OVERLAY WELD KG & RUN TIME ESTIMATION TOME REQUIRED FOR RADIOGRAPHY TEST C/SEAM OR L/SEAM OR T-FRAME (LS/CS/TF)? (LS/CS/T F)? LG OF SHELL/NOZZLE= LOWER THK INCLUDING RAINFORCEMENT RADIOGRAPHY BY IRIDIUM/COBALT(I/C)? IRIDIUM/COBALT (I/C)? SPOT RT OR PENOROMIC RT (S/P)?
LG OF SHELL/NOZZLE= SPOT LENGTH= NO. OF SPOT=
3000 300 10
LS TIME REQUIRED FOR RT=
3000 50 I S
THK=
50
TIME CALCUCATION SPOT SPOT FOR FILLET IN T-FRAMES PEMOROMIC
168744192.xls.ms_office
IRIDIUM 86.4 691.2 2592.0
COBALT 23.8 113.0 458.2
9/1/2013
864 14.4 0.60
MIN HRS DAYS
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION SINGLE 'V'
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=
PARAMETERS SETTING KG/SHIFT PROCESS
LS
HRS/KG
1). SMAW 2). SAW
q=
45
52 R.F.=
R.G.=
THK= TH K= 54
2
LG OF LONG LONG SEAM= SEAM= 5800 58000 0 MATERIAL (SS/STEEL) MATERIAL (SS/STEEL)= = ss
3
DENSITY= DENSITY= 0.000008 0.000008
4 2.00 (C/S) 30 0.27 (L/S) 18 0.44 3).FCAW (1.2 ) 6 1.33 4). GTAW 1.6 5.00 5). TW IN HD. (C/S 24 24 48 0.330.66 AW ** (L/S) 14.428.8 0.561.11 ** WITH 2 OPERATORS POSITION OF MULTIPLICATION WELDING FACTOR 1). 1G 1 2). 2G 1.6 3). 3G 1.3
ALL DIMENSIONS DIMENSIONS ARE IN MM PREHEATING REQUIRED? YES NO
CROSS CROS S SEC. AREA TOTAL WELD WELD KG O/S WELDING= C/B WELDING= TOTAL WELDING=
1420.3 298.2 1718.5
LONG SEAM
659.0 138.4 797.4
CHIP BACK DEPTH(MM) THK <= 30 THK > 30
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
OUTSIDE ROOT RUN
20%
2
0.44
1
1.0
N
1
OUT SIDE BALANCE
80%
1
2
1
1.0
N
1
CHIP BACK WELDING
100%
1
2
1
1.0
N
1
TOTAL =
168744192.xls.ms_office
MULTIPLICATION FACTOR 1.15 1
9/1/2013
RUN TIME (min) (Hrs) 3514.7 58.6 63264.4 1054.4 16603.5 276.7 83382.6 1389.7
6 12
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION SINGLE 'V'
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=
PARAMETERS SETTING KG/SHIFT PROCESS
LS
HRS/KG
1). SMAW 2). SAW
q=
45
52 R.F.=
R.G.=
THK= TH K= 54
2
LG OF LONG LONG SEAM= SEAM= 5800 58000 0 MATERIAL (SS/STEEL) MATERIAL (SS/STEEL)= = ss
3
DENSITY= DENSITY= 0.000008 0.000008
4 2.00 (C/S) 30 0.27 (L/S) 18 0.44 3).FCAW (1.2 ) 6 1.33 4). GTAW 1.6 5.00 5). TW IN HD. (C/S 24 24 48 0.330.66 AW ** (L/S) 14.428.8 0.561.11 ** WITH 2 OPERATORS POSITION OF MULTIPLICATION WELDING FACTOR 1). 1G 1 2). 2G 1.6 3). 3G 1.3
ALL DIMENSIONS DIMENSIONS ARE IN MM PREHEATING REQUIRED? YES NO
