KOTA MERAUKE
JUMLAH HARGA JENIS PEKERJAAN
NO.
2
1
A. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
B. 1
2
3
4
5
6
7
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28
C. 1
2
3
BAHAN
TENAGA/ALAT
HARGA SATUAN PEKERJAAN
(Rp.)
(Rp.)
(Rp.)
4
5
6
7=(5+6)
CKA.1
SNI 03 03-2835-2002
511.385,20
77.700,00
CKA.2
SNI 03 03-2835-2002
369.922,72
77.700,00
CKA.3
SNI 03 03-2835-2002
791.735,59
66.800,00
CKA.4
SNI 03-2835-2002
CKA.5
SNI 03-2835-2002
CKA.6
HPS. CK 2015
CKA.7
HPS. CK 2015
CK A. A. 8 CKA.9 C KA KA. 10 10
ANALISA 3
REFERENSI
PEKE PEKERJ RJAA AAN N PERSI PERSIAP APAN AN 1 M' 1 M' 1 M' 1 M2 1 M' 1 M' 1 M' 1 M2 1 M2 1 M2 1 M2 1 M2 1 Unit 1 M3 1 M3 1 M2 1 Ret
Pagar Kayu Tinggi Tinggi 2 M Pagar Sementara (Seng (Seng Gelombang 2 M) M) Pagar Kawat Duri, Duri, Tinggi 1,80 1,80 M Membersihkan Membersihkan Lapangan dan Perataan Pengukuran dan Pasangan Bouwplank Pengukuran dan Pematokan Saluran Pengukuran dan Pematokan Jalan Kantor Sementara Sementara dgn Lantai Lantai Plesteran Gudang Semen Semen dan Alat-alat Alat-alat Rumah Jaga/konstruksi Jaga/konstruksi Kayu Bedeng Bedeng Buruh Buruh Camp Darurat Kontsruksi Kontsruksi Kayu Kayu Camp Darurat Darurat - Terpal Terpal Bongkaran Beton Beton Bertulang Bertulang Bongkaran Dnding Tembok Bata Bata Merah Membersihkan Membersihkan Saluran (Drainase) Pengangkutan Sampah (10 KM)
-
19.400,00
63.470,43
27.100,00
SNI 03-2835-2002
3. 7 72 27. 5 55 50,15
687.000,00
SNI 03 03-2835-2002
958.060,56
424.500,00
SN I 03-2 83 835- 20 2002
1. 06 065. 23 23 5, 5,12
347.750,00
589.085,00 447.622,00 858.535,00 19.400,00 90.570,00 1.106,00 497,00 4.414.550,00 1.382.560,00 1.412.985,00 1.437.303,00 463.200,00 2.162.404,00 783.313,00 732.313,00 3.357,00 108.847,00
C KA KA. 11 11
SN I 03-2 83 835- 20 2002
1. 01 012. 80 80 3, 3,08
424.500,00
CKA.12
HPS. CK 2015
285.080,10
178.120,00
CKA.13
HPS. CK CK 20 2015
1.806.404,30
356.000,00
CKA.14
SNI 03-2835-2002
-
783.313,00
CKA.15
SNI 03-2835-2002
-
732.313,00
CKA.16
HPS. CK 2015
-
3.357,26
CKA.17
HPS. CK 2015
-
108.847,70
-
86.000,00
86.000,00 28.666,00
-
105.750,00
105.750,00 35.250,00
-
125.840,00
125.840,00 41.946,00
-
114.440,00
114.440,00 38.146,00
-
119.200,00
119.200,00 39.733,00
-
116.650,00
116.650,00 38.883,00
PEKERJ PEKERJAAN AAN TANAH TANAH DAN PASIR PASIR 1 M3 Galian dan Urugan Tanah Biasa Sedalam 1 M
SNI 2835:2008
a. Ga Galian Tanah Biasa Sedalam 1 M
CKB.1a.
b. Urug Kembali Bekas Galian Tanah Biasa Sedalam 1 M
CKB.1b.
1 M3 a. b. 1 M3 a. b. 1 M3 a. b. 1 M3 a. b. 1 M3 a. b. 1 M3 a. b. 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M2 1 M3 1 M3 1 M3 1 M3 1 M3 1 M2 1 M'
Galian dan Urugan Tanah Biasa Sedalam 1 - 2 M
SNI 2835:2008
Ga G alian Tanah Biasa Sedalam 1 - 2 M
CKB.2a.
Urug Kembali Bekas Galian Tanah Biasa Sedalam 1 - 2 M
CKB.2b.
Galian dan Urugan Tanah Biasa Sedalam 2 - 3 M
SNI 2835:2008
Ga G alian Tanah Biasa Sedalam 2 - 3 M
CKB.3a.
Urug Kembali Bekas Galian Tanah Biasa Sedalam 2 - 3 M
CKB.3b.
Galian dan Urugan Tanah Keras Sedalam 1 M Galian Galian Tanah Tanah Keras Sedala Sedalam m1M Urug Kembali Bekas Galian Tanah Tanah Keras Sedalam Sedalam 1 M Galian dan Urugan Tanah Cadas Sedalam 1 M Galian Galian Tanah Tanah Cadas Sedalam Sedalam 1 M Urug Kembali Bekas Galian Tanah Tanah Cadas Sedalam 1 M Galian dan Urugan Tanah Lumpur Sedalam Sedalam 1 M G Ga alian Tanah Lumpur Sedalam 1 M Urug Kembali Bekas Galian Tanah Lumpur Sedalam 1 M Galian dan Urugan Tanah Berbatu Berbatu Galian Galian Tanah Tanah Berbat Berbatu u Urug Kembali Bekas Galian Galian Tanah Tanah Berbatu Berbatu Memadatkan Tanah Per 20 cm Urugan Tanah Urug (material (material didatangkan) didatangkan) Urugan Pasir Bawah Bawah Pondasi/Lantai Urugan Tanah Pilihan (Selmat) (Selmat) - Manual Urugan Sirtu Padat (Peninggian (Peninggian Lantai Bangunan) Pengangkutan Tanah Sampai Sampai Dengan Sejauh 15 M Pengangkutan Tanah Sampai Sampai Dengan Sejauh 30 M Pengangkutan Tanah Sampai Sampai Dengan Sejauh 150 M Lapisan Ijuk Tebal 10 cm Untuk Peresapan Peresapan Land Clearing (Mekanis) (Mekanis) - Bulldozer Galian Tanah (Mekanis) (Mekanis) - Excavator Penimbunan, pemadatan pemadatan dan perataan tanah tanah (Stamper) Penimbunan dan pemadatan pemadatan Tanah Pilihan (Mekanis) (Mekanis) Penimbunan dan pemadatan pemadatan Tanah Biasa (Mekanis) (Mekanis) Soil Semen (termasuk (termasuk penghamparan dan pemadatan pemadatan mekanis) Pembentukan Pembentukan dan Pemadatan Pemadatan Badan Jalan Perapihan Tanggul Saluran (Excavator)
SNI 2835:2008 CKB.4a. CKB.4b. SNI 2835:2008 CKB.5a. CKB.5b. SNI 2835:2008 CKB.6a. CKB.6b.
-
-
HPS. CK 2015 CKB.7a.
-
132.348,00
-
63.000,00
CKB.7b. CKB.8
SNI 2835:2008
CKB.9
SNI 2835:2008
408.231,60
34.400,00
CKB.10
HPS. CK CK 20 2015
1.118.503,20
31.500,00
CKB.11
HPS. CK 2015
477.231,60
63.000,00
CKB.12
SNI 2835:2008
1.739.834,40
31.500,00
CKB.13
SNI 2835:2008
-
37.670,00
CKB.14
HPS. CK 2015
-
37.670,00
CKB.15
HPS. CK 2015
-
64.744,00
CKB.16
SNI 2835:2008
CKB.17
HPS. CK 2015
-
2.140,50
CKB.18
HPS. CK 2015
-
22.773,37
CKB.19
HPS. CK 2015
477.231,60
34.371,52
CKB.20
HPS. CK 2015
477.231,60
30.831,22
CKB.21
HPS. CK 2015
408.231,60
30.831,22
CKB.22
HPS. CK CK 20 2015
1.008.299,60
165.983,17
HPS. CK 2015
-
11.551,88
CKB.23
60.000,00
18.900,00
HPS. CK 2015
a. Lebar melintang badan tanggul 5,57 M
CKB.24a.
-
10.976,22
b. Lebar melintang badan tanggul 6,89 M
CKB.24b.
-
13.564,99
c. Lebar melintang badan tanggul 8,03 M
CKB.24c.
-
15.808,47
d. Lebar melintang badan tanggul 8,94 M
CKB.24d.
-
17.607,93
e. Lebar melintang badan tanggul 11,07 M
CKB.24e.
-
18.153,03
f. Lebar melintang badan badan tanggul tanggul 12,98 M
CKB.24f.
-
25.550,08
g. Lebar melintang badan tanggul 16,06 M
CKB.24g.
