5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
FINISHES All the finishing items shall be as per the schedule of finishes. The floor and wall tiles Shall be fixed using approved epoxy adhesive and epoxy grout Colour matching to the tiles, and to approval. All the pattern and finishing level shall be maid as per drawing and specification. All rates includes supply and fix of tile and necessary cement sand screed, grouting, cutting as per shape and post protection method after fixing. (The material and workmanship shall be to the approval of The engineer.) INTERNAL Floor Finishes A
Polished marble tile
20.25
m2
20.00
405.00
B
Semi-solid Parquet
14.04
m2
20.00
280.80
C
Supply and fixing of 300x300/400x400x8mm unglazed ceramic tile (heavy Duty) with matching colour epoxy grout. (Allow a PC rate of - Dhs. 40/m2 for supply of Ceramic) - CT-3
#N/A
m2
20.00
#N/A
D1
300x300mm 'Graniti tiles'
#N/A
m2
20.00
#N/A
#N/A
m2
20.00
#N/A
#N/A
m2
20.00
#N/A
#N/A
m2
20.00
#N/A
PC Supp ly Rate Dhs.75/m2
D2
E1
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
300x300mm non-slip ceramic tile finish with cemnt sand screed (O/A 50mm thick) PC Supp ly Rate Dhs.45/m2
E2
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
8/1
1/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
Unit
Rate
Amount (Dhs.)
#N/A
8/2
2/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Supply and fix 60mm thick interlock paving tiles on cement bed (Basement); colour to approval
#N/A
m2
20.00
#N/A
Cut to size polished granite to approved pattern
#N/A
m2
20.00
#N/A
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
#N/A
m2
20.00
#N/A
B3
Main Contractors OHP percentage on B1 & B2
#REF!
%
20.00
#REF!
C1
300x300 Granite tile
#N/A
m2
20.00
EXCLUDED #N/A
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
#N/A
m2
20.00
#N/A
Main Contractors OHP percentage on C1 & C2
#REF!
%
20.00
#REF!
Amount (Dhs.)
INTERNAL FINISHES (Cont'd) Floor Finishes (Cont'd). A
B1
P C S u p p l y Ra t e Dh s . 5 00 /m2
B2
P C S u p p l y Ra t e Dh s . 2 00 /m2
C2
C3
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#N/A
8/3
3/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
#N/A
m2
20.00
#N/A
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
#N/A
m2
20.00
#N/A
Main Contractors OHP percentage on A1 & A2
#REF!
%
20.00
#REF!
#N/A
m2
20.00
#N/A
Amount (Dhs.)
INTERNAL FINISHES (Cont'd) Floor Finishes (Cont'd). A1
Fully Vitrified porcelain tiles with to approved pattern P C S u p p l y Ra t e Dh s . 7 5/ m2
A2
A3
B1
Non - slip ceramic tiles P C S u p p l y Ra t e Dh s . 4 5/ m2
B2
C1
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
EXCLUDED #N/A
m2
20.00
#N/A
Non-slip fully Vitrified porcelain tiles
#N/A
m2
20.00
#N/A
#N/A
m2
20.00
#N/A
P C S u p p l y Ra t e Dh s . 7 5/ m2
C2
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#N/A
8/4
4/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
#N/A
m2
20.00
#N/A
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
#N/A
m2
20.00
#N/A
Main Contractors OHP percentage on A1 & A2
#REF!
%
20.00
#REF!
Amount (Dhs.)
INTERNAL FINISHES (Cont'd) Floor Finishes (Cont'd). A1
Non-slipCeramic floor tile PC Supp ly Rate Dhs.25/m2
A2
A3
Non-Slip Procelain tiles Tread & riser with, cement sand screed for staircase steps 300mm tread & 180mm rise B1
Main Stair Case
EXCLUDED
#N/A
m
20.00
#N/A
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
#N/A
m
20.00
#N/A
B3
Main Contractors OHP percentage on B1 & B2
#REF!
%
20.00
#REF!
C1
Service Stair Case
PC Supp ly Rate Dhs.75/m
B2
Not Applicable
PC Supp ly Rate Dhs.65/m
C2
C3
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed
Not Applicable
Main Contractors OHP percentage on C1 & C2
#REF!
Not Applicable
Non-Slip Procelain tiles for stair case landing with, cement sand screed D1
Main Staircase
#N/A
m2
20.00
#N/A
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed (O/A 50mm thick) - and wastage factor
#N/A
m2
20.00
EXCLUDED #N/A
Main Contractors OHP percentage on D1 & D2
#REF!
