Star Trek Federation Ship Recognition ManualDescrição completa
STSFull description
Deskripsi lengkap
Basic Knowledger about ship related, design, manufacturing, and how it worksFull description
Ship structure, different structural elements. Systems of framing.Full description
sDescripción completa
Ship Construction
Full description
describing any detail of ship unloader
Warmaster Building a Ship Fanatic Mag
Full description
Full description
sandi
mimetDescription complète
Basic Knowledger about ship related, design, manufacturing, and how it works
Descrição: Basic Knowledger about ship related, design, manufacturing, and how it works
Descrição: Doors Crystal Ship
Piano Vocal score
Full description
BUILDING No.
JOS. L. MEYER
S. 663
PAPENBURG
2004
GERMANY
INSTRUCTION
AND
MAINTENANCE
MANUAL FOR
K.M .M.. “L “LAB ABO OBA BAR R”
P.T .T.. PELA PELAY YARAN NASIONAL INDONESIA PELNI LINES JAKARTA
P R E F A C E
The users of this Instruction and Maintenance Manual are herewith informed that this manual has been prepared for guidance only. This manual replaces in no case the instruction manuals supplied by manufacturers and subcontractors.
No claims can be raised on the ground of missing instructions or discrepancies from figures indicated in manufacturers operating instructions. Alterations from scheduled intervals or maintenance recommendations may become necessary due to extraordinary service conditions or unforeseen fatigue of material.
Besides of all scheduled instructions, the individual inspections carried-out by the Engineers' and Officers remain to be the important target for trouble free operations.
MEYER WERFT, May 2004
P R E F A C E
The users of this Instruction and Maintenance Manual are herewith informed that this manual has been prepared for guidance only. This manual replaces in no case the instruction manuals supplied by manufacturers and subcontractors.
No claims can be raised on the ground of missing instructions or discrepancies from figures indicated in manufacturers operating instructions. Alterations from scheduled intervals or maintenance recommendations may become necessary due to extraordinary service conditions or unforeseen fatigue of material.
Besides of all scheduled instructions, the individual inspections carried-out by the Engineers' and Officers remain to be the important target for trouble free operations.
MEYER WERFT, May 2004
T AB LE O F C ON TE NT S HULL & GENERAL DRAWINGS
General Data General Arrangement Plan 1 General Arrangement Plan 2 General Arrangement Plan 3 General Arrangement Plan 4 Detecting and Alarm System Symbols of Fire Doors Fire Doors Watertight- and Splash-Watertight Fire Doors Symbols of Lifesaving Appliances Plan of Lifesaving Appliances 1 Plan of Lifesaving Appliances 2 Plan of Lifesaving Appliances 3 Plan of Lifesaving Appliances 4 Plan of Lifesaving Appliances 5 Symbols of Fire Extinguishing System Fire Extinguishing System 1 Fire Extinguishing System 2 Fire Extinguishing System 3 Fire Extinguishing System 4 Symbols of Sprinkler and CO 2 System Sprinkler and CO2 System 1 Sprinkler and CO2 System 2 Sprinkler and CO2 System 3 Sprinkler and CO2 System 4 Sprinkler and CO2 System 5 Symbols of Fire Ext. and Fireman’s Outfit Fire Ext. and Fireman’s Outfit 1 Fire Ext. and Fireman’s Outfit 2 Fire Ext. and Fireman’s Outfit 3 Fire Ext. and Fireman’s Outfit 4 Fire Ext. and Fireman’s Outfit 5