-
31.607,26 12.492,82
1 M3 1 M3 1 M' 1 M'
Pemindahan Tanah Mekanis (Excavator) (Excavator) Pemindahan Tanah Mekanis (Bulldozer) (Bulldozer) Pembentukan Pembentukan Badan Tanggul (Bulldozer) (Bulldozer) Pemadatan Tanggul (Mekanis) (Mekanis)
132.348,00 44.116,00 63.000,00 442.631,00 1.150.003,00 540.231,00 1.771.334,00 37.670,00 37.670,00 64.744,00 78.900,00 2.140,00 22.773,00 511.603,00 508.062,00 439.062,00 1.174.282,00 11.551,00
CKB.25
HPS. CK 2015
-
CKB.26
HPS. CK 2015
-
7.746,59
CKB.27
HPS. CK 2015
-
22.072,51
CKB.28
HPS. CK 2015
-
30.831,22
10.976,00 13.564,00 15.808,00 17.607,00 18.153,00 25.550,00 31.607,00 12.492,00 7.746,00 22.072,00 30.831,00
PEKERJ PEKERJAAN AAN PON PONDAS DASII PASANG PASANGAN AN BATU BATU 1 M3 a. b. 1 M3 a. b. 1 M3 a.
Pondasi Pasangan Bata, Bata, Camp. 1PC : 4PS Mengguna Menggunakan kan Pasir Semen Semen Import Import Mengguna Menggunakan kan Pasir Semen Semen lokal Pondasi Pasangan Bata, Bata, Camp. 1PC : 3PS Mengguna Menggunakan kan Pasir Semen Semen Import Import Mengguna Menggunakan kan Pasir Semen Semen lokal Pondasi Pasangan Bata, Bata, Camp. 1PC : 2PS Mengguna Menggunakan kan Pasir Semen Semen Import Import
HPS. CK 2015
2.819.732,00 2.632.670,00
CKC.1a.
2.166.482,70
653.250,00
CKC.1b.
1.979.420,86
653.250,00
CKC.2a.
2.225.621,84
759.000,00
CKC.2b.
2.048.405,36
759.000,00
2.984.621,00 2.807.405,00
2.301.414,68
759.000,00
3.060.414,00
HPS. CK 2015
HPS. CK 2015 CKC.3a.
KETERANGAN 8
JUMLAH HARGA JENIS PEKERJAAN
NO.
2
1
4 5
D. 1
2
3
4
5
6 7
8
9
10
11
12 13 14 15 16 17 18 19 20 21 22 23 24 25
26
27 28 29 30 31
b. Menggunakan Pasir Semen lokal 1 M3 Tiang Pancang (40 x 40) Cm, beton bertulang 1 M3 Tiang Pancang (35 x 35) Cm, beton bertulang
33 34 35 36 37 38 39 40 41 42
3
REFERENSI 4
CKC.3b.
BAHAN
TENAGA/ALAT
HARGA SATUAN PEKERJAAN
(Rp.)
(Rp.)
(Rp.)
5
6
7=(5+6)
2.143.888,92
759.000,00
CKC.4
HPS. CK 2015
1.339.245,18
220.345,00
CKC.5
HPS. CK 2015
1.076.020,76
170.750,00
CKD.1a.
3.517.598,57
858.500,00
CKD.1b.
2.990.168,57
858.500,00
CKD.2a.
3.210.484,02
858.500,00
CKD.2b.
2.617.125,27
858.500,00
2.902.888,00 1.559.590,00 1.246.770,00
PEKERJAAN COR BETON 1 M3 a. b. 1 M3 a. b. 1 M3
Cor Beton 1PC : 2PS Manual Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Cor Beton 1PC : 3PS Manual Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Cor Beton 1PC : 4PS Manual
HPS. CK 2015
3.026.215,29
858.500,00
b. Menggunakan Pasir Semen lokal
CKD.3b.
2.393.299,29
858.500,00
CKD.4a.
2.903.369,46
858.500,00
CKD.4b.
2.244.081,96
858.500,00
CKD.5a.
2.815.622,45
858.500,00
CKD.5b.
2.137.498,16
858.500,00
2.967.265,12
858.500,00
Cor Beton 1PC : 5PS Manual Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Cor Beton 1PC : 6PS Manual Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Campuran Beton 1PC : 2PS : 3KR, Import - Manual Campuran Beton 1PC : 2PS (mekanis)
CKD.6
HPS. CK 2015
3.674.122,00 2.995.998,00 3.825.765,00
HPS. CK 2015 CKD.7a.
3.517.598,57
712.946,49
CKD.7b.
2.990.168,57
712.946,49
1 M3 Campuran Beton 1PC : 3PS (mekanis)
4.230.545,00 3.703.115,00
HPS. CK 2015
a. Menggunakan Pasir Semen Import
CKD.8a.
3.210.484,02
695.773,87
b. Menggunakan Pasir Semen Lokal
CKD.8b.
2.617.125,27
695.773,87
CKD.9a.
3.026.215,29
685.470,30
CKD.9b.
2.393.299,29
685.470,30
CKD.10a.
2.903.369,46
678.601,25
CKD.10b.
2.244.081,96
678.601,25
CKD.11a.
2.815.622,45
673.694,78
CKD.11b.
2.137.498,16
673.694,78
3.906.257,00 3.312.899,00
HPS. CK 2015
3.711.685,00 3.078.769,00
HPS. CK 2015
3.581.970,00 2.922.683,00
HPS. CK 2015
CKD.12
HPS. CK 2015
2.967.017,62
671.370,67
CKD.13
SNI 7394:2008
2.623.796,76
236.087,50
CKD.14
SNI 7394:2008
2.673.069,17
236.087,50
CKD.15
SNI 7394:2008
2.710.022,55
236.087,50
CKD.16
SNI 7394:2008
2.632.383,46
171.700,00
CKD.17
SNI 7394:2008
2.754.943,78
236.087,50
CKD.18
SNI 7394:2008
2.796.643,25
236.087,50
CKD.19
SNI 7394:2008
2.830.716,74
236.087,50
CKD.20
SNI 7394:2008
2.850.548,59
236.087,50
CKD.21
SNI 7394:2008
2.886.879,79
236.087,50
CKD.22
SNI 7394:2008
2.897.049,74
236.087,50
CKD.23
SNI 7394:2008
2.938.804,81
300.475,00
CKD.24
SNI 7394:2008
2.953.212,79
300.475,00
3.489.317,00 2.811.192,00 3.638.388,00 2.859.884,00 2.909.156,00 2.946.110,00 2.804.083,00 2.991.031,00 3.032.730,00 3.066.804,00 3.086.636,00 3.122.967,00 3.133.137,00 3.239.279,00 3.253.687,00
SNI 7394:2008 CKD.25a.
15.094,41
1.905,50
CKD.25b.
14.130,51
1.905,50
CKD.25c.
14.049,66
1.905,50
CKD.25d.
14.144,16
1.905,50
CKD.25e.
14.733,21
1.905,50
CKD.25f.
14.647,11
1.905,50
CKD.25g.
14.871,81
1.905,50
CKD.25h.
15.573,21
1.905,50
CKD.26a.
138.403,26
101.010,00
CKD.26b.
155.018,63
101.010,00
CKD.26c.
354.642,90
128.205,00
CKD.26d.
365.548,73
128.205,00
CKD.26e.
429.482,90
128.205,00
CKD.26f.
438.298,54
128.205,00
CKD.26g.
321.162,16
128.205,00
16.999,00 16.036,00 15.955,00 16.049,00 16.638,00 16.552,00 16.777,00 17.478,00
SNI 7394:2008
CKD.27
SNI 7394:2008
107.044,75
25.385,00
CKD.28
HPS. CK 2015
155.686,72
100.250,00
CKD.29
HPS. CK 2015
192.233,38
100.250,00
CKD.30
HPS. CK 2015
436.000,00
239.413,00 256.028,00 482.847,00 493.753,00 557.687,00 566.503,00 449.367,00 132.429,00 255.936,00 292.483,00 436.000,00
-
HPS. CK 2015 CKD.31a.
523.880,00
2.023.000,00
2.546.880,00
CKD.31b.