%
20.00
#REF!
PC Supp ly Rate Dhs.50/m2
D2
D3
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#N/A
8/5
5/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
INTERNAL FINISHES (Cont'd) A1
Service Staircase
Not Applicable
PC Supply Rate Dhs.45/m2
A2
A3
B1
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed
Not Applicable
Main Contractors OHP percentage on A1 & A2
#REF!
Supply and fixing of high pressurised Laminate flooring with necessary under lay as per drawing and specfication
Not Applicable
523
m2
20.00
10,460.00
#REF!
%
20.00
#REF!
70
m
20.00
EXCLUDED
314
m
20.00
6,280.00
314
m
20.00
6,280.00
#REF!
%
20.00
(PC Supply and Fix rate Dhs.100/m2) - Includin g wastage
B2
Main Contractors OHP percentage on B1
Skirting D
100mm high epoxy paint
D1
Procelain tile skirting match to the floor (PC Supply Rate Dhs. 15/Rm)
D2
D3
Main Contractors rate for fixing with all items necessary for fixing, etc Including Cement mortar/glue and wastage factor Main Contractors OHP percentage on D1 & D2
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#REF!
#REF!
8/6
6/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
399
m
#REF!
#REF!
399
m
#REF!
#REF!
#REF!
%
#REF!
#REF!
INTERNAL FINISHES (Cont'd) Skirting (Cont'd) A1
100mm high Granite Skirting (PC Supply Rate Dhs. 20/Rm)
A2
Main Contractors rate for fixing with all items necessary for fixing, etc Including Cement mortar/glue and wastage factor
A3
Main Contractors OHP percentage on A1 & A2
B1
100mm highRate Ceramic Skirting (PC Supply Dhs.tile 10/Rm)
144
m
#REF!
#REF!
B2
Main Contractors rate for fixing with all items necessary for fixing, etc Including Cement mortar/glue and wastage factor
144
m
#REF!
#REF!
B3
Main Contractors OHP percentage on B1 & B2
#REF!
%
#REF!
#REF!
C1
100mm high ceramic tile skirting for Stair case (Main Staircase - PC Supply Rate Dhs. 15/Rm)
145
m
#REF!
#REF!
C2
Main Contractors rate for fixing with all items necessary for fixing, etc Including Cement mortar/glue and wastage factor
C3
Main Contractors OHP percentage on C1 & C2
D1
Ceramic tile skirting to Toilet
EXCLUDED 145
m
#REF!
#REF!
#REF!
%
#REF!
#REF!
326
m
#REF!
#REF!
326
m
#REF!
#REF!
#REF!
%
#REF!
#REF!
400
m
#REF!
#REF!
400
m
#REF!
#REF!
#REF!
%
#REF!
#REF!
(PC Supply Rate Dhs. 15/Rm)
D2
Main Contractors rate for fixing with all items necessary for fixing, etc Including Cement mortar/glue and wastage factor
D3
Main Contractors OHP percentage on D1 & D2
E1
100mm high pressurised laminate skirting to match floor (PC Supply Rate Dhs . 50/Rm)
E2
Main Contractors rate for fixing with all items necessary for fixing, etc. including wastage factor
E3
Main Contractors OHP percentage on E1 & E2
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#REF!
8/7
7/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
30
m
#REF!
#REF!
30
m
#REF!
#REF!
#REF!
%
#REF!
#REF!
87
m
#REF!
#REF!
87
m
#REF!
EXCLUDED #REF!
INTERNAL FINISHES (Cont'd) Threshold A1
350mm wide threshold for doors as per site measurement (PC Supply rate = Dhs. 150/M)
A2
Main Contractors rate for fixing with all items necessary for fixing, etc Including Cement mortar/glue
A3
Main Contractors OHP percentage on A1 & A2
B1
200mm wide threshold for doors as per site measurement (PC Supply rate = AED 50/M)
B2
Main Contractors rate for fixing with all items necessary for fixing, etc Including Cement mortar/glue
B3
Main Contractors OHP percentage on B1 & B2
#REF!
%
#REF!
#REF!
C1
100mm wide threshold for doors as per site measurement (PC Supply r ate = AED 50/M)
3
m
#REF!
#REF!
C2
Main Contractors rate for all items necessary For fixing, etc as described in preambles
3
m
#REF!
#REF!
#REF!
%
#REF!
#REF!