CROSS CROS S SEC. AREA TOTAL WELD WELD KG O/S WELDING= C/B WELDING= TOTAL WELDING=
1420.3 298.2 1718.5
LONG SEAM
659.0 138.4 797.4
CHIP BACK DEPTH(MM) THK <= 30 THK > 30
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
OUTSIDE ROOT RUN
20%
2
0.44
1
1.0
N
1
OUT SIDE BALANCE
80%
1
2
1
1.0
N
1
CHIP BACK WELDING
100%
1
2
1
1.0
N
1
TOTAL =
168744192.xls.ms_office
MULTIPLICATION FACTOR 1.15 1
9/1/2013
RUN TIME (min) (Hrs) 3514.7 58.6 63264.4 1054.4 16603.5 276.7 83382.6 1389.7
6 12
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
168744192.xls.ms_office
9/1/2013
LONG SEAM/ CIRC SEAM WELD KG & RUN TIME ESTIMATION DOUBLE 'V'
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)= q=
PARAMETERS SETTING KG/SHIFT HRS/KG PROCESS
ls
45
1). SMAW 2). SAW 36.0 THK= 54 R.F.=
3
LG OF LONG SEAM= 1364 MATERIAL (SS/STEEL)= steel
15.0 =
R.G.=
60
DENSITY= 0.00000785
2
ALL DIMENSIONS ARE IN MM
PREHEATING REQUIRED? YES NO
CROSS SEC. AREA TOTAL WELD KG O/S WELDING= C/B WELDING= TOTAL WELDING=
RUN TIME (min) (Hrs) 683.1 11.4 2732.5 45.5 760.3 12.7 4175.9 69.6
6 12
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
168744192.xls.ms_office
9/1/2013
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION COMPOUND 'V' =
RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)= 10
45 12 R.F.=
R.G.=
2
3
O/S WELDING= C/B WELDING= TOTAL WELDING=
738.6 298.2 1036.8
CIRC SEAM
PREHEATING REQUIRED? YES NO
20%
48.3 19.5 67.8
MULTIPLICATION FACTOR 1.15 1
CHIP BACK DEPTH(MM) THK <= 30 THK > 30
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
1
2
1
1.0
Y
1.15
OUT SIDE BALANCE
80%
2
0.27
1
1.0
Y
1
CHIP BACK WELDING
100%
2
0.27
1
1.0
Y
1
TOTAL =
168744192.xls.ms_office
HRS/KG
4 2.00 (C/S) 30 0.27 (L/S) 18 0.44 3).FCAW (1.2 ) 6 1.33 THK= 50 4). GTAW 1.6 5.00 I/D OF SHELL= 2600 5). TWIN HD. (C/S) 24 48 0.33 0.66 SAW ** (L/S) 14.4 28.8 MATERIAL (SS/STEEL)= STEEL 0.56 1.11 ** WITH 2 OPERATORS POSITION OF MULTIPLICATION DENSITY= 0.00000785 WELDING FACTOR 1). 1G 1 ALL DIMENSIONS ARE IN MM 2). 2G 1.6 3). 3G 1.3
CROSS SEC. AREA TOTAL WELD KG
OUTSIDE ROOT RUN
PARAMETERS SETTING KG/SHIFT PROCESS 1). SMAW 2). SAW
36 q=
CS
9/1/2013
RUN TIME (min) (Hrs) 1332.3 22.2 617.9 10.3 311.8 5.2 2262.0 37.7
6 12
LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION
168744192.xls.ms_office
9/1/2013
NOZZLE WELD KG & RUN TIME ESTIMATION SINGLE 'V'
NOZZLE ON SHELL/DEND) (D/S) ?