640.000,00
797.450,00
1.437.450,00
SNI 7394:2008
5.628.386,68
1.025.610,00
SNI 7394:2008
6.579.319,36
1.160.455,00
SNI 7394:2008
###########
1.446.375,00
SNI 7394:2008
8.555.736,10
1.256.675,00
SNI 7394:2008
8.079.907,58
1.026.075,00
SNI 7394:2008
7.803.258,70
1.025.610,00
SNI 7394:2008
8.048.462,86
1.160.455,00
HPS. CK 2015
7.811.271,92
1.266.415,00
SNI 7394:2008
79.219,82
30.360,00
SNI 7394:2008
107.615,36
50.135,00
6.653.996,00 7.739.774,00 12.043.657,00 9.812.411,00 9.105.982,00 8.828.868,00 9.208.917,00 9.077.686,00 109.579,00 157.750,00
ANALISA CKD.32 s/d CKD.39 UNTUK GAMBAR RENCANA YANG BELUM MEMPUNYAI GAMBAR DETAIL 1 M3 Pondasi beton bertulang (150 kg besi + bekisting) CKD.32 1 M3 Sloof beton bertulang (200 kg besi + bekisting) CKD.33 1 M3 Kolom beton bertulang (300 kg besi + bekisting) CKD.34 1 M3 Balok beton bertulang (200 kg besi + bekisting) CKD.35 1 M3 Plat beton bertulang (150 kg besi + bekisting) CKD.36 1 M3 Dinding beton bertulang (150 kg besi + bekisting) CKD.37 1 M3 Dinding beton bertulang (200 kg besi + bekisting) CKD.38 1 M3 Tangga beton bertulang (150 kg besi + bekisting) CKD.39 1 M' Kolom penguat/praktis beton bertulang (11 x 11) cm CKD.40 1 M' Sloof/Ring balok beton bertulang (10 x 15) cm CKD.41 1 M' Kolom Ukuran 15 x 15 (1PC : 3PS) a. Menggunakan Pasir Semen Import
3.761.869,00 3.102.581,00
HPS. CK 2015
b. Menggunakan Pasir Semen Lokal
Campuran Beton 1PC : 4PS (mekanis) Menggunakan Pasir Semen Import Menggunakan Pasir Semen Lokal Campuran Beton 1PC : 5PS (mekanis) Menggunakan Pasir Semen Import Menggunakan Pasir Semen Lokal Campuran Beton 1PC : 6PS (mekanis) Menggunakan Pasir Semen Import Menggunakan Pasir Semen Lokal Campuran beton 1PC : 2 PS : 3KR, Import - Mekanis Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 Pembesian Besi polos atau ulir SNI Besi Beton Dia.6 SNI (P=12 m) Besi Beton Dia.8 SNI (P=12 m) Besi Beton Dia.10 SNI (P=12 m) Besi Beton Dia.12 SNI (P=12 m) Besi Beton Dia.14 SNI (P=12 m) Besi Beton Dia.16 SNI (P=12 m) Besi Beton Dia.19 SNI (P=12 m) Besi Beton Dia.22 SNI (P=12 m) Pekerjaan Bekisting untuk Beton Bekisting untuk Pondasi Bekisting untuk Sloof Bekisting untuk Kolom Bekisting untuk Balok Bekisting untuk Lantai Bekisting untuk Dinding Bekisting untuk Tangga Pasang Jembatan untuk Pengecoran Beton Cetakan Beton / Begisting Memakai Papan Cetakan Beton / Begisting Memakai Multiplek Membongkar cetakan / Bekisting Beton Stutwerk untuk 1 M3 Beton, tinggi 3 - 4 m Memakai dolken kayu bulat
3.884.715,00 3.251.799,00
HPS. CK 2015
a. Menggunakan Pasir Semen Import
1 M3 a. b. 1 M3 a. b. 1 M3 a. b. 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 KG a. b. c. d. e. f. g. h. 1 M2 a. b. c. d. e. f. g. 1 M2 1 M2 1 M2 1 M3 1 Set a.
4.068.984,00 3.475.625,00
HPS. CK 2015 CKD.3a.
1 M3 a. b. 1 M3 a. b. 1 M3 1 M3
4.376.098,00 3.848.668,00
HPS. CK 2015
a. Menggunakan Pasir Semen Import
b. Memakai Scafolding 32
ANALISA
CKD.42a.
HPS. CK 2015
204.956,00
KETERANGAN 8
JUMLAH HARGA JENIS PEKERJAAN
NO.
2
1
43
44 45
E. 1
b. 1 M' a. b. 1 Btg 1 M' a. b.
Menggunakan Pasir Semen Lokal Balok 15 x 15 (1PC : 3PS) Menggunakan Pasir Semen Import Menggunakan Pasir Semen Lokal Tiang Pancang Beton 20x20; L=5 M (1PC : 2PS : 3KR) Pekerjaan Bantalan Beton (1PC : 3PS) Menggunakan Pasir Semen Import Menggunakan Pasir Semen Lokal
3
4 5 6 7 8 9 10 11 12 13 14
F. 1
2
3
4
5
6 7 8 9
10
11
12
13 14
15
16
17
18
19
20 21 22
3
REFERENSI 4
BAHAN
TENAGA/ALAT
HARGA SATUAN PEKERJAAN
(Rp.)
(Rp.)
(Rp.)
5
6
7=(5+6)
190.270,00
CKD.42b. HPS. CK 2015 CKD.43a. CKD.43b. CKD.44
HPS. CK 2015
5.615.531,36
-
204.956,00 190.270,00 5.615.531,00
HPS. CK 2015
155.052,00 140.367,00
CKD.45a. CKD.45b.
PEKERJAAN DINDING BATU 1 M3 Pasangan Bata Merah Tebal 1 bata, 1PC : 4PS a. Menggunakan Pasir Semen Import b. Menggunakan Pasir Semen lokal
2
ANALISA
1 M3 a. b. 1 M3 a. b. 1 M2 1 M2 1 M2 1 M2 1 M2
Pasangan Bata Merah Tebal 1 bata, 1PC : 3PS Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Pasangan Bata Merah Tebal 1 bata, 1PC : 2PS Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Pasangan Bata Merah Tebal 1 Bata, 1PC : 2PS Pasangan Bata Merah Tebal 1 Bata, 1PC : 3PS Pasangan Bata Merah Tebal 1 Bata, 1PC : 4PS Pasangan Bata Merah Tebal 1 Bata, 1PC : 5PS Pasangan Bata Merah Tebal 1 Bata, 1PC : 6PS
1 M2 1 M2 1 M2 1 M2 1 M2 1 M2
Pasangan Bata Merah Tebal 1/2 Bata, 1PC : 2PS Pasangan Bata Merah Tebal 1/2 Bata, 1PC : 3PS Pasangan Bata Merah Tebal 1/2 Bata, 1PC : 4PS Pasangan Bata Merah Tebal 1/2 Bata, 1PC : 5PS Pasangan Bata Merah Tebal 1/2 Bata, 1PC : 6PS Pasangan Bata Merah Tebal 1/2 Bata, 1PC : 8PS
HPS. CK 2015 CKE.1a.
2.166.482,70
653.250,00
2.819.732,00
CKE.1b.
1.979.420,86
653.250,00
2.632.670,00
CKE.2a.
2.225.621,84
759.000,00
CKE.2b.
2.048.405,36
759.000,00
2.984.621,00 2.807.405,00
CKE.3a.
2.301.414,68
759.000,00
CKE.3b.
2.143.888,92
759.000,00
HPS. CK 2015
HPS. CK 2015
CKE.4
SNI 6897:2008
415.502,88
101.200,00
CKE.5
SNI 6897:2008
397.735,03
101.200,00
CKE.6
SNI 6897:2008
382.600,80
101.200,00
CKE.7
SNI 6897:2008
379.435,97
101.200,00
CKE.8
SNI 6897:2008
388.250,49
101.200,00
CKE.9
SNI 6897:2008
198.450,47
50.600,00
CKE.10
SNI 6897:2008
188.150,16
50.600,00
CKE.11
SNI 6897:2008
183.323,70
50.600,00
CKE.12
SNI 6897:2008
180.353,95
50.600,00
CKE.13
SNI 6897:2008
180.470,13
50.600,00
CKE.14
SNI 6897:2008
176.568,30
50.600,00
3.060.414,00 2.902.888,00 516.702,00 498.935,00 483.800,00 480.635,00 489.450,00 249.050,00 238.750,00 233.923,00 230.953,00 231.070,00 227.168,00
PEKERJAAN PLESTERAN 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm
SNI 2837:2008
a. Menggunakan Pasir Semen Import
CKF.1a.
63.968,29
58.275,00
b. Menggunakan Pasir Semen lokal
CKF.1b.
56.092,00
58.275,00
CKF.2a.
55.642,02
58.275,00
CKF.2b.
45.796,66
58.275,00
CKF.3a.
53.413,20
58.275,00
CKF.3b.
42.091,03
58.275,00
CKF.4a.
50.757,94
58.275,00
CKF.4b.
38.943,50
58.275,00
CKF.5a.
50.801,91
58.275,00
CKF.5b.
38.002,94
58.275,00
1 M2 a. b. 1 M2 a. b. 1 M2 a. b. 1 M2 a. b. 1 M2 1 M2 1 M2 1 M2 a. b. 1 M2 a. b. 1 M2 a. b. 1 M2
Plesteran 1PC : 2PS, Tebal 15 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 3PS, Tebal 15 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 4PS, Tebal 15 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 5PS, Tebal 15 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 6PS, Tebal 15 mm Plesteran 1PC : 7PS, Tebal 15 mm Plesteran 1PC : 8PS, Tebal 15 mm Plesteran 1PC : 2PS, Tebal 20 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 3PS, Tebal 20 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 4PS, Tebal 20 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 5PS, Tebal 20 mm
122.243,00 114.367,00
SNI 2837:2008
113.917,00 104.071,00
SNI 2837:2008
111.688,00 100.366,00
SNI 2837:2008
109.032,00 97.218,00
SNI 2837:2008
CKF.6
SNI 2837:2008
36.895,22
58.275,00
CKF.7
SNI 2837:2008
36.552,42
58.275,00
CKF.8
SNI 2837:2008
36.209,63
58.275,00
CKF.9a.
74.664,15
78.040,00
CKF.9b.
61.372,91
78.040,00
CKF.10a.
71.692,38
78.040,00
CKF.10b.
56.432,07
78.040,00
CKF.11a.
67.677,25
78.040,00
CKF.11b.
