
Abis 2 (TX)
6 - braid 6 - inner conductor
4
Abis 2 (RX)
5 - braid 5 - inner conductor
50 mm
1234 10 mm
1 1
2
RX TX RX
4
1
3
TX
ABIS3
8
1
ABIS4
8
1
5
6
1. Remove the PCM lightening protection from KRONE connector of OUTC board
3BK 17430 3135 RJZZA Ed.03
65 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Using Hot Air Blower, fit the Heat Shrink Sleeve 1AC 00330 0002 on each coaxial. Fit a rubber sleeve on head of cable 3. Insert the 75-ohm coaxial using original KRONE tool 4. Connect wire bridge for used ports on OUTC ABIS green connectors as follows: Wire bridge from pin 1 to pin 2 Wire bridge from pin 4 to pin 5 Wire bridge from pin 6 to pin 7 Ports assignment is 1 and 2 for GSM (3 and 4 are not used). 5. Fit the lightening protection to the KRONE connector. 6. Fit two SP2M 75-ohm adapter at PCM sub-D port ABIS1 and ABIS2 on OUTC board. The following figure shows an example of 75-ohm cabling.
8 coaxial cable
4
RX
5
TX
6
RX
7
RX
7
3
TX
TX
TX
8
RX
8
TX
TX coax.
2
TX
1
RX
Core
Figure 18: FLEX 3/8 Connection
66 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.4 Other Connection Possibilities
RX RX 1 TX
ABIS1
8
1 TX
ABIS2
8
2.7.4.1 Connection of Other 120 Ohm Cables
Figure 19: Example of OUTC Screwing Connectors If cables are not supplied by Alcatel-Lucent, then the wires must have right specifications for inserting in the KRONE connector. If not, the wires have to be connected to the green screwing connectors of OUTC board ( Figure 19 ). The 3 jumpers must be removed from the connectors (they are used only for 75-Ohm connection).
3BK 17430 3135 RJZZA Ed.03
1
GND braid earthing clamp
2
TX
3
TX
4
GND drain wires
5
RX
6
RX
7
R200 (not used)
8
GND braid earthing clamp
BTS output signal going toward BSC
BTS input signal coming from BSC
67 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.4.2 Connection of Other 75 Ohm Coaxial Cables
123 123 123 123
10 mm 7
12345123 1234 123 121 1123456 12 12345 1234567 12345 123 123412345 123 123 121 121234567 11234567 1234 12345678 123456 123451 6
5
4
3
50 mm
2
1
123 123 2
1
To connect the cables: 1. Prepare the head of cables 2. Connect the wires to the terminals and mount the earthing clamp. Coaxial
Connector
Pin
Remarks
1
Abis 1 (TX)
2 - braid
For each connector :
3 - inner conductor
- wire bridge from pin 1 to pin 2
2
Abis 1 (RX)
5 - braid 6 - inner conductor
3
Abis 2 (TX)
- wire bridge from pin 4 to pin 5 - wire bridge from pin 6 to pin 7
2 - braid 3 - inner conductor
4
Abis 2 (RX)
5 - braid 6 - inner conductor
68 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.4.3 Connection of Optical Fiber PCM cable The section applies only for the optical transmission on Abis. The following table lists the items required to complete the task.
*
Description
Reference
Kit
Cable Optical fiber LC-LC 2SM 15m *
849122239
-
Cable Optical fiber LC-LC 2MM 5m *
849125513
-
SFP transceiver *
1AB 18728 0029
-
: Refer to Installation Kits (Section 1.4.1.2) for more optical fiber cables and SFP variants
To connect the PCM optical fiber cables: 1. Run the optical fiber cables through the cable gland/cable entry inside the cabinet. 2. Insert a SFP transceiver module in the OPT1 slot (on the GNC daughter board of the SUMX) and lock it. 3. Remove the protection cover from the SFP transceiver module. 4. Remove the protection caps from the optical fiber connectors. 5. Connect the cables to the OPT1 connector on SUMX. 6. Label the optical fiber cable on the SUMX side. 7. Tighten the cable gland, if applicable. The PCM optical fiber cables are installed.