CFW= 10 INC. ANG 45
S
MATERIAL (SS/STEEL)= STEEL DENSITY= 7.85E-06 NOZZLE O/D= 60
R.F.= 2 0 L 0 L 3 E 4 H S
R.G= 4
ELLIPSE DIMENSION MAJOR AXIS= 64.0 MINOR AXIS= 64 LG. OF WELDING= 201.07
ON SHELL OUTSIDE ROOT RUN OUT SIDE BALANCE CHIP BACK WELDING
20% 80% 100%
NOZ O/D 60
WEIGHT CROSS SEC. WELD KG AREA CALCULATION ON SHEL ON D/END O/S WELDING= 338.00 0.53 0.53 C/B WELDING= 56.55 0.09 0.09 TOTAL WELDING= 0.62 0.62 PROCESS POSITION HEATING CODE CODE (Y/N) 1 2.5 1 1.0 Y 1.15 1.15 1 2.5 1 1.0 Y 1.15 1 2.5 1 1.0 Y TOTAL =
WELD KG CROSS SEC. AREA ON SHELL ON D/END 13984.83 131.46 131.46 800.00 20.26 20.26 151.71 151.71
CHIP BACK DEPTH(MM) THK <= 30 THK > 30
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
OUT SIDE BALANCE
100%
2
0.56
1
1.0
Y
R.F.PAD WELDING
100%
1
2.50
3
1.3
Y
1 1.15
TOTAL = BACKING STRIPP DIMENSION OUTER MAJOR AXIS= 386.2 OUTER MINOR AXIS= 371.0 WIDTH= 25.2
168744192.xls.ms_office
9/1/2013
RUN TIME (min) (Hrs) 4381.9 73.0 4542.3 75.7 8924.1 148.7
6 12
NOZZLE WELD KG & RUN TIME ESTIMATION R.F. PAD +SINGLE 'V'
S
NOZZLE ON SHELL/DEND) (D/S) ?
CFW = 9 MATERIAL (SS/STEEL)= STEEL INC. ANG= 35
1). SMAW 2). SAW 3).FCAW (1.2 4). GTAW
5 DENSITY= 0.00000785 OFF SET=
THK= 16 R.F.PAD
PARAMETERS SETTING KG/SHIFT PROCESS )
HRS/KG
3.2 14.4 6.0 1.3
2.50 0.56 1.33 6.25
545 5 R.F.= 2
# # # # # # # # # #
NOZZLE O/D=
407 THK= 17
NOZ O/D
PREHEATING REQUIRED? YES NO
MULTIPLICATION FACTOR 1.15 1
FILLET SIZE=30
R.G= 3
INC. ANG=
35 424.7 410 1311.309
ON SHELL
WEIGHT WELD KG CALCULATION CROSS SEC. AREA ON SHELL ON D/END I/S WELDING= 129.77 0.42 1.36 C/B(O/S) WELDING= 314.68 1.01 3.30 R.F. PAD WELDING 450.00 22.42 22.42 TOTAL WELDING= 23.85 27.07
CHIP BACK DEPTH(MM) THK <= 30 THK > 30
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
OUTSIDE ROOT RUN
20%
1
2.5
1
1.0
N
1
OUT SIDE BALANCE
80%
1
2.5
1
1.0
N
1
CHIP BACK WELDING
100%
1
2.5
1
1.0
N
1
R.F.PAD WELDING
100%
1
2.5
1
1.0
N
1
TOTAL =
168744192.xls.ms_office
MULTIPLICATION FACTOR 1 1.6 1.3
407
= D / I L 0 L 0 3 E 4 H S
ELLIPSE DIMENSION MAJOR AXIS= MINOR AXIS= LG. OF W ELDING=
POSITION OF WELDING 1). 1G 2). 2G 3). 3G
9/1/2013
RUN TIME (min) (Hrs) 12.5 0.2 50.1 0.8 151.9 2.5 3362.6 56.0 3577.2 59.6
6 12
NOZZLE WELD KG & RUN TIME ESTIMATION
168744192.xls.ms_office
9/1/2013
NOZZLE WELD KG & RUN TIME ESTIMATION
R.F.PAD + DOUBLE 'V'
D
NOZZLE ON SHELL/DEND) (D/S) ?
CFW = 9 INC. ANG= 60 INC. ANG= 10
MATERIAL (SS/STEEL)= STEEL
1). SMAW 2). SAW 3).FCAW (1.2 4). GTAW
10 DENSITY= 0.00000785
THK= 30 R.F.PAD
PARAMETERS SETTING KG/SHIFT PROCESS )
3.2 14.4 6.0 1.3
OFF SET=
10
330 NOZZLE O/D=
345
40 THK= 60
# # # # # # # # # #
R.F.= 2
18
ELLIPSE DIMENSION MAJOR AXIS= MINOR AXIS= LG. OF WELDING=
R.G=
FILLET SIZE=30
3
INC. ANG=
45
363.0 348 1117.086
ON D/END
WEIGHT CALCULATION O/S WELDING= C/B WELDING= R.F. PAD WELDING TOTAL WELDING=
WELD KG CROSS SEC. AREA ON SHELL ON D/END 4099.95 35.95 35.19 450.00 3.95 3.86 450.00 22.42 22.42 39.90 39.05
PREHEATING REQUIRED? YES NO
MULTIP FAC 1.