S-2 S-3 S-4 S-5 S-6 S-7 to S-11 S-12 S-13 to S-17 S-18 to S-20 S-21 to S-23 S-24 S-25 S-26 S-27 S-28 S-29 S-30 S-31 S-32 S-33 S-34 S-35 S-36 S-37 S-38 S-39 S-40 to S-41 S-42 S-43 S-44 S-45 S-46
Symbols of Remote Controls Remote Control 1 Remote Control 2 Remote Control 3 Remote Control 4 Remote Control 5 Symbols of Detecting and Alarm System Detecting and Alarm System 1 Detecting and Alarm System 2 Detecting and Alarm System 3 Detecting and Alarm System 4 Detecting and Alarm System 5 Symbols of Fire Protection Fire Protection 1 Fire Protection 2 Fire Protection 3 Fire Protection 4 Fire Protection 5 Tank Plan Venting Pipes Sounding Pipes Tank Level Indication
Main Diesel Engine Controllable Pitch Propeller Sterntube Seal Shaft Coupling Main Reduction Gear with Oil Cooler Auxiliary Diesel Set Emergency Diesel Generating Set 270 kVA
M-2 to M-18 M-19 to M-28 M-29 to M-32 M-33 to M-37 M-38 to M-45 M-46 to M-50 M-51 to M-54
T AB LE O F C ON TE NT S PIPING & AUXILIARY PLANTS
Diesel Fuel Filling & Transfer System Fuel Oil Plant Diesel Fuel Overflow System Lubr. Oil Filling & Transfer System Bilge System Ballast System Sea Water Pumps & Cooler Fresh Water Pumps & Cooler UV-Filter Starting Air Plant Dehumidifier Starting Air Plant Fire Extinguishing System Sprinkler System Sanit. Fresh Water System in E.R. Fresh Water-, Filling & Suct. System Sanit. Fresh Water System in Acc. (Hot and Circul. Water) Sanit. Fresh Water System in Acc. (Cold Fresh Water) Sanit. Sea Water System Sanit. Sea Water System in Acc. Sewage Treatment Plant
P-2 to P-4 P-5 to P-11 P-12 to P-13 P-14 to P-18 P-19 to P-21 P-22 to P-23 P-24 to P-32 P-33 to P-37 P-38 P-39 P-40 P-41 to P-42 P-43 to P-49 P-50 to P-52 P-53 to P-54 P-55 to P-56 P-57 to P-60 P-61 to P-64 P-65 P-66 to P-68 P-69 to P-73
T AB LE O F C ON TE NT S HULL & DECK'S MACHINERY
Provision Refrigeration Plant Sea Water Cooling Prov. Refr. Plant Chilled Water Plant Chilled Water Diagram Chilled Water Plant Chilled Water Plant / AC Plant Chilled Water Plant Boiler Plant Steering Gear Mounting and Final State Rudder Stock Bow Thruster Anchor and Winches Spindle Band Brake Windlass Part Spindle Band Brake (Windlass Part) Mooring Winch Roller Chain Stopper Loading Crane
H-2 to H-6 H-7 H-8 to H-15 H-16 H-17 H-18 H-19 H-20 to H-28 H-29 to H-34 H-35 to H-37 H-38 to H-40 H-41 to H-42 H-43 H-44 H-45 H-46 H-47 H-48 to H-49
COOLING SEA WATER
COLD SAN. FRESH WATER
LUBRICATING OIL
DIESEL OIL
STARTING AIR
BLACK WATER
STEAM
BALLAST
HOT SAN. FRESH WATER
HYDRAUIC OIL
DIESEL OIL SEP.
WORKING AIR
GREY WATER
CONDENSATE
FIRE EXTINGUISHING
COOLING FRESH WATER
LUBR. OIL SEP.
CROSS FLOODING F.O.
SEP. CONTROL AIR
DECK DRAIN
ACETYLENE
SANITARY SEA WATER
CHILLED WATER
OIL LEAKAGE
PNEUM. QUICK CLOSING VALVES
DECK DRAIN
OXYGEN
SPRINKLER
HEATING WATER
PNEUM. CONTROL
BILGE
REFRIGERANT
GOLD
WATERSPRAY
SEP. OPERATING WATER
MECH. EXHAUST AIR
CROSS FLOODING BALLAST
WATER LEAKAGE
AIR CONDITION
VENT TK. N°
SOUNDING P. TK. N°
COLOURACC. TO SYSTEM
COLOURACC. TO SYSTEM
COLOUR SCHEME
CO2 SYSTEM
HULL & GENERAL DRAWINGS
Passenger Ship KM "LABOBAR" Class:
KI
Call Sign:
YHKN
Length over all: Length between P.P.: Breadth moulded: Draft: Gross tonnage: Deadweight:
Passengers
abt
abt abt abt
1st class A: 1st class B:
146.50 130.00 23.40 5.90 15200 3350
26 40
Impr. Economy class (double bed) Impr. economy class (single bed) Passengers total: Crew, owners, pilot: Total: