ANALISA HARGA SATUAN PEKERJAAN DINAS TATA KOTA - KOTA BANDUNG
URAIAN
NO.
KOEF.
SAT.
HARGA SATUAN
JUMLAH
PEKERJAAN PERSIAPAN 1 m2
-
Pembersihan Lokasi
1
Pekerja
0.0500
hr hr
55.000.00
2.750.00
2
Mandor
0.0100
hr hr
70.000.00
700.00
1 bh
-
JUMLAH
3.450.00
DIBULATKAN
3.450.00
Papan nama proyek
Multipleks 122 x 244, 9 mm
0.5000
lbr
103.360.00
51.680.00
Cat kayu/besi
1.1000
kg kg
25.840.00
28.424.00
Kaso kayu meranti
0.0280
m3 m3
2.876.860.00
80.552.08
Penulisan
1.0000
ls ls
56.000.00
56.000.00
Ongkos pasang
1.0000
ls ls
32.000.00
32.000.00
1 m2
-
JUMLAH
248.656.08
DIBULATKAN
248.656.00
Direksikeet (lantai plesteran)
1
Pasir pasang
0.2500
m3 m3
150.000.00
37.500.00
2
Pasir beton
0.0517
m3 m3
150.000.00
7.755.00
3
Batu bata merah
25.0000
bh bh
700.00
17.500.00
4
Semen PC 50 kg
0.2500
za z ak
60.000.00
15.000.00
5
Kayu kaso meranti
0.0300
m3 m3
2.876.860.00
86.305.80
6
Triplek 122 x 244 x 4 mm
1.0000
l br lb
50.000.00
50.000.00
7
Engsel pintu uk 3 "
0.1667
bh bh
25.080.00
4.180.84
8
Asbes semen gelombang 250x92 x 0. 5 cm
0.5000
l br lb
40.130.00
20.065.00
9
Kaca polos 5 mm
0.2917
m2 m2
102.600.00
29.928.42
10
Rangka teralis nako
0.2917
bh bh
9.120.00
2.660.30
11
Paku segala ukuran ( rata-rata)
0.5000
kg kg
15.000.00
7.500.00
12
Kunci gembok kecil
0.0834
bh bh
10.260.00
855.68
13
Pekerja
0.4000
hr hr
48.000.00
19.200.00
14
Tukang batu
0.0834
hr hr
55.000.00
4.587.00
15
Tukang kayu
0.3340
hr hr
55.000.00
18.370.00
16
Mandor
0.0200
hr hr
70.000.00
1.400.00
1 m1
-
JUMLAH
322.808.04
DIBULATKAN
322.808.00
Pengukuran & pemasangan bouwplank
1
Kayu Kaso terentang 5/7-400 cm
0.0040
m3 m3
1.197.100.00
4.788.40
2
Kayu Papan terentang 2/20- 400 cm
0.0060
m3 m3
1.197.100.00
7.182.60
3
Paku segala ukuran
0.0200
kg kg
15.000.00
300.00
4
Pekerja
0.0500
hr hr
55.000.00
2.750.00
5
Tukang Kayu
0.0500
hr hr
55.000.00
2.750.00
6
Mandor
0.0050
hr hr
70.000.00
350.00
JUMLAH
18.121.00
DIBULATKAN 1 m1
-
18.121.00
Pagar Pengaman Proyek
1
Pasir Beton
0.0012
m³ m³
150.000.00
180.00
2
Batu kali
0.0048
m³ m³
160.000.00
768.00
3
Semen PC ( 50 kg )
0.0170
za z ak
60.000.00
1.020.00
4
Kaso Meranti Ja Jambi Basah uk. 5 x 10 x 400 cm
0.0360
m³ m³
2.876.860.00
103.566.96
5
Seng Gelombang BJLS 28 (90x180) cm
1.4300
l br lb
40.660.00
58.143.80
6
Paku Kayu Segala uk.
0.0200
kg kg
15.000.00
300.00
7
Pekerja
0.3000
hr hr
55.000.00
16.500.00
8
Tukang Batu
0.3750
hr hr
55.000.00
20.625.00
9
Tukang Kayu
0.1500
hr hr
55.000.00
8.250.00
10
Mandor
0.0150
hr hr
70.000.00
1.050.00
1 m1
-
1
BRC t = 0.9 m Ø 6
2
Pekerja
3
JUMLAH
210.403.76
DIBULATKAN
210.403.00
Pagar BRC tinggi 90 cm
0.4340
lbr
167.210.00
72.569.14
0.0420
hr hr
55.000.00
2.310.00
Tukang Kayu
0.0420
hr hr
55.000.00
2.310.00
4
Kepala Tukang Kayu
0.0040
hr hr
55.000.00
220.00
5
Mandor
0.0020
hr hr
70.000.00
140.00
JUMLAH
77.549.14
DIBULATKAN
77.549.00
PEKERJAAN TANAH 1 m3
-
Perataan Tanah
1
Pekerja
0.0400
hr hr
55.000.00
2.200.00
2
Mandor
0.0040
hr hr
70.000.00
280.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
2.900.00
DIBULATKAN
2.900.00
Galian Tanah Biasa Kedalaman 1 m
1
Pekerja
0.7500
hr hr
55.000.00
41.250.00
2
Mandor
0.0250
hr hr
70.000.00
1.750.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
43.420.00
DIBULATKAN
43.420.00
Galian Tanah Biasa Kedalaman 1 m - 2 m
1
Pekerja
0.9000
m3 m3
55.000.00
49.500.00
2
Mandor
0.0325
hr hr
70.000.00
2.275.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
52.195.00
DIBULATKAN
52.195.00
Galian Tanah Biasa Kedalaman 2 m - 3 m
1
Pekerja
0.9350
hr hr
55.000.00
51.425.00
2
Mandor
0.0730
hr hr
70.000.00
5.110.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
56.955.00
DIBULATKAN
56.955.00
Galian Tanah Biasa Kedalaman 3 m - 4 m
DIBULATKAN 1 m1
-
18.121.00
Pagar Pengaman Proyek
1
Pasir Beton
0.0012
m³ m³
150.000.00
180.00
2
Batu kali
0.0048
m³ m³
160.000.00
768.00
3
Semen PC ( 50 kg )
0.0170
za z ak
60.000.00
1.020.00
4
Kaso Meranti Ja Jambi Basah uk. 5 x 10 x 400 cm
0.0360
m³ m³
2.876.860.00
103.566.96
5
Seng Gelombang BJLS 28 (90x180) cm
1.4300
l br lb
40.660.00
58.143.80
6
Paku Kayu Segala uk.
0.0200
kg kg
15.000.00
300.00
7
Pekerja
0.3000
hr hr
55.000.00
16.500.00
8
Tukang Batu
0.3750
hr hr
55.000.00
20.625.00
9
Tukang Kayu
0.1500
hr hr
55.000.00
8.250.00
10
Mandor
0.0150
hr hr
70.000.00
1.050.00
1 m1
-
1
BRC t = 0.9 m Ø 6
2
Pekerja
3
JUMLAH
210.403.76
DIBULATKAN
210.403.00
Pagar BRC tinggi 90 cm
0.4340
lbr
167.210.00
72.569.14
0.0420
hr hr
55.000.00
2.310.00
Tukang Kayu
0.0420
hr hr
55.000.00
2.310.00
4
Kepala Tukang Kayu
0.0040
hr hr
55.000.00
220.00
5
Mandor
0.0020
hr hr
70.000.00
140.00
JUMLAH
77.549.14
DIBULATKAN
77.549.00
PEKERJAAN TANAH 1 m3
-
Perataan Tanah
1
Pekerja
0.0400
hr hr
55.000.00
2.200.00
2
Mandor
0.0040
hr hr
70.000.00
280.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
2.900.00
DIBULATKAN
2.900.00
Galian Tanah Biasa Kedalaman 1 m
1
Pekerja
0.7500
hr hr
55.000.00
41.250.00
2
Mandor
0.0250
hr hr
70.000.00
1.750.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
43.420.00
DIBULATKAN
43.420.00
Galian Tanah Biasa Kedalaman 1 m - 2 m
1
Pekerja
0.9000
m3 m3
55.000.00
49.500.00
2
Mandor
0.0325
hr hr
70.000.00
2.275.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
52.195.00
DIBULATKAN
52.195.00
Galian Tanah Biasa Kedalaman 2 m - 3 m
1
Pekerja
0.9350
hr hr
55.000.00
51.425.00
2
Mandor
0.0730
hr hr
70.000.00
5.110.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
56.955.00
DIBULATKAN
56.955.00
Galian Tanah Biasa Kedalaman 3 m - 4 m
1
Pekerja
0.9400
hr hr
55.000.00
51.700.00
2
Mandor
0.0940
hr hr
70.000.00
6.580.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
58.700.00
DIBULATKAN
58.700.00
Galian tanah kedalaman 1 - 5 m dengan alat besar
1
Pekerja
0.2000
hr hr
55.000.00
11.000.00
2
Mandor
0.0020
hr hr
70.000.00
140.00
3
Excavator kap. 80 - 120 HP
0.1000
ja jam
211.400.00
21.140.00
4
Alat bantu
0.3000
hr hr
700.00
210.00
1 m3
-
JUMLAH
32.490.00
DIBULATKAN
32.490.00
Galian Tanah Keras
1
Pekerja
0.9650
hr hr
55.000.00
53.075.00
2
Mandor
0.0350
hr hr
70.000.00
2.450.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
55.945.00
DIBULATKAN
55.945.00
Galian Tanah Berbatu
1
Pekerja
1.9600
hr hr
55.000.00
107.800.00
2
Mandor
0.0323
hr hr
70.000.00
2.261.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
110.481.00
DIBULATKAN
110.481.00
Galian Tanah Lumpur
1
Pekerja
0.9750
hr hr
55.000.00
53.625.00
2
Mandor
0.0325
hr hr
70.000.00
2.275.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
56.320.00
DIBULATKAN
56.320.00
Galian Tanah Sumuran Kedalaman Max. 10 m
1
Pekerja
1.2000
hr hr
55.000.00
66.000.00
2
Mandor
0.0500
hr hr
70.000.00
3.500.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
69.920.00
DIBULATKAN
69.920.00
Angkutan Galian Jarak Max. 30 m
1
Pekerja
0.2480
hr hr
55.000.00
13.640.00
2
Mandor
0.0080
hr hr
70.000.00
560.00
3
Alat bantu
0.6000
se set
700.00
420.00
1 m3
-
JUMLAH
14.620.00
DIBULATKAN
14.620.00
Urugan Kembali Galian Tanah
1
Pekerja
0.3000
hr hr
55.000.00
16.500.00
2
Mandor
0.0100
hr hr
70.000.00
700.00
3
Alat bantu
0.6000
se set
700.00
420.00
JUMLAH
17.620.00
DIBULATKAN
17.620.00
1 m3
-
Urugan Tanah bahan dari luar dipadatkan dg stamper tiap 20 cm (tanah biasa)
1
Tanah Urug
1.2000
m3
50.000.00
60.000.00
2
Pekerja
0.1240
hr
55.000.00
6.820.00
3
Mandor
0.0040
hr
70.000.00
280.00
4
Stamper, 5 HP, Kap. 0.17 ton
0.8000
jam
43.000.00
34.400.00
5
Alat bantu
0.3000
set
700.00
210.00
1 m3
-
JUMLAH
101.710.00
DIBULATKAN
101.710.00
Urugan Tanah bahan dari luar pakai alat besar ( tiap 20 cm ) tanah biasa
1
Tanah Urug
1.2000
m3
50.000.00
60.000.00
2
Pekerja
0.1240
hr
55.000.00
6.820.00
3
Mandor
0.0040
hr
70.000.00
280.00
4
Buldozer kap. 100 - 150 HP
0.1000
jam
313.200.00
31.320.00
5
Alat bantu
0.3000
set
700.00
210.00
1 m3
-
JUMLAH
98.630.00
DIBULATKAN
98.630.00
Urugan tanah bahan dari luar pakai alat besar ( tiap 20 cm) tanah berbatu
1
Tanah Urug
1.2000
m3
50.000.00
60.000.00
2
Pekerja
0.1500
hr
55.000.00
8.250.00
3
Mandor
0.0050
hr
70.000.00
350.00
4
Buldozer kap. 100 - 150 HP
0.1500
jam
313.200.00
46.980.00
5
Alat bantu
0.3000
set
700.00
210.00
1 m3
-
JUMLAH
115.790.00
DIBULATKAN
115.790.00
Urugan pasir bawah lantai & pondasi
1
Pasir Urug
1.2000
m3
100.000.00
120.000.00
2
Pekerja
0.3000
hr
55.000.00
16.500.00
3
Mandor
0.0100
hr
70.000.00
700.00
4
Alat bantu
0.6000
set
700.00
420.00
1 m3
-
JUMLAH
137.620.00
DIBULATKAN
137.620.00
Urugan Sirtu
1
Sirtu
1.2000
m3
140.000.00
168.000.00
2
Pekerja
0.5000
hr
55.000.00
27.500.00
3
Mandor
0.0200
hr
70.000.00
1.400.00
4
Alat bantu
0.6000
set
700.00
420.00
1 m3
-
JUMLAH
197.320.00
DIBULATKAN
197.320.00
Pemadatan Tanah ( tiap 20 cm ) dengan stamper
1
Pekerja
0.3000
hr
55.000.00
16.500.00
2
Mandor
0.0050
hr
70.000.00
350.00
3
Stamper
0.9000
jam
43.000.00
38.700.00
4
Alat bantu
0.6000
set
700.00
420.00
PEKERJAAN PONDASI 1 m3
-
Lantai kerja, mutu fc = 7.4 MPa (K.100)
JUMLAH
55.970.00
DIBULATKAN
55.970.00
1
Pasir beton
0.6200
m3
144.410.00
89.534.20
2
Split pecah mesin 2/3
0.7400
m3
164.000.00
121.360.00
3
Semen PC ( 50 kg )
4.9400
zak
54.000.00
266.760.00
4
Pekerja
1.6500
hr
55.000.00
90.750.00
5
Tukang batu
0.2500
hr
52.000.00
13.000.00
6
Kepala Tukang
0.0250
hr
56.000.00
1.400.00
7
Mandor
