ANALISA HARGA SATUAN PEKERJAAN MAKASAR Kota
:
Makasar
No.
URAIAN
I
PEKERJAAN PERSIAPAN 1 M¹ PAGAR SENG GELOMBANG TINGGI : 2 M a Tiang kayu borneo 4/6 b Semen PC (abu-abu) c Seng gelombang d Pasir beton e Split (batu pecah) f Balok kayu borneo 4/6 g Paku 5 - 10 cm h Meni Besi i Tukang kayu j Pembantu tukang
1
KOEFISIEN SAT HARGA SATUAN
0.05 0.05 1.20 0.01 0.01 0.05 0.06 0.45 0.20 0.10
m3 sak sak m3 m3 m3 kg kg org org
3,600,000.00 42,000.00 53,800.00 72,000.00 210,000.00 3,600,000.00 14,700.00 20,000.00 55,000.00 40,000.00
180,000.00 2,100.00 64,560.00 360.00 1,890.00 180,000.00 882.00 9,000.00 11,000.00 4,000.00 453,792.00 453,790.00
3,600,000.00 42,000.00 166,000.00 72,000.00 210,000.00 14,700.00 55,000.00 40,000.00
180,000.00 1,680.00 415,000.00 360.00 1,890.00 882.00 11,000.00 12,000.00 622,812.00
Jumlah Dibulatkan 2
1 M¹ PAGAR KAWAT BERDURI TINGGI : 1,8 M a Tiang kayu borneo 4/6 b Semen PC (abu-abu) c Kawat Duri d Pasir beton e Split (batu pecah) f Paku 5 - 10 cm g Tukang kayu h Pembantu tukang Jumlah
0.05 0.04 2.50 0.01 0.01 0.06 0.20 0.30
m3 sak kg m3 m3 kg org org
JUMLAH (RP)
3
4
Dibulatkan 1 M1 PENGUKURAN & PEMASANGAN BOWPLANK a Kayu kaso 5/7 borneo b Paku 5 - 10 cm c Papan papan kayu terentang 2/20 d Tukang kayu e Pembantu tukang Jumlah Dibulatkan 1 M2 PEMBUATAN KANTOR DIREKSI a Kayu kaso 5/7 borneo b Papan kayu terentang c Paku semua ukuran d Besi strip e Semen PC (abu-abu) f Pasir pasang g Pasir beton h Split (batu pecah) i Bata merah j Seng gelombang 180 x 90 x 0,05 cm k Seng Plat BJLS 32 l Kawat harmonika m Kaca polos 3 mm n Kunci tanam standart o Triplek 120 x 240 x 0,4 cm p Tukang kayu q Tukang batu r Pembantu tukang Jumlah Dibulatkan
622,810.00 0.02 0.02 0.10 0.10
m3 kg m3 org org
3,600,000.00 14,700.00 1,220,000.00 55,000.00 40,000.00
72,000.00 294.00 4,880.00 5,500.00 4,000.00 86,674.00 86,670.00
0.02 0.18 0.85 1.10 35.00 0.15 0.10 0.15 30.00 1.20 1.00 2.00 0.08 0.15 0.06 2.00 1.00 2.00
m3 m3 kg kg kg m3 m3 m3 bh lbr m2 m2 m2 bh lbr org org org
3,600,000.00 1,220,000.00 14,700.00 17,500.00 42,000.00 68,000.00 72,000.00 210,000.00 600.00 60,600.00 33,000.00 22,000.00 63,000.00 55,000.00 51,000.00 55,000.00 55,000.00 40,000.00
72,000.00 219,600.00 12,495.00 19,250.00 1,470,000.00 10,200.00 7,200.00 31,500.00 18,000.00 72,720.00 33,000.00 44,000.00 5,040.00 8,250.00 3,060.00 110,000.00 55,000.00 80,000.00 2,271,315.00 2,271,310.00
5
6
7
8
9
1 M2 PEMBUATAN GUDANG PROYEK a Kayu kaso 5/7 borneo b Papan kayu terentang c Paku d Semen PC (abu-abu) e Pasir beton f Split (batu pecah) g Seng gelombang 180 x 90 x 0,05 cm h Tukang kayu i Pembantu tukang Jumlah Dibulatkan 1 M2 MEMBERSIHKAN LOKASI ROYEK a Pembantu tukang Jumlah Dibulatkan 1 M2 MEMBERSIHKAN PUING-PUING a Pembantu tukang Jumlah Dibulatkan 1 BH MEMBERSIHKAN TUNGGUL TANAMAN a Pembantu tukang Jumlah Dibulatkan 1M2 PEMBUATAN JALAN MASUK PROYEK a Batu belah 15/20 b Koral 5/7 ( sirtu ) c Pasir urug d Pembantu tukang Jumlah
0.02 0.10 0.30 0.21 0.03 0.05 1.20 1.00 1.00
m3 m3 kg sak m3 m3 lbr org org
3,600,000.00 1,220,000.00 14,700.00 42,000.00 72,000.00 210,000.00 60,600.00 55,000.00 40,000.00
72,000.00 122,000.00 4,410.00 8,820.00 2,160.00 10,500.00 72,720.00 55,000.00 40,000.00 387,610.00 387,610.00
0.10
org
40,000.00
4,000.00 4,000.00 4,000.00
0.20
org
40,000.00
8,000.00 8,000.00 8,000.00
2.00
org
40,000.00
80,000.00 80,000.00 80,000.00
0.10 0.05 0.01 1.00
m3 m3 m3 org
72,000.00 122,000.00 66,000.00 40,000.00
7,200.00 6,100.00 660.00 40,000.00 53,960.00
10
11
12
II 1
2
Dibulatkan 1 M3 PEMBONGKARAN BETON a Pembantu tukang Jumlah Dibulatkan 1 M3 PEMBONGKARAN DINDING BATA a Pembantu tukang Jumlah Dibulatkan 1 M2 PEKERJAAN PAGAR PAPAN RANGKA BALOK a Papan kayu borneo b Balok kayu borneo 5/7 c Pasir beton d Split (batu pecah) e Semen abu - abu f Tukang kayu g Pembantu tukang Jumlah Dibulatkan