C3
Main Contractors OHP percentage on C1 & C2
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#REF!
8/8
8/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
12mm thick Internal wall plastering
6440
m2
#REF!
#REF!
B
Emulsion Painting 1 coat Primer only for the plastered surf
4729
m2
#REF!
#REF!
C
Epoxy Coating System
275
m2
#REF!
#REF!
D
Oil Paint System
500
m2
#REF!
#REF!
E
20mm thick render with matt finish sandtec or approved similar
80
m2
#REF!
#REF!
977
m2
#REF!
#REF!
977
m2
#REF!
EXCLUDED #REF!
#REF!
%
#REF!
#REF!
INTERNAL FINISHES (Cont'd) Wall Finishes Plastering for the walls shall be including all accessories as per drawings / specifications The spills shall be cleaned and touch up shall be done wherever required. A
Porcelain tile / Ceramic tiles / Glossy-Ceramic Tiles/ Vitrified Ceramic tile / Marble stone wall finishes laying to pattern as per drawing & specification, including back ground Plaster & adhesives/glue, grouting to approval of the Engineer; F1
300x300-Glazed ceramic tiles PC Suply Rate Dhs 30/m2
F2
Main Contractors rate for fixing with all items necessary For fixing, etc Including backgroun d plaster
F3
Main Contractors OHP percentage on F1 & F2
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#REF!
8/9
9/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
556
m2
#REF!
EXCLUDED
INTERNAL FINISHES (Cont'd) Ceiling finishes A
12mm thick Ceiling Plaster
B
Complete false ceiling with bulkhead, Cove light, Cornice and curtain box detail
C
Epoxy Paint on Plaster
280
m2
#REF!
EXCLUDED
D
Oil Paint on Plaster
179
m2
#REF!
EXCLUDED
E
Emulsion Paint on plaster
97
m2
#REF!
EXCLUDED
Refer Provisional Sum
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
8/10
10/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
13
Sets
#REF!
#REF!
13
Set
#REF!
#REF!
#REF!
%
#REF!
#REF!
16
No
#REF!
#REF!
16
No
#REF!
#REF!
#REF!
%
#REF!
5
No
#REF!
#REF! EXCLUDED #REF!
5
No
#REF!
#REF!
#REF!
%
#REF!
#REF!
3
Set
#REF!
#REF!
3
Set
#REF!
#REF!
#REF!
%
#REF!
#REF!
INTERNAL FINISHES (Cont'd) ACCESSORIES Sanitary Fittings Supply & Install the following Sanitarywares & accessories Complete with Fittings , Taps & Mixers, Traps And accessories as per drawing & specification A1
Bathroom Set (Master bathroom & Secondary Bedroom Bathroom) including mirrors PC Rate.Dhs.7000/Each set
A2
Main Contractors rate for all items necessary For fixing, etc as described in preambles
A3
Main Contractors OHP percentage on A1 & A2
B1
Toilets including mirrors PC Rate.Dhs.5000/Each Toilet
B2
Main Contractors rate for all items necessary For fixing, etc as described in preambles
B3
Main Contractors OHP percentage on B1 & B2
C1
Toilet Maid Room including mirrors PC Rate.Dhs.1500/Each Toilet
C2
Main Contractors rate for all items necessary For fixing, etc as described in preambles
C3
Main Contractors OHP percentage on C1 & C2
D1
Jacuzzi with necessary mixer (Master Bathroom Villa 1,2&3) PC Rate Dhs.10,000/set
D2
Main Contractors rate for all items necessary For fixing, etc as described in preambles
D3
Main Contractors OHP percentage on D1 & D2
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#REF!
8/11
11/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
Supply and fix corner gaurds, wall guard as per DM requirement to basement parking
12
No
#REF!
#REF!
B
Floor marking to basement parking
1
LS
#REF!
#REF!
C
Concave mirrors as per requirement for basement parking
2
Nos
#REF!
#REF!
D
Internal signage on staircase doors, landing, corridor, service room etc., as per civil Defence/DEWA requirement
1
LS
#REF!
EXCLUDED
E
Garbage Container as per DM requirement
1
LS
#REF!
#REF!
F
MR Gypsum board ducts for vertical down take pipe.
1
LS
#REF!
#REF!
INTERNAL FINISHES (Cont'd) Accessories (Cont'd) Sundries A
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#REF!
8/12
12/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
8
m2
#REF!
#REF!
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed
8
m2
#REF!
#REF!