1 1
CHIP BACK DEPTH( THK <= 30 THK > 30
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
OUTSIDE ROOT RUN
20%
2
0.56
1
1.0
Y
1
OUT SIDE BALANCE
80%
1
2.5
2
1.6
Y
1.15
CHIP BACK WELDING
100%
1
2.5
2
1.6
Y
1.15
R.F.PAD WELDING
100%
1
2.5
1
1.0
Y
1.15
TOTAL =
168744192.xls.ms_office
MULTIP FAC
NOZ O/D
345 = D / I 0 L 5 L 4 E 2 H S
POSITION OF WELDING 1). 1G 2). 2G 3). 3G
9/1/2013
RUN TIME (min) (Hrs) 234.6 3.9 7769.2 129.5 1065.9 17.8 3867.0 64.4 12936.7 215.6
NOZZLE WELD KG & RUN TIME ESTIMATION
HRS/KG 2.50 0.56 1.33 6.25
ICATION TOR 1 .6 .3 ICATION TOR .15 1 M) 6 12
168744192.xls.ms_office
9/1/2013
NOZZLE WELD KG & RUN TIME ESTIMATION
SET ON
S
NOZZLE IN SHELL/DEND) (D/S) ?
50
35
NOZ I/D
MATERIAL (SS/STEEL)=
19
STEEL
DENSITY= 0.00000785 `
INC. ANG.=
15
CFW = 9 INC. ANG.= 50
3
THK= 70
NOZ I/D 203 NOZ O/D 273
L L = 0 E D 0 / 4 H I 3 S
ELLIPSE DIMENSION
MAJOR AXIS= MINOR AXIS= LG. OF WELDING=
CROSS SEC. AREA 238.2 238 748.0
WEIGHT CALCULATION O/S WELDING=
716.09
TOTAL WELDING=
ON SHELL
WELD KG ON SHELL ON D/END 4.20 4.20 4.20
3.2 14.4 6.0 1.3
POSITION OF WELDING 1). 1G 2). 2G 3). 3G
MULTIPLICATION FACTOR 1 1.6 1.3
PREHEATING REQUIRED? YES NO
MULTIPLICATION FACTOR 1.15 1
4.20
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
OUTSIDE ROOT RUN
20%
4
6.25
1
1.0
Y
OUT SIDE BALANCE
80%
1
2.5
1
1.0
y
1.15 1.15
TOTAL =
168744192.xls.ms_office
HRS/KG
1). SMAW 2). SAW 3).FCAW (1.2 ) 4). GTAW
2.50 0.56 1.33 6.25
OFFSET= 0
R.F.= 1
R.G.=
PARAMETERS SETTING KG/SHIFT PROCESS
9/1/2013
RUN TIME (min) (Hrs) 362.6 6.0 580.2 9.7 942.9 15.7
FILLET WELD KG & RUN TIME ESTIMATION
PARAMETERS SETTING KG/SHIFT PROCESS
WELD LG (CALCULATED/MANUAL) (C/M?) M MANUAL LENGTH OF WELDING(MM)=
33615
1). SMAW 2). SAW 3).FCAW (1.2
)
3.2 14.4 6.0
HRS/KG 2.50 0.56 1.33
MATERIAL (SS/STEEL)= STEEL DENSITY= 0.00000785 FOR CALCULATING WELD LENGTH RADIUS OF WELDING(MM)= 0 INCLUDED ANGLE OF WELDING(DEG)= 0 CALCULATED LENGTH OF W ELDING(MM)= 0.000
6
6
LENGTH OF WELDING(MM)=
WELD CALCULATION CROSS SEC. AREA TOTAL WELDING 18.00