PEKERJAAN TANAH 1 M3 GALIAN TANAH SEDALAM 1 M a Pembantu tukang b Tukang gali Jumlah Dibulatkan 1 M3 GALIAN TANAH SEDALAM 2 M a Pembantu tukang
53,900.00 6.20
org
40,000.00
248,000.00 248,000.00 248,000.00
4.60
org
40,000.00
184,000.00 184,000.00 184,000.00
0.02 0.02 0.08 0.15 0.50 0.13 0.38
m3 m3 m3 m3 sak org org
4,000,000.00 3,600,000.00 72,000.00 210,000.00 42,000.00 55,000.00 40,000.00
80,000.00 72,000.00 5,760.00 31,500.00 21,000.00 7,150.00 15,200.00 232,610.00 232,600.00
0.40 0.02
org org
40,000.00 45,000.00
16,000.00 900.00 16,900.00 16,900.00
0.53
org
40,000.00
21,200.00
3
4
5
6
7
8
b Tukang gali 0.02 Jumlah Dibulatkan 1 M3 GALIAN TANAH SEDALAM 3 M a Pembantu tukang 0.74 b Tukang gali 0.02 Jumlah Dibulatkan 1 M3 GALIAN TANAH KERAS SEDALAM 1 M a Pembantu tukang 0.45 b Tukang gali 0.02 Jumlah Dibulatkan 1 M2 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM a Pembantu tukang 0.05 b Tukang gali 0.02 Jumlah Dibulatkan 1 M3 PEMBUANGAN TANAH SEJAUH 150 M a Pembantu tukang 0.42 b Tukang gali 0.02 Jumlah Dibulatkan 1 M3 URUGAN TANAH KEMBALI a Pembantu tukang 0.19 b Tukang gali 0.02 Jumlah Dibulatkan 1 M3 PEMADATAN TANAH a Pembantu tukang 0.50
org
45,000.00
900.00 22,100.00 22,100.00
org org
40,000.00 45,000.00
29,600.00 900.00 30,500.00 30,500.00
org org
40,000.00 45,000.00
18,000.00 900.00 18,900.00 18,900.00
org org
40,000.00 45,000.00
1,000.00 675.00 1,675.00 1,670.00
org org
40,000.00 45,000.00
16,800.00 900.00 17,700.00 17,700.00
org org
40,000.00 45,000.00
7,600.00 900.00 8,500.00 8,500.00
org
40,000.00
20,000.00
9
10
11
III 1
b Tukang gali Jumlah Dibulatkan 1 M3 URUGAN PASIR a Pasir urug b Pembantu tukang c Tukang gali Jumlah Dibulatkan 1 M3 URUGAN TANAH a Tanah urug b Pembantu tukang c Tukang gali Jumlah Dibulatkan 1 M3 URUGAN SIRTU a Sirtu ( koral ) b Pembantu tukang c Tukang gali Jumlah Dibulatkan
PEKERJAAN PONDASI 1 M3 PASANG PONDASI BT KALI , 1 Pc : 3 Ps a Batu belah b Semen PC (abu-abu) c Pasir pasang d Pembantu tukang
0.02
org
45,000.00
900.00 20,900.00 20,900.00
1.20 0.30 0.02
m3 org org
66,000.00 40,000.00 45,000.00
79,200.00 12,000.00 900.00 92,100.00 92,100.00
1.20 0.30 0.02
m3 org org
70,000.00 40,000.00 45,000.00
84,000.00 12,000.00 900.00 96,900.00 96,900.00
1.20 0.25 0.02
m3 org org
122,000.00 40,000.00 45,000.00
146,400.00 10,000.00 900.00 157,300.00 157,300.00
1.10 4.04 0.49 1.50
m3 sak m3 org
72,000.00 42,000.00 68,000.00 40,000.00
79,200.00 169,680.00 32,980.00 60,000.00
2
3
4
5
e Tukang batu 0.60 org Jumlah Dibulatkan 1 M3 PASANG PONDASI BT KALI , 1 Pc : 4 Ps a Batu belah 1.10 m3 b Semen PC (abu-abu) 3.26 sak c Pasir pasang 0.52 m3 d Pembantu tukang 1.50 org e Tukang batu 0.60 org Jumlah Dibulatkan 1 M3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps a Batu belah 1.10 m3 b Semen PC (abu-abu) 2.72 sak c Pasir pasang 0.54 m3 d Pembantu tukang 1.50 org e Tukang batu 0.60 org Jumlah Dibulatkan 1 M3 PASANG PONDASI BATU KOSONG ( AANSTAMPING ) a Batu belah 1.20 m3 b Pasir urug 0.30 m3 c Pembantu tukang 0.78 org d Tukang batu 0.39 org Jumlah Dibulatkan 1 M3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr a Semen PC (abu-abu) 6.72 sak b Pasir beton 0.54 m3 c Split (batu pecah) 0.81 m3
55,000.00
33,000.00 374,860.00 374,860.00
72,000.00 42,000.00 68,000.00 40,000.00 55,000.00
79,200.00 136,920.00 35,360.00 60,000.00 33,000.00 344,480.00 344,480.00
72,000.00 42,000.00 68,000.00 40,000.00 55,000.00
79,200.00 114,240.00 36,992.00 60,000.00 33,000.00 323,432.00 323,430.00
72,000.00 66,000.00 40,000.00 55,000.00
86,400.00 19,800.00 31,200.00 21,450.00 158,850.00 158,800.00
42,000.00 72,000.00 210,000.00
282,240.00 38,880.00 170,100.00
6
7
8
