Transformer basics, construction (very detailed) and aplicationFull description
power transformerFull description
Descrição: power transformer
Full description
Descripción: Current Transformer
Power plant transformer protectionsFull description
Descripción: Power Transformer Testing Procedures
Power Transformer Protection
Descripción: test
IEC 60186 (1995) Voltage TransformerFull description
Current TransformerFull description
Current Transformer
Descripción: k
Checklist of Erection of power Transformer
Full description
Descrição: to whom may concern it
Acceptance Criteria for Transformer Routine Test
EKARAT ENGINEERING PUBLIC CO.,LTD.
This document is to give a brief outline of the routine testing to be carried out for each transformer. Test Certificates will be given after the test. A comprehensive routine testing procedure can be referred to in the Routine Test Procedure of the Quality Control Department. The routine test is performed in accordance with the IEC 60076 standard. Item
1
Test Item
Objectives
Acceptance Criteria
Test Equipments
Measurement of
To measure the resistance of each
The resistance variation of each HV
Autometic Transformer Winding
winding resistance.
HV and LV windings.
winding within +/- 8%, and the
Resitance Meter
variation of each LV winding within +/- 12 % 2
Measurement ent of volt oltage age
To measur asure e the the voltage turn urn ratio
The voltage rati atio error shal hall be
ratio and phase
and vector group of the transformer transformers. s. within within +/- 0.5 % for each tap
Transform ormer Turn urn Rat Ratio Meter ter
displacement. 3
4
5
Meas Measur urem emen entt of of sho short rt
To measu easure re the the loa load d los losse ses s ( cop copper per
Not Not exc excee eed d + 15% 15% of of gua guarrante anteed ed
circui circuitt imped impedance ance and
losses losses ) and and the the perce percent nt of of imped impedanc anc for Load Loss Loss , and not exceed exceed
load losses.
voltage.
Digi igital tal Pow Power er Meter eter,, Yok Yokog ogaw awa a
+ /- 10% of guaranteed impedance
Meas Measur urem emen entt of of NoNo-lo load ad To mea measu sure re the the no-l no-loa oad d los losse ses s ( cor core e Not Not exc excee eed d + 15% 15% of gua guara rant ntee eed d loss losses es and and no-l no-loa oad d
loss losses es ) and and the the no-l no-loa oad d curr curren entt
current.
( exiting current )
Separate sou sourrce AC
To tes testt th the ins insul ulat atiion between HV HV an and No co collapse of of the the test est vol volta tag ge
voltag voltage e wit withs hstan tand d tes testt
LV side side,, HV HV sid side e and and GND, GND, LV side side
Digi Digita tall Pow Power er Mete Meter, r, Yoko Yokoga gawa wa
for for No-L No-Loa oad d Loss Loss
Apply pot pote ential tes testt set set for AC AC 50 Hz.
and GND ( power frequency test ) Print date 20/9/2005
Page 1 of 2
Acceptance Criteria for Transformer Routine Test
6
Induced AC voltage test
To test the insulation of each winding
EKARAT ENGINEERING PUBLIC CO.,LTD.
No collapse of the test voltage
between the turns and between
Induced Potential Test Set frequency 200 Hz
winding to widing. 7
Measurement of
To test the insulation resistance
insulation resistance.
between HV and LV windings, HV and >2000 M.Ohm between HV -GND GND, LV and GND.