A3
Main Contractors OHP percentage on A1 & A2
#REF!
%
#REF!
#REF!
B1
Supply and fix of Polished granite finish for external steps tread & riser
67
m
#REF!
EXCLUDED #REF!
Main Contractors rate for fixing with all items necessary for fixing, etc including Cement Sand Screed
67
m
#REF!
#REF!
Main Contractors OHP percentage on B1 & B2
#REF!
%
#REF!
#REF!
20mm thick cement & sand render with paint finish.
3075
m2
#REF!
#REF!
Natural Stone Cladding to the wall
178
m2
#REF!
#REF!
178
m2
#REF!
#REF!
#REF!
%
#REF!
#REF!
FINISHES (Cont'd) EXTERNAL External Entrance Finishes A1
Supply and fix of granite bushed hammer finish for external entrance Ramps PC Supply Rate Dhs.200/m2
A2
PC Supp ly Rate Dhs.300/m
B2
B3
External wall Finishes C
D1
PC Supply Rate.Dhs.200/m2
D2
D3
Main Contractors rate for fixing with all items necessary For fixing, etc Main Contractors OHP percentage on D1 & D2
E
50mm Depth Punch Hole Groove in Plaster wall as per Drawing & Specification
F
Heavy Texture 4 coats solvent based epoxy paint system for all exposed surface
G
Extra over for Grooves in Plaster with 12mm wide x 10mm deep aluminium channel Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
Included
3075
m2
#REF!
#REF!
1
LS
#REF!
#REF! #REF!
8/13
13/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
EXTERNAL FINISHES (Cont'd) EXTERNAL (Cont'd) A
Supply and install 60mm thick inter lock paver with all necessary base and kerb stone as per the drawings
Refer Provisional Sum
Pitched Roof B1
Clay roof tiles red colour including Eaves, Ridges
135
m2
#REF!
#REF!
135
m2
#REF!
#REF!
#REF!
%
#REF!
#REF!
(PC Supply Rate Dhs.55/m2)
B2
Main Contractors rate for all items necessary For fixing, etc
B3
Main Contractors OHP percentage on B1 & B2
GRC WORKS C
Supply & Fixing GRC Elements as per drawing and specification.
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
Refer Provisional Sum
#REF!
8/14
14/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
EXTERNAL FINISHES (Cont'd) ADDITIONAL ITEMS The tenderer is to detail below any additional items with quantities and rates not previously included to complete the build up of lumpsum tender price for this section of the works. Should the tenderer fail to insert any items here, it will be deemed that his lumpsum price for the tender includes all items and no subsequent claim for any additional item will be entertained. Finishes to Ponds / Fountain Mosaic tile for ponds/Fountains
By Client
B
Mosaic skirting for ponds & fountain
By Client
C
WC back wall top as per drawings
A
1
Total Carried To Collection
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
LS
#REF!
#REF!
#REF!
8/15
15/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
EXTERNAL FINISHES (Cont'd) Collection From Page 8/1
#N/A
From Page 8/2
#N/A
From Page 8/3
#N/A
From Page 8/4
#N/A
From Page 8/5
#REF!
From Page 8/6
#REF!
From Page 8/7
#REF!
From Page 8/8
#REF!
From Page 8/9
Total Carried To Page 8/15
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
#N/A
8/16
16/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Project: Private Residence Al Quoz 4, Dubai Client: Consultant: Bill No. 2 – FINISHES
Item No.
Description
Qty
Unit
Rate
Amount (Dhs.)
EXTERNAL FINISHES (Cont'd) Collection From Page 8/15 (B/F)
#N/A
From Page 8/10
#REF!
From Page 8/11
#REF!
From Page 8/12
#REF!
From Page 8/13
#REF!
From Page 8/14
#REF!