0.0800
hr
70.000.00
5.600.00
8
Sewa molen
0.4000
jam
43.000.00
17.200.00
1 m3
-
JUMLAH
605.604.20
DIBULATKAN
605.604.00
Pas.Pondasi batu kali 1 : 2
1
Pasir Pasang
0.4300
m3
144.410.00
62.096.30
2
Batu Kali
1.2000
m3
140.000.00
168.000.00
3
Semen PC ( 50 kg )
5.2000
zak
54.000.00
280.800.00
4
Pekerja
1.6500
hr
55.000.00
90.750.00
5
Tukang Batu
0.5775
hr
52.000.00
30.030.00
6
Mandor
0.0495
hr
70.000.00
3.465.00
7
Alat Bantu
2.0000
set
700.00
1.400.00
1 m3
-
JUMLAH
636.541.30
DIBULATKAN
636.541.00
Pas.Pondasi batu kali 1 : 3
1
Pasir Pasang
0.4560
m3
144.410.00
65.850.96
2
Batu Kali
1.2000
m3
140.000.00
168.000.00
3
Semen PC ( 50 kg )
4.0000
zak
54.000.00
216.000.00
4
Pekerja
1.6500
hr
55.000.00
90.750.00
5
Tukang Batu
0.5775
hr
52.000.00
30.030.00
6
Mandor
0.0495
hr
70.000.00
3.465.00
7
Alat Bantu
2.0000
set
700.00
1.400.00
1 m3
-
JUMLAH
575.495.96
DIBULATKAN
575.495.00
Pas.Pondasi batu kali 1 : 4
1
Pasir Pasang
0.3910
m3
144.410.00
56.464.31
2
Batu Kali
1.2000
m3
140.000.00
168.000.00
3
Semen PC ( 50 kg )
3.5280
zak
54.000.00
190.512.00
4
Pekerja
1.6500
hr
55.000.00
90.750.00
5
Tukang Batu
0.8000
hr
52.000.00
41.600.00
6
Mandor
0.2000
hr
70.000.00
14.000.00
7
Alat Bantu
2.0000
set
700.00
1.400.00
1 m3
-
JUMLAH
562.726.31
DIBULATKAN
562.726.00
Pas.Pondasi batu kali 1 : 5
1
Pasir Pasang
0.5600
m3
144.410.00
80.869.60
2
Batu Kali
1.2000
m3
140.000.00
168.000.00
3
Semen PC ( 50 kg )
2.8640
zak
54.000.00
154.656.00
4
Pekerja
1.6500
hr
55.000.00
90.750.00
5
Tukang Batu
0.5775
hr
52.000.00
30.030.00
6
Mandor
0.0495
hr
70.000.00
3.465.00
7
Alat Bantu
2.0000
set
700.00
1.400.00
JUMLAH
529.170.60
DIBULATKAN 1 m3
-
529.170.00
Pas.Batu kosong
1
Batu Kali
1.2000
m3
140.000.00
168.000.00
2
Pekerja
1.1240
hr
55.000.00
61.820.00
3
Mandor
0.0560
hr
70.000.00
3.920.00
4
Alat Bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
235.140.00
DIBULATKAN
235.140.00
Pas. Cerucuk Dolken sedalam 3 m jarak tiap 50 cm
1
Dolken Ø 8-10 x 350-400 cm
4.0000
btg
20.520.00
82.080.00
2
Pekerja
0.7500
hr
55.000.00
41.250.00
3
Tukang Kayu
0.2625
hr
52.000.00
13.650.00
4
Mandor
2.0000
hr
70.000.00
140.000.00
1 m2
-
JUMLAH
276.980.00
DIBULATKAN
276.980.00
Pas. Cerucuk Dolken sedalam 3 m jarak tiap 50 cm
1
Dolken Ø 8-10 x 350-400 cm
4.0000
btg
20.520.00
82.080.00
2
Pekerja
0.7500
hr
55.000.00
41.250.00
3
Tukang Kayu
0.2625
hr
52.000.00
13.650.00
4
Mandor
2.0000
hr
70.000.00
140.000.00
JUMLAH
276.980.00
DIBULATKAN
276.980.00
PEKERJAAN BETON 1 m3
-
Cor beton K.125 ( manual )
1
Pasir beton
0.5070
m3
144.410.00
73.215.87
2
Split pecah mesin 2/3
0.7160
m3
164.000.00
117.424.00
3
Semen PC ( 50 kg )
5.0000
zak
54.000.00
270.000.00
4
Pekerja
1.8000
hr
55.000.00
99.000.00
5
Tukang batu
0.4750
hr
52.000.00
24.700.00
6
Mandor
0.2858
hr
70.000.00
20.006.00
7
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
606.095.87
DIBULATKAN
606.095.00
Cor beton K.175 ( manual )
1
Pasir beton
0.5070
m3
144.410.00
73.215.87
2
Split pecah mesin 2/3
0.7160
m3
164.000.00
117.424.00
3
Semen PC ( 50 kg )
9.0000
zak
54.000.00
486.000.00
4
Pekerja
1.8000
hr
55.000.00
99.000.00
5
Tukang batu
0.4858
hr
52.000.00
25.261.60
6
Mandor
0.2608
hr
70.000.00
18.256.00
7
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
820.907.47
DIBULATKAN
820.907.00
Cor beton K.225 ( manual )
1
Pasir beton
0.5070
m3
144.410.00
73.215.87
2
Split pecah mesin 2/3
0.7160
m3
164.000.00
117.424.00
3
Semen PC ( 50 kg )
11.0000
zak
54.000.00
594.000.00
4
Pekerja
hr
55.000.00
99.000.00
1.8000
5
Tukang batu
0.2608
hr
52.000.00
13.561.60
6
Mandor
0.5858
hr
70.000.00
41.006.00
7
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
939.957.47
DIBULATKAN
939.957.00
Cor beton K.250 ( manual )
1
Pasir beton
0.4000
m3
144.410.00
57.764.00
2
Split pecah mesin 2/3
0.7400
m3
164.000.00
121.360.00
3
Semen PC ( 50 kg )
11.8000
zak
54.000.00
637.200.00
4
Pekerja
1.8000
hr
55.000.00
99.000.00
5
Tukang batu
0.2620
hr
52.000.00
13.624.00
6
Mandor
0.6270
hr
70.000.00
43.890.00
7
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
974.588.00
DIBULATKAN
974.588.00
Cor beton K.125 dengan readymix
1
Beton readymix K.125
1.0000
m3
402.830.00
402.830.00
2
Pekerja
0.5508
hr
55.000.00
30.294.00
3
Tukang batu
0.1377
hr
52.000.00
7.160.40
4
Mandor
0.0688
hr
70.000.00
4.816.00
5
Concrete vibrator
0.4819
jam
39.500.00
19.035.05
6
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
465.885.45
DIBULATKAN
465.885.00
Cor beton K.225 dengan readymix
1
Beton readymix K.225
1.0000
m3
620.000.00
620.000.00
2
Pekerja
0.6885
hr
55.000.00
37.867.50
3
Tukang batu
0.1377
hr
55.000.00
7.573.50
4
Mandor
0.0688
hr
70.000.00
4.816.00
5
Concrete vibrator
0.4819
jam
39.500.00
19.035.05
6
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
691.042.05
DIBULATKAN
691.042.00
Cor beton K.250 dengan readymix
1
Beton readymix K.250
1.0000
m3
550.000.00
550.000.00
2
Pekerja
0.6885
hr
55.000.00
37.867.50
3
Tukang batu
0.1377
hr
55.000.00
7.573.50
4
Mandor
0.0688
hr
70.000.00
4.816.00
5
Concrete vibrator
0.4819
jam
39.500.00
19.035.05
6
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
621.042.05
DIBULATKAN
621.042.00
Cor beton K.300 dengan readymix
1
Beton readymix K.300
1.0000
m3
532.040.00
532.040.00
2
Pekerja
0.6885
hr
55.000.00
37.867.50
3
Tukang batu
0.1377
hr
55.000.00
7.573.50
4
Mandor
0.0688
hr
70.000.00
4.816.00
5
Concrete vibrator
0.4819
jam
42.000.00
20.239.80
6
Alat bantu
1 m3
-
2.5000
set
700.00
1.750.00
JUMLAH
604.286.80
DIBULATKAN
604.286.00
Cor beton K.350 dengan readymix
1
Beton readymix K.350
1.0000
m3
650.000.00
650.000.00
2
Pekerja
0.6885
hr
55.000.00
37.867.50
3
Tukang batu
0.1377
hr
55.000.00
7.573.50
4
Mandor
0.0688
hr
70.000.00
4.816.00
5
Concrete vibrator
0.4819
jam
42.000.00
20.239.80
6
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
722.246.80
DIBULATKAN
722.246.00
Cor beton K.400 dengan readymix
1
Beton readymix K.400
1.0000
m3
700.000.00
700.000.00
2
Pekerja
0.6885
hr
55.000.00
37.867.50
3
Tukang batu
0.1377
hr
55.000.00
7.573.50
4
Mandor
0.0688
hr
70.000.00
4.816.00
5
Concrete vibrator
0.4819
jam
42.000.00
20.239.80
6
Alat bantu
2.5000
set
700.00
1.750.00
1 kg
-
JUMLAH
772.246.80
DIBULATKAN
772.246.00
Pembesian ( besi polos )
1
Kawat beton
0.0200
kg
11.400.00
228.00
2
Besi beton polos
1.1000
kg
8.000.00
8.800.00
3
Pekerja
0.0150
hr
55.000.00
825.00
4
Tukang besi
0.0050
hr
55.000.00
275.00
5
Mandor
0.0050
hr
70.000.00
350.00
6
Alat bantu
2.5000
set
700.00
1.750.00
1 kg
-
JUMLAH
12.228.00
DIBULATKAN
12.228.00
Pembesian ( besi ulir )
1
Kawat beton
0.0200
kg
11.400.00
228.00
2
Besi beton ulir
1.1000
kg
9.000.00
9.900.00
3
Pekerja
0.0150
hr
55.000.00
825.00
4
Tukang besi
0.0050
hr
55.000.00
275.00
5
Mandor
0.0050
hr
70.000.00
350.00
6
Alat bantu
2.5000
set
700.00
1.750.00
1 m2
-
JUMLAH
13.328.00
DIBULATKAN
13.328.00
Bekisting dengan papan + bongkaran dan penyiraman
1
Kayu Papan terentang 2/20-400 cm
0.0240
m3
1.197.100.00
28.730.40
2
Kayu Kaso terentang 5/7-400 cm
0.0280
m3
1.197.100.00
33.518.80
3
Paku
0.2500
kg
15.000.00
3.750.00
4
Pekerja
0.1650
hr
55.000.00
9.075.00
5
Tukang kayu
0.3940
hr
55.000.00
21.670.00
6
Mandor
0.0270
hr
70.000.00
1.890.00
7
Alat bantu
2.5000
set
700.00
1.750.00
JUMLAH
100.384.20
DIBULATKAN 1 m2
-
100.384.00
Bekisting dengan triplex 9 mm + bongkaran dan penyiraman
1
Kayu Kaso terentang 5/7-400 cm
2
Triplex 9 mm
3
Paku
4
0.0280
m3
1.197.100.00
33.518.80
0.3500
lbr
103.360.00
36.176.00
0.2500
kg
15.000.00
3.750.00
Pekerja
0.1650
bh
55.000.00
9.075.00
5
Tukang kayu
0.3940
hr
55.000.00
21.670.00
6
Mandor
0.0270
hr
70.000.00
1.890.00
7
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
107.829.80
DIBULATKAN
107.829.00
Bekisting kolom beton struktur
1
Kayu Kaso terentang 5/7-400 cm
2
Triplex 9 mm
3
Paku
4
0.2520
m3
1.197.100.00
301.669.20
3.1500
lbr
103.360.00
325.584.00
2.2500
kg
15.000.00
33.750.00
Pekerja
1.4850
hr
55.000.00
81.675.00
5
Tukang kayu
3.5440
hr
55.000.00
194.920.00
6
Mandor
0.2430
hr
70.000.00
17.010.00
7
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
956.358.20
DIBULATKAN
956.358.00
Bekisting balok beton struktur
1
Kayu Kaso terentang 5/7-400 cm
2
Triplex 9 mm
3
Paku
4
0.1870
m3
1.197.100.00
223.857.70
2.3500
lbr
103.360.00
242.896.00
1.6680
kg
15.000.00
25.020.00
Pekerja
1.1010
hr
55.000.00
60.555.00
5
Tukang kayu
2.6260
hr
55.000.00
144.430.00
6
Mandor
0.1800
hr
70.000.00
12.600.00
7
Alat bantu
2.5000
set
700.00
1.750.00
1 m3
-
JUMLAH
711.108.70
DIBULATKAN
711.108.00
Bekisting lantai beton
1
Kayu Kaso terentang 5/7-400 cm
2
Triplex 9 mm
3
Paku
4
0.2320
m3
1.197.100.00
277.727.20
2.9050
lbr
103.360.00
300.260.80
2.0750
kg
15.000.00
31.125.00
Pekerja
1.3700
hr
55.000.00
75.350.00
5
Tukang kayu
3.2685
hr
55.000.00
179.767.50
6
Mandor
0.2245
hr
70.000.00
15.715.00
7
Alat bantu
2.5000
set
700.00
1.750.00
1 m2
-
JUMLAH
881.695.50
DIBULATKAN
881.695.00
Perancah kayu / stoot werk - tinggi s/d 2 m
1
Kayu Kaso terentang 5/7-400 cm
0.0608
m3
1.197.100.00
72.783.68
2
Paku
0.3000
kg
15.000.00
4.500.00
3
Pekerja
0.6000
hr
55.000.00
33.000.00
4
Tukang kayu
0.4200
hr
55.000.00
23.100.00
5
Mandor
0.0300
hr
70.000.00
2.100.00
6
Alat bantu
2.5000
set
700.00
1.750.00
1 m2
-
JUMLAH
137.233.68
DIBULATKAN