51.924,67
78.040,00
109.076,00 96.277,00 95.170,00 94.827,00 94.484,00
SNI 2837:2008
152.704,00 139.412,00
SNI 2837:2008
149.732,00 134.472,00
SNI 2837:2008
145.717,00 129.964,00
SNI 2837:2008
146.250,00 129.021,00 127.233,00
a. Menggunakan Pasir Semen Import
CKF.12a.
68.210,66
78.040,00
b. Menggunakan Pasir Semen lokal
CKF.12b.
50.981,28
78.040,00
49.193,62
78.040,00
CKF.14a.
59.684,60
65.525,00
CKF.14b.
53.285,12
65.525,00
125.209,00 118.810,00
1 M2 1 M2 a. b. 1 M2
Plesteran 1PC : 6PS, Tebal 20 mm Plesteran 1PC : 2PS, Tebal 25 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 3PS, Tebal 25 mm
CKF.13
SNI 2837:2008 HPS. CK 2015
HPS. CK 2015
a. Menggunakan Pasir Semen Import
CKF.15a.
81.060,39
65.610,00
146.670,00
b. Menggunakan Pasir Semen lokal
CKF.15b.
63.831,01
65.610,00
129.441,00 144.914,00 126.208,00
1 M2 Plesteran 1PC : 4PS, Tebal 25 mm
HPS. CK 2015
a. Menggunakan Pasir Semen Import
CKF.16a.
79.304,33
65.610,00
b. Menggunakan Pasir Semen lokal
CKF.16b.
60.598,15
65.610,00
1 M2 Plesteran 1PC : 5PS, Tebal 25 mm
HPS. CK 2015
a. Menggunakan Pasir Semen Import
CKF.17a.
76.638,45
65.610,00
b. Menggunakan Pasir Semen lokal
CKF.17b.
57.439,99
65.610,00
1 M2 Plesteran 1PC : 2PS, Tebal 30 mm
HPS. CK 2015
a. Menggunakan Pasir Semen Import
CKF.18a.
99.386,79
75.805,00
b. Menggunakan Pasir Semen lokal
CKF.18b.
82.157,41
75.805,00
CKF.19a.
93.132,21
75.805,00
CKF.19b.
73.933,75
75.805,00
1 M2 a. b. 1 M2 1 M2 1 M2
Plesteran 1PC : 3PS, Tebal 30 mm Menggunakan Pasir Semen Import Menggunakan Pasir Semen lokal Plesteran 1PC : 4PS, Tebal 30 mm Plesteran 1PC : 5PS, Tebal 30 mm Barapen 1PC : 3PS, Tebal 30 mm
142.248,00 123.049,00 175.191,00 157.962,00
HPS. CK 2015
CKF.20
HPS. CK 2015
69.372,89
75.805,00
CKF.21
HPS. CK 2015
63.696,51
75.805,00
HPS. CK 2015
168.937,00 149.738,00 145.177,00 139.501,00
KETERANGAN 8
JUMLAH HARGA JENIS PEKERJAAN
NO.
2
1
23 24 25 26 27 28 29 30 31 32
G. 1 2
3 4 5
7
8 9
10
11 12 13
14 15
16 17 18 19
20
21
22
23
24
25
27
28
29 30
31
4
BAHAN
TENAGA/ALAT
HARGA SATUAN PEKERJAAN
(Rp.)
(Rp.)
(Rp.)
5
6
7=(5+6)
CKF.23
HPS. CK 2015
36.497,50
28.455,00
CKF.24
HPS. CK 2015
39.755,43
77.700,00
CKF.25
HPS. CK 2015
36.773,81
77.700,00
CKF.26
SNI 2837:2008
13.445,12
70.800,00
CKF.27
SNI 2837:2008
17.066,44
50.600,00
CKF.28
SNI 2837:2008
8.254,85
29.300,00
CKF.29
HPS. CK 2015
4.249,60
13.760,00
CKF.30
SNI 2837:2008
28.024,07
58.275,00
CKF.31
SNI 2837:2008
8.632,00
38.850,00
CKF.32
HPS. CK 2015
4.648,00
11.020,00
77.144,00 66.806,00 64.952,00 117.455,00 114.473,00 84.245,00 67.666,00 37.554,00 18.009,00 86.299,00 47.482,00 15.668,00
SNI 3434:2008
7.232.572,05
4.046.000,00
11.278.572,00
CKG.2a.
4.406.427,45
3.468.000,00
CKG.2b.
4.031.785,05
3.468.000,00
CKF.22a.
48.689,35
28.455,00
b. Menggunakan Pasir Semen lokal
CKF.22b.
38.351,73
28.455,00
1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M'
Barapen 1PC : 5PS, Tebal 30 mm Plesteran Batu Kali 1PC : 3PS Plesteran Batu Kali 1PC : 4PS Plesteran Skoning 1PC : 2PS, Tebal 10 mm Plesteran Ciprat 1PC : 2PS, Tebal 10 mm Finishing Siar Pasangan Dinding Bata Merah 20 M' Finishing Siar Pasangan Dinding Coneblock Ekspose 8 M' Finishing Siar Pasangan Batu Kali/Belah Adukan 1PC : 2PS Acian Benangan
PEKERJAAN KAYU 1 M3 1 M3 a. b. 1 M2 1 M2 1 M2 a.
Kusen Pintu dan Jendela Kayu Kelas I Kusen Pintu dan Jendela Kayu Kelas II/III Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Pintu Klamp Standar Kayu Kelas II Pintu Klamp Sederhana Kayu Kelas III Daun Pintu Panel Kayu Kelas I/II Menggunakan Kayu Kelas I
1 M2 a. b. 1 M2 a. b. 1 M2 1 M2 a. b. 1 M2 a. b. 1 M2 1 M2 1 M3 a. b. c. 1 M3 1 M3 a. b. 1 M2 1 M2 1 M2 1 M2 a. b. 1 M2 a. b. 1 M2 a. b. 1 M2 a. b. 1 M' a. b. 1 M' a. b. 1 M' a.
Pintu dan Jendela Kaca, Kayu Kelas I/II Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Pintu dan Jendela Jalusi, Kayu Kelas I/II Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup Kayu Kelas II (Lebar Sampai 90 cm) Pintu Plywood Rangkap Rangka Expose, Kayu Kelas I/II Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Jalusi Kusen, Kayu Kelas I/II Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Teakwood Rangkap Rangka Expose, Kayu Kelas I Teakwood Rangkap Lapis Formika Rangka Expose, Kayu Kelas II Konstruksi Kuda-Kuda Konvensional, Kayu Kelas I,II,III Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Konstruksi Kuda-Kuda Expose, Kayu Kelas I Konstruksi Gordeng Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Rangka Atap Genteng Keramik, Kayu Kelas II Rangka Atap Genteng Beton, Kayu Kelas II Rangka Atap Genteng Sirap, Kayu Kelas II Rangka Plafond (50 x 100), Kayu Kelas II/III Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Rangka Plafond (60 x 60), Kayu Kelas II/III Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Rangka Plafond (100 x 100), Kayu Kelas II/III Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Rangka Plafond (60 x 120), Kayu Kelas II/III Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Lisplank Ukuran (3 x 20) cm, Kayu Kelas I/II Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Lisplank Ukuran (3 x 30) cm, Kayu Kelas I/II Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Lisplank Ukuran (2 x 20) cm, Kayu Kelas I/II Menggunakan Kayu Kelas I
b. Menggunakan Kayu Kelas II 26
3
REFERENSI
a. Menggunakan Pasir Semen Import
b. Menggunakan Kayu Kelas II 6
ANALISA
1 M' a. b. 1 M' a. b. 1 M' a. b. c. 1 M' 1 M2 a. b. 1 M2
Lisplank Ukuran (2x25) cm, Kayu Kelas I/II Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas I/II Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Lisplank Ukuran (2x20) cm Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Papan Ruiter Dinding Bilik Bambu, Rangka Kayu Kelas III, IV Menggunakan Kayu Kelas III Menggunakan Kayu Kelas IV Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II/III
CKG.1
SNI 3434:2008
CKG.3
SNI 3434:2008
146.241,09
202.385,00
CKG.4
SNI 3434:2008
133.753,01
202.385,00
7.874.427,00 7.499.785,00 348.626,00 336.138,00
CKG.5a.
204.071,62
578.000,00
782.071,00
CKG.5b.
157.083,54
578.000,00
735.083,00
CKG.6a.
355.340,97
462.400,00
CKG.6b.
327.148,12
462.400,00
817.740,00 789.548,00
CKG.7a.
319.511,09
578.000,00
CKG.7b.
244.330,16
578.000,00
CKG.8
194.160,43
578.000,00
CKG.9a.
226.413,97
462.400,00
CKG.9b.
196.341,60
462.400,00
CKG.10a.
291.088,83
436.980,00
CKG.10b.
220.606,71
436.980,00
SNI 3434:2008
SNI 3434:2008
SNI 3434:2008
897.511,00 822.330,00 772.160,00
SNI 3434:2009
688.813,00 658.741,00
SNI 3434:2009
CKG.11
SNI 3434:2009
252.432,97
462.400,00
CKG.12
SNI 3434:2009
401.281,43
462.400,00
CKG.13a.
7.398.861,40
2.312.000,00
CKG.13b.
4.209.189,20
2.312.000,00
3.865.767,00
2.312.000,00
8.052.359,20
3.872.600,00
CKG.15a.
4.166.026,60
1.387.200,00
CKG.15b.