Total Bill No. 8- Carried To Summary
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
8/17
#N/A
17/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
PMT SSP
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
8/18
18/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/19
19/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/20
20/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/21
21/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/22
22/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/23
23/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/24
24/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/25
25/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/26
26/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/27
27/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/28
28/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/29
29/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/30
30/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/31
31/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/32
32/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/33
33/42
5/28/2018
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
BOQ - Al Quoz 4 - slide pdf.c om
8/34
34/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
Room Code 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Room Drying room cool room Laundry Storage Storage room ( Maids room
Foyer 1 Lounge area Bedroom 8
Foyer 2 Bedroom 7 Lounge area
26 Recreation area
11.4 8.7 12.87 15.8
0.9 0.9 1.8 1.8
20.45 14.8 12.75 4 3.17 4.1
4.5 0.9 1.8 0.9 0 2.7 0.9 0.9 0.9 2.8 1.8 0.9 0.9 0.9 1.8 0.9 0.9 5.6 0 1.8 0
7.15 6.3 10.95 5.4 15.1 14.9 18.75 10.8 11 14.5 14.75 13.65 29.15 24 39.5
1 2 3 4 5 6 7 8 9 10 11 12 13
24.5 22.45 12.7 34.1 5.2
1 2 3 4
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
dr1 d36 d36 d36 d36 d36 d34 d33 d33 d d30 d30 d29 d22 d28 d28 d36 d27 d27 d24 d25 d28 d d24 bw2
0.9 d23 d2 d3 d1 d10 d11
15.35 29.5 7 12.4 37.8 0 4.9
1.95 3.85 6.3 1.8 0.9 0.9 6.2 5.9 0.9 1.8 0.9 0 0
20.6 11.2 18.4 7.1
0.9 1.9 1.8 0.9
d19 d18 d12 d36
d1 d9 d6 d5 d5 d d
-2.5 -2.5 -2.5 -2.5 -2.5 -2.25 -2.25 -2.25 0 -2.25 #N/A -2.25 -2.367 -5.51 -2.5 -2.5 -2.5 -5.1585 -5.1585 -2.45 -4.6155 -2.5 0 -2.45 -12.1992
dr2 d d d36 d36 d36 d d32 d d d31
0 0 -2.5 -2.5
d d d36 d29 d w7 w7 d36 d w7 d26 d d25 d
-2.5 0 -2.25 0 0 -2.61 #N/A 0 0 -2.5 -2.367 0 -1.28 -1.28 -2.5 0 -1.28 -2.9 0 -4.6155 0
-5.51 ed3
-6.004
-5.51 -5.51 -6.6 -3 -2.574 #N/A -6.6 -5.434 -2.016 -3.19 -3.19 0 0
w1 d4 d2 d11 w4 d1 w1 w4 d6 bw1 d d
-4.56 -3.19 -5.51 -2.574 -1.885 #N/A -6.6 -4.56 -1.885 -2.016 -9.92082 0 0
-2.574 -5.434 -2.86 -2.5
w1 w6 d36 d36
-4.56 -5.28 -2.5 -2.5
35/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
5 6 7 8 9 10
23.8 6.3 6.3
11 12 13 14 15 16 17 18 19 20 21 22
17.3 11.7 19.4 11.35 8 18 18.4 26.7 4.9 4.9 5.7 7.3
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
10 9.6
0.9 1.8 0.9 6.4 2.7 1.8
d13 d13 d12 d14 d15
0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 d36 0.9 0.9 0.9
-2.304 -2.304 #N/A -2.86 -2.86 -2.574
w1 d36 d18 d36 d36
-4.56 -2.5 #N/A -5.434 -2.5 -2.5
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A -2.5 d36 #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A -2.5 #N/A #N/A #N/A
36/42
5/28/2018
dr3 d d d d d31 d w8 d d d36
BOQ - Al Quoz 4 - slide pdf.c om
0 0 0 0
dr4 d d d d
d d d d d w7 d d d d d22 d w7 d
-2.61 0 -1.12 0 0 -2.5 #N/A 0 0 0 0 0 -1.28 0 0 0 0 -5.51 0 -1.28 0