d Pembantu tukang 2.00 org e Tukang batu 0.35 org Jumlah Dibulatkan 1 Kg PENULANGAN BETON PONDASI a Besi beton polos 1.05 kg b Kawat beton 0.02 kg c Pembantu tukang 0.01 org d Tukang besi 0.01 org Jumlah Dibulatkan 1 M2 PEKERJAAN BEKISTING UNTUK PONDASI a Papan kayu terentang 0.04 m3 b Paku 5 - 12 cm 0.30 kg c Pelumas begisting (oli/minyak) 0.10 Ltr d Pembantu tukang 0.30 org e Tukang kayu 0.26 org Jumlah Dibulatkan 1 M3 PASANG PONDASI CYCLOOP (60 %BETON : 40% BATU KALI) a Besi beton polos 50.00 kg b Semen PC (abu-abu) 4.04 sak c Pasir beton 0.32 m3 d Split (batu pecah) 0.49 m3 e Kawat beton 0.80 kg f Batu belah 0.40 m3 g Pembantu tukang 2.00 org h Tukang batu 0.85 org Jumlah Dibulatkan
40,000.00 55,000.00
80,000.00 19,250.00 590,470.00 590,400.00
8,800.00 19,000.00 40,000.00 55,000.00
9,240.00 285.00 280.00 385.00 10,190.00 10,100.00
1,220,000.00 1,925.00 10,000.00 40,000.00 55,000.00
48,800.00 577.50 1,000.00 12,000.00 14,300.00 76,677.50 76,600.00
8,800.00 42,000.00 72,000.00 210,000.00 19,000.00 72,000.00 40,000.00 55,000.00
440,000.00 169,680.00 23,040.00 102,900.00 15,200.00 28,800.00 80,000.00 46,750.00 906,370.00 906,300.00
9
10
11
1 M3 PASANG PONDASI SUMURAN DIAMETER 100 cm a Batu belah 0.45 m3 72,000.00 b Semen PC (abu-abu) 5.60 sak 42,000.00 3 c Pasir beton 0.45 m 72,000.00 d Split (batu pecah) 0.67 m3 210,000.00 e Pembantu tukang 2.38 org 40,000.00 f Tukang batu 0.30 org 55,000.00 Jumlah Dibulatkan 1 M¹ PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 40 X 40 Cm a Pasir beton 0.10 m3 72,000.00 3 b Split (batu pecah) 0.15 m 210,000.00 c Semen PC (abu-abu) 1.21 sak 42,000.00 d Besi beton polos 45.00 kg 8,800.00 e Kawat beton 0.90 kg 19,000.00 3 f Balok kayu borneo super 5/7 0.03 m 3,600,000.00 g Papan kayu terentang 0.01 m3 4,000,000.00 h Paku 5 - 12 cm 0.12 kg 14,700.00 i Pelumas begisting (oli/minyak) 0.09 Ltr 10,000.00 j Plamir tembok 0.24 kg 27,000.00 k Pembantu tukang 1.00 org 40,000.00 l Tukang batu 0.67 org 55,000.00 Jumlah Dibulatkan 1 M¹ PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 35 X 35 CM a Pasir beton 0.08 m3 72,000.00 3 b Split (batu pecah) 0.13 m 210,000.00 c Semen PC (abu-abu) 0.98 sak 42,000.00 d Besi beton polos 34.50 kg 8,800.00 e Kawat beton 0.70 kg 19,000.00
32,400.00 235,200.00 32,400.00 140,700.00 95,200.00 16,500.00 552,400.00 552,400.00 7,200.00 31,500.00 50,820.00 396,000.00 17,100.00 115,200.00 40,000.00 1,764.00 900.00 6,480.00 40,000.00 36,850.00 743,814.00 743,800.00 5,760.00 27,300.00 41,160.00 303,600.00 13,300.00
12
13
f Balok kayu borneo super 5/7 0.03 m3 3,600,000.00 3 g Papan kayu terentang 0.01 m 4,000,000.00 h Paku 5 - 12 cm 0.12 kg 14,700.00 i Pelumas begisting (oli/minyak) 0.09 Ltr 10,000.00 j Plamir tembok 0.20 kg 27,000.00 k Pembantu tukang 0.80 org 40,000.00 l Tukang batu 0.50 org 55,000.00 Jumlah Dibulatkan 1 M3 MEMBUAT PONDASI TIANG PANCANG UKURAN 25 X 25 a Pasir beton 0.06 m3 72,000.00 3 b Split (batu pecah) 0.11 m 210,000.00 c Semen PC (abu-abu) 0.82 sak 42,000.00 d Besi beton polos 34.50 kg 8,800.00 e Kawat beton 0.60 kg 19,000.00 3 f Balok kayu borneo super 5/7 0.03 m 3,600,000.00 g Papan kayu terentang 0.01 m3 4,000,000.00 h Paku 5 - 12 cm 0.11 kg 14,700.00 i Pelumas begisting (oli/minyak) 0.08 Ltr 10,000.00 j Plamir tembok 0.20 kg 27,000.00 k Pembantu tukang 0.80 org 40,000.00 l Tukang batu 0.50 org 55,000.00 Jumlah Dibulatkan 1 M3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 125 kg + BEKISTING ) a Papan kayu terentang 0.20 m3 1,220,000.00 b Paku 5 - 12 cm 1.50 kg 14,700.00 c Pelumas begisting (oli/minyak) 0.40 Ltr 10,000.00 d Besi beton polos 125.00 kg 8,800.00 e Kawat beton 2.25 kg 19,000.00
108,000.00 40,000.00 1,764.00 900.00 5,400.00 32,000.00 27,500.00 606,684.00 606,600.00 4,320.00 23,100.00 34,440.00 303,600.00 11,400.00 108,000.00 40,000.00 1,617.00 800.00 5,400.00 32,000.00 27,500.00 592,177.00 592,100.00 244,000.00 22,050.00 4,000.00 1,100,000.00 42,750.00
14
15