137.233.00
Perancah kayu / stoot werk - tinggi s/d 3 m
1
Kayu Kaso terentang 5/7-400 cm
0.0851
m3
1.197.100.00
101.873.21
2
Paku
0.4200
kg
15.000.00
6.300.00
3
Pekerja
0.8400
hr
55.000.00
46.200.00
4
Tukang kayu
0.5880
hr
55.000.00
32.340.00
5
Mandor
0.0420
hr
70.000.00
2.940.00
6
Alat bantu
3.5000
set
700.00
2.450.00
1 m2
-
JUMLAH
192.103.21
DIBULATKAN
192.103.00
Perancah kayu / stoot werk - tinggi s/d 4 m
1
Kayu Kaso terentang 5/7-400 cm
0.1094
m3
1.197.100.00
130.962.74
2
Paku
0.5400
kg
15.000.00
8.100.00
3
Pekerja
1.0800
hr
55.000.00
59.400.00
4
Tukang kayu
0.7560
hr
55.000.00
41.580.00
5
Mandor
0.0540
hr
70.000.00
3.780.00
6
Alat bantu
4.5000
set
700.00
3.150.00
1 m2
-
JUMLAH
246.972.74
DIBULATKAN
246.972.00
Perancah kayu / stoot werk - tinggi s/d 5 m
1
Kayu Kaso terentang 5/7-400 cm
0.1398
m3
1.197.100.00
167.354.58
2
Paku
0.6900
kg
15.000.00
10.350.00
3
Pekerja
1.3800
hr
55.000.00
75.900.00
4
Tukang kayu
0.9660
hr
55.000.00
53.130.00
5
Mandor
0.0690
hr
70.000.00
4.830.00
6
Alat bantu
5.7500
set
700.00
4.025.00
1 m3
-
JUMLAH
315.589.58
DIBULATKAN
315.589.00
Balok beton praktis K.175
1
Adukan beton K.175 ( konvensional )
1.0000
m3
820.907.00
820.907.00
2
Pembesian besi polos
120.0000
kg
12.228.00
1.467.360.00
3
Bekisting dengan papan
5.0000
m2
100.384.00
501.920.00
4
Alat bantu
4.2000
set
700.00
2.940.00
1 m3
-
JUMLAH
2.793.127.00
DIBULATKAN
2.793.127.00
Kolom beton praktis K.175
1
Adukan beton K.175 ( konvensional )
1.0000
m3
820.907.00
820.907.00
2
Pembesian besi polos
156.8622
kg
12.228.00
1.918.111.25
3
Bekisting dengan papan
5.0000
m2
100.384.00
501.920.00
4
Alat bantu
4.2000
set
700.00
2.940.00
1 m3
-
JUMLAH
3.243.878.25
DIBULATKAN
3.243.878.00
Pondasi beton setapak K.225
1
Adukan beton K.225 ( konvensional )
1.0000
m3
939.957.00
939.957.00
2
Pembesian besi polos
160.0000
kg
12.228.00
1.956.480.00
3
Bekisting triplek 9 mm
m2
107.829.00
287.579.94
2.6670
JUMLAH
3.184.016.94
DIBULATKAN 1 m3
-
3.184.016.00
Sloof beton 20/35 K-225 ( SL1 )
1
Adukan beton K-225 (Konvensional)
1.0000
m3
939.957.00
939.957.00
2
Pembesian
158.9524
kg
12.228.00
1.943.669.71
3
Bekisting balok struktur
m3
711.108.00
711.108.00
1 m3
-
1.0000
JUMLAH
3.594.734.71
DIBULATKAN
3.594.734.00
Sloof beton 20/40 K.225 ( SL2 )
1
Adukan beton K.225 ( konvensional )
1.0000
m3
939.957.00
939.957.00
2
Pembesian besi polos
162.5000
kg
12.228.00
1.987.050.00
3
Bekisting balok struktur
m3
711.108.00
711.108.00
1 m3
-
1.0000
JUMLAH
3.638.115.00
DIBULATKAN
3.638.115.00
Kolom beton 30/40 K-225 ( K1 )
1
Adukan beton K-225 (ready-mixl)
1.0000
m3
691.042.00
691.042.00
2
Pembesian
213.0000
kg
12.228.00
2.604.564.00
3
Bekisting Kolom
m3
930.903.00
930.903.00
1 m3
-
1.0000
JUMLAH
4.226.509.00
DIBULATKAN
4.226.509.00
Sloof beton 15/20 K.175
1
Adukan beton K.175 ( konvensional )
1.0000
m3
820.907.00
820.907.00
2
Pembesian besi polos
187.1111
kg
12.228.00
2.287.994.67
3
Bekisting balok struktur
m3
711.108.00
711.108.00
1 m3
-
1.0000
JUMLAH
3.820.009.67
DIBULATKAN
3.820.009.00
Kolom beton 30/30 K-225 ( K1 )
1
Adukan beton K-225 (ready-mixl)
1.0000
m3
691.042.00
691.042.00
2
Pembesian
259.5556
kg
12.228.00
3.173.845.33
3
Bekisting Kolom
m3
930.903.00
930.903.00
1 m3
-
1.0000
JUMLAH
4.795.790.33
DIBULATKAN
4.795.790.00
Kolom beton 30/30 K.225 ( K2)
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
189.3333
kg
12.228.00
2.315.168.00
3
Bekisting kolom
m3
930.903.00
930.903.00
1 m3
-
1.0000
JUMLAH
3.937.113.00
DIBULATKAN
3.937.113.00
Kolom beton 25/25 K.225
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
155.0000
kg
12.228.00
1.895.340.00
3
Bekisting kolom
m2
930.903.00
930.903.00
1 m3
-
1.0000
JUMLAH
3.517.285.00
DIBULATKAN
3.517.285.00
Kolom beton 15/30 K.225
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
170.0000
kg
12.228.00
2.078.760.00
3
Bekisting kolom
m3
930.903.00
930.903.00
1.0000
JUMLAH
3.700.705.00
DIBULATKAN 1 m3
-
3.700.705.00
Balok beton 30/50 K-225
1
Adukan beton K-225 (ready-mixl)
1.0000
m3
691.042.00
691.042.00
2
Pembesian
154.0000
kg
12.228.00
1.883.112.00
3
Perancah kayu / stoot werk - tinggi s/d 4 m
2.0000
m2
246.972.00
493.944.00
4
Bekisting Balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
3.779.206.00
DIBULATKAN
3.779.206.00
Balok beton 25/50 K.225 ( B1 )
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
181.3600
kg
12.228.00
2.217.670.08
3
Perancah kayu / stoot werk - tinggi s / d 4 m
1.6675
m2
246.972.00
411.825.81
4
Bekisting balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
4.031.645.89
DIBULATKAN
4.031.645.00
Balok beton 25/45 K-225
1
Adukan beton K-225 (ready-mixl)
1.0000
m3
691.042.00
691.042.00
2
Pembesian
170.0000
kg
12.228.00
2.078.760.00
3
Perancah kayu / stoot werk - tinggi s/d 4 m
2.2200
m2
246.972.00
548.277.84
4
Bekisting Balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
4.029.187.84
DIBULATKAN
4.029.187.00
Balok beton 25/35 K.225
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
170.0000
kg
12.228.00
2.078.760.00
3
Perancah kayu / stoot werk - tinggi s / d 4 m
2.8575
m2
246.972.00
705.722.49
4
Bekisting balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
4.186.632.49
DIBULATKAN
4.186.632.00
Balok beton 20/40 K-225 ( B2 )
1
Adukan beton K-225 (ready-mixl)
1.0000
m3
691.042.00
691.042.00
2
Pembesian
162.5000
kg
12.228.00
1.987.050.00
3
Perancah kayu / stoot werk - tinggi s/d 4 m
1.6675
m2
246.972.00
411.825.81
4
Bekisting balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
3.801.025.81
DIBULATKAN
3.801.025.00
Balok beton 20/30 K-225 ( B3 )
1
Adukan beton K-225 (ready-mixl)
1.0000
m3
691.042.00
691.042.00
2
Pembesian
180.5556
kg
12.228.00
2.207.833.33
3
Perancah kayu / stoot werk - tinggi s/d 4 m
1.6675
m2
246.972.00
411.825.81
4
Bekisting Balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
4.021.809.14
DIBULATKAN
4.021.809.00
Balok beton 15/30 K.225 ( B4 )
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
199.1111
kg
12.228.00
2.434.730.67
3
Perancah kayu / stoot werk - tinggi s / d 4 m
1.6675
m2
246.972.00
411.825.81
4
Bekisting balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
4.248.706.48
DIBULATKAN
4.248.706.00
Balok beton 15/60 K.225
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
120.0000
kg
12.228.00
1.467.360.00
3
Perancah kayu / stoot werk - tinggi s / d 4 m
1.6665
m2
246.972.00
411.578.84
4
Bekisting balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
3.281.088.84
DIBULATKAN
3.281.088.00
Plat lantai & tangga beton K.225
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
105.0000
kg
12.228.00
1.283.940.00
3
Perancah kayu / stoot werk - tinggi s / d 4 m
6.2475
m2
246.972.00
1.542.957.57
4
Bekisting plat lantai
1.0000
m3
881.695.00
881.695.00
1 m3
-
JUMLAH
4.399.634.57
DIBULATKAN
4.399.634.00
Plat listplank beton K.225
1
Adukan beton K.225 ( ready - mix )
1.0000
m3
691.042.00
691.042.00
2
Pembesian besi polos
100.0000
kg
12.228.00
1.222.800.00
3
Perancah kayu / stoot werk - tinggi s / d 4 m
1.0000
m2
246.972.00
246.972.00
4
Bekisting balok
1.0000
m3
711.108.00
711.108.00
1 m3
-
JUMLAH
2.871.922.00
DIBULATKAN
2.871.922.00
Beton Plat Canopy atas jendela t = 10 cm - K.225
1
Adukan beton K-225 (ready-mixl)
1.0000
m3
691.042.00
691.042.00
2
Pembesian
75.0000
kg
12.228.00
917.100.00
3
Perancah kayu / stoot werk - tinggi s/d 4 m
1.0000
m2
246.972.00
246.972.00
4
Bekisting pelat lantai
1.0000
m3
881.695.00
881.695.00
1 m3
-
Adukan beton K.225 ( ready - mix )
2
Wiremesh M - 8
3
Pembesian besi polos
-
2.736.809.00
DIBULATKAN
2.736.809.00
Beton slab, T=10cm, + wiremesh M- 8
1
1 m2
JUMLAH
1.0000
m3
691.042.00
691.042.00
0.8818
lbr
323.020.00
284.850.09
51.0000
kg
12.228.00
623.628.00
JUMLAH
1.599.520.09
DIBULATKAN
1.599.520.00
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 2
1
Pasir pasang
0.0380
m3
144.410.00
5.487.58
2
Bata merah
75.0000
bh
400.00
30.000.00
3
Semen PC ( 50 kg )
0.4700
zak
54.000.00
25.380.00
4
Pekerja
0.3600
hr
55.000.00
19.800.00
5
Tukang batu
0.1875
hr
55.000.00
10.312.50
6
Mandor
0.0155
hr
70.000.00
1.085.00
7
Alat bantu
4.0000
set
700.00
2.800.00
1 m2 1
Pasir pasang
-
JUMLAH
94.865.08
DIBULATKAN
94.865.00
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 3
0.0430
m3
144.410.00
6.209.63
2
Bata merah
75.0000
bh
400.00
30.000.00
3
Semen PC ( 50 kg )
0.3600
zak
54.000.00
19.440.00
4
Pekerja
0.3600
hr
55.000.00
19.800.00
5
Tukang batu
0.1875
hr
55.000.00
10.312.50
6
Mandor
0.0155
hr
70.000.00
1.085.00
7
Alat bantu
4.0000
set
700.00
2.800.00
1 m2
-
JUMLAH
89.647.13
DIBULATKAN
89.647.00
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 4
1
Pasir pasang
0.0460
m3
144.410.00
6.642.86
2
Bata merah
75.0000
bh
400.00
30.000.00
3
Semen PC ( 50 kg )
0.2900
zak
54.000.00
15.660.00
4
Pekerja
0.3600
hr
55.000.00
19.800.00
5
Tukang batu
0.1875
hr
55.000.00
10.312.50
6
Mandor
0.0155
hr
70.000.00
1.085.00
7
Alat bantu
4.0000
set
700.00
2.800.00
1 m2
-
JUMLAH
86.300.36
DIBULATKAN
86.300.00
Pas.Batu bata, t = 1 / 2 bata ad. 1 : 5
1
Pasir pasang
0.0480
m3
144.410.00
6.931.68
2
Bata merah
75.0000
bh
400.00
30.000.00
3
Semen PC ( 50 kg )
0.2400
zak
54.000.00
12.960.00
4
Pekerja
0.3600
hr
55.000.00
19.800.00
5
Tukang batu
0.1875
hr
55.000.00
10.312.50