3.822.604,40
1.387.200,00
728.068,00 657.586,00 714.832,00 863.681,00
SNI 3434:2009
CKG.13c. CKG.14
SNI 3434:2009
9.710.861,00 6.521.189,00 6.177.767,00 11.924.959,00
SNI 3434:2009
5.553.226,00 5.209.804,00 112.900,00 143.656,00 635.660,00
CKG.16
SNI 3434:2009
85.800,11
27.100,00
CKG.17
SNI 3434:2009
116.556,11
27.100,00
CKG.18
SNI 3434:2009
603.140,74
32.520,00
CKG.19a.
59.303,45
75.150,00
CKG.19b.
54.495,54
75.150,00
CKG.20a.
63.405,25
69.550,00
CKG.20b.
58.316,36
69.550,00
CKG.21a.
45.283,41
67.475,00
CKG.21b.
41.536,99
56.000,00
CKG.22a.
49.250,71
61.420,00
CKG.22b.
45.192,08
61.420,00
CKG.23a.
53.607,86
42.450,00
CKG.23b.
40.921,08
42.450,00
CKG.24a.
53.739,81
42.450,00
CKG.24b.
40.818,09
42.450,00
96.189,00 83.268,00
CKG.25a.
24.083,95
27.100,00
51.183,00
CKG.25b.
18.445,38
27.100,00
45.545,00
CKG.26a.
29.855,93
27.100,00
CKG.26b.
22.807,72
27.100,00
56.955,00 49.907,00
CKG.27a.
70.740,74
56.000,00
CKG.27b.
53.707,56
56.000,00
CKG.28a.
42.361,87
27.100,00
CKG.28b.
32.259,43
27.100,00
29.574,50
27.100,00
14.873,12
15.570,00
CKG.30a.
386.250,34
19.425,00
CKG.30b.
373.656,45
19.425,00
SNI 3434:2009
134.453,00 129.645,00
SNI 3434:2009
132.955,00 127.866,00
HPS. CK 2015
112.758,00 97.536,00
HPS. CK 2015
110.670,00 106.612,00
SNI 3434:2009
96.057,00 83.371,00
SNI 3434:2009
HPS. CK 2015
HPS. CK 2015
HPS. CK 2015
126.740,00 109.707,00
HPS. CK 2015
CKG.28c. CKG.29
HPS. CK 2015
69.461,00 59.359,00 56.674,00 30.443,00
SNI 3434:2009
SNI 3434:2009
405.675,00 393.081,00
KETERANGAN 8
JUMLAH HARGA JENIS PEKERJAAN
NO.
ANALISA
2
1
4
BAHAN
TENAGA/ALAT
HARGA SATUAN PEKERJAAN
(Rp.)
(Rp.)
(Rp.)
5
6
7=(5+6)
46
a. b. 1 M2 1 M2 1 M2 1 M2 1 M3 a. b. c. 1 M3 a. b. c. 1 M2 a. b. c. 1 M2 a. b. c. 1 M2 a. b. c. d. 1 Btg 1 Btg 1 Btg 1 Btg 1 Btg 1 Btg
47
1 Btg Pancang Tiang Umpak untuk Pondasi Rumah
CKG.47
HPS. CK 2015
117.144,50
61.486,68
178.631,00
48
1 M3 1 M3 1 M2 1 M3
CKG.48
HPS. CK 2015
3.948.048,07
4.624.000,00
CKG.49
HPS. CK 2015
3.779.888,90
4.624.000,00
CKG.50
HPS. CK 2015
195.219,82
197.633,33
CKG.51
HPS. CK 2015
3.779.888,90
4.624.000,00
8.572.048,00 8.403.888,00 392.853,00 8.403.888,00
32 33 34 35 36
37
38
39
40
41 42 43 44 45
49 50 51
H. 1
2
3 4 5 6 7 8 9
I.
Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Rangka Dinding Pemisah Teakwood Rangkap, Rangka Dinding Pemisah Plywood Rangkap, Lambriziring Dari Papan Kayu Kelas I Lambriziring dari Plywood Ukuran (120 x 240) cm Rangka/kolom dinding (kayu gergajian) Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Gelagar bawah lantai (kayu gergajian) Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Lantai papan tebal 3,50 cm (bersih 3,00 cm) Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Dinding papan (kayu gergajian) Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Jalusi kayu lapis has nyamuk 5 CM Menggunakan Kayu Kelas I Menggunakan Kayu Kelas II Menggunakan Kayu Kelas III Menggunakan Kayu Kelas IV Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Manual Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Manual Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Mekanis Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Mekanis Pancang Tiang Cerucuk Kayu (Excavator) Pancang Tiang Cerucuk Beton (Excavator)
3
REFERENSI
Gelagar Melintang Jembatan Gelagar Memanjang Jembatan Lantai dan Dinding Turap Jembatan Sandaran dan Balok Pengikat Tiang Pancang Jembatan
CKG.31a.
104.277,88
86.785,00
CKG.31b.
86.785,00
95.536,22
CKG.32
SNI 3434:2009
218.080,30
86.785,00
CKG.33
SNI 3434:2009
331.786,06
115.600,00
CKG.34
SNI 3434:2009
39.079,95
346.800,00
CKG.35
SNI 3434:2009
100.567,25
14.485,00
CKG.36a.
7.522.379,80
3.540.000,00
CKG.36b.
4.332.707,60
3.540.000,00
3.989.285,40
3.540.000,00
CKG.37a.
7.221.525,80
3.007.500,00
CKG.37b.
4.031.853,60
3.007.500,00
3.688.431,40
3.007.500,00
CKG.38a.
180.915,48
109.700,00
CKG.38b.
139.800,91
109.700,00
128.873,84
109.700,00
CKG.39a.
147.604,34
177.120,00
CKG.39b.
112.363,28
177.120,00
102.997,22
177.120,00
CKG.40a.
200.084,74
94.300,00
CKG.40b.
160.614,75
94.300,00
CKG.40c.
150.124,77
94.300,00
CKG.40d.
114.103,42
191.062,00 182.321,00 304.865,00 447.386,00 385.879,00 115.052,00
HPS. CK 2015
CKG.36c.
11.062.379,00 7.872.707,00 7.529.285,00
HPS. CK 2015
CKG.37c.
10.229.025,00 7.039.353,00 6.695.931,00
HPS. CK 2015
CKG.38c.
290.615,00 249.500,00 238.573,00
HPS. CK 2015
CKG.39c.
324.724,00 289.483,00 280.117,00
HPS. CK 2015
94.300,00
CKG.41
HPS. CK 2015
-
112.973,35
CKG.42
HPS. CK 2015
-
97.812,85
CKG.43
HPS. CK 2015
-
152.277,33
CKG.44
HPS. CK 2015
-
147.086,67
CKG.45
HPS. CK 2015
-
294.554,67
CKG.46
HPS. CK 2015
-
310.126,67
294.384,00 254.914,00 244.424,00 208.403,00 112.973,00 97.812,00 152.277,00 147.086,00 294.554,00 310.126,00
PEKERJAAN ATAP 1 M2 a. b. c. 1 M' a. b. 1 M2 1 M' 1 M2 1 M' 1 M2 1 M' 1 M'
Penutup Atap Seng Gelombang BJLS Menggunakan Seng Gelombang BJLS 0,30 Menggunakan Seng Gelombang BJLS 0,22 Menggunakan Seng Gelombang BJLS 0,20 Bubungan/Nok Atap Seng Gelombang Menggunakan Seng Plat BJLS 0,3 Menggunakan Seng Plat BJLS 0,2 Penutup Atap Fiberglass Gelombang Bubungan/Nok Atap Fiberglass Gelombang Penutup Atap Genteng Metal - Multiroof Bubungan/Nok Atap Genteng Metal - Multiroof Penutup Atap Alumunium Bubungan/Nok Atap Alumunium Gelombang Talang Datar / Jurai
SNI 03-3436-2002 CKH.1a.
47.322,72
23.310,00
CKH.1b.
45.261,92
23.310,00
37.952,52
23.310,00
CKH.2a.
27.997,84
53.020,00
CKH.2b.
28.553,14
53.020,00
CKH.1c.