f Semen PC (abu-abu) 6.46 sak 42,000.00 3 g Pasir beton 0.52 m 72,000.00 3 h Split (batu pecah) 0.78 m 210,000.00 i Pembantu tukang 3.90 org 40,000.00 j Tukang batu 0.35 org 55,000.00 k Tukang kayu 1.04 org 55,000.00 l Tukang besi 1.05 org 55,000.00 Jumlah Dibulatkan 1 M3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 150 kg + BEKISTING ) a Papan kayu terentang 0.20 m3 1,220,000.00 b Paku 5 - 12 cm 1.50 kg 14,700.00 c Pelumas begisting (oli/minyak) 0.40 ltr 10,000.00 d Besi beton polos Polos 150.00 kg 8,800.00 e Kawat beton 2.25 kg 19,000.00 f Semen PC (abu-abu) 6.46 sak 42,000.00 g Pasir beton 0.52 m3 72,000.00 3 h Split (batu pecah) 0.78 m 210,000.00 i Pembantu tukang 4.00 org 40,000.00 j Tukang batu 0.40 org 55,000.00 k Tukang kayu 1.00 org 55,000.00 l Tukang besi 1.00 org 55,000.00 Jumlah Dibulatkan 1 M3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 125 kg + BEKISTING ) a Papan kayu terentang 0.20 m3 1,220,000.00 b Paku 5 - 12 cm 1.50 kg 14,700.00 c Pelumas begisting (oli/minyak) 0.40 ltr 10,000.00 d Besi beton polos Polos 125.00 kg 8,800.00 e Kawat beton 2.10 kg 19,000.00
271,320.00 37,440.00 163,800.00 156,000.00 19,250.00 57,200.00 57,750.00 2,175,560.00 2,175,500.00 244,000.00 22,050.00 4,000.00 1,320,000.00 42,750.00 271,320.00 37,440.00 163,800.00 160,000.00 22,000.00 55,000.00 55,000.00 2,397,360.00 2,397,300.00 244,000.00 22,050.00 4,000.00 1,100,000.00 39,900.00
16
IV A
f Semen PC (abu-abu) 6.46 sak 42,000.00 3 g Pasir beton 0.52 m 72,000.00 3 h Split (batu pecah) 0.78 m 210,000.00 i Pembantu tukang 3.90 org 40,000.00 j Tukang batu 0.40 org 55,000.00 k Tukang kayu 1.00 org 55,000.00 l Tukang besi 1.00 org 55,000.00 Jumlah Dibulatkan 1 M3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 150 kg + BEKISTING ) a Papan kayu terentang 0.20 m3 1,220,000.00 b Paku 5 - 12 cm 1.50 kg 14,700.00 c Pelumas begisting (oli/minyak) 0.40 ltr 10,000.00 d Besi beton polos 150.00 kg 8,800.00 e Kawat beton 2.25 kg 19,000.00 f Semen PC (abu-abu) 6.46 sak 42,000.00 g Pasir beton 0.52 m3 72,000.00 3 h Split (batu pecah) 0.78 m 210,000.00 i Pembantu tukang 4.00 org 40,000.00 j Tukang batu 0.40 org 55,000.00 k Tukang kayu 1.00 org 55,000.00 l Tukang besi 1.00 org 55,000.00 Jumlah Dibulatkan
PEKERJAAN BETON NON STRUKTUR DAN BETON STRUKTUR PEKERJAAN BETON
271,320.00 37,440.00 163,800.00 156,000.00 22,000.00 55,000.00 55,000.00 2,170,510.00 2,170,500.00 244,000.00 22,050.00 4,000.00 1,320,000.00 42,750.00 271,320.00 37,440.00 163,800.00 160,000.00 22,000.00 55,000.00 55,000.00 2,397,360.00 2,397,300.00
1
2
3
4
1 M3 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt a Semen PC (abu-abu) 4.36 b Pasir beton 0.52 c Split (batu pecah) 0.87 d Pembantu tukang 2.00 e Tukang batu 0.35 Jumlah Dibulatkan 1 M3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 4 Splt a Semen PC (abu-abu) 4.64 b Pasir beton 0.52 c Split (batu pecah) 0.78 d Pembantu tukang 2.00 e Tukang batu 0.35 Jumlah Dibulatkan 1 M3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt a Semen PC (abu-abu) 6.72 b Pasir beton 0.54 c Split (batu pecah) 0.81 d Pembantu tukang 2.00 e Tukang batu 0.35 Jumlah Dibulatkan 1 M3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225 a Semen PC (abu-abu) 7.76 b Pasir beton 0.65 c Split (batu pecah) 0.65 d Pembantu tukang 2.00 e Tukang batu 0.35
sak m3 m3 org org
42,000.00 72,000.00 210,000.00 40,000.00 55,000.00
183,120.00 37,440.00 182,700.00 80,000.00 19,250.00 502,510.00 502,500.00
sak m3 m3 org org
42,000.00 72,000.00 210,000.00 40,000.00 55,000.00
194,880.00 37,440.00 163,800.00 80,000.00 19,250.00 495,370.00 495,300.00
sak m3 m3 org org
42,000.00 72,000.00 210,000.00 40,000.00 55,000.00
282,240.00 38,880.00 170,100.00 80,000.00 19,250.00 590,470.00 590,400.00
sak m3 m3 org org
42,000.00 72,000.00 210,000.00 40,000.00 55,000.00
325,920.00 46,800.00 136,500.00 80,000.00 19,250.00
5
B 1
2
C 1