6
Mandor
0.0155
hr
70.000.00
1.085.00
7
Alat bantu
4.0000
set
700.00
2.800.00
1 m2
-
JUMLAH
83.889.18
DIBULATKAN
83.889.00
Pas.Batako beton ad. 1 : 2
1
Pasir pasang
0.0130
m3
144.410.00
1.877.33
2
Batako beton 20 / 40
13.0000
bh
7.300.00
94.900.00
3
Semen PC ( 50 kg )
0.1570
zak
54.000.00
8.478.00
4
Pekerja
0.2900
hr
55.000.00
15.950.00
5
Tukang batu
0.1500
hr
55.000.00
8.250.00
6
Mandor
0.0300
hr
70.000.00
2.100.00
7
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
132.955.33
DIBULATKAN
132.955.00
Pas.Batako beton ad. 1 : 3
1
Pasir pasang
0.0140
m3
144.410.00
2.021.74
2
Batako beton 20 / 40
13.0000
bh
7.300.00
94.900.00
3
Semen PC ( 50 kg )
0.1000
zak
54.000.00
5.400.00
4
Pekerja
0.2900
hr
55.000.00
15.950.00
5
Tukang batu
0.1500
hr
55.000.00
8.250.00
6
Mandor
0.0300
hr
70.000.00
2.100.00
7
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
Pas.Batako beton ad. 1 : 4
JUMLAH
130.021.74
DIBULATKAN
130.021.00
1
Pasir pasang
0.0150
m3
144.410.00
2.166.15
2
Batako beton 20 / 40
13.0000
bh
7.300.00
94.900.00
3
Semen PC ( 50 kg )
0.1000
zak
54.000.00
5.400.00
4
Pekerja
0.2900
hr
55.000.00
15.950.00
5
Tukang batu
0.1500
hr
55.000.00
8.250.00
6
Mandor
0.0300
hr
70.000.00
2.100.00
7
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
130.166.15
DIBULATKAN
130.166.00
Pas.Batako beton ad. 1 : 5
1
Pasir pasang
0.0160
m3
144.410.00
2.310.56
2
Batako beton 20 / 40
13.0000
bh
7.300.00
94.900.00
3
Semen PC ( 50 kg )
0.0800
zak
54.000.00
4.320.00
4
Pekerja
0.2900
hr
55.000.00
15.950.00
5
Tukang batu
0.1500
hr
55.000.00
8.250.00
6
Mandor
0.0300
hr
70.000.00
2.100.00
7
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
129.230.56
DIBULATKAN
129.230.00
Pas. Bata Ringan (Silicon) beton ad. 1 : 3
1
Pasir pasang
0.0070
m3
144.410.00
1.010.87
2
Batako beton 20 / 40
8.3300
bh
7.300.00
60.809.00
3
Semen PC ( 50 kg )
0.1000
zak
54.000.00
5.400.00
4
Pekerja
0.2000
hr
55.000.00
11.000.00
5
Tukang batu
0.1500
hr
55.000.00
8.250.00
6
Mandor
0.0300
hr
70.000.00
2.100.00
7
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
89.969.87
DIBULATKAN
89.969.00
Pas. Bata Ringan (Silicon) beton ad. 1 : 5
1
Pasir pasang
0.0060
m3
144.410.00
866.46
2
Batako beton 20 / 40
8.3300
bh
7.300.00
60.809.00
3
Semen PC ( 50 kg )
0.0800
zak
54.000.00
4.320.00
4
Pekerja
0.2000
hr
55.000.00
11.000.00
5
Tukang batu
0.1500
hr
55.000.00
8.250.00
6
Mandor
0.0300
hr
70.000.00
2.100.00
7
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
88.745.46
DIBULATKAN
88.745.00
Plesteran & acian tebal 1,5 cm ad. 1 : 2
1
Pasir pasang
0.0180
m3
144.410.00
2.599.38
2
Semen PC ( 50 kg )
0.2130
zak
54.000.00
11.502.00
3
Pekerja
0.3000
hr
55.000.00
16.500.00
4
Tukang batu
0.1575
hr
55.000.00
8.662.50
5
Mandor
0.0115
hr
70.000.00
805.00
6
Alat bantu
2.0000
set
700.00
1.400.00
JUMLAH
41.468.88
DIBULATKAN
41.468.00
1 m2
-
Plesteran & acian tebal 1,5 cm ad. 1 : 3
1
Pasir pasang
0.0210
m3
144.410.00
3.032.61
2
Semen PC ( 50 kg )
0.1920
zak
54.000.00
10.368.00
3
Pekerja
0.3000
hr
55.000.00
16.500.00
4
Tukang batu
0.1575
hr
55.000.00
8.662.50
5
Mandor
0.0115
hr
70.000.00
805.00
6
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
40.768.11
DIBULATKAN
40.768.00
Plesteran & acian tebal 1,5 cm ad. 1 : 4
1
Pasir pasang
0.0230
m3
144.410.00
3.321.43
2
Semen PC ( 50 kg )
0.1570
zak
54.000.00
8.478.00
3
Pekerja
0.3000
hr
55.000.00
16.500.00
4
Tukang batu
0.1575
hr
55.000.00
8.662.50
5
Mandor
0.0115
hr
70.000.00
805.00
6
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
39.166.93
DIBULATKAN
39.166.00
Plesteran & acian tebal 1,5 cm ad. 1 : 5
1
Pasir pasang
0.0240
m3
144.410.00
3.465.84
2
Semen PC ( 50 kg )
0.1240
zak
54.000.00
6.696.00
3
Pekerja
0.3000
hr
55.000.00
16.500.00
4
Tukang batu
0.1575
hr
55.000.00
8.662.50
5
Mandor
0.0115
hr
70.000.00
805.00
6
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
37.529.34
DIBULATKAN
37.529.00
Pek.Acian
1
Semen PC ( 50 kg )
0.0800
zak
54.000.00
4.320.00
2
Pekerja
0.1430
hr
55.000.00
7.865.00
3
Tukang batu
0.1123
hr
55.000.00
6.176.50
4
Mandor
0.0063
hr
70.000.00
441.00
5
Alat bantu
2.0000
set
700.00
1.400.00
1 m2
-
JUMLAH
20.202.50
DIBULATKAN
20.202.00
Pasang Dinding Rooster / Terawang, Natural, uk. 12x11x24 cm, Ad. 1Pc : 4Ps
1
Rooster
36.0000
bh
4.600.00
165.600.00
2
Pasir pasang
0.0350
m3
144.410.00
5.054.35
3
Semen PC ( 50 kg )
0.2560
zak
54.000.00
13.824.00
4
Pekerja
0.3000
hr
55.000.00
16.500.00
5
Tukang Batu
0.1000
hr
55.000.00
5.500.00
6
Kepala Tukang Batu
0.0100
hr
56.000.00
560.00
7
Mandor
0.0150
hr
70.000.00
1.050.00
1 m2
-
JUMLAH
208.088.35
DIBULATKAN
208.088.00
Pas. Dinding glass block uk. 20x20x10 cm , ad. 1 PC : 4 psr
1
Glass Block 20 x 20 (Kedawung)
25.0000
bh
31.000.00
775.000.00
2
Pasir pasang
m3
144.410.00
5.054.35
0.0350
3
Semen PC ( 50 kg )
0.2560
zak
54.000.00
13.824.00
4
Pekerja
0.3000
hr
55.000.00
16.500.00
5
Tukang Batu
0.1000
hr
55.000.00
5.500.00
6
Kepala Tukang Batu
0.0100
hr
56.000.00
560.00
7
Mandor
0.0150
hr
70.000.00
1.050.00
1 m2
-
JUMLAH
817.488.35
DIBULATKAN
817.488.00
Pasang Dinding Batu Tempel Palimanan Kuning, 20 x 20 cm Texture Kasar
1
Batu Tempel Palimanan
1.0500
m2
60.800.00
63.840.00
2
Pasir pasang
0.0350
m3
144.410.00
5.054.35
3
Semen PC ( 50 kg )
0.2350
zak
54.000.00
12.690.00
4
Pekerja
0.6200
hr
55.000.00
34.100.00
5
Tukang batu
0.3500
hr
55.000.00
19.250.00
6
Kepala Tukang Batu
0.0350
hr
56.000.00
1.960.00
7
Mandor
0.0300
hr
70.000.00
2.100.00
JUMLAH
138.994.35
DIBULATKAN
138.994.00
PEKERJAAN ATAP 1 m3
-
Kuda - kuda kayu kamper kruing
1
Kayu balok kamper kruing
1.1000
m3
4.408.400.00
4.849.240.00
2
Paku 8 - 12
3.0000
kg
13.680.00
41.040.00
3
Besi pengikat kuda - kuda
15.0000
kg
7.600.00
114.000.00
4
Pekerja
5.0000
hr
55.000.00
275.000.00
5
Tukang kayu
15.7500
hr
55.000.00
866.250.00
6
Mandor
hr
70.000.00
70.000.00
1 m3
-
1.0000
JUMLAH
6.215.530.00
DIBULATKAN
6.215.530.00
Kuda - kuda kayu kamper banjar
1
Kayu balok kamper banjar
1.1000
m3
4.408.400.00
4.849.240.00
2
Paku 8 - 12
3.0000
kg
13.680.00
41.040.00
3
Besi pengikat kuda - kuda
15.0000
kg
7.600.00
114.000.00
4
Pekerja
5.0000
hr
55.000.00
275.000.00
5
Tukang kayu
15.7500
hr
55.000.00
866.250.00
6
Mandor
hr
70.000.00
70.000.00
1 m3
-
1.0000
JUMLAH
6.215.530.00
DIBULATKAN
6.215.530.00
Kuda - kuda kayu meranti
1
Kayu meranti
1.1000
m3
2.876.860.00
3.164.546.00
2
Paku 8 - 12
3.0000
kg
13.680.00
41.040.00
3
Besi pengikat kuda - kuda
15.0000
kg
7.600.00
114.000.00
4
Pekerja
5.0000
hr
55.000.00
275.000.00
5
Tukang kayu
15.7500
hr
55.000.00
866.250.00
6
Mandor
hr
70.000.00
70.000.00
1 m2
-
1.0000
JUMLAH
4.530.836.00
DIBULATKAN
4.530.836.00
Rangka atap ( kaso 5/7 dan reng 3/4 ) kayu meranti
1
Kayu meranti
0.0180
m3
2.876.860.00
51.783.48
2
Paku 8 - 12
0.1500
kg
13.680.00
2.052.00
3
Pekerja
0.1000
hr
55.000.00
5.500.00
4
Tukang kayu
0.1000
hr
55.000.00
5.500.00
5
Mandor
0.0150
hr
70.000.00
1.050.00
1 m'
-
JUMLAH
65.885.48
DIBULATKAN
65.885.00
Listplank 3 / 30 + 3 / 15 kayu kamper banjar
1
Papan kayu kamper banjar
0.0150
m3
4.651.620.00
69.774.30
2
Paku 8 - 12
0.8000
kg
13.680.00
10.944.00
3
Pekerja
0.2800
hr
55.000.00
15.400.00
4
Tukang kayu
0.5600
hr
55.000.00
30.800.00
5
Mandor
0.0720
hr
70.000.00
5.040.00
1 m'
-
JUMLAH
131.958.30
DIBULATKAN
131.958.00
Listplank 3 / 30 kayu kamper banjar
1
Papan kayu kamper banjar
0.0100
m3
4.651.620.00
46.516.20
2
Paku 8 - 12
0.0500
kg
13.680.00
684.00
3
Pekerja
0.1430
hr
55.000.00
7.865.00
4
Tukang kayu
0.2850
hr
55.000.00
15.675.00
5
Mandor
0.0360
hr
70.000.00
2.520.00
1 m2
-
JUMLAH
73.260.20
DIBULATKAN
73.260.00
Atap genteng morando glasuur
1
Genteng morando Glazur
18.0000
bh
3.040.00
54.720.00
2
Pekerja
0.1500
hr
55.000.00
8.250.00
3
Tukang kayu
0.0790
hr
55.000.00
4.345.00
4
Mandor
0.0120
hr
70.000.00
840.00
1 m'
-
JUMLAH
68.155.00
DIBULATKAN
68.155.00
Karpusan genteng morando glasuur
1
Pasir pasang
0.0320
m3
144.410.00
4.621.12
2
Semen PC ( 50 kg )
0.2200
zak
54.000.00
11.880.00
3
Genteng bubungan / nok
3.5000
bh
5.700.00
19.950.00
4
Pekerja
0.3000
hr
55.000.00
16.500.00
5
Tukang batu
0.1575
hr
55.000.00
8.662.50
6
Mandor
0.0225
hr
70.000.00
1.575.00
1 m2
-
JUMLAH
63.188.62
DIBULATKAN
63.188.00
Atap genteng beton (polos)
1
Genteng beton polos
18.0000
bh
3.800.00
68.400.00
2
Pekerja
0.1500
hr
55.000.00
8.250.00
3
Tukang kayu
0.0790
hr
55.000.00
4.345.00
4
Mandor
0.0120
hr
70.000.00
840.00
1 m'
-
JUMLAH
81.835.00
DIBULATKAN
81.835.00
Karpusan genteng beton
1
Pasir pasang
0.0320
m3
144.410.00
4.621.12
2
Semen PC ( 50 kg )
0.2200
zak
54.000.00
11.880.00
3
Genteng bubungan / nok
3.5000
bh
5.240.00
18.340.00
4
Pekerja
0.3000
hr
55.000.00
16.500.00
5
Tukang batu
0.1575
hr
55.000.00
8.662.50
6
Mandor
0.0225
hr
70.000.00
1.575.00
1 m2
-
JUMLAH
61.578.62
DIBULATKAN
61.578.00
Pasang atap asbes gelombang 5 mm
1
Asbes Gelombang 5 mm (180x108)cm
0.9000
lbr
40.280.00
36.252.00
2
Paku asbes / kg
0.1200
kg
13.680.00
1.641.60
3
Pekerja
0.1400
hr
55.000.00
7.700.00
4
Tukang Kayu
0.0750
hr
55.000.00
4.125.00
5
Kepala Tukang Kayu
0.0080
hr
56.000.00
448.00
6
Mandor
0.0080
hr
70.000.00
560.00
1 m1
-
JUMLAH
50.726.60
DIBULATKAN
50.726.00
Pasang bubungan/nok stel 1.05 m
1
Asbes Nok Stel
2.1000
lbr
15.730.00
33.033.00
2
Paku Kayu Segala uk.