3BK 17430 3135 RJZZA Ed.03
69 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.8 Antenna Jumpers Installation 2.8.1 Jumper Installation Nr
Material
Reference
Kit
1
Labels
3BK 08062 ADAA
Basic kit
2
Tie wraps
1AD 00414 0006
3
Antenna jumper cable
3BK 05360 xAAA
Installation kit
For the jumpers type 1AB 18821 0001 (3m) or 1AB 18821 0002 (4m), use the bending tool and follow the instructions from IO 95 (3DF 00300 0095 UAZZA). 45
NORTH
Ant A Ant B
Ant B Ant A
230 A
B A
B Label: ANT B AZIMUTH 125
Label: SECT: N ANT A
B
A
A
A
B
A B
B
N
P
ANB
ANB
CBO
Figure 20: Example of Antenna Cabling and Labeling
Figure 21: Label the Antenna Jumpers (Do Not forget the Frequency Labels)
70 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.8.2 Connection to the Rack The antenna connections mapping is done according to the following scheme:
Sector N Ant B Sector N Ant A Sector P Ant B Sector P Ant A
Figure 22: Antenna Mapping To connect the cables: 1. Ensure that the radius of each cable is at least 3 cm. 2. Refer to Site-Specific Information (Section 1.2.2) for cables connections 3. Connect the cables to the rack (See Figure 23 ). 4. Tighten the screw manually then shake cables a little. 5. Using the tightening tool, tighten with firmness. 6. Use tie wraps to bundle the jumpers together.
Figure 23: Antenna Jumpers Connection
3BK 17430 3135 RJZZA Ed.03
71 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.8.3 Connection to the Feeders Check that feeders are properly connected to site ground ! If the feeders are not labeled, don’t connect the jumpers, but inform the customer and fulfill the CCL
Nr
Material
Reference
Kit
1
Vinyl electrical tape
1AC 01556 0001
Basic kit
2
Tie wraps
1AD 00414 0006
3
Rubber splicing tape
1AC 01595 0001
To connect the feeders: 1. Connect the antenna jumpers to the feeders 2. Verify the connectors 3. Screw connector male with connector female 4. Tighten the screw manually then shake cables a little
Figure 24: First Tighten Manually, then Use the Specific Tightening Tool 5. Using specific tightening tool tighten with firmness (“Tools catalogue”) 6. Fit the vinyl electrical tape (1) over the connectors. Start taping from 30 mm from the connector (jumper side) and go down stretching and overlapping (50%) 30 mm over the connector (1 layer). You should not see any metal after taping.
7. Fit the rubber splicing tape (3) of Figure 25 over the vinyl electrical tape. Start taping from 20 mm top of the connector (coaxial cable side) and go down stretching and overlapping (50%) 20 mm over the connector (1 layer).
72 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8. Fit the vinyl electrical tape (1) over the rubber splicing tape. Start taping from 30 mm from the connector (jumper side) and go down stretching and overlapping (50%) 30 mm over the connector (1 layer). At the end of taping do not stretch the tape in the last few turns.
9. Secure with tie wraps to avoid tape removing (2) of Figure 25 .
Vinyl Tie wrap electrical (2) tape (1) Feeder
Rubber splicing tape (3)
Tie wrap (2) Jumper
123 12345 12 1 1 12 23 123 12 12 12345 123456 1234567 1 12345 234 1212 12 1 1234 123 23 123 12345 1 12345 234 12 12 1 1212 123 1234 12345 12 1 123 1 234 1234 123 12 23 123 123 12 123 12 123 123 12345 1234 12 123 1234 12 12 1234 1234 123 123 12 123 1234 12 123 123 12 1234 12 1 1234 1234 123 12 234 12 123 12 1 12 1 12 123 23 123 123 123 12 123 123 1234 12 123 1234 123 12 12 1 123 123456 121234 123 12 1 1 234 2 123 12 123 12 123 1234 123 12 12345 123456 1212 12 12123 123 12345 1 23412 11 12 23 12 123 23 Ground link for feeders
Figure 25: Water Proof the Connections
3BK 17430 3135 RJZZA Ed.03
73 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9 Options Installation 2.9.1 Alarm Cables Installation 2.9.1.1 Alarm Cables Passing Nr
Material
Reference
Kit
1
Tie wraps
1AD 00414 0006
Basic kit
2
Labels
3BK 08062 ADAA
Basic kit
3
L907/4 in 100 m roll
3BK 08965 AAAA
Installation kit
L907/4 in 250 m roll
3BK 08965 ABAA
Alarm
Figure 26: Alarm Cable Passing Through the OUTC Board
74 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
1
2
1m rm 1
Ala
4 3
15 mm
15 mm
6 5
To pass the cables: 1. Mark the cables with a marker 2. Install the cables in the special compartment of the cable tray 3. Attach the cables with plastic tie wraps 4. Label the cables with supplied labels 5. Strip the cables at cable gland level 6. Pass the cables trough the cable glands Use adhesive tie wraps to fix the cable to the side wall.