Jumlah Dibulatkan 1 M3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275 a Semen PC (abu-abu) 8.00 b Pasir beton 0.55 c Split (batu pecah) 0.70 d Pembantu tukang 2.02 e Tukang batu 0.40 Jumlah Dibulatkan PEKERJAAN PEMBESIAN 1 KG PENULANGAN BETON/BESI BETON POLOS a Besi beton polos 1.05 b Kawat beton 0.02 c Pembantu tukang 0.01 d Tukang besi 0.01 Jumlah Dibulatkan 1 KG PENULANGAN BETON/BESI BETON ULIR a Besi Beton Ulir 1.10 b Kawat beton 0.02 c Pembantu tukang 0.01 d Tukang besi 0.02 Jumlah Dibulatkan PEKERJAAN BEGISTING 1 M2 PASANG BEKISTING UNTUK SLOOF a Papan kayu terentang 0.05 b Paku 5 - 12 cm 0.30 c Pelumas begisting (oli/minyak) 0.10
608,470.00 608,400.00 sak m3 m3 org org
42,000.00 72,000.00 210,000.00 40,000.00 55,000.00
336,000.00 39,600.00 147,000.00 80,800.00 22,000.00 625,400.00 625,400.00
kg kg org org
8,800.00 19,000.00 40,000.00 55,000.00
9,240.00 380.00 400.00 550.00 10,570.00 10,500.00
kg kg org org
16,300.00 19,000.00 40,000.00 55,000.00
17,930.00 285.00 400.00 1,100.00 19,715.00 19,700.00
m3 kg Ltr
1,220,000.00 14,700.00 10,000.00
54,900.00 4,410.00 1,000.00
2
3
4
d Pembantu tukang e Tukang kayu Jumlah Dibulatkan 1 M2 PASANG BEKISTING UNTUK KOLOM a Papan kayu terentang b Paku 5 - 12 cm c Pelumas begisting (oli/minyak) d Balok Kayu Borneo e Multiplex 120 x 240 x 9 mm f Pembantu tukang g Tukang kayu Jumlah Dibulatkan 1M2 PASANG BEKISTING UNTUK BALOK a Papan kayu terentang b Paku 5 - 12 cm c Pelumas begisting (oli/minyak) d Balok Kayu Borneo e Multiplex 120 x 240 x 9 mm f Pembantu tukang g Tukang kayu Jumlah Dibulatkan 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI a Papan kayu terentang b Paku 5 - 12 cm c Pelumas begisting (oli/minyak) d Balok Kayu Borneo e Multiplex 120 x 240 x 9 mm
0.30 0.26
org org
40,000.00 55,000.00
12,000.00 14,300.00 86,610.00 86,600.00
0.04 0.40 0.20 0.04 0.35 0.30 0.33
m3 kg Ltr m3 lbr org org
1,220,000.00 14,700.00 10,000.00 3,600,000.00 105,000.00 40,000.00 55,000.00
48,800.00 5,880.00 2,000.00 144,000.00 36,750.00 12,000.00 18,150.00 267,580.00 267,500.00
0.04 0.40 0.20 0.04 0.35 0.32 0.33
m3 kg Ltr m3 lbr org org
1,220,000.00 14,700.00 10,000.00 3,600,000.00 105,000.00 40,000.00 55,000.00
48,800.00 5,880.00 2,000.00 144,000.00 36,750.00 12,800.00 18,150.00 268,380.00 268,300.00
0.04 0.40 0.20 0.04 0.35
m3 kg Ltr m3 lbr
1,220,000.00 14,700.00 10,000.00 3,600,000.00 105,000.00
48,800.00 5,880.00 2,000.00 144,000.00 36,750.00
5
D 1
f Pembantu tukang 0.32 org 40,000.00 g Tukang kayu 0.33 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG BEKISTING UNTUK TANGGA a Papan kayu terentang 0.03 m3 1,220,000.00 b Paku 5 - 12 cm 0.40 kg 14,700.00 c Pelumas begisting (oli/minyak) 0.15 Ltr 10,000.00 d Balok kayu borneo 0.02 m3 3,600,000.00 e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 f Pembantu tukang 0.32 org 40,000.00 g Tukang kayu 0.33 org 55,000.00 Jumlah Dibulatkan PEKERJAAN BETON BERTULANG 1 M3 MEMBUAT SLOOF BETON BERTULANG ( 200 kg BESI + BEKISTING ) K225 a Papan kayu terentang 0.27 m3 1,220,000.00 b Paku 5 - 12 cm 2.00 kg 14,700.00 c Pelumas begisting (oli/minyak) 0.60 Ltr 10,000.00 d Besi beton polos 200.00 kg 8,800.00 e Kawat beton 3.00 kg 19,000.00 f Semen PC (abu-abu) 8.00 sak 42,000.00 3 g Pasir beton 0.52 m 72,000.00 3 h Split (batu pecah) 0.78 m 210,000.00 i Pembantu tukang 4.50 org 40,000.00 j Tukang batu 0.35 org 55,000.00 k Tukang kayu 1.56 org 55,000.00 l Tukang besi 1.40 org 55,000.00 Jumlah Dibulatkan
12,800.00 18,150.00 268,380.00 268,300.00 36,600.00 5,880.00 1,500.00 72,000.00 36,750.00 12,800.00 18,150.00 183,680.00 183,600.00
329,400.00 29,400.00 6,000.00 1,760,000.00 57,000.00 336,000.00 37,440.00 163,800.00 180,000.00 19,250.00 85,800.00 77,000.00 3,081,090.00 3,081,000.00
2
3