6.0000
kg
13.680.00
82.080.00
3
Pekerja
0.0840
hr
55.000.00
4.620.00
4
Tukang Kayu
0.1250
hr
55.000.00
6.875.00
5
Kepala Tukang Kayu
0.0130
hr
56.000.00
728.00
6
Mandor
0.0040
hr
70.000.00
280.00
1 kg
-
JUMLAH
127.616.00
DIBULATKAN
127.616.00
Konstruksi baja H - beam / WF ( termasuk plat simpul,las & zinkchromate )
1
Zinkcchromate
0.0400
m2
760.00
30.40
2
Besi WF ex. DN SII
1.0500
kg
11.020.00
11.571.00
3
Pekerja
0.0600
hr
55.000.00
3.300.00
4
Tukang besi
0.0045
hr
55.000.00
247.50
5
Mandor
0.0025
hr
70.000.00
175.00
6
Erection
1.0000
kg
800.00
800.00
1 kg
-
JUMLAH
16.123.90
DIBULATKAN
16.123.00
Konstruksi besi siku ( termasuk plat simpul,las & zinkchromate )
1
Zinkcchromate
0.0400
m2
760.00
30.40
2
Besi siku ex. DN SII
1.0500
kg
11.400.00
11.970.00
3
Pekerja
0.0600
hr
55.000.00
3.300.00
4
Tukang besi
0.0045
hr
55.000.00
247.50
5
Mandor
0.0025
hr
70.000.00
175.00
6
Erection
1.0000
kg
800.00
800.00
1 kg
-
JUMLAH
16.522.90
DIBULATKAN
16.522.00
Konstruksi gording besi ( termasuk plat simpul,las & zinkchromate )
1
Zinkcchromate
0.0400
m2
760.00
30.40
2
Gording besi
1.0200
kg
11.020.00
11.240.40
3
Pekerja
0.0600
hr
55.000.00
3.300.00
4
Tukang besi
0.0045
hr
55.000.00
247.50
5
Mandor
0.0025
hr
70.000.00
175.00
6
Erection
1.0000
kg
800.00
800.00
1 m2
-
JUMLAH
15.793.30
DIBULATKAN
15.793.00
Alumunium foil
1
Alumunium foil
1.0500
m2
14.440.00
15.162.00
2
Pekerja
0.0330
hr
55.000.00
1.815.00
3
Tukang kayu
0.0330
hr
55.000.00
1.815.00
4
Mandor
0.0050
hr
70.000.00
350.00
1 m'
-
JUMLAH
19.142.00
DIBULATKAN
19.142.00
Talang datar / jurai seng tebal 0.3 mm
1
Papan kayu meranti Oven
0.0096
m3
2.622.230.00
25.173.41
2
Plat seng lebar 90 cm, tebal 0.30 mm
0.5000
m'
25.760.00
12.880.00
3
Paku
0.0150
kg
13.680.00
205.20
4
Pekerja
0.0500
hr
55.000.00
2.750.00
5
Tukang kayu
0.1200
hr
55.000.00
6.600.00
6
Mandor
0.0120
hr
70.000.00
840.00
1 m2
-
JUMLAH
48.448.61
DIBULATKAN
48.448.00
Pasangan Atap Zincalume + Glasswall+Alumunium Foil + Roofmesh
1
Atap Zincalume
1.0000
m2
112.110.00
112.110.00
2
Glasswall
1.0000
m2
11.400.00
11.400.00
3
Alumunium Foil
1.0500
m2
19.142.00
20.099.10
4
Roofmesh
1.0000
m2
13.300.00
13.300.00
5
Paku Pengikat Atap metal/zincalume
0.1750
kg
13.680.00
2.394.00
6
Sealent
0.0650
kg
20.440.00
1.328.60
7
Pekerja
0.0695
hr
55.000.00
3.822.50
8
Tukang Besi
0.1225
hr
55.000.00
6.737.50
9
Mandor
0.0067
hr
70.000.00
469.00
1 m'
-
JUMLAH
171.660.70
DIBULATKAN
171.660.00
Pasangan Nok Zincalume + Glasswall+Alumunium Foil + Roofmesh
1
Atap Zincalume
0.3500
m2
112.110.00
39.238.50
2
Paku Pengikat Atap metal/zincalume
0.1550
kg
13.680.00
2.120.40
3
Sealent
0.0250
kg
20.440.00
511.00
4
Pekerja
0.0693
hr
55.000.00
3.811.50
5
Tukang Besi
0.1213
hr
55.000.00
6.671.50
6
Mandor
0.0067
hr
70.000.00
469.00
JUMLAH
52.821.90
DIBULATKAN
52.821.00
PEKERJAAN KAYU 1 m3
-
Kusen kayu kamper samarinda
1
Kayu balok kamper samarinda Oven
1.1000
m3
5.875.330.00
6.462.863.00
2
Paku
3.0000
kg
13.680.00
41.040.00
3
Angkur
10.5600
kg
7.600.00
80.256.00
4
Pekerja
7.2000
hr
55.000.00
396.000.00
5
Tukang kayu
25.2000
hr
55.000.00
1.386.000.00
6
Mandor
hr
70.000.00
109.200.00
1.5600
JUMLAH
8.475.359.00
DIBULATKAN 1 m3
-
8.475.359.00
Kusen kayu kamper banjar
1
Kayu balok kamper banjar
1.1000
m3
5.875.330.00
6.462.863.00
2
Paku
3.0000
kg
13.680.00
41.040.00
3
Angkur
10.5600
kg
7.600.00
80.256.00
4
Pekerja
7.2000
hr
55.000.00
396.000.00
5
Tukang kayu
25.2000
hr
55.000.00
1.386.000.00
6
Mandor
hr
70.000.00
109.200.00
1 m3
-
1.5600
JUMLAH
8.475.359.00
DIBULATKAN
8.475.359.00
Kusen kayu kamper kruing
1
Kayu balok kamper kruing
1.1000
m3
4.408.400.00
4.849.240.00
2
Paku
3.0000
kg
13.680.00
41.040.00
3
Angkur
10.5600
kg
7.600.00
80.256.00
4
Pekerja
7.2000
hr
55.000.00
396.000.00
5
Tukang kayu
25.2000
hr
55.000.00
1.386.000.00
6
Mandor
hr
70.000.00
109.200.00
1 m3
-
1.5600
JUMLAH
6.861.736.00
DIBULATKAN
6.861.736.00
Kusen kayu meranti
1
Kayu balok meranti
1.1000
m3
2.876.860.00
3.164.546.00
2
Paku
3.0000
kg
13.680.00
41.040.00
3
Angkur
10.5600
kg
7.600.00
80.256.00
4
Pekerja
7.2000
hr
55.000.00
396.000.00
5
Tukang kayu
25.2000
hr
55.000.00
1.386.000.00
6
Mandor
hr
70.000.00
109.200.00
1 m2
-
1.5600
JUMLAH
5.177.042.00
DIBULATKAN
5.177.042.00
Daun pintu double teakwood
1
Rangka papan kamper banjar
0.0400
m3
4.408.400.00
176.336.00
2
Teakwood 4 mm ukuran pintu
1.0000
lbr
75.200.00
75.200.00
3
Lem putih
0.3000
kg
12.540.00
3.762.00
4
Paku triplek
0.0300
kg
13.680.00
410.40
5
Pekerja
0.4800
hr
55.000.00
26.400.00
6
Tukang kayu
1.6000
hr
55.000.00
88.000.00
7
Mandor
0.1840
hr
70.000.00
12.880.00
1 m2
-
JUMLAH
382.988.40
DIBULATKAN
382.988.00
Daun pintu double teakwood lapis formika ( untuk KM/WC )
1
Rangka papan kamper banjar
0.0400
m3
4.408.400.00
176.336.00
2
Teakwood 4 mm ukuran pintu
1.0000
lbr
75.200.00
75.200.00
3
Formika
0.5000
lbr
66.700.00
33.350.00
4
Lem putih
0.8000
kg
12.540.00
10.032.00
5
Paku triplek
0.0300
kg
13.680.00
410.40
6
Pekerja
0.4800
hr
55.000.00
26.400.00
7
Tukang kayu
1.6000
hr
55.000.00
88.000.00
8
Mandor
0.1840
hr
70.000.00
12.880.00
JUMLAH
422.608.40
DIBULATKAN 1 m2
-
422.608.00
Daun pintu kaca polos
1
Rangka papan kamper banjar
0.0300
m3
4.408.400.00
132.252.00
2
Lem putih
0.4000
kg
12.540.00
5.016.00
3
Paku
0.0300
kg
13.680.00
410.40
4
Kaca polos 5 mm
0.9000
m2
102.600.00
92.340.00
5
Pekerja
0.8000
hr
55.000.00
44.000.00
6
Tukang kayu
2.0000
hr
55.000.00
110.000.00
7
Mandor
0.2400
hr
70.000.00
16.800.00
1 m2
-
JUMLAH
400.818.40
DIBULATKAN
400.818.00
Daun pintu kaca rayben
1
Rangka papan kamper banjar
0.0300
m3
4.408.400.00
132.252.00
2
Lem putih
0.4000
kg
12.540.00
5.016.00
3
Paku
0.0300
kg
13.680.00
410.40
4
Kaca rayben 5 mm
0.9000
m2
106.100.00
95.490.00
5
Pekerja
0.8000
hr
55.000.00
44.000.00
6
Tukang kayu
2.0000
hr
55.000.00
110.000.00
7
Mandor
0.2400
hr
70.000.00
16.800.00
1 m2
-
JUMLAH
403.968.40
DIBULATKAN
403.968.00
Daun pintu kaca es
1
Rangka papan kamper banjar
0.0300
m3
4.408.400.00
132.252.00
2
Lem putih
0.4000
kg
12.540.00
5.016.00
3
Paku
0.0300
kg
13.680.00
410.40
4
Kaca es 5 mm
0.9000
m2
144.030.00
129.627.00
5
Pekerja
0.8000
hr
55.000.00
44.000.00
6
Tukang kayu
2.0000
hr
55.000.00
110.000.00
7
Mandor
0.2400
hr
70.000.00
16.800.00
1 m2
-
JUMLAH
438.105.40
DIBULATKAN
438.105.00
Daun pintu panel kayu samarinda
1
Rangka papan kamper samarinda Oven
0.0440
m3
5.738.520.00
252.494.88
2
Lem putih
0.4000
kg
12.540.00
5.016.00
3
Pekerja
1.2150
hr
55.000.00
66.825.00
4
Tukang kayu
2.4300
hr
55.000.00
133.650.00
5
Mandor
0.2590
hr
70.000.00
18.130.00
1 m2
-
JUMLAH
476.115.88
DIBULATKAN
476.115.00
Daun pintu panel kayu banjar
1
Rangka papan kamper banjar
0.0440
m3
4.408.400.00
193.969.60
2
Lem putih
0.4000
kg
12.540.00
5.016.00
3
Pekerja
1.2150
hr
55.000.00
66.825.00
4
Tukang kayu
2.4300
hr
55.000.00
133.650.00
5
Mandor
0.2590
hr
70.000.00
18.130.00
1 m2
-
Daun pintu panel kayu meranti
JUMLAH
417.590.60
DIBULATKAN
417.590.00
1
Rangka papan kamper meranti
0.0440
m3
2.876.860.00
126.581.84
2
Lem putih
0.4000
kg
12.540.00
5.016.00
3
Pekerja
1.2150
hr
55.000.00
66.825.00
4
Tukang kayu
2.4300
hr
55.000.00
133.650.00
5
Mandor
0.2590
hr
70.000.00
18.130.00
1 m2
-
JUMLAH
350.202.84
DIBULATKAN
350.202.00
Daun pintu / jendela krepyak ( jalusi ) kamper samarinda
1
Rangka papan kamper samarinda
0.0420
m3
5.738.520.00
241.017.84
2
Lem putih
0.2000
kg
12.540.00
2.508.00
3
Pekerja
1.0000
hr
55.000.00
55.000.00
4
Tukang kayu
3.0000
hr
55.000.00
165.000.00
5
Mandor
0.3500
hr
70.000.00
24.500.00
1 m2
-
JUMLAH
488.025.84
DIBULATKAN
488.025.00
Daun pintu / jendela krepyak ( jalusi ) kamper banjar
1
Rangka papan kamper banjar
0.0420
m3
4.408.400.00
185.152.80
2
Lem putih
0.2000
kg
12.540.00
2.508.00
3
Pekerja
1.0000
hr
55.000.00
55.000.00
4
Tukang kayu
3.0000
hr
55.000.00
165.000.00
5
Mandor
0.3500
hr
70.000.00
24.500.00
JUMLAH
432.160.80
DIBULATKAN
432.160.00
PEKERJAAN LANTAI 1 m2
-
Rabat beton 7 cm + plester dan acian
1
Pasir pasang
0.0030
m3
144.410.00
433.23
2
Pasir beton
0.0330
m3
144.410.00
4.765.53
3
Kerikil / split
0.0650
m3
164.000.00
10.660.00
4
Semen PC ( 50 kg )
0.2760
zak
54.000.00
14.904.00
5
Pekerja
0.1150
hr
55.000.00
6.325.00
6
Tukang batu
0.0120
hr
55.000.00
660.00
7
Mandor
0.0060
hr
70.000.00
420.00
1 m2
-
JUMLAH
38.167.76
DIBULATKAN
38.167.00
Lantai keramik 20 x 20 ad.1 : 3
1
Pasir pasang
0.0300
m3
144.410.00
4.332.30
2
Semen PC ( 50 kg )
0.0337
zak
54.000.00
1.819.80
3
Semen warna ( cor nat )
0.0125
kg
10.600.00
132.50
4
Keramik 20 x 20 standar Kw 1
1.0500
m2
40.050.00
42.052.50
5
Pekerja
0.2816
hr
55.000.00
15.488.00
6
Tukang batu
0.1320
hr
55.000.00
7.260.00
7
Mandor
0.0203
hr
70.000.00
1.421.00
8
Alat bantu
0.6000
set
700.00
420.00
1 m2
-
JUMLAH
72.926.10
DIBULATKAN
72.926.00
Lantai keramik 30 x 30 ad.1 : 3
1
Pasir pasang
0.0300
m3
144.410.00
4.332.30
2
Semen PC ( 50 kg )
0.0337
zak
54.000.00
1.819.80
3
Semen warna ( cor nat )
0.0125
kg
10.600.00
132.50
4
Keramik 30 x 30 standar 40 x 40
1.0500
m2
33.820.00
35.511.00
5
Pekerja
0.2816
hr
55.000.00
15.488.00
6
Tukang batu
0.1320
hr
55.000.00
7.260.00
7
Mandor
0.0203
hr
70.000.00
1.421.00
8
Alat bantu
0.6000
set
700.00
420.00
1 m2
-
JUMLAH
66.384.60
DIBULATKAN
66.384.00
Lantai keramik 40 x 40 ad.1 : 3
1
Pasir pasang
0.0300
m3
144.410.00
4.332.30
2
Semen PC ( 50 kg )
0.0337
zak
54.000.00
1.819.80
3
Semen warna ( cor nat )
0.0125
kg
10.600.00
132.50
4
Keramik 40 x 40 standar
1.0500
m2
42.940.00
45.087.00
5
Pekerja
0.2816
hr
55.000.00
15.488.00
6
Tukang batu
0.1320
hr
55.000.00
7.260.00
7
Mandor
0.0203
hr
70.000.00
1.421.00
8
Alat bantu
0.6000
set
700.00
420.00
1 m2
-
JUMLAH