POSITION
HEATING
CODE
CODE
(Y/N)
FILLET WELD 1
168744192.xls.ms_office
2.50
1
1.0
Y
9/1/2013
1
MULTIPLICATION FACTOR 1 1.1
PREHEATING REQUIRED? YES NO
MULTIPLICATION FACTOR 1.15 1
33615.000
TOTAL WELD KG 4.75
PROCESS
POSITION OF WELDING 1). 1F/2F 2) 3F
(min) 712.5 712.5
RUN TIME (Hrs) 11.9 11.9
FILLET WELD KG & RUN TIME ESTIMATION DOUBLE SIDE FILLET JOINT WELDING BY SINGLE OPERATOR/ DOUBLE OPERATOR(S/D)? WELD LG (CALCULATED/AMNUAL) (C/M?) m MANUAL LENGTH OF WELDING(MM)=
D
1). SMAW 2). SAW 3).FCAW (1.2
)
HRS/KG
3.2 14.4 6.0
2.50 0.56 1.33
1000
MATERIAL (SS/STEEL)= STEEL
13
DENSITY= 0.00000785 FOR CALCULATING WELD LENGTH RADIUS OF WELDING(MM)= 0 INCLUDED ANGLE OF WELDING(DEG)= 0 CALCULATED LENGTH OF WELDING(MM)= 0.000 LG OF WELDING= 1000.000
13
WELD CALCULATION FIRST SIDE WELDING SECOND SIDE WELDING TOTAL WELDING=
CROSS SEC. AREA 84.50 84.50
TOTAL WELD KG 0.66 0.66
169.00
1.33
DOUBLE OPERATOR
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
FIRST SIDE
100%
1
2.50
1
1.0
Y
SECOND SIDE SIDE
100%
1
2.50
1
1.0
Y
1 1 TOTAL=
168744192.xls.ms_office
PARAMETERS SETTING KG/SHIFT PROCESS
9/1/2013
(min) 99.5 99.5 99.5
POSITION OF WELDING 1). 1F/2F 2) 3F
MULTIPLICATION FACTOR 1 1.1
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
YES
1.15
NO
1
RUN TIME (Hrs) 1.7 1.7 1.7
FILLET WELD KG & RUN TIME ESTIMATION DOUBLE SIDE FILLET JOINT WELDING BY SINGLE OPERATOR/ DOUBLE OPERATOR(S/D)?
S
PARAMETERS SETTING KG/SHIFT PROCESS 1). SMAW 2).FCAW (1.2
)
HRS/KG
3.2 6.0
2.50 1.33
MATERIAL (SS/STEEL)= STEEL SECOND SIDE 20CFW
20CFW FIRST SIDE
WELD CALCULATION FIRST SIDE WELDING SECOND SIDE WELDING TOTAL WELDING=
DENSITY= 0.00000785
O/D= 400
CROSS SEC. AREA 200.00 200.00
TOTAL WELD KG 1.94 2.01
400.00
3.95
SINGLE OPERATOR
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
FIRST SIDE
100%
1
2.50
1
1.0
N
SECOND SIDE SIDE
100%
1
2.50
1
1.0
N
1.1 1.1 TOTAL=
168744192.xls.ms_office
9/1/2013
(min) 320.1 331.0 651.1
POSITION OF WELDING 1). 1F/2F 2) 3F
MULTIPLICATION FACTOR 1 1.1
PREHEATING REQUIRED?
