ENGINEERING SHORT COURSE CIVIL 3D ESSENTIALS
Edi Supriyanto, ST
[email protected]
BALI – INDONESIA 2013
SECTION-‐I BOUNDARY SURVEY Work flow : • Data needs to be entered intothe data collector. • Data can be transferred from the data collector to the computer using an ASCII file.
•
Inserting Data Point
•
Boundary
•
Presentation Drawing
SECTION-‐II CREATING SURFACE Creating Surfaces From Survey Data Points Work flow : • ASCII file (4810 data points)
Existing Ground Points -‐ PENZD
•
Inserting point from file
•
Creating Surface
•
Object Viewer
Creating Surfaces From Contour Work flow : • Contour Drawing
•
Surfaces From Contour
•
Object Viewer
SECTION-‐III DYNAMIC CROSS SECTION Work flow : • Draw standard polyline
•
Quick Profile
•
Dynamic long section