75.960.60
DIBULATKAN
75.960.00
Keramik dinding 20 x 20
1
Pasir pasang
0.0380
m3
144.410.00
5.487.58
2
Semen PC ( 50 kg )
0.0340
zak
54.000.00
1.836.00
3
Semen warna ( cor nat )
0.0125
kg
10.600.00
132.50
4
Keramik 20 x 20 standar
1.0500
m2
40.050.00
42.052.50
5
Pekerja
0.2620
hr
55.000.00
14.410.00
6
Tukang batu
0.2760
hr
55.000.00
15.180.00
7
Mandor
0.0263
hr
70.000.00
1.841.00
8
Alat bantu
0.6000
set
700.00
420.00
1 m2
-
JUMLAH
81.359.58
DIBULATKAN
81.359.00
Keramik dinding 20x25
1
Pasir pasang
0.0380
m3
144.410.00
5.487.58
2
Semen PC ( 50 kg )
0.0340
zak
54.000.00
1.836.00
3
Semen warna ( cor nat )
0.0125
kg
10.600.00
132.50
4
Keramik 20/25 Kw 1
1.0500
m2
39.140.00
41.097.00
5
Pekerja
0.2620
hr
55.000.00
14.410.00
6
Tukang batu
0.2760
hr
55.000.00
15.180.00
7
Mandor
0.0263
hr
70.000.00
1.841.00
8
Alat bantu
0.6000
set
700.00
420.00
1 m1
-
JUMLAH
80.404.08
DIBULATKAN
80.404.00
Plint keramik standar
1
Pasir pasang
0.0030
m3
144.410.00
433.23
2
Semen PC ( 50 kg )
0.0353
zak
54.000.00
1.906.20
3
Plint keramik standar
0.1100
m2
5.850.00
643.50
4
Semen warna ( cor nat )
0.0500
kg
10.600.00
530.00
5
Pekerja
0.4000
hr
55.000.00
22.000.00
6
Tukang batu
0.1300
hr
55.000.00
7.150.00
7
Mandor
0.0260
hr
70.000.00
1.820.00
8
Alat bantu
1 m1
-
0.6000
set
700.00
420.00
JUMLAH
34.902.93
DIBULATKAN
34.902.00
Plint kayu standar
1
Rangka papan kamper banjar
0.0016
m3
4.408.400.00
7.053.44
2
Paku segala ukuran
0.1000
kg
18.000.00
1.800.00
3
Pekerja
0.4000
hr
55.000.00
22.000.00
4
Tukang kayu
0.1300
hr
55.000.00
7.150.00
5
Mandor
0.0260
hr
70.000.00
1.820.00
6
Alat bantu
0.6000
set
700.00
420.00
1 m'
-
JUMLAH
40.243.44
DIBULATKAN
40.243.00
Plint keramik 10x20 dinding Kamar mandi
1
Pasir pasang
0.0030
m3
144.410.00
433.23
2
Semen PC ( 50 kg )
0.0353
zak
54.000.00
1.906.20
3
Plint keramik standar
5.0000
bh
5.850.00
29.250.00
4
Semen warna ( cor nat )
0.0500
kg
10.600.00
530.00
5
Pekerja
0.0400
hr
55.000.00
2.200.00
6
Tukang batu
0.0130
hr
55.000.00
715.00
7
Mandor
0.0026
hr
70.000.00
182.00
8
Alat bantu
0.0600
set
700.00
42.00
1 m'
-
JUMLAH
35.258.43
DIBULATKAN
35.258.00
Border 7x20 / Plint keramik dinding Kamar mandi
1
Pasir pasang
0.0030
m3
144.410.00
433.23
2
Semen PC ( 50 kg )
0.0353
zak
54.000.00
1.906.20
3
Border Keramik Dinding 7/20
1.0000
m'
31.350.00
31.350.00
4
Semen warna ( cor nat )
0.0500
kg
10.600.00
530.00
5
Pekerja
0.0400
hr
55.000.00
2.200.00
6
Tukang batu
0.0130
hr
55.000.00
715.00
7
Mandor
0.0026
hr
70.000.00
182.00
8
Alat bantu
0.0600
set
700.00
42.00
JUMLAH
37.358.43
DIBULATKAN
37.358.00
PEKERJAAN PLAFOND 1 m2
-
Rangka plafond gird 60 x 60 cm ( Rangka Hollow )
1
Hollow 20X40X0,7 mm
0.4500
btg
29.000.00
13.050.00
2
Hollow 40X40X0,7 mm
0.2250
btg
17.100.00
3.847.50
3
Wall Angle
0.2400
btg
15.200.00
3.648.00
4
Suspention Road 4 mm
0.9750
unit
12.160.00
11.856.00
5
Paku Riffet
0.0180
dos
18.240.00
328.32
6
Gypsumboard 9 mm
0.4320
lbr
40.280.00
17.400.96
7
Drywall Screw
0.0400
dos
57.000.00
2.280.00
8
Cornice Adhesive
0.0340
zak
64.600.00
2.196.40
9
Catton Tape
0.0520
roll
10.030.00
521.56
10
Tukang
0.3980
hr
55.000.00
21.890.00
11
Pekerja
0.3740
hr
55.000.00
20.570.00
12
Mandor
0.0700
hr
70.000.00
4.900.00
JUMLAH
102.488.74
DIBULATKAN 1 m2
-
102.488.00
Rangka plafond gird 60 x 60 cm ( Rangka Hollow )
1
Hollow 20X40X0,7 mm
0.4500
btg
29.000.00
13.050.00
2
Hollow 40X40X0,7 mm
0.2250
btg
17.100.00
3.847.50
3
Wall Angle
0.2400
btg
15.200.00
3.648.00
4
Suspention Road 4 mm
0.9750
unit
12.160.00
11.856.00
5
Paku Riffet
0.0180
dos
18.240.00
328.32
6
GRC Board t=6 mm
0.4320
lbr
152.010.00
65.668.32
7
Drywall Screw
0.0400
dos
57.000.00
2.280.00
8
Cornice Adhesive
0.0340
zak
64.600.00
2.196.40
9
Catton Tape
0.0520
roll
10.030.00
521.56
10
Tukang
0.3980
hr
55.000.00
21.890.00
11
Pekerja
0.3740
hr
55.000.00
20.570.00
12
Mandor
0.0700
hr
70.000.00
4.900.00
1 m2
-
JUMLAH
150.756.10
DIBULATKAN
150.756.00
Rangka plafond gird 50 x 100 cm ( kayu kamper banjar )
1
Kayu kamper banjar Oven
0.0080
m3
4.408.400.00
35.267.20
2
Paku
0.1400
kg
18.000.00
2.520.00
3
Pekerja
0.1700
hr
55.000.00
9.350.00
4
Tukang kayu
0.2800
hr
55.000.00
15.400.00
5
Mandor
0.0370
hr
70.000.00
2.590.00
6
Alat bantu
0.6000
set
700.00
420.00
1 m2
-
JUMLAH
65.547.20
DIBULATKAN
65.547.00
Plafond asbes 5 mm + rangka kayu meranti
1
Kayu meranti
0.0080
m3
2.876.860.00
23.014.88
2
Plat asbes semen 100 x 100 cm, t = 6 mm
1.0250
lbr
21.430.00
21.965.75
3
Paku
0.1750
kg
18.000.00
3.150.00
4
Pekerja
0.2200
hr
55.000.00
12.100.00
5
Tukang kayu
0.3500
hr
55.000.00
19.250.00
6
Mandor
0.0460
hr
70.000.00
3.220.00
7
Alat bantu
1.0000
set
700.00
700.00
1 m2
-
JUMLAH
83.400.63
DIBULATKAN
83.400.00
Plafond gysum 9 mm + rangka kayu meranti
1
Kayu meranti
0.0080
m3
2.876.860.00
23.014.88
2
Gypsum 9 mm
0.5800
lbr
40.280.00
23.362.40
3
Paku
0.1750
kg
18.000.00
3.150.00
4
Pekerja
0.2200
hr
55.000.00
12.100.00
5
Tukang kayu
0.3500
hr
55.000.00
19.250.00
6
Mandor
0.0460
hr
70.000.00
3.220.00
7
Alat bantu
1.0000
set
700.00
700.00
1 m2
-
JUMLAH
84.797.28
DIBULATKAN
84.797.00
Plafond triplek 4 mm + rangka kayu meranti
1
Kayu meranti
0.0080
m3
2.876.860.00
23.014.88
2
Triplek 4 mm
0.3750
lbr
75.200.00
28.200.00
3
Paku
0.1750
kg
18.000.00
3.150.00
4
Pekerja
0.2200
hr
55.000.00
12.100.00
5
Tukang kayu
0.3500
hr
55.000.00
19.250.00
6
Mandor
0.0460
hr
70.000.00
3.220.00
7
Alat bantu
1.0000
set
700.00
700.00
1 m2
-
JUMLAH
89.634.88
DIBULATKAN
89.634.00
Plafond asbes 5 mm + rangka kayu meranti
1
Kayu meranti
0.0080
m3
2.876.860.00
23.014.88
2
Asbes 5 mm
0.3750
lbr
40.280.00
15.105.00
3
Paku
0.1750
kg
18.000.00
3.150.00
4
Pekerja
0.2200
hr
55.000.00
12.100.00
5
Tukang kayu
0.3500
hr
55.000.00
19.250.00
6
Mandor
0.0460
hr
70.000.00
3.220.00
7
Alat bantu
1.0000
set
700.00
700.00
1 m2 1
Kayu meranti
2
GRC Board
3
Paku
4
-
JUMLAH
76.539.88
DIBULATKAN
76.539.00
Plafond GRC + rangka kayu meranti
0.0080
m3
2.876.860.00
23.014.88
0.5800
lbr
152.010.00
88.165.80
0.1750
kg
18.000.00
3.150.00
Pekerja
0.2200
hr
55.000.00
12.100.00
5
Tukang kayu
0.3500
hr
55.000.00
19.250.00
6
Mandor
0.0460
hr
70.000.00
3.220.00
7
Alat bantu
1.0000
set
700.00
700.00
1 m1
-
JUMLAH
149.600.68
DIBULATKAN
149.600.00
List Plafond Kayu Kamper Samarinda 5 cm
1
List Profil Kamper 5 cm
1.1000
m1
12.160.00
13.376.00
2
Paku
0.0100
kg
18.000.00
180.00
3
Pekerja
0.0500
hr
55.000.00
2.750.00
4
Tukang kayu
0.0500
hr
55.000.00
2.750.00
5
Kepala Tukang Kayu
0.0050
hr
56.000.00
280.00
6
Mandor
0.0030
hr
70.000.00
210.00
JUMLAH
19.546.00
DIBULATKAN
19.546.00
PEKERJAAN CAT 1 m2
-
Cat dinding dalam ( ICI )
1
Cat setara ICI - interior
0.2800
kg
29.300.00
8.204.00
2
Roll cat + bak
0.0100
bh
16.300.00
163.00
3
Plamur / dempul tembok
0.1600
kg
12.380.00
1.980.80
4
Ampelas
0.5000
lbr
2.600.00
1.300.00
5
Tukang cat
0.2950
hr
65.000.00
19.175.00
6
Mandor
0.0250
hr
80.000.00
2.000.00
1 m2
-
JUMLAH
32.822.80
DIBULATKAN
32.822.00
Cat dinding dalam ( Jotun )
1
Cat setara jotun
0.2800
kg
19.900.00
5.572.00
2
Roll cat + bak
0.0100
bh
16.300.00
163.00
3
Plamur / dempul tembok
0.1600
kg
12.380.00
1.980.80
4
Ampelas
0.5000
lbr
2.600.00
1.300.00
5
Tukang cat
0.2950
hr
65.000.00
19.175.00
6
Mandor
0.0250
hr
80.000.00
2.000.00
1 m2
-
JUMLAH
30.190.80
DIBULATKAN
30.190.00
Cat dinding luar dengan ( ICI Weathershield )
1
Cat setara ICI Weathershield )
0.2800
kg
47.100.00
13.188.00
2
Roll cat + bak
0.0100
bh
16.300.00
163.00
3
Plamur / dempul tembok
0.1600
kg
12.380.00
1.980.80
4
Ampelas
0.5000
lbr
2.600.00
1.300.00
5
Tukang cat
0.2950
hr
65.000.00
19.175.00
6
Mandor
0.0250
hr
80.000.00
2.000.00
1 m2
JUMLAH
37.806.80
DIBULATKAN
37.806.00
-
Cat dinding dengan Vinilex
1
Cat setara Vinilex
0.2800
kg
16.500.00
4.620.00
2
Roll cat + bak
0.0100
bh
16.300.00
163.00
3
Plamur / dempul tembok
0.1600
kg
12.380.00
1.980.80
4
Ampelas
0.5000
lbr
2.600.00
1.300.00
5
Tukang cat
0.2950
hr
65.000.00
19.175.00
6
Mandor
0.0250
hr
80.000.00
2.000.00
1 m2
-
JUMLAH
29.238.80
DIBULATKAN
29.238.00
Cat dinding dengan Metrolith
1
Cat setara Metrolith
0.2800
kg
12.900.00
3.612.00
2
Roll cat + bak
0.0100
bh
16.300.00
163.00
3
Plamur / dempul tembok
0.1600
kg
12.380.00
1.980.80
4
Ampelas
0.5000
lbr
2.600.00
1.300.00
5
Tukang cat
0.2950
hr
65.000.00
19.175.00
6
Mandor
0.0250
hr
80.000.00
2.000.00
1 m2
-
JUMLAH
28.230.80
DIBULATKAN
28.230.00
Cat plafond setara ICI
1
Cat setara ICI
0.3000
kg
29.300.00
8.790.00
2
Roll cat + bak
0.0500
bh
16.300.00
815.00
3
Plamur / dempul tembok
0.0450
kg
12.380.00
557.10
4
Ampelas
0.2000
lbr
2.600.00
520.00
5
Tukang cat
0.3150
hr
65.000.00
20.475.00
6
Mandor
0.0250
hr
80.000.00
2.000.00
1 m2
-
JUMLAH
33.157.10
DIBULATKAN
33.157.00
Cat plafond setara Jotun
1
Cat setara jotun
0.3000
kg
19.900.00
5.970.00
2
Roll cat + bak
0.0500
bh
16.300.00
815.00
3
Plamur / dempul tembok
0.0450
kg
12.380.00
557.10
4
Ampelas
0.2000
lbr
2.600.00
520.00
5
Tukang cat
0.3150
hr
65.000.00
20.475.00
6
Mandor
1 m2
-
0.0250
hr
80.000.00
2.000.00
JUMLAH
30.337.10
DIBULATKAN
30.337.00
Cat besi memakai kuas
1
Cat besi / kayu setara F - Talit
0.2000
kg
38.700.00
7.740.00
2
Kuas 3"
0.0500
bh
12.920.00
646.00
3
Minyak cat / thiner
0.1500
lt
12.540.00
1.881.00
4
Meni besi
0.1675
kg
19.760.00
3.309.80
5
Ampelas
0.4000
lbr
4.560.00
1.824.00
6
Tukang cat
0.3150
hr
65.000.00
20.475.00
7
Mandor
0.0250
hr
80.000.00
2.000.00
1 m2
-
JUMLAH
37.875.80
DIBULATKAN
37.875.00
Cat kayu memakai kuas
1
Cat besi / kayu setara F - Talit
0.2000
kg
38.700.00
7.740.00
2
Kuas 3"
0.0500
bh
12.920.00
646.00
3
Plamir kayu
0.0630
kg
12.380.00
779.94
4
Meni kayu
0.1670
kg
20.140.00
3.363.38
5
Ampelas
0.4000
lbr
2.600.00