MULTIPLICATION FACTOR
YES
1.15
NO
1
RUN TIME (Hrs) 5.3 5.5 10.9
FILLET WELD KG & RUN TIME ESTIMATION DOUBLE SIDE + FULL PENETATION JOINT PROCESS? (DOT/ WITH CHIP BACK/TIG+SMAW) (D/C/T) ? WELD LG (CALCULATED/AMNUAL) (C/M?) C MANUAL LENGTH OF WELDING(MM)= MATERIAL (SS/STEEL)= STEEL
PARAMETERS SETTING KG/SHIFT PROCESS
C
20
60
10 RG=
DEG
2 2 20
10000
DENSITY= 0.00000785 FOR CALCULATING WELD LENGTH RADIUS OF WELDING(MM)= 1000 INCLUDED ANGLE OF WELDING(DEG)= 360 CALCULATED LENGTH OF W ELDING(MM)= 6283.185 LENGTH OF WELDING(MM)= 6283.185
WELD CALCULATION FIRST SIDE WELDING SECOND SIDE WELDING
CROSS SEC. AREA 137.59 194.14
TOTAL WELD KG 6.79 9.58
331.73
16.36
TOTAL WELDING=
WITH CHIP BACK
(INCLUDING CHIP BACK)
PROCESS
POSITION
HEATING
CODE
CODE
(Y/N)
FIRST SIDE
100%
4
2.63
1
1.0
N
SCOND SIDE SIDE
100%
4
2.63
1
1.0
N
1.1 1.1 TOTAL=
168744192.xls.ms_office
9/1/2013
(min) 1175.7 1658.9 2834.7
RUN TIME (Hrs) 19.6 27.6 47.2
OVERLAY WELD KG & RUN TIME ESTIMATION FORGING GASKET FACE O/LAY O/D OF GASKET FACE O/LAY= BORE OF FLANGE AFTER O/L= MEAN DIA OF GASKER GROOVE= DEPTH OF GASKET GROOVE= WIDTH OF GROOVE AT TOP= THK OF O/LAY= GASKET FACE O/LAY=
BORE O/LAY 229 165 200 10 23 8
BORE OF FLANGE AFTER O/LAY= LENGTH OF FLANGE/FORG= THK OF O/LAY=
2.423601 KG
BORE O/LAY=
165 1234 8
42.9231 KG
BACK FACE O/LAY O/D OF LIP = BORE OF FORG AFTER O/L= THK OF O/LAY= BACK FACE O/LAY= TOTAL O/LAY=
FLANGE GASKET FACE O/LAY O/D OF GASKET FACE O/LAY= BORE OF FLANGE AFTER O/L= DIA OF GASKER GROOVE= DEPTH OF GASKET GROOVE= WIDTH OF GROOVE AT TOP= THK OF O/LAY=
BORE O/LAY 483 381 450 0 0 7
BORE OF FLANGE AFTER O/LAY= LENGTH OF FLANGE= THK OF O/LAY=
OVERLAY WELD KG & RUN TIME ESTIMATION ELBOW I/D O/LAY BORE OF ELBOW AFTER O/LAY= RADIUS OF ELBOW INCLUDED ANGLE OF ELBOW= THK OF O/LAY=
BORE O/LAY=
PARAMETERS SETTING PROCESS KG/SHIFT
448 1176 90 8
1). SMAW 2). FCAW (MANUAL)
PREHEATING REQUIRED? YES NO
169.3643 KG
KG
BORE OVER LAY
168744192.xls.ms_office
169.4
2
PROCESS
HEATING
CODE
(Y/N)
1.33
N
1.00
9/1/2013
4 6
2.00 1.33
MULTIPLICATION FACTOR 1.15 1
RUN TIME (min) 13549
HRS/KG
(Hrs.) 225.8
OVERLAY WELD KG & RUN TIME ESTIMATION PIPE I/D O/LAY BORE OF PIPE AFTER O/LAY= LENGTH OF PIPE= THK OF O/LAY=
BORE O/LAY=
PARAMETERS SETTING KG/SHIFT HRS/KG PROCESS
381 463 6
1). SMAW 2).FCAW (1.2 )(M/C) 3). FCAW (MANUAL)
PREHEATING REQUIRED? YES NO
27.01986 KG
KG
BORE OVER LAY
168744192.xls.ms_office
27.0
PROCESS
HEATING
CODE
(Y/N)
2
1.14
Y
1.15
9/1/2013
4 7 6
2.00 1.14 1.33
MULTIPLICATION FACTOR 1.15 1
RUN TIME (min)
(Hrs.)
2131
35.5
OVERLAY WELD KG & RUN TIME ESTIMATION CIRC. SEAM/ LONG SEAM OVERLAY I/D OF SHELL= THK OF O/LAY= CLAD STRIP ANG.= THK OF CLAD= CALCULATION WIDTH OF O/LAY= R.F. WIDTH= AREA OF O/LAY=
3400 6 45 5
THK= I/S INC. ANG.= I/S 'V' HEIGHT= CLAD STRIPPING= ROOT GAP= LG OF CEAM=