70.632,00 68.571,00 61.262,00
SNI 03-3436-2002
CKH.3
SNI 03-3436-2002
47.162,34
26.781,00
CKH.4
SNI 03-3436-2002
33.750,76
53.020,00
CKH.5
SNI 03-3436-2002
84.736,15
37.320,00
CKH.6
SNI 03-3436-2002
35.313,95
52.485,00
CKH.7
SNI 03-3436-2002
74.303,47
122.110,00
CKH.8
SNI 03-3436-2002
85.202,84
27.100,00
CKH.9
HPS. CK 2015
112.532,67
82.575,00
CKI.1
SNI 7395-2008
118.831,06
52.610,00
CKI.2
SNI 7395-2008
145.813,18
50.505,00
CKI.3
SNI 7395-2008
156.895,73
47.795,00
CKI.4
SNI 7395-2008
156.667,03
52.610,00
CKI.5
SNI 7395-2008
153.757,85
50.505,00
CKI.6
SNI 7395-2008
179.008,01
48.725,00
CKI.7
SNI 7395-2008
156.855,92
50.505,00
CKI.8
SNI 7395-2008
173.916,17
48.725,00
CKI.9
SNI 7395-2008
193.142,51
50.505,00
CKI.10
SNI 7395-2008
215.008,91
48.725,00
CKI.11
SNI 7395-2008
166.779,24
50.505,00
CKI.12
SNI 7395-2008
180.592,58
81.017,00 81.573,00 73.943,00 86.770,00 122.056,00 87.798,00 196.413,00 112.302,00 195.107,00
PEKERJAAN PENUTUP LANTAI DAN DINDING
12
1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2
48.725,00
171.441,00 196.318,00 204.690,00 209.277,00 204.262,00 227.733,00 207.360,00 222.641,00 243.647,00 263.733,00 217.284,00 229.317,00
13
1 M2 Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm
CKI.13
SNI 7395-2008
339.088,57
46.620,00
385.708,00
14
1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M' 1 M' 1 M'
CKI.14
SNI 7395-2008
237.776,33
48.725,00
CKI.15
SNI 7395-2008
194.709,35
50.505,00
CKI.16
SNI 7395-2008
150.076,01
135.975,00
CKI.17
HPS. CK 2015
137.790,11
135.975,00
CKI.18
SNI 7395-2008
230.480,11
135.975,00
CKI.19
SNI 7395-2008
141.825,27
135.975,00
CKI.20
SNI 7395-2008
149.710,18
135.975,00
CKI.21
HPS. CK 2015
165.575,13
135.975,00
CKI.22
HPS. CK 2015
145.399,27
135.975,00
CKI.23
HPS. CK 2015
161.930,11
135.975,00
CKI.24
SNI 7395-2008
166.710,53
135.975,00
CKI.25
SNI 7395-2008
165.745,14
135.975,00
CKI.26
SNI 7395-2008
501.811,59
135.975,00
CKI.27
SNI 7395-2008
42.258,08
24.475,00
CKI.28
SNI 7395-2008
43.907,85
24.475,00
CKI.29
SNI 7395-2008
37.168,40
24.475,00
286.501,00 245.214,00 286.051,00 273.765,00 366.455,00 277.800,00 285.685,00 301.550,00 281.374,00 297.905,00 302.685,00 301.720,00 637.786,00 66.733,00 68.382,00 61.643,00
1 2 3 4 5 6 7 8 9 10 11
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm Lantai Ubin PC Warna Ukuran 20 x 20 cm Lantai Ubin PC Warna Ukuran 30 x 30 cm Lantai Ubin PC Warna Ukuran 40 x 40 cm Lantai Ubin PC Teraso Ukuran 30 x 30 cm Lantai Ubin PC Teraso Ukuran 40 x 40 cm Lantai Ubin PC Granito Ukuran 30 x 30 cm Lantai Ubin PC Granito Ukuran 40 x 40 cm Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm Lantai Keramik Artistik Ukuran 10 x 20 cm Lantai Keramik Ukuran 15 x 15 cm Lantai Keramik Artistik Uk. 10 x 10 cm atau 5 x 20 cm Lantai Keramik Ukuran 33 x 33 cm Lantai Keramik Ukuran 30 x 30 cm berglasir Lantai Keramik Ukuran 40 x 40 cm Lantai Keramik Ukuran 25 x 25 cm Lantai Keramik Ukuran 20 x 25 cm Lantai Keramik Ukuran 20 x 20 Lantai Mozaik Uk. 30 x 30 cm, Camp. 1PC : 3PS Lantai Marmer Ukuran 100 x 100 cm Plint Ubin PC Abu-abu Ukuran 10 x 30 cm Plint Ubin PC Abu-abu Ukuran 10 x 40 cm Plint Ubin PC Warna Ukuran 10 x 20 cm
KETERANGAN 8
JUMLAH HARGA JENIS PEKERJAAN
NO.
2
1 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
J. 1
2 4 5 6 7 8 9
K. 1
ANALISA
1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M' 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2
Plint Ubin PC Warna Ukuran 10 x 30 cm Plint Ubin PC Warna Ukuran 10 x 40 cm Plint Ubin Teraso Ukuran 10 x 30 cm Plint Ubin Teraso Ukuran 10 x 40 cm Plint Ubin Granito Ukuran 10 x 40 cm Plint Ubin Granito Ukuran 10 x 30 cm Plint Ubin Teralux Kerang Ukuran 10 x 40 cm Plint Ubin Teralux Kerang Ukuran 10 x 30 cm Plint Ubin Teralux Marmer Ukuran 10 x 60 cm Plint Ubin Teralux Marmer Ukuran 10 x 40 cm Plint Ubin Teralux Marmer Ukuran 10 x 30 cm Plint Keramik Artistik Ukuran 10 x 20 cm Plint Keramik Artistik Ukuran 10 x 10 cm Plint Keramik Ukuran 5 x 20 cm Plint Keramik Ukuran 10 x 30 CM Plint Kayu Klas II Tebal 2 cm, Lebar 10cm Dinding Porselin Ukuran 11 x 11 cm, (putih/warna) Dinding Porselin Ukuran 15 x 15 cm Dinding Porselin Ukuran 10 x 20 cm Dinding Porselin Ukuran 20 x 20 cm Dinding Keramik Artistik Ukuran 10 x 20 cm Dinding Keramik Ukuran 20 x 20 cm Dinding Marmer Ukuran 100 x 100 cm
3
REFERENSI 4
BAHAN
TENAGA/ALAT
HARGA SATUAN PEKERJAAN
(Rp.)
(Rp.)
(Rp.)
5
6
7=(5+6)
CKI.30
SNI 7395-2008
37.179,67
24.475,00
CKI.31
SNI 7395-2008
29.427,75
24.475,00
CKI.32
SNI 7395-2008
37.179,67
24.475,00
CKI.33
SNI 7395-2008
44.665,25
24.475,00
CKI.34
HPS. CK 2015
44.665,25
24.475,00
CKI.35
SNI 7395-2008
37.179,67
24.475,00
CKI.36
SNI 7395-2008
29.427,75
24.475,00
CKI.37
SNI 7395-2008
37.179,67
24.475,00
CKI.38
SNI 7395-2008
35.740,40
24.475,00
CKI.39
SNI 7395-2008
37.046,50
24.475,00
CKI.40
HPS. CK 2015
37.179,67
24.475,00
CKI.41
SNI 7395-2008
36.973,55
24.475,00
CKI.42
SNI 7395-2008
68.123,00
24.475,00
CKI.43
SNI 7395-2008
34.030,32
24.475,00
CKI.44
HPS. CK 2015
35.417,87
24.475,00
CKI.45
SNI 7395-2008
10.847,22
32.520,00
CKI.46
SNI 7395-2008
121.485,35
194.250,00
CKI.47
HPS. CK 2015
97.897,85
174.825,00
CKI.48
SNI 7395-2008
106.657,85
174.825,00
CKI.49
SNI 7395-2008
130.920,97
174.825,00
CKI.50
SNI 7395-2008
129.341,85
174.825,00
CKI.51
SNI 7395-2008
139.453,97
174.825,00
CKI.52
SNI 7395-2008
544.310,67
252.525,00
61.654,00 53.902,00 61.654,00 69.140,00 69.140,00 61.654,00 53.902,00 61.654,00 60.215,00 61.521,00 61.654,00 61.448,00 92.597,00 58.505,00 59.892,00 43.367,00 315.735,00 272.722,00 281.482,00 305.745,00 304.166,00 314.278,00 796.835,00
PEKERJAAN BESI - ALUMUNIUM 1 KG a. b. c. d. 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2
Plat Besi Lembaran Menggunakan Besi Plat 1.0 mm - 120 x 240 Cm Menggunakan Besi Plat 1.2 mm - 120 x 240 Cm Menggunakan Besi Plat 2.0 mm - 120 x 240 Cm Menggunakan Besi Plat 3.0 mm - 120 x 240 Cm Pintu Besi Plat Baja Tbl 2 mm Rangkap, Rangka Baja Siku Pasang Terali Besi Strip (2 x 3) mm Pasang Kawat Nyamuk (Rangka Besi) Pasang Kawat Nyamuk (Rangka Kayu) Pasang Kawat Harmonika Pasang Kawat Kassa Pasang Kawat Burung
HPS. CK 2015 CKJ.1a.
19.852,45
16.260,00
CKJ.1b.
18.357,45
16.260,00
CKJ.1c.
16.876,25
16.260,00
CKJ.1d.
17.208,60
16.260,00
CKJ.2
SNI 7393-2008
667.672,80
284.465,00
CKJ.4
HPS. CK 2015
2.305.140,02
452.485,00
CKJ.5
HPS. CK 2015
964.682,91
27.100,00
CKJ.6
HPS. CK 2015
44.068,72
26.335,00
CKJ.7
HPS. CK 2015
57.498,62
26.335,00
CKJ.8
HPS. CK 2015
44.068,72
26.335,00
CKJ.9
HPS. CK 2015
35.529,42
26.335,00
CKK.1a.
27.662,28
27.100,00
CKK.1b.
34.663,53
27.100,00
36.112,00 34.617,00 33.136,00 33.468,00 952.137,00 2.757.625,00 991.782,00 70.403,00 83.833,00 70.403,00 61.864,00
PEKERJAAN LANGIT - LANGIT 1 M2 a. b. c.