1 M3 MEMBUAT KOLOM BETON BERTULANG ( 125 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 b Paku 5 - 12 cm 4.00 kg c Pelumas begisting (oli/minyak) 2.00 Ltr d Besi beton polos 125.00 kg e Kawat beton 4.50 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.30 m3 j Multiplex 120 x 240 x 9 mm 3.50 lbr k Pembantu tukang 7.30 org l Tukang batu 0.35 org m Tukang kayu 3.30 org n Tukang besi 2.10 org Jumlah Dibulatkan 1 M3 MEMBUAT KOLOM BETON BERTULANG (150 kg BESI + BEKISTING) a Papan kayu terentang 0.40 m3 b Paku 5 - 12 cm 4.00 kg c Pelumas begisting (oli/minyak) 2.00 Ltr d Besi beton polos 150.00 kg e Kawat beton 4.50 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.30 m3 j Multiplex 120 x 240 x 9 mm 3.50 lbr k Pembantu tukang 7.30 org l Tukang batu 0.35 org
1,220,000.00 14,700.00 10,000.00 8,800.00 19,000.00 42,000.00 72,000.00 210,000.00 3,600,000.00 105,000.00 40,000.00 55,000.00 55,000.00 55,000.00
488,000.00 58,800.00 20,000.00 1,100,000.00 85,500.00 270,900.00 37,440.00 163,800.00 1,080,000.00 367,500.00 292,000.00 19,250.00 181,500.00 115,500.00 4,280,190.00 4,280,100.00
1,220,000.00 14,700.00 10,000.00 8,800.00 19,000.00 42,000.00 72,000.00 210,000.00 3,600,000.00 105,000.00 40,000.00 55,000.00
488,000.00 58,800.00 20,000.00 1,320,000.00 85,500.00 270,900.00 37,440.00 163,800.00 1,080,000.00 367,500.00 292,000.00 19,250.00
4
5
m Tukang kayu 3.30 org n Tukang besi 2.10 org Jumlah Dibulatkan 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 160 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 b Paku 5 - 12 cm 4.00 kg c Pelumas begisting (oli/minyak) 2.00 Ltr d Besi beton polos 160.00 kg e Kawat beton 4.50 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.30 m3 j Multiplex 120 x 240 x 9 mm 3.50 lbr k Pembantu tukang 7.30 org l Tukang batu 0.35 org m Tukang kayu 3.30 org n Tukang besi 2.10 org Jumlah Dibulatkan 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 175 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 b Paku 5 - 12 cm 4.00 kg c Pelumas begisting (oli/minyak) 2.00 Ltr d Besi beton polos 175.00 kg e Kawat beton 4.50 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3
55,000.00 55,000.00
181,500.00 115,500.00 4,500,190.00 4,500,100.00
1,220,000.00 14,700.00 10,000.00 8,800.00 19,000.00 42,000.00 72,000.00 210,000.00 3,600,000.00 105,000.00 40,000.00 55,000.00 55,000.00 55,000.00
488,000.00 58,800.00 20,000.00 1,408,000.00 85,500.00 270,900.00 37,440.00 163,800.00 1,080,000.00 367,500.00 292,000.00 19,250.00 181,500.00 115,500.00 4,588,190.00 4,588,100.00
1,220,000.00 14,700.00 10,000.00 8,800.00 19,000.00 42,000.00 72,000.00 210,000.00
488,000.00 58,800.00 20,000.00 1,540,000.00 85,500.00 270,900.00 37,440.00 163,800.00
6
7
i Balok kayu Borneo Super 0.30 m3 j Multiplex 120 x 240 x 9 mm 3.50 lbr k Pembantu tukang 7.30 org l Tukang batu 0.35 org m Tukang kayu 3.30 org n Tukang besi 2.10 org Jumlah Dibulatkan 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 200 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 b Paku 5 - 12 cm 4.00 kg c Pelumas begisting (oli/minyak) 2.00 Ltr d Besi beton polos 200.00 kg e Kawat beton 4.50 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.30 m3 j Multiplex 120 x 240 x 9 mm 3.50 lbr k Pembantu tukang 7.30 org l Tukang batu 0.35 org m Tukang kayu 3.30 org n Tukang besi 2.10 org Jumlah Dibulatkan 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 250 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 b Paku 5 - 12 cm 4.00 kg c Pelumas begisting (oli/minyak) 2.00 Ltr d Besi beton polos 250.00 kg
3,600,000.00 105,000.00 40,000.00 55,000.00 55,000.00 55,000.00
1,080,000.00 367,500.00 292,000.00 19,250.00 181,500.00 115,500.00 4,720,190.00 4,720,100.00
1,220,000.00 14,700.00 10,000.00 8,800.00 19,000.00 42,000.00 72,000.00 210,000.00 3,600,000.00 105,000.00 40,000.00 55,000.00 55,000.00 55,000.00
488,000.00 58,800.00 20,000.00 1,760,000.00 85,500.00 270,900.00 37,440.00 163,800.00 1,080,000.00 367,500.00 292,000.00 19,250.00 181,500.00 115,500.00 4,940,190.00 4,940,100.00
1,220,000.00 14,700.00 10,000.00 8,800.00