3BK 17430 3135 RJZZA Ed.03
75 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9.1.2 Alarm Cables Connecting To install the alarm cables: 1. Prepare the end of cable (cut the no-used wires)
70 mm
5
6
2. Label the cable with supplied labels: [Alarm 1]
3. Unscrew and remove the jumpers from X900 external alarm connector on OUTC
76 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
4. Connect the cable to the X900 connector
5. Fix the cable in the earthing clamp.
3BK 17430 3135 RJZZA Ed.03
77 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9.2 Synchronization Cables Installation 2.9.2.1 Synchronization Cables Passing Nr
Materials
Reference
Kit
1
Labels
3BK 08062 ADAA
Basic kit
2
Tie wrap
1AD 00414 0006
Basic kit
3
Cable for clock synchronization
-
Installation kit
Alcatel-Lucent 9100 BTS/G2-BTS (10 m)
3BK 08303 AA
Alcatel-Lucent 9100 BTS/Alcatel-Lucent 9100 BTS (10 m)
3BK 08304 AA
XCLK
Figure 27: Synchronization Cable Passing Through the OUTC Board
78 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9.2.2 Compact BTS Indoor/Outdoor Evolution / Alcatel-Lucent G2 BTS Connection
CLK in STSE via COB2
CBOE
OUTC XCLC 1 out
Master G2
G2
Slave CBOE OUTC XCLC 1 in
CLK out MBSR via COB2 Master
Slave 10 m
P2
P1 1
2 3 4 5
6 7 8 9
OUTC
COB2
screen screen white
5 9
5 9
brown green
4
4
yellow
8
8
grey
3
3
pink
7
7
blue
2
2
red
6 P1
6 P2
OCC23
3BK 08303 AA
Figure 28: Compact BTS Indoor/Outdoor / Alcatel-Lucent G2 BTS Synchronization Cable
3BK 17430 3135 RJZZA Ed.03
79 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9.2.3 Compact BTS Indoor/Outdoor Evolution / MBS GSM Outdoor or 9100 BTS Evolution or 9100 BTS Connection
G3/G4/ COAR/ MBO/ OUTC CBOE XCLK 1 in
CBOE OUTC XCLC 1 out
Slave
Master 10 m
P2
P1 1
2 3 4 5
6 7 8 9
OUTC 1
COAR/OUTC 2 screen screen white
5 9
5 9
brown green
4
4
yellow
8
8
grey
3
3
pink
7
7
blue
2
2
red
6 P1
6 P2
OCC33
3BK 08304 AA
Figure 29: Compact BTS Indoor/Outdoor Evolution/ 9100 BTS Synchronization Cable To install the synchronization cables: 1. Choose the good configuration 2. Pass the synchronization cables in the site cable way 3. Label the cables with supplied labels 4. Dismantle SubD 9 connectors (write down the wire colors) 5. Pass the cables through the BTS bottom plate 6. Put back the SubD 9 connectors 7. Connect the cables to the corresponding sockets of connection area 8. Fasten the connectors with knurled screws.
80 / 84
3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.10 Finish Installation 2.10.1 Label the Rack BTS STATION
BTS STATION
4
4
Figure 30: Fit the "BTS STATION" and "N" Labels at the Top of the BTS
2.10.2 Close the Cable Entry
Cover Plate for Cable Entry
Figure 31: Close the Cable Entry To close the cable entry: 1. Fit the cover plate 2. Fix the plate to the rack with the provided screws (A).
3BK 17430 3135 RJZZA Ed.03
81 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.10.3 Leave the Site
1
2 1. Clean the site. Do not put packages into the customer bin. 2. Give the key to the site responsible.
82 / 84
3BK 17430 3135 RJZZA Ed.03
8
1
Figure 32: OUTC Connectors
2.11 OUTC Layout
3BK 17430 3135 RJZZA Ed.03
1
16
83 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8 1 8 1 8 1 8 1
16 1
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
BLANK PAGE BREAK
84 / 84
3BK 17430 3135 RJZZA Ed.03