Routine inspection by tower crane operator at cabin area
2. P.Parthiban
2.
RISK ASSESSMENT Which can cause/ effect
Existing risk control (is any)
Likelihood
Severity
RISK CONTROL Risk
Recommended control measures
LEGAL REQUIREMENT – COMPLY TO LEGAL REQUIREMENT AS PER FMA 1967
Fall from height
Fatality
Tripping
Sharp object
Tripping hazards Slip and fall from height
1
5
5
Major injury
1
4
4
Finger cut
1
1
1
Serious injury Major injury
2
3
6
2
3
3
To provide lifeline and safety harness To provide guardrail on the climbing ladder To provide leather gloves To provide anti slip mat at cabin area To provide guardrail at cabin
PIC (Due date/ status)
Form No. : CSCEC-HSE-F08
CHINA STATE CONSTRUCTION ENGINEERING (M) SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL (HIRARC) area 4
Operation thunderstorm
5
Check device
during
Chain sling snap
Fatality
1
5
5
Lighting
Serious injury
1
2
2
supporting
Loss of load
Fatality / moderate injury
1
5
5
6
Check lifting appliance
Loss of load
Fatality/ moderate injury
1
5
5
7
Check signal man/communication set
Hit by moving object
Fatality
2
3
6
Loss of load
Major injury
3
2
6
Serious injury
3
3
9
Crash in between 8
Ensure load are fastened properly
Hit by moving object
Routine inspection by operator Stop operating during thunderstorm Install the lighting indicator Check wire rope, limit switches hook latch and checklist Ensure proper lifting appliance and used for right job Ensure trained signalman Inspection of the signals and crane Ensure loads are properly tied and secured