488,000.00 58,800.00 20,000.00 2,200,000.00
8
9
e Kawat beton 4.50 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.30 m3 j Multiplex 120 x 240 x 9 mm 3.50 lbr k Pembantu tukang 7.30 org l Tukang batu 0.35 org m Tukang kayu 3.30 org n Tukang besi 2.10 org Jumlah Dibulatkan 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 300 kg BESI + BEKISTING ) a Papan kayu terentang 0.40 m3 b Paku 5 - 12 cm 4.00 kg c Pelumas begisting (oli/minyak) 2.00 Ltr d Besi beton polos 300.00 kg e Kawat beton 4.50 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.30 m3 j Multiplex 120 x 240 x 9 mm 3.50 lbr k Pembantu tukang 7.30 org l Tukang batu 0.35 org m Tukang kayu 3.30 org n Tukang besi 2.10 org Jumlah Dibulatkan 1 M3 MEMBUAT BALOK BETON BERTULANG ( 125 kg BESI + BEKISTING )
19,000.00 42,000.00 72,000.00 210,000.00 3,600,000.00 105,000.00 40,000.00 55,000.00 55,000.00 55,000.00
85,500.00 270,900.00 37,440.00 163,800.00 1,080,000.00 367,500.00 292,000.00 19,250.00 181,500.00 115,500.00 5,380,190.00 5,380,100.00
1,220,000.00 14,700.00 10,000.00 8,800.00 19,000.00 42,000.00 72,000.00 210,000.00 3,600,000.00 105,000.00 40,000.00 55,000.00 55,000.00 55,000.00
488,000.00 58,800.00 20,000.00 2,640,000.00 85,500.00 270,900.00 37,440.00 163,800.00 1,080,000.00 367,500.00 292,000.00 19,250.00 181,500.00 115,500.00 5,820,190.00 5,820,100.00
10
a Papan kayu terentang 0.32 m3 b Paku 5 - 12 cm 3.20 kg c Pelumas begisting (oli/minyak) 1.60 Ltr d Besi beton polos 125.00 kg e Kawat beton 2.25 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.12 m3 j Multiplex 120 x 240 x 9 mm 2.80 lbr k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg l Pembantu tukang 5.80 org m Tukang batu 0.35 org n Tukang kayu 2.80 org o Tukang besi 1.05 org Jumlah Dibulatkan 1 M3 MEMBUAT BALOK BETON BERTULANG ( 150 kg BESI + BEKISTING ) a Papan kayu terentang 0.32 m3 b Paku 5 - 12 cm 3.20 kg c Pelumas begisting (oli/minyak) 1.60 Ltr d Besi beton polos 150.00 kg e Kawat beton 2.25 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.12 m3 j Multiplex 120 x 240 x 9 mm 2.80 lbr k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg l Pembantu tukang 5.80 org
1,220,000.00 14,700.00 10,000.00 8,800.00 19,000.00 42,000.00 72,000.00 210,000.00 3,600,000.00 105,000.00 8,500.00 40,000.00 55,000.00 55,000.00 55,000.00
390,400.00 47,040.00 16,000.00 1,100,000.00 42,750.00 270,900.00 37,440.00 163,800.00 432,000.00 294,000.00 272,000.00 232,000.00 19,250.00 154,000.00 57,750.00 3,529,330.00 3,529,300.00
1,220,000.00 14,700.00 10,000.00 8,800.00 10,000.00 42,000.00 72,000.00 10,000.00 3,600,000.00 105,000.00 8,500.00 40,000.00
390,400.00 47,040.00 16,000.00 1,320,000.00 22,500.00 270,900.00 37,440.00 7,800.00 432,000.00 294,000.00 272,000.00 232,000.00
11
12
m Tukang batu 0.35 org n Tukang kayu 2.80 org o Tukang besi 1.05 org Jumlah Dibulatkan 1 M3 MEMBUAT BALOK BETON BERTULANG ( 200 kg BESI + BEKISTING ) a Papan kayu terentang 0.32 m3 b Paku 5 - 12 cm 3.20 kg c Pelumas begisting (oli/minyak) 1.60 Ltr d Besi beton polos 200.00 kg e Kawat beton 3.00 kg f Semen PC (abu-abu) 6.45 sak g Pasir beton 0.52 m3 h Split (batu pecah) 0.78 m3 i Balok kayu Borneo Super 0.14 m3 j Multiplex 120 x 240 x 9 mm 2.80 lbr k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg l Pembantu tukang 5.96 org m Tukang batu 0.35 org n Tukang kayu 2.80 org o Tukang besi 1.40 org Jumlah Dibulatkan 1 M3 MEMBUAT BALOK BETON BERTULANG (200 kg BESI + BEKISTING) a Papan kayu terentang 0.32 m3 b Paku 5 - 12 cm 3.20 kg c Pelumas begisting (oli/minyak) 1.60 Ltr d Besi beton polos 225.00 kg e Kawat beton 4.00 kg f Semen PC (abu-abu) 6.45 sak
55,000.00 55,000.00 55,000.00
19,250.00 154,000.00 57,750.00 3,573,080.00 3,573,000.00
1,220,000.00 14,700.00 10,000.00 8,800.00 19,000.00 42,000.00 72,000.00 140,000.00 4,000,000.00 105,000.00 18,000.00 27,500.00 42,000.00 42,000.00 42,000.00
