1. Scope
This standard applies to steel scaffolding commonly used in executing, repairing and completing construction works.
2. Structure, parameters and basic dimension
2.1 Structure of a steel scaffolding must comply with stipulations in Figure 1.
1. Adjust screw 4. Connect Connect pipe 7. Clock
2. Tie plate 5. Cross pipe
3. Vertical frame 6. Working Working floor
TCVN 6052: 1995 2.2 Basis dimensions and parameters of steel scaffolding provided in table 1 and Figure 2
Figure 2
Note – Figures in this standard provide no particular structure of scaffolding Table 1 Permissible working load per 1m2 of working floor N 2000
Breadth
Height
Length
B mm 914 1219
H mm 1524 1700 1930
L mm 1219 1524 1829
Standing pipe Diameter x thickness mm Ø 42 x 2.5
Note 1. It’s It’s permit permit to design design a steel steel scaffol scaffoldin ding g with with parame parameter terss and dimensi dimensions ons differ from stipulations provided in Table 1 if requested; 2. Selection Selection of dimension dimensionss B, L, L is upon upon specifi specificc requests. requests. 3. Technical requirements
3.1 Bold, screw nut, pipe clock must be made by steel CT51, TCVN 1765-85 Pipe must be made by steel CT38, TCVN 1765-85 Note - It’s permit to replace by other equivalent materials
3.2 Tolerance of pipe used for making steel scaffolding = ± 0.5mm. Flexure of steel must not exceed 1mm/1000mm per pipe length. 3.3 Outside surface of pipe must be free from any traces with depth >1mm. Total dimension of traces per 1mm length must not exceed 100mm 2. Within 120mm length at ends of standing pipe must have no trace with depth >0.5mm. 3.4 Welds of pipe edge [If use of any welded pipe] must be even, solid, firm and free from any burn, damage, hole. In cool repair of weld, it’s permitted the weld part higher than the outside surface of pipe to 1mm and lower than the outside surface of pipe to 0.2mm. 3.5 Ends of pipe after processed must be smooth and its hole oblique = 0.5 x 450. 3.6 Parts of clock connecting the cross bar on the standing pipe must ensure the sensitivity, convenience when working and safety for assembling joints. 3.7 Locks of the tie plates must be easy for assembling and ensure the plate will not be removed from the horizontal pipe. 3.8 Steel Steel scaffo scaffoldi lding ng must must ensure ensure solid solid enough enough and warran warrantt testin testing g load load as provided in Article 4.5 of this Standard. 3.9 Standards of the steel scaffolding manufactured within the same factory at similar dimensions and parameters must be easy replaceable when install for use. 3.10 Steel scaffolding must be color painted. Color layer must be held firmly and covered smoothly over all items.
4. Testing method
4.1 Quality of materials used for manufacturing the steel scaffolding is checked by determ determini ining ng input input materi materials als of the factor factory. y. In case case the materi material alss can not be determined, it’s to make a mechanical testing for these ones. 4.2 Check the outside quality of all steel scaffolding items by naked eyes. 4.3 Check Check all geomet geometric ric dimens dimension ions, s, tolera tolerance nce and differ differenc encee of geomet geometric ric dimensions by specialized measurement tools with the exactness to 0.1mm. 4.4 Check the operation of all locks.
4.5 Procedures for hardness test will be done as follow: Randomly assembly any 2 steel scaffoldings [Include 3 standing frames, 4 pairs of cross bars and 2 tie plates] and connecting into one floor. Gradually load to 3000N on overall the surface of floor in 4 hours. After the test, no item of the steel scaffolding is allowed from any damage, damage, deformati deformation on compared compared with stipulat stipulations ions provided in Article Article 3.2 - 3.9 of this standard. After the loading test, if not qualified, repeat another time with other 2 different steel scaffoldings. Testing load = 4000N and testing time = 4 hours. Result from the 2nd test will be final. 4.6 Check the replaceable ability when assembling of scaffolding items by taking items enough for assembling 4 steel scaffoldings in 2 floors [Two upper floors and 2 lower floors]. All items must ensure replaceable ability. 5. Packing, labeling, transportation and maintenance 5.1 All items of steel scaffolding are packed by disassembling, arranged into catalogue and firmly tied by wire. Small items are packed in wood box. Weight of each packing unit should comply with the factory and customer. 5.2 Standing frame of each steel scaffolding must be transparently described: -
Name ame of of man manuf ufaactur cturer er;; Product signal; Net weight.
5.3 Manufacturing factory must have the unpainted surface and lace surface well anti-rust lubricated and maintain steel scaffolding in dry with roof and far from corrosive environment.