1.040.00
6
Minyak cat / thiner
0.1500
lt
12.540.00
1.881.00
7
Tukang cat
0.3150
hr
65.000.00
20.475.00
8
Mandor
0.0250
hr
80.000.00
2.000.00
JUMLAH
37.925.32
DIBULATKAN
37.925.00
PEKERJAAN SANITER 1 unit
-
Closet jongkok standar
1
Pasir pasang
0.1500
m3
144.410.00
21.661.50
2
Semen PC ( 50 kg )
0.1000
zak
54.000.00
5.400.00
3
Closet jongkok standar
1.0000
bh
222.390.00
222.390.00
4
Pekerja
0.3000
hr
55.000.00
16.500.00
5
Tukang batu
0.2500
hr
55.000.00
13.750.00
6
Mandor
0.1800
hr
70.000.00
12.600.00
1 unit
-
JUMLAH
292.301.50
DIBULATKAN
292.301.00
Bak air fiber glass kap. 200 ltr
1
Pasir pasang
0.1500
m3
144.410.00
21.661.50
2
Semen PC ( 50 kg )
0.1000
zak
54.000.00
5.400.00
3
Bak air fiber glass kap. 200 ltr
1.0000
bh
248.540.00
248.540.00
4
Pekerja
0.3000
hr
55.000.00
16.500.00
5
Tukang batu
0.2500
hr
55.000.00
13.750.00
6
Mandor
0.1800
hr
70.000.00
12.600.00
1 bh
-
JUMLAH
318.451.50
DIBULATKAN
318.451.00
Floor drain
1
Floor drain kuningan
1.0000
bh
25.460.00
25.460.00
2
Pekerja
0.0100
hr
55.000.00
550.00
3
Tukang batu
0.1000
hr
55.000.00
5.500.00
4
Mandor
0.0050
hr
70.000.00
350.00
1 bh
-
JUMLAH
31.860.00
DIBULATKAN
31.860.00
Kran air 1/2"
1
Kran air 1/2 ex toto
1.0000
bh
91.960.00
91.960.00
2
Seal tape
0.0250
roll
2.280.00
57.00
3
Lem pipa PVC
0.1250
tube
6.840.00
855.00
4
Pekerja
0.0100
hr
55.000.00
550.00
5
Tukang batu
0.1000
hr
55.000.00
5.500.00
6
Mandor
0.0050
hr
70.000.00
350.00
1 unit
-
JUMLAH
99.272.00
DIBULATKAN
99.272.00
Pompa air jet pump + Instalasi dan pengeboran
1
Pompa air jet pump
1.0000
bh
2.299.200.00
2.299.200.00
2
Pipa PVC 1 "
40.0000
m'
5.850.00
234.000.00
3
Pipa PVC 4 "
16.0000
m'
34.480.00
551.680.00
4
Bocht LL-D 1" (lokal)
6.0000
bh
20.980.00
125.880.00
5
Water moer
2.0000
bh
50.580.00
101.160.00
6
Ongkos pengeboran
1.0000
ls
1.200.000.00
1.200.000.00
1 unit
-
JUMLAH
4.511.920.00
DIBULATKAN
4.511.920.00
Water tower rangka besi siku
1
Konstruksi besi siku
175.0000
kg
16.522.00
2.891.350.00
2
Pondasi beton tapak K. 175
0.7665
m3
820.907.00
629.225.22
3
Pekerja
2.5000
hr
55.000.00
137.500.00
4
Tukang besi
3.0000
hr
55.000.00
165.000.00
5
Tukang batu
3.0000
hr
55.000.00
165.000.00
6
Mandor
0.3000
hr
70.000.00
21.000.00
1 bh
-
JUMLAH
4.009.075.22
DIBULATKAN
4.009.075.00
Tangki air kapasitas 1 m3
1
Tangki air kapasitas 1 m3
1.0000
bh
1.320.990.00
1.320.990.00
2
Pekerja
0.1000
hr
55.000.00
5.500.00
3
Tukang batu
0.2500
hr
55.000.00
13.750.00
4
Mandor
0.0250
hr
70.000.00
1.750.00
1 unit
-
JUMLAH
1.341.990.00
DIBULATKAN
1.341.990.00
Septictank & Rembesan + Instalasi
1
Pas batu bata, t = 1/2 bata ad 1 : 2
12.5000
m2
86.300.00
1.078.750.00
2
Pasir urug unt rembesan
0.3000
m3
100.000.00
30.000.00
3
Koral beton unt. rembesan
1.5080
m3
133.800.00
201.770.40
4
Plesteran dan acian trasraam ad. 1 : 3
11.3400
m2
40.768.00
462.309.12
5
Plat beton penutup t = 12 cm (beton site mix K. 17
0.3600
m3
820.907.00
295.526.52
6
Besi beton polos
47.4000
kg
12.228.00
579.607.20
7
Pipa PVC 1 "
0.5000
m'
5.850.00
2.925.00
8
Pipa porous 4 "
3.0000
m'
34.480.00
103.440.00
9
Ijuk
30.0000
ikt
6.840.00
205.200.00
10
Pekerja
2.5000
hr
55.000.00
137.500.00
11
Tukang batu
3.0000
hr
55.000.00
165.000.00
12
Mandor
0.0500
hr
70.000.00
3.500.00
JUMLAH
3.265.528.24
DIBULATKAN
3.265.528.00
PEKERJAAN ASESORIS 1 bh
-
Pasang Engsel pintu nilon 4"
1
Engsel nilon 4"
1.0000
bh
28.040.00
28.040.00
2
Pekerja
0.0150
hr
55.000.00
825.00
3
Tukang kayu
0.1500
hr
55.000.00
8.250.00
4
Mandor
0.0075
hr
70.000.00
525.00
1 bh
-
JUMLAH
37.640.00
DIBULATKAN
37.640.00
Pasang Engsel jendela
1
Engsel nilon 3"
1.0000
bh
25.080.00
25.080.00
2
Pekerja
0.0100
hr
55.000.00
550.00
3
Tukang kayu
0.1000
hr
55.000.00
5.500.00
4
Mandor
0.0050
hr
70.000.00
350.00
1 bh
-
JUMLAH
31.480.00
DIBULATKAN
31.480.00
Pasang hak angin
1
Hak angin
1.0000
bh
11.170.00
11.170.00
2
Pekerja
0.0100
hr
55.000.00
550.00
3
Tukang kayu
0.1000
hr
55.000.00
5.500.00
4
Mandor
0.0050
hr
70.000.00
350.00
1 bh
-
JUMLAH
17.570.00
DIBULATKAN
17.570.00
Pasang slot jendela
1
Slot jendela
1.0000
bh
17.480.00
17.480.00
2
Pekerja
0.0100
hr
55.000.00
550.00
3
Tukang kayu
0.1000
hr
55.000.00
5.500.00
4
Mandor
0.0050
hr
70.000.00
350.00
1 bh
-
JUMLAH
23.880.00
DIBULATKAN
23.880.00
Pasang kunci double slaag (SOLID)
1
Kunci double slaag (SOLID)
1.0000
bh
202.630.00
202.630.00
2
Pekerja
0.0500
hr
55.000.00
2.750.00
3
Tukang kayu
0.2500
hr
55.000.00
13.750.00
4
Mandor
0.0100
hr
70.000.00
700.00
1 Titik
-
JUMLAH
219.830.00
DIBULATKAN
219.830.00
Instalasi Lampu (kabel NYM 3x2,5 mm)
1
Kabel NYM 3x2.5 mm
5.0000
m
11.020.00
55.100.00
2
Klem kabel
1.0000
dus
2.410.00
2.410.00
3
Pipa PVC AW 1/2"
2.0000
m
5.850.00
11.700.00
4
Pembantu Instalator
0.3715
hr
56.000.00
20.804.00
5
Instalator
0.1050
hr
64.000.00
6.720.00
6
Mandor
0.0050
hr
70.000.00
350.00
1 Titik
-
JUMLAH
97.084.00
DIBULATKAN
97.084.00
Instalasi Saklar/Stop Kontak (kabel NYM 3x2,5 mm)
1
Kabel NYM 3x2.5 mm
5.0000
m
11.020.00
55.100.00
2
Klem kabel
1.0000
dus
2.410.00
2.410.00
3
Pipa PVC AW 1/2"
2.0000
m
5.850.00
11.700.00
4
Pembantu Instalator
0.3715
hr
56.000.00
20.804.00
5
Instalator
0.1050
hr
64.000.00
6.720.00
6
Mandor
0.0050
hr
70.000.00
350.00
1 Bh
-
JUMLAH
97.084.00
DIBULATKAN
97.084.00
Pasang Saklar Tunggal
1
Saklar tunggal
1.0000
bh
13.300.00
13.300.00
2
Pembantu Instalator
0.2500
hr
56.000.00
14.000.00
3
Instalator
0.1500
hr
64.000.00
9.600.00
4
Mandor
0.0050
hr
70.000.00
350.00
1 Bh
-
JUMLAH
37.250.00
DIBULATKAN
37.250.00
Pasang Saklar Ganda
1
Saklar ganda
1.0000
bh
16.990.00
16.990.00
2
Pembantu Instalator
0.2500
hr
56.000.00
14.000.00
3
Instalator
0.1500
hr
64.000.00
9.600.00
4
Mandor
0.0050
hr
70.000.00
350.00
1 Bh
-
JUMLAH
40.940.00
DIBULATKAN
40.940.00
Pasang Stop Kontak
1
Stop Kontak
1.0000
bh
14.060.00
14.060.00
2
Pembantu Instalator
0.2500
hr
56.000.00
14.000.00
3
Instalator
0.1500
hr
64.000.00
9.600.00
4
Mandor
0.0050
hr
70.000.00
350.00
1 Bh
-
JUMLAH
38.010.00
DIBULATKAN
38.010.00
Lampu TL 2 x 18 watt setara philips (inbouw) termasuk bahan komplit
1
Lampu TL 2 x 18 watt, armatur, komplit philips
1.0000
bh
136.810.00
136.810.00
2
Pekerja
0.3132
hr
48.000.00
15.033.60
3
Tukang listrik
0.1045
hr
64.000.00
6.688.00
4
Mandor
0.0050
hr
70.000.00
350.00
5
Alat bantu
0.3000
set
700.00
210.00
1 Bh
-
JUMLAH
159.091.60
DIBULATKAN
159.091.00
Lampu SL 18 watt setara philips (inbouw) termasuk bahan komplit
1
Lampu SL 18 watt, komplit philips
1.0000
bh
36.570.00
36.570.00
2
Fitting keramik
1.0000
bh
23.240.00
23.240.00
3
Pekerja
0.3132
hr
48.000.00
15.033.60
4
Tukang listrik
0.1045
hr
64.000.00
6.688.00
5
Mandor
0.0050
hr
70.000.00
350.00
6
Alat bantu
0.3000
set
700.00
210.00
PEKERJAAN SARANA LUAR 1 m'
-
Saluran buis beton 1/2 dia. 20 cm
JUMLAH
82.091.60
DIBULATKAN
82.091.00
1
Buis beton 1/2 dia. 20 cm
1.0250
m'
28.350.00
29.058.75
2
Pasir urug
0.1200
m3
100.000.00
12.000.00
3
Pasir pasang
0.0540
m3
144.410.00
7.798.14
4
Semen PC ( 50 kg )
0.0270
zak
54.000.00
1.458.00
5
Pekerja
0.0750
hr
48.000.00
3.600.00
6
Tukang batu
0.0500
hr
52.000.00
2.600.00
7
Mandor
0.0125
hr
70.000.00
875.00
1 m2
-
JUMLAH
57.389.89
DIBULATKAN
57.389.00
Paving block t = 6 cm
1
Paving block t = 6 cm K.250
1.0250
m2
43.000.00
44.075.00
2
Pasir pasang
0.0250
m3
144.410.00
3.610.25
3
Pekerja
0.1500
hr
48.000.00
7.200.00
4
Tukang batu
0.0500
hr
52.000.00
2.600.00
5
Mandor
0.0030
hr
70.000.00
210.00
1 m2
-
JUMLAH
57.695.25
DIBULATKAN
57.695.00
Paving block t = 8 cm
1
Paving block t = 8 cm K.250
1.0250
m2
49.800.00
51.045.00
2
Pasir beton
0.0250
m3
144.410.00
3.610.25
3
Pekerja
0.1500
hr
48.000.00
7.200.00
4
Tukang batu
0.0500
hr
52.000.00
2.600.00
5
Mandor
0.0030
hr
70.000.00
210.00
1 m'
-
JUMLAH
64.665.25
DIBULATKAN
64.665.00
Kanstin abu - abu 10.20.40 - K.175
1
Kanstin abu - abu 10.20.40 - K.175
1.0000
m2
26.400.00
26.400.00
2
Adukan
0.0100
m3
606.095.00
6.060.95
3
Pekerja
0.0500
hr
48.000.00
2.400.00
4
Tukang batu
0.0175
hr
52.000.00
910.00
5
Mandor
0.00875
hr
70.000.00
612.50
1 m'
-
JUMLAH
36.383.45
DIBULATKAN
36.383.00
Pagar beton precat t = 2.00 m
1
Galian tanah pondasi
0.1200
m3
43.420.00
5.210.40
2
Pasir beton
0.0150
m3
144.410.00
2.166.15
3
Batu pecah 3/4
0.0290
m3
164.000.00
4.756.00
4
Semen
0.2250
zak
54.000.00
12.150.00
5
Tinggi pagar 5 panel/ 2 m, panjang kolom 3 m, mu
1.0000
m
167.970.00
167.970.00
6
Pekerja
0.6000
hr
48.000.00
28.800.00
7
Tukang batu
0.3500
hr
52.000.00
18.200.00
8
Mandor
0.0350
hr
70.000.00
2.450.00
1 m'
-
JUMLAH
241.702.55
DIBULATKAN
241.702.00
Pagar beton precat t = 2.40 m
1
Galian tanah pondasi
0.1200
m3
43.420.00
5.210.40
2
Pasir beton
0.0150
m3
144.410.00
2.166.15
3
Batu pecah 3/4
0.0290
m3
164.000.00
4.756.00
4
Semen
0.2250
zak
54.000.00
12.150.00
5
Tinggi pagar 6 panel/ 2.4 m, pjang kolom 3.5 m, m
1.0000
m
197.610.00
197.610.00
6
Pekerja
0.6000
hr
48.000.00
28.800.00
7
Tukang batu
0.3500
hr
52.000.00
18.200.00
8
Mandor
0.0350
hr
70.000.00
2.450.00
1 m'
-
JUMLAH
271.342.55
DIBULATKAN
271.342.00
Pas.Pagar Tralis Besi
1
Galian Tanah Pondasi
0.1000
m3
43.420.00
4.342.00
2
Urugan Tanah Kembali
0.0250
m3
17.620.00
440.50
3
Pas. Batu Kali 1 : 5
0.1875
m3
529.170.00
99.219.38
4
Sloof beton 15/20 K.175
0.0300
m3
3.820.009.00
114.600.27
5
Kolom beton 25/25 K.225
0.0354
m3
3.263.329.00
115.576.24
6
Kepala pagar dengan beton K.225
0.0167
m3
3.263.329.00
54.388.82
7
Pas.Batu bata 1 : 5
0.5000
m2
83.889.00
41.944.50
8
Plester + Acian
1.5200
m2
37.529.00
57.044.08
9
Pas. Batu Tempel
1.0000
m2
133.424.00
133.424.00
10
Pengecetan Kolom
1.5200
m2
32.822.00
49.889.44
11
Besi Beton Polos dia..16
9.8000
kg
12.228.00
119.834.40
12
Besi Beton Polos dia..10