d32 d d d d d
ed4
-16.0844 d
w1 d36 d1 w1 d d3 w3 d d w2 d d
-4.56 -2.5 -6.6 -4.56 0 #N/A -5.51 -2.4 0 0 -3.5815 0 0
w1 d w1 d
-4.56 0 -4.56 0
d d d d d w8 d d d d d23 d d d
w1 w1 d w1 d d9 d5 d d w2 d d d d d d
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
0 0 0 0 -2.25 0 0 0 0 0 #N/A 0 0 0 0 0 -1.12 0 0 0 0 -5.51 0 0 0
dr5 d d d d
d d d d d d d d d d d d d d
-2.25 0 0 0 0 0 #N/A 0 0 0 0 0 0 0 0 0 0 0 0 0 0
80.21 55.84 48.22 15.88 11.73 17.80 #N/A 27.54 24.27 42.87 21.77 56.70 52.28 66.27 38.96 41.58 51.08 58.88 50.51 106.17 76.60
65.24 46.42 39.49 12.94 9.83 13.72 #N/A 22.71 19.95 34.62 17.45 47.10 42.80 54.48 31.40 34.44 41.84 46.67 42.32 87.60 62.20
0d
0
121.88
97.64
-4.56 -4.56 0 0 0 #N/A -4.56 #N/A 0 0 -3.5815 0 0
76.76 79.62 53.49 121.73 18.72 #N/A 53.19 #N/A 26.12 48.75 123.20 0.00 18.62
60.89 63.84 42.09 100.19 15.06 #N/A 40.26 #N/A 21.38 40.23 99.98 0.00 15.68
0 0 0 0
72.16 40.38 68.86 26.20
60.33 33.17 57.75 21.80
-4.56 -4.56 0 -4.56 0 #N/A -5.434 -3.19 0 0 -3.5815 0 0 0 0 0 0
d34 d d d d d
0 0 0 0
PL Qty WF Qty WF code 43.01 35.63 33.02 27.26 49.28 40.48 60.12 49.56
w1 w1 d d d w1 d d w2 d d d d d d
37/42
5/28/2018
d w4 d14 d15 d
BOQ - Al Quoz 4 - slide pdf.c om
0 -1.885 #N/A -2.86 -2.574 0
d d d16 d d
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A d
0d 0d #N/A -2.86 d36 0d 0d
#N/A -2.5 0 0
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
0d #N/A #N/A #N/A
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
0 0
0d #N/A #N/A #N/A
0 #N/A #N/A #N/A
35.65 37.77 #N/A 101.27 27.17 26.52
29.65 31.50 #N/A 84.66 22.22 22.06
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 17.62 #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 14.43 #N/A #N/A #N/A
38/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
CF Qty
CF code
SF Qty SF code 11.4 8.7 12.87 15.8 20.45 14.8 12.75 4 3.17 4.1 7.15 6.3 10.95 5.4 15.1 14.9 18.75 10.8 11 14.5 14.75 13.65 29.15 24 39.5 24.5 22.45 12.7 34.1 5.2 15.35 29.5 7 12.4 37.8 7.5 4.9 20.6 11.2 18.4 7.1
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
39/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
10 9.6 23.8 6.3 6.3 17.3 11.7 19.4 11.35 8 18 18.4 26.7 4.9 4.9 5.7 7.3
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
40/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
W W1 W2 W3 W4 W5
0 1.9 1.9 1 1 0.8
0 2.4 1.885 2.4 1.885 2.4
0.00 -4.56 -3.58 -2.40 -1.89 -1.92
W6 W7 W8
2.2 1.6 1.4
2.4 0.8 0.8
-5.28 -1.28 -1.12
ED1 ED2 ED3 ED4
1 5.09 1.9 5.09
2.9 2.9 3.16 3.16
-2.90 -14.76 -6.00 -16.08
*BW1a *2BW1b BW1
2.11 1.478 3.588
2.765 2.765 2.765
-9.92
*BW2a *2BW2b BW2
2.11 1.478 3.588
3.4 3.4 3.4
-12.20
D D1 D2 D3
0 2.2 1.9 1.9
0 3 2.9 2.9
0.00 -6.60 -5.51 -5.51
D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23
1.1 1.1 0.9 0.9 0.9 1.9 1 0.9 1 0.9 1 0.9 1 0.9 1.9 0.9 1 0.9 1.9 1.9
2.9 2.9 2.24 2.6 2.6 2.86 3 2.86 2.86 2.56 2.86 2.86 2.86 2.86 2.86 2.86 2.86 2.61 2.9 2.9
-3.19 -3.19 -2.02 -2.34 -2.34 -5.43 -3.00 -2.57 -2.86 -2.30 -2.86 -2.57 -2.86 -2.57 -5.43 -2.57 -2.86 -2.35 -5.51 -5.51
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4
41/42
5/28/2018
BOQ - Al Quoz 4 - slide pdf.c om
D24 D25 D26 D27 D28 D29
1 1.81 1 1.81 1 0.9
2.45 2.55 2.9 2.85 2.5 2.63
-2.45 -4.62 -2.90 -5.16 -2.50 -2.37
D30 D31 D32 D33 D34 D35 D36
0.9 0.9 0.9 0.9 0.9 1 1
2.5 2.9 2.5 2.5 2.5 2.5 2.5
-2.25 -2.61 -2.25 -2.25 -2.25 -2.50 -2.50
http://slide pdf.c om/re a de r/full/boq-a l-quoz -4