Langit-langit Triplek Ukuran (120 x 240) Menggunakan Triplek Tebal 3 mm Menggunakan Triplek Tebal 4 mm Menggunakan Triplek Tebal 6 mm
SNI 2839:2008
44.282,66
27.100,00
54.762,00 61.763,00 71.382,00
2
1 M2 Langit-langit Lambriziring Kayu, Tebal 9 mm
CKK.2
SNI 2839:2008
54.695,15
216.800,00
271.495,00
3
1 M2 Langit-langit Gypsum Board Ukuran (1200 x 2400 x 9) mm 1 M' Pasang list plafond gypsum profil 1 M' List Langit - langit Kayu profil 3"
CKK.3
SNI 2839:2008
43.602,02
19.425,00
CKK.4
SNI 2839:2008
43.475,10
16.260,00
CKK.5
SNI 2839:2008
10.930,61
13.635,00
63.027,00 59.735,00 24.565,00
CKL.1
HPS. CK 2015
234.838,00
94.200,00
CKL.2
HPS. CK 2015
267.666,00
94.200,00
CKL.3
HPS. CK 2015
288.513,00
94.200,00
CKL.4
HPS. CK 2015
326.288,00
94.200,00
CKL.5
HPS. CK 2015
299.246,95
288.450,00
CKL.6
HPS. CK 2015
587.696,00
CKL.7
HPS. CK 2015
281.933,41
625.000,00
CKL.8
HPS. CK 2015
432.745,42
1.336.446,10
CKL.9
HPS. CK 2015
536.326,76
498.975,00
HPS. CK 2015
1. 093. 127,86
4 5
L. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
M. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
CKK.1c.
PEKERJAAN PINTU DAN JENDELA 1 Set 1 Set 1 Set 1 Set 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 M2
Kaca Louvers + tralis, jumlah 7 Klip Kaca Louvers + tralis, jumlah 8 Klip Kaca Louvers + tralis, jumlah 9 Klip Kaca Louvers + tralis, jumlah 10 Klip Jendela Ungkit (75 x 115 cm), bingkai 3x8 cm, kaca polos 5 mm Untuk Jendela gantung hanya 1 bh kait angin dan 1 grendel Jendela Jalusi 75 x 120 cm Pintu Panel 80 x 210 cm Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm Pi ntu dou ble trip lek s 80x 210 cm, bin gk ai kayu 3,5x9 cm lapi s s eng plat Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm Pi ntu dou ble trip lek s 70x 210 cm, bin gk ai kayu 3,5x9 cm lapi s s eng plat
Pintu double tekwood 80 x 210 cm, bingkai kayu 3,5 x 9 cm Pintu kisi kaca kayu rahay 80 x 210 cm Pintu klam 80 x 210 cm ( tempel ) Kaca mati polos tebal 5 mm
CK L. 10 CKL.11 CK L. 12
HPS. CK 2015 HPS. CK 2015
-
510.879,83 1. 067. 680,93
498.975,00 -
CKL.13
HPS. CK 2015
1.246.130,36
CKL.14
HPS. CK 2015
676.766,42
1.156.000,00
-
CKL.15
HPS. CK 2015
593.749,53
746.000,00
CKL.16
HPS. CK 2015
255.637,75
47.100,00
CKM.1
RSNI T-15-2002
1.639.814,00
1.522.743,40
CKM.2
RSNI T-15-2002
1.077.570,86
575.700,00
CKM.3
RSNI T-15-2002
284.934,50
328.550,00
CKM.4
RSNI T-15-2002
744.293,86
710.922,20
CKM.5
RSNI T-15-2002
574.668,86
497.427,68
CKM.6
RSNI T-15-2002
339.966,00
732.393,88
CKM.7
RSNI T-15-2002
377.706,00
716.524,72
CKM.8
RSNI T-15-2002
933.177,80
671.200,00
CKM.9
RSNI T-15-2002
984.628,20
11.570,00
CKM.10
RSNI T-15-2002
553.385,40
491.822,50
CKM.11
RSNI T-15-2002
798.599,08
239.409,00
CKM.12
RSNI T-15-2002
1.192.912,55
378.120,00
CKM.13
RSNI T-15-2002
173.300,40
74.836,95
CKM.14
RSNI T-15-2002
217.504,80
87.729,90
CKM.15
RSNI T-15-2002
337.285,20
138.694,85
CKM.16
RSNI T-15-2002
664.832,40
244.079,95
329.038,00 361.866,00 382.713,00 420.488,00 587.696,00 587.696,00 906.933,00 1.769.191,00 1.035.301,00 1.093.127,00 1.009.854,00 1.067.680,00 1.246.130,00 1.832.766,00 1.339.749,00 302.737,00
PEKERJAAN SANITASI DAN AIR 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1 BH 1M 1 BH 1 BH 1 BH 1M 1M 1M 1M
Closet duduk / monoblok Closet jongkok porselin Closet jongkok plastik Memasang Urinoir Memasang Wastafel Bak Mandi Fiberglass 0,3 M3 Bak Air Fiberglass 1 M3 Bak Mandi Batu Bata Volume 0,3 M3 Pipa penyalur air limbah jenis pipa tanah Dia. 15 cm Bak Kontrol Pasangan Bata Ukuran (30 x 30) x 35 cm Bak Kontrol Pasangan Bata Ukuran (45 x 45) x 50 cm Bak Kontrol Pasangan Bata Ukuran (60 x 60) x 65 cm Memasang Pipa Galvanis Dia. 3/4" Memasang Pipa Galvanis Dia. 1" Memasang Pipa Galvanis Dia. 1,5" Memasang Pipa Galvanis Dia. 3"
3.162.557,00 1.653.270,00 613.484,00 1.455.216,00 1.072.096,00 1.072.359,00 1.094.230,00 1.604.377,00 996.198,00 1.045.207,00 1.038.008,00 1.571.032,00 248.137,00 305.234,00 475.980,00 908.912,00
KETERANGAN 8
JUMLAH HARGA JENIS PEKERJAAN
NO.
2
1 17 18 19 20 21 22 23 24 25
26
1M 1M 1M 1M 1M 1M 1M 1 BH 1 Unit a. b. 1 M3 a.
Memasang Pipa Galvanis Dia. 4" Memasang Pipa PVC Tipe AW Dia. 1/2" Memasang Pipa PVC Tipe AW Dia. 3/4" Memasang Pipa PVC Tipe AW Dia. 1" Memasang Pipa PVC Tipe AW Dia. 2" Memasang Pipa PVC Tipe AW Dia. 3" Memasang Pipa PVC Tipe AW Dia. 4" Kran air Dia. 3/4" atau 1/2" Bak air volume 1 m3 Menggunakan pasir semen import Menggunakan pasir semen lokal Dwiker, Campuran 1PC : 2PS Menggunakan pasir semen import Import
28 29
30 31 32 33 34
N. 1 2 3 4 5 6 7 8 9 10
O. 1 2 3 4 5 6 7 8
P. 1 2 3
4
Q. 1 2 3 4 5 6 7
I 1 2 3
3
REFERENSI 4
BAHAN
TENAGA/ALAT
HARGA SATUAN PEKERJAAN
(Rp.)
(Rp.)
(Rp.)
5
6
7=(5+6)
CKM.17
RSNI T-15-2002
862.351,20
CKM.18
RSNI T-15-2002
33.657,60
301.927,60 58.572,80
CKM.19
RSNI T-15-2002
43.414,80
61.418,65
CKM.20
RSNI T-15-2002
58.015,20
65.677,10
CKM.21
RSNI T-15-2002
80.978,40
43.778,70
CKM.22
RSNI T-15-2002
166.980,00
78.951,00
CKM.23
RSNI T-15-2002
242.278,80
100.913,15
CKM.24
RSNI T-15-2002
1.164.278,00 92.230,00 104.833,00 123.692,00 124.757,00 245.931,00 343.191,00 62.185,00
44.770,80
17.415,00
CKM.25a.
3.120.572,50
695.500,00
CKM.25b.
2.628.304,50
695.500,00
3.816.072,00 3.323.804,00
3.948.557,72
741.000,00
4.689.557,00
HPS. CK 2015
HPS. CK 2015 CKM.26a.
a1. DWIKER dia 30 cm ( 0,09 M 3 )
CKM.26a1.
422.060,00
a2. DWIKER dia 40 cm ( 0,1 M 3 )
CKM.26a2.
468.955,00
a3. DWIKER dia 60 cm ( 0,2 M 3 )
CKM.26a3.
937.911,00
a4. DWIKER dia 80 cm ( 0,3 M 3 )
CKM.26a4.
1.406.867,00
a5. DWIKER dia 100 cm ( 0,4 M 3 ) b. Menggunakan pasir semen lokal Lokal
CKM.26a5.
1.875.823,00
CKM.26b.
4.113.478,00
b1. DWIKER dia 30 cm ( 0,09 M 3 )
CKM.26b1.
370.213,00
b2. DWIKER dia 40 cm ( 0,1 M 3 )
CKM.26b2.
411.347,00
b3. DWIKER dia 60 cm ( 0,2 M 3 )
CKM.26b3.
822.695,00
b4. DWIKER dia 80 cm ( 0,3 M 3 )
CKM.26b4.
