Site Layout-Cabinet/Frame locations agree with floor plan Cabinet/Frame not damaged / scratched RF Cables routed agree with cable lay out plan. RF Cables leveled correctly. Checking proper RF cable connection Hardware Commissioning TestAntenna mapping TRX/sector testing Cabinet/Frame grounded properly Power Up Procedure for BTS, Verify DC voltages and polarity check Checking of transmission parameters (circuit and data TS & Numbers of E1) Hardware configuration checks Fans Fault Handling Test Power and Earthing Cables routing correctly. Verify proper status of LED for CARDS/Modules/Power Supply/AC controller etc. Documentation Inbuilt VSWR sensor testing Out Door BTS Testing All type of External Alarm Testing
Yes
No
Accepted Remark
( As per Huawei Scope)
GSM BTS Acceptance Testing BTS H-G 1A Site Name
Site ID
Circle
BTS ID
SDCA/CITY
Cell Type
BTS Site Address
BTS Site – SAP ID
BSIC
Software Release
Configuration
a) No. of Sectors: 03 b) No. of TRX per Sector: 02/02/02
ARFCN
Punch List :Sr. No.
Item
Date Closed
Name / Signature of closing authority
All test completed without any items on punch list Yes
No
HUAWEI Site Representative Virendra Singh -----------------------------------------------ALUMS Site / RTIC Representative
-----------------------------------------------Reliance Circle/Project Head
-------------------------------------Signature
-----------------------Date
-----------------------------------------------ALUMS RTIC Head
-------------------------------------Signature
-----------------------Date
------------------------------------------------
--------------------------------------
------------------------
1. 2.
Above test cases are subjected to revision /change on completion of the Reliance Test Lab validation. The details of test procedure and operation guide for the above mention test will be provided by Huawei to Reliance Communications. 3. If test cases can not be performed due to the test environmental factor, such test cases should not be recognized as pending and should be recorded in memo without affecting the acceptance procedure. Huawei shall perform all these test cases mentioned above when the test environment meets requirement.
GSM BTS Acceptance Testing BTS H-G 1B BTS INTEGRATION and ACCEPTANCE TESTS Site Name
Site ID
Circle
BTS ID
SDCA/CITY
Cell Type
BTS Site Address
BTS Site – SAP ID
BSIC
Software Release
Configuration
a) No. of Sectors: 03 b) No. of TRX per Sector: 02/02/02
ARFCN
Section 2: BTS Acceptance Tests Test Case Number 1.
Test Description
BTS Tests
TC-BTS-ATP-1
TC-BTS-ATP-6
Software/Firmware downloading and system initialization. System Restart/Auto Recovery by (i)LMT and (ii) Hardware Reset (Power Cycle) SW/ FW Version check Self diagnostics tests Abis Link Fault Handling - Auto Recovery after PCM link failure Power Supply Fault
TC-BTS-ATP-7
BTS temperature warning Fault
TC-BTS-ATP-8
Checking of PCM synchronization
TC-BTS-ATP-9
Measurement of Total RF Power Configured frequency verification
Basic call processing test a) M-M b) L-M c) M-L BTS Redundancy Test ( Card Level , Module Level ) – As Applicable
Hand-off Test
TC-BTS-ATP-13
Handover Test – For the following scenarios(As Applicable ) a) Inter Band Handoff b) Idle handoff c) Inter BTS d) Intra BTS e) Inter BSC f) Inter MSC
Test Results
Remarks
GSM BTS Acceptance Testing Test Case Number 3.
Test Description
Test Results
BTS H-G 1B Remarks
Feature Tests
TC-BTS-ATP-14 TC-BTS-ATP-15
1. 2.
Abis Pooling feature BCCH switchover testing
Above test cases are subjected to revision /change on completion of the Reliance Test Lab validation. The details of test procedure and operation guide for the above mention test will be provided by Huawei to Reliance Communications. 3. If test cases can not be performed due to the test environmental factor, such test cases should not be recognized as pending and should be recorded in memo without affecting the acceptance procedure. Huawei shall perform all these test cases mentioned above when the test environment meets requirement.
GSM BTS Acceptance Testing BTS H-G 1B Site Name
Site ID
Circle
BTS ID
SDCA/CITY
Cell Type
BTS Site Address
BTS Site – SAP ID
BSIC Configuration
Software Release a) No. of Sectors: 03 b) No. of TRX per Sector: 02/02/02
ARFCN
Punch List : S. No.
Item
Date Closed
Name / Signature of closing authority
All test completed without any items on punch list Yes
No
HUAWEI Site Representative Virendra Singh -----------------------------------------------ALUMS Site / RTIC Representative