2.2200
kg
12.228.00
27.146.16
13
Besi siku L.40.40.4
4.8333
kg
11.400.00
55.100.00
14
Tombak Beton
7.0000
bh
5.700.00
39.900.00
15
Pengelasan & Pengecetan
1.0000
ls
44.000.00
44.000.00
16
Ongkos pasang Pagar Besi
1.0000
ls
8.000.00
8.000.00
1 m'
-
JUMLAH
964.849.78
DIBULATKAN
964.849.00
Pas.Pintu Pagar Tralis Besi
1
Besi Beton Polos dia..16
18.0000
kg
12.228.00
220.104.00
2
Besi Beton Polos dia..10
4.9950
kg
12.228.00
61.078.86
3
Besi Galvanis dia. 2"
4.5000
m1
45.600.00
205.200.00
4
Tombak Beton
54.0000
bh
5.700.00
307.800.00
5
Pengelasan & Pengecetan
1.0000
ls
44.000.00
44.000.00
6
Roda Pagar
0.7500
bh
11.400.00
8.550.00
7
Kunci Pagar
0.2500
bh
38.000.00
9.500.00
8
Rel Besi
1.3000
kg
7.600.00
9.880.00
9
Ongkos pasang Pagar Besi
1.0000
ls
8.000.00
8.000.00
1 m'
-
JUMLAH
874.112.86
DIBULATKAN
874.112.00
Ralling Tangga Kayu
1
Catur kayu kamper
4.0000
bh
38.000.00
152.000.00
2
Hand Ralling
1.1000
m'
22.990.00
25.289.00
3
Melamin
0.2000
m2
6.680.00
1.336.00
4
Dyna Bolt
6.0000
bh
4.180.00
25.080.00
5
Pekerja
0.3550
hr
48.000.00
17.040.00
6
Tukang
0.8875
hr
52.000.00
46.150.00
7
Mandor
0.0533
hr
70.000.00
3.727.50
8
Alat bantu
1.0000
set
700.00
700.00
JUMLAH
271.322.50
DIBULATKAN
271.322.00
PEKERJAAN PARTISI 1 M2 Rangka partisi besi hollow, modul 60X60 CM 1
Hollow 40X40X0,7 mm
1.1000
btg
17.100.00
18.810.00
2
Paku Riffet
6.0000
bj
1.000.00
6.000.00
3
Tukang
0.2260
org/hr
48.000.00
10.848.00
4
Pekerja
0.2160
org/hr
52.000.00
11.232.00
5
Mandor
0.0250
org/hr
70.000.00
1.750.00
JUMLAH
48.640.00
DIBULATKAN
48.600.00
1 M2 Partisi gypsumboard 9 MM 1
Gypsumboard 9 mm
0.4320
lbr
40.280.00
17.400.96
2
Drywall Screw
0.0400
dos
57.000.00
2.280.00
3
Cornice Adhesive
0.0340
zak
64.600.00
2.196.40
4
Catton Tape
0.0520
roll
10.030.00
521.56
5
Tukang
0.1220
org/hr
48.000.00
5.856.00
6
Pekerja
0.1080
org/hr
52.000.00
5.616.00
7
Mandor
0.0250
org/hr
70.000.00
1.750.00
JUMLAH
35.620.92
DIBULATKAN
35.600.00
1 M2 Mengerjakan dinding kisi-kisi / sunshading besi hollow 1
Besi holllow 40X40x1,8 mm
0.5000
btg
60.800.00
30.400.00
2
Besi holllow 40X20x1,8 mm
4.0000
btg
41.800.00
167.200.00
3
Aksesories dan perlengkapan
0.2500
hrg
51.300.00
12.825.00
4
Upah potong besi
1.0000
m2
4.000.00
4.000.00
5
Upah las dan pasang
1.0000
m2
4.000.00
4.000.00
JUMLAH
218.425.00
DIBULATKAN
218.400.00
Mengerjakan dinding partisi type - PR1 1
Rangka hollow 4/4
2.0720
m2
48.600.00
100.699.20
2
Gypsumboard 9 mm
4.1440
m2
45.000.00
186.480.00
3
Papan kayu 3X10 cm
1.4800
m'
19.000.00
28.120.00
4
List profil kayu 2X4 cm
2.9600
m'
12.160.00
35.993.60
5
Plint kayu 1,5/10
5.9200
m'
17.100.00
101.232.00
6
Paku
0.1000
kg
13.680.00
1.368.00
JUMLAH
453.892.80
DIBULATKAN
453.800.00
Mengerjakan dinding partisi type - PR2 1
Rangka hollow 4/4
3.4300
m2
48.600.00
166.698.00
2
Gypsumboard 9 mm
6.8600
m2
45.000.00
308.700.00
3
Papan kayu 3X10 cm
2.4500
m'
19.000.00
46.550.00
4
List profil kayu 2X4 cm
4.9000
m'
12.160.00
59.584.00
5
Plint kayu 1,5/10
9.8000
m'
17.100.00
167.580.00
6
Paku
0.1500
kg
13.680.00
2.052.00
JUMLAH
751.164.00
DIBULATKAN
751.100.00
Mengerjakan dinding partisi type - PR3 1
Rangka hollow 4/4
6.6920
m2
48.600.00
325.231.20
2
Gypsumboard 9 mm
13.3840
m2
45.000.00
602.280.00
3
Papan kayu 3X10 cm
4.7800
m'
19.000.00
90.820.00
4
List profil kayu 2X4 cm
9.5600
m'
12.160.00
116.249.60
5
Plint kayu 1,5/10
19.1200
m'
17.100.00
326.952.00
6
Paku
kg
13.680.00
3.420.00
0.2500
JUMLAH
1.464.952.80
DIBULATKAN
1.464.900.00
`
Mengerjakan dinding partisi type - PR4
1
Rangka hollow 4/4
4.4800
m2
48.600.00
217.728.00
2
Gypsumboard 9 mm
8.9600
m2
45.000.00
403.200.00
3
Papan kayu 3X10 cm
3.2000
m'
19.000.00
60.800.00
4
List profil kayu 2X4 cm
6.4000
m'
12.160.00
77.824.00
5
Plint kayu 1,5/10
12.8000
m'
17.100.00
218.880.00
6
Paku
kg
13.680.00
2.736.00
0.2000
JUMLAH
981.168.00
DIBULATKAN
981.100.00
`
Mengerjakan dinding partisi type - PR5
1
Rangka hollow 4/4
3.2620
m2
48.600.00
158.533.20
2
Gypsumboard 9 mm
6.5240
m2
45.000.00
293.580.00
3
Papan kayu 3X10 cm
2.3300
m'
19.000.00
44.270.00
4
List profil kayu 2X4 cm
4.6600
m'
12.160.00
56.665.60
5
Plint kayu 1,5/10
9.3200
m'
17.100.00
159.372.00
6
Paku
0.1500
kg
13.680.00
2.052.00
JUMLAH
714.472.80
DIBULATKAN
714.400.00
`
Mengerjakan dinding partisi type - PR6
1
Rangka hollow 4/4
5.1520
m2
48.600.00
250.387.20
2
Gypsumboard 9 mm
10.3040
m2
45.000.00
463.680.00
3
Papan kayu 3X10 cm
3.6800
m'
19.000.00
69.920.00
4
List profil kayu 2X4 cm
7.3600
m'
12.160.00
89.497.60
5
Plint kayu 1,5/10
14.7200
m'
17.100.00
251.712.00
6
Paku
kg
13.680.00
2.736.00
0.2000
JUMLAH
1.127.932.80
DIBULATKAN
1.127.900.00
`
Mengerjakan dinding partisi type - PR7 / PR7a
1
Rangka hollow 4/4
3.5420
m2
48.600.00
172.141.20
2
Gypsumboard 9 mm
7.0840
m2
45.000.00
318.780.00
3
Papan kayu 3X10 cm
2.5300
m'
19.000.00
48.070.00
4
List profil kayu 2X4 cm
5.0600
m'
12.160.00
61.529.60
5
Plint kayu 1,5/10
10.1200
m'
17.100.00
173.052.00
6
Paku
kg
13.680.00
2.052.00
0.1500
JUMLAH
775.624.80
DIBULATKAN
775.600.00
`
Mengerjakan dinding partisi type - PR8
1
Rangka hollow 4/4
10.9760
m2
48.600.00
533.433.60
2
Gypsumboard 9 mm
21.9520
m2
45.000.00
987.840.00
3
Plint kayu 1,5/10
6.8600
m'
17.100.00
117.306.00
4
Paku
0.3000
kg
13.680.00
4.104.00
JUMLAH
1.642.683.60
DIBULATKAN
1.642.600.00
`
Mengerjakan dinding partisi type - PR9
1
Rangka hollow 4/4
4.3520
m2
48.600.00
211.507.20
2
Gypsumboard 9 mm
8.7040
m2
45.000.00
391.680.00
3
Plint kayu 1,5/10
2.7200
m'
17.100.00
46.512.00
4
Paku
0.2000
kg
13.680.00
2.736.00
JUMLAH
652.435.20
DIBULATKAN
652.400.00
1 UNIT PK
No
Uraian
1
Pintu Kaca+kaca Frameless Tempered 12mm
2
Vol
Sat
Harga
Jumlah Harga
8.30
m2
850.000.00
7.055.000.00
Floor Hings, Ex. Dexon
2.00
Set
2.150.000.00
4.300.000.00
3
Pasang Fitch Fitting Komplit, Ex. Dexon
1.00
Set
2.350.000.00
2.350.000.00
4
Handle Stainless
2.00
Psg
350.000.00
700.000.00
5
pasang "u" aluminium
18.64
m1
60.000.00
1.118.400.00
6
Upah kerja + pasang
1.00
Unit
750.000.00
750.000.00
Jumlah
16.273.400.00
Dibulatkan
16.273.400.00
1 UNIT P1
1
Kusen kayu kamper samarinda
0.04
m3
8.475.359.00
375.034.64
2
Daun pintu panel kayu samarinda
1.71
m2
476.115.00
814.156.65
3
Pas. Double Multipleks 6 mm + Teakwood
0.20
m2
382.988.00
76.597.60
4
Pasang Engsel pintu nilon 4"
3.00
Bh
28.040.00
84.120.00
5
Pasang kunci standar (SOLID)
1.00
Bh
202.630.00
202.630.00
6
Handle Stailess Steel (Decksen)
2.00
Bh
275.000.00
550.000.00
7
Kaca Es 5mm
0.17
m2
144.030.00
24.485.10
Jumlah
2.127.023.99
Dibulatkan
2.127.000.00
1 UNIT P2
1
Kusen kayu kamper samarinda
0.04
m3
8.475.359.00
375.034.64
2
Daun pintu panel kayu samarinda
1.50
m2
476.115.00
714.172.50
3
Pas. Double Multipleks 6 mm + Teakwood
0.20
m2
382.988.00
76.597.60
4
Pasang Engsel pintu nilon 4"
3.00
Bh
28.040.00
84.120.00
5
Pasang kunci standar (SOLID)
1.00
Bh
202.630.00
202.630.00
6
Handle Stailess Steel (Decksen)
2.00
Bh
275.000.00
550.000.00
7
Kaca Es 5mm
0.17
m2
144.030.00
24.485.10
Jumlah
2.027.039.84
Dibulatkan
2.027.000.00
1 UNIT P6
1
Kusen kayu kamper samarinda
0.10
m3
8.475.359.00
847.535.90
2
Daun pintu panel kayu samarinda
1.71
m2
476.115.00
814.156.65
3
Pas. Double Multipleks 6 mm + Teakwood
0.75
m2
382.988.00
287.241.00
4
Pasang Engsel pintu nilon 4"
3.00
Bh
28.040.00
84.120.00
5
Pasang Engsel jendela nilon 3"
-
Bh
6
Handle Stailess Steel (Decksen)
2.00
Bh
6
GRENDEL TANAM
7
Kaca Es 5mm
1.65
25.080.00
set m2
275.000.00 44.230.00
144.030.00
550.000.00 237.649.50
Jumlah
2.820.703.05
Dibulatkan
2.820.700.00
1 UNIT P4
1
Pintu PVC
1.00
Bh
266.020.00
266.020.00
2
Upah Pasang
1.51
m2
13.301.00
20.084.51
Jumlah
286.104.51
Dibulatkan
286.100.00
1 UNIT P3
1
Kusen kayu kamper samarinda
0.03
m3
8.475.359.00
286.043.37
2
Daun pintu panel kayu samarinda
1.30
m2
476.115.00
618.949.50
3
Pas. Double Multipleks 6 mm + Teakwood
4
Pasang Engsel pintu nilon 4"
5
Pasang Engsel jendela nilon 3"
-
Bh
6
Pasang kunci standar (SOLID)
1.00
Ps
202.630.00
202.630.00
7
Handle Stailess Steel (Decksen)
2.00
Bh
275.000.00
550.000.00
8
Kaca Es 5mm
0.12
m2
144.030.00
17.283.60
3.00
m2 Bh
382.988.00
28.040.00 25.080.00
84.120.00 -
Jumlah
1.759.026.47
Dibulatkan
1.759.000.00
1 UNIT JENDELA J2
1
Kusen Alumunium warna ukuran 4" x 1 3/4"
13.00
m'
88.540.00
1.151.020.00
2
Pasangan kaca polos, t= 8 mm
3.60
m2
109.440.00
393.984.00
3
Fisher
12.00
bh
500.00
6.000.00
4
Upah potong kaca
3.60
m2
5.000.00
18.000.00
5
Upah pasang + aksesories
1.00
Unit
75.000.00
75.000.00
Jumlah
1.644.004.00
Dibulatkan
1.644.000.00
1 UNIT JENDELA J5
1
Kusen Alumunium warna ukuran 4" x 1 3/4"
5.40
m'
88.540.00
478.116.00
2
Pasangan kaca polos, t= 5 mm
0.98
m2
102.600.00
100.548.00
3
Fisher
6.00
bh
500.00
3.000.00
4
Upah potong kaca
0.98
m2
5.000.00
4.900.00
5
Upah pasang + aksesories
1.00
Unit
75.000.00
75.000.00
Jumlah
661.564.00
Dibulatkan
661.500.00
1 UNIT JENDELA J1
1
Kusen Alumunium warna ukuran 4" x 1 3/4"
4.40
m'
88.540.00
389.576.00
2
Bingkai jendela aluminium
4.00
m'
109.520.00
438.080.00
3
Pasangan kaca polos, t= 5 mm
0.65
m2
102.600.00
66.690.00
4
Engsel jendela casemen 16"
1.00
set
39.520.00
39.520.00
5
Karet dan silent
4.00
m'
1.920.00
7.680.00
6
Fisher
4.00
bh
500.00
2.000.00
7
ramp buncis
1.00
bh
15.000.00
15.000.00
8
Upah potong kaca
0.65
m2
5.000.00
3.250.00
9
Upah pasang + aksesories
1.00
Unit
75.000.00
75.000.00
Jumlah
1.036.796.00
Dibulatkan
1.036.700.00
1 UNIT JENDELA J6/J6a
1
Kusen Alumunium warna ukuran 4" x 1 3/4"
9.10
m'
88.540.00
805.714.00
2
Pasangan kaca polos, t= 8 mm
2.88
m2
109.440.00
315.187.20
3
Fisher
10.00
bh
500.00
5.000.00
4
Upah potong kaca
2.25
m2
5.000.00
11.250.00