1.234.043,00
3
27
ANALISA
b5. DWIKER dia 100 cm ( 0,4 M ) 1 M Talang air pvc 8" 1 Unit Talang jurai/talang got 1 Unit Septictank (200x100x180cm), Pas. 1/2 Bata 1PC : 4PS, Dalam galian 1,5 m a. Menggunakan pasir semen import b. Menggunakan pasir semen lokal 1 Unit Septictank (150x150x150cm), Dalam 1,5 m, dinding papan 1 Unit Septictank 2x(75 x 75) cm, Dalam 1,5 m dan peresapan 1 Unit Bak Peresapan Uk.1 x 1 m, jarak 2 m dari septictank 1 Unit Bak air Uk. 60 x 60 x 80 1 Unit Pompa dragon/pompa tangan
1.645.391,00
CKM.26b5. CKM.27
HPS. CK 2015
166.434,65
69.550,00
CKM.28
HPS. CK 2015
39.133,02
44.325,00
CKM.29a.
8.363.712,50
1.082.500,00
CKM.29b.
7.133.042,50
1.082.500,00
235.984,00 83.458,00
HPS. CK 2015
CKM.30
HPS. CK 2015
4.421.895,10
CKM.31
HPS. CK 2015
2.087.178,70
-
CKM.32
HPS. CK 2015
1.166.503,50
CKM.33
HPS. CK 2015
850.248,43
CKM.34
HPS. CK 2015
1.073.108,98
25.000,00
CKN.1
Pt.T-38-2000-C
9.360,30
15.350,00
CKN.2
Pt.T-38-2000-C
8.879,00
8.855,00
CKN.3
Pt.T-38-2000-C
25.482,60
40.735,00
CKN.4
Pt.T-38-2000-C
6.512,30
8.855,00
CKN.5
Pt.T-38-2000-C
15.771,50
40.735,00
CKN.6
Pt.T-38-2000-C
3.527,20
6.955,00
CKN.7
SNI 03-2835-2002
14.769,30
12.275,50
CKN.8
SNI 03-2835-2002
11.500,92
9.924,00
CKN.9
Pt.T-38-2000-C
24.295,31
13.190,00
CKN.10
HPS. CK 2015
CKO.1
HPS. CK 2015
67.672,00
223.031,90
CKO.2
HPS. CK 2015
57.706,00
222.035,30
CKO.3
HPS. CK 2015
18.101,00
219.810,10
CKO.4
HPS. CK 2015
22.643,00
220.264,30
CKO.5
HPS. CK 2015
18.388,00
219.838,80
CKO.6
HPS. CK 2015
575.897,00
560.448,50
CKO.7
HPS. CK 2015
12.017,04
11.111,57
CKO.8
HPS. CK 2015
550.000,00
207.500,00
CKP.1
HPS. CK 2015
17.890,24
4.009,15
CKP.2
HPS. CK 2015
17.989,10
4.729,61
CKP.3a
168.424,39
24.886,72
CKP.3b
159.744,40
21.790,63
826.000,00 -
9.446.212,00 8.215.542,00 4.421.895,00 2.913.178,00 1.166.503,00 850.248,00 1.098.108,00
PEKERJAAN CAT DAN RESIDU 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2
Pelapisan Bidang Kayu Dengan Residu (ter) Pelapisan Bidang Kayu Dengan Meny Mengecat penutup 2 lapis pd kayu Pelapisan Bidang Besi-Baja Dengan Meny Mengecat penutup 2 lapis pd permukaan besi (manual) Lapis Plamir Cat tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) Cat tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Cat Plafond 2 Lapis dgn cat tembok menggunakan roll Cat ulang dinding/tembok
24.710,00 17.734,00 66.217,00 15.367,00 56.506,00 10.482,00 27.044,00 21.424,00 37.485,00 18.029,00
PEKERJAAN INSTALASI LISTRIK 1 Titik 1 Titik 1 Titik 1 Titik 1 Titik 1 Unit 1 M' 1 Unit
Lampu SL 23 VA Lampu SL 14 VA Stop Kontak Saklar Ganda Saklar Tunggal Panel Box Kabel NYA 2.5 mm Pasang Kipas Angin
290.703,00 279.741,00 237.911,00 242.907,00 238.226,00 1.136.345,00 23.128,00 757.500,00
PEKERJAAN ASPAL 1 M2 1 M2 1 M2 a b 1 M2
Lapis Resap Pengikat (Prime Coat) Lapis Perekat (Tack Coat) Latasir Kls B Menggunakan Pasir Import Menggunakan Pasir Lokal Lapis Permukaan Hot Mix (Tebal 4 CM)
21.899,00 22.718,00
HPS. CK 2015
CKP.4
HPS. CK 2015
219.530,09
215.226,12
CKQ.1
HPS. CK 2015
-
141.000,00
CKQ.2
HPS. CK 2015
-
235.000,00
CKQ.3
HPS. CK 2015
-
11.750,00
CKQ.4
HPS. CK 2015
-
3.236.921,30
CKQ.5
HPS. CK 2015
-
770.666,67
CKQ.6
HPS. CK 2015
CKQ.7
HPS. CK 2015
-
235.000,00
193.311,00 181.535,00 434.756,00
PEKERJAAN PEMBONGKARAN 1 M3 1 M3 1 M2 1 M3 1 M3 1 M3 1 M3
Pembongkaran Tembok Pembongkaran lantai Mengupas plesteran Pembongkaran kuda-kuda, diambil 1/3 Harga Kuda2, bentang <7 m (kayu besi) + upah kerja Bongkar ramuan kayu dan bisa dipakai lagi (konstruksi ringan) Bongkar ramuan kayu tak bisa dipakai lagi ( konstruksi ringan ) Bongkar pondasi (konstruksi ringan)
DAFTAR HARGA SATUAN UPAH 1 OH Mandor Bangunan / Lapangan 1 OH Kepala Tukang (Batu, Pasir, Kayu, dsb) 1 OH Tukang (Batu, Pasir, Kayu, dsb)
T-1
Std CK 2015
T-2
Std CK 2015
T-3
Std CK 2015
141.000,00 235.000,00 11.750,00 3.236.921,00 770.666,00 256.888,00 235.000,00
170.000,00 155.000,00 138.000,00
KETERANGAN 8
JUMLAH HARGA JENIS PEKERJAAN
NO.
2
1 4 5 6 7 8 9 10 11 12 13
II 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
ANALISA
1 OH 1 OH 1 OH 1 OH 1 OH 1 OH 1 OH 1 OH 1 OH 1 OH
Pe ke rj a Mandor Alat Berat (F. Equipment) Operator Alat Berat Pembantu Operator Sopir / Driver Pembantu Sopir / Driver Meka nik Pembantu Mekanik Surveyor Pembantu Surveyor
DAFTAR HARGA SATUAN ALAT 1 Jam DUMP TRUCK 3-4 M3 1 Jam EXCAVATOR 80-140 HP 1 Jam BULLDOZER 100-150 HP 1 Jam MOTOR GRADER >100 HP 1 Jam VIBRATOR ROLLER 5-8 T. 1 Jam PNEUMATIC T. ROLLER 8-15 T. 1 Jam TANDEM ROLER 6-8 T 1 Jam CONCRETE MIXER 0.3-0.6 M3 1 Jam WATER PUMP 70-100 mm 1 Jam WATER TANKER 3000-4500 L. 1 Jam CHAIN SAW (MESIN POTONG KAYU) 1 Jam COMPRESSOR 4000-6500 L\M 1 Jam ASPHALT SPRAYER 1 Jam FARM TRACTOR (ROTARI) 1 Jam STAMPER 1 Jam WHELL LOADER 1 Jam ASPHALT FINIZHER 1 Jam GENERATOR ZET 1 Jam ASPHAL MIXING PLANT (AMP)
3
REFERENSI 4
T-4
Std CK 2015
T-5
Std CK 2015
T-6
Std CK 2015
T-7
Std CK 2015
T-8
Std CK 2015
T-9
Std CK 2015
T - 10
Std CK 2015
T - 11
Std CK 2015
T - 12
Std CK 2015
T - 13
Std CK 2015
E-1
An. CK 2015
E-2
An. CK 2015
E-3
An. CK 2015
E-4
An. CK 2015
E-5
An. CK 2015
E-6
An. CK 2015
E-7
An. CK 2015
E-8
An. CK 2015
E-9
An. CK 2015
E - 10
An. CK 2015
E - 11
An. CK 2015
E - 12
An. CK 2015
E - 13
An. CK 2015
E - 14
An. CK 2015
E - 15
An. CK 2015
E - 16
An. CK 2015
E - 17
An. CK 2015
E - 18
An. CK 2015
E - 19
An. CK 2015
BAHAN
TENAGA/ALAT
HARGA SATUAN PEKERJAAN
(Rp.)
(Rp.)
(Rp.)
5
6
7=(5+6)
109.000,00 229.000,00 155.000,00 109.000,00 138.000,00 109.000,00 138.000,00 109.000,00 155.000,00 109.000,00
402.761,00 743.089,00 1.044.226,00 920.678,00 504.244,00 665.472,00 562.122,00 80.241,00 58.000,00 400.092,00 62.464,00 230.548,00 86.133,00 245.166,00 59.124,00 783.687,00 1.144.681,00 241.787,00 11.219.709,00
KETERANGAN 8