390,400.00 47,040.00 16,000.00 1,760,000.00 57,000.00 270,900.00 37,440.00 109200 560,000.00 294,000.00 288,000.00 163,900.00 14,700.00 117,600.00 58,800.00 4,184,980.00 4,184,900.00
1,750,000.00 14,700.00 10,000.00 8,750.00 15,000.00 49,500.00
560,000.00 47,040.00 16,000.00 1,968,750.00 60,000.00 319,275.00
13
14
g Pasir beton 0.52 m3 140,000.00 3 h Split (batu pecah) 0.78 m 140,000.00 3 i Balok kayu Borneo Super 0.14 m 4,000,000.00 j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 8,500.00 l Pembantu tukang 5.96 org 40,000.00 m Tukang batu 0.35 org 55,000.00 n Tukang kayu 2.80 org 55,000.00 o Tukang besi 1.40 org 55,000.00 Jumlah Dibulatkan 1 M3 MEMBUAT BALOK BETON BERTULANG ( 250 kg BESI + BEKISTING ) a Papan kayu terentang 0.32 m3 1,220,000.00 b Paku 5 - 12 cm 3.20 kg 14,700.00 c Pelumas begisting (oli/minyak) 1.60 Ltr 10,000.00 d Besi beton polos 250.00 kg 8,800.00 e Kawat beton 6.00 kg 19,000.00 f Semen PC (abu-abu) 6.45 sak 42,000.00 3 g Pasir beton 0.52 m 72,000.00 3 h Split (batu pecah) 0.78 m 210,000.00 i Balok kayu Borneo Super 0.14 m3 3,600,000.00 j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 8,500.00 l Pembantu tukang 5.96 org 40,000.00 m Tukang batu 0.35 org 55,000.00 n Tukang kayu 2.80 org 55,000.00 o Tukang besi 1.40 org 55,000.00 Jumlah Dibulatkan 1 M3 MEMBUAT TANGGA BETON BERTULANG ( 200 kg BESI + BEKISTING )
72,800.00 109,200.00 560,000.00 294,000.00 136,000.00 238,400.00 19,250.00 154,000.00 77,000.00 4,631,715.00 4,631,700.00 390,400.00 47,040.00 16,000.00 2,200,000.00 114,000.00 270,900.00 37,440.00 163,800.00 504,000.00 294,000.00 136,000.00 238,400.00 19,250.00 154,000.00 77,000.00 4,662,230.00 4,662,200.00
15
16
17
a Papan kayu terentang 0.25 m3 1,220,000.00 b Paku 5 - 12 cm 3.00 kg 14,700.00 c Pelumas begisting (oli/minyak) 1.20 Ltr 10,000.00 d Besi beton polos 200.00 kg 8,800.00 e Kawat beton 3.00 kg 19,000.00 f Semen PC (abu-abu) 6.45 sak 42,000.00 3 g Pasir beton 0.52 m 72,000.00 3 h Split (batu pecah) 0.78 m 210,000.00 i Balok kayu Borneo Super 0.30 m3 3,600,000.00 j Multiplex 120 x 240 x 9 mm 2.50 lbr 105,000.00 k Pembantu tukang 5.60 org 40,000.00 l Tukang batu 0.35 org 55,000.00 m Tukang kayu 2.30 org 55,000.00 n Tukang besi 1.40 org 55,000.00 Jumlah Dibulatkan 1 M3 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 2 b Pasang Bekisting untuk lantai 10.00 m 268,300.00 c Besi Beton rakit 100.00 kg 8,800.00 Jumlah Dibulatkan 1 M3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 b Pasang Bekisting untuk lantai 8.33 m2 268,300.00 c Besi Beton rakit 115.00 kg 10,500.00 Jumlah Dibulatkan 1 M3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 125 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00
305,000.00 44,100.00 12,000.00 1,760,000.00 57,000.00 270,900.00 37,440.00 163,800.00 1,080,000.00 262,500.00 224,000.00 19,250.00 126,500.00 77,000.00 4,439,490.00 4,439,400.00 590,400.00 2,683,000.00 880,000.00 4,153,400.00 4,153,400.00 590,400.00 2,234,939.00 1,207,500.00 4,032,839.00 4,032,800.00 590,400.00
18
19
20
b Pasang Bekisting untuk lantai 8.33 m2 268,300.00 c Besi Beton rakit 125.00 kg 10,500.00 Jumlah Dibulatkan 1 M3 MEMBUAT PLAT LANTAI Tb. 15 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 b Pasang Bekisting untuk lantai 6.67 m2 268,300.00 c Besi Beton rakit 100.00 kg 10,500.00 Jumlah Dibulatkan 1 M3 MEMBUAT PLAT LANTAI Tb. 20 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING ) a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 b Pasang Bekisting untuk lantai 7.50 m2 268,300.00 c Besi Beton rakit 115.00 kg 10,500.00 Jumlah Dibulatkan 1M3 MEMBUAT RING BALK BETON BERTULANG ( 175 kg BESI + BEKISTING ) K225 a Papan kayu terentang 0.27 m3 1,220,000.00 b Paku 5 - 12 cm 2.00 kg 14,700.00 c Pelumas begisting (oli/minyak) 0.60 Ltr 10,000.00 d Besi beton polos 175.00 kg 8,800.00 e Kawat beton 3.00 kg 19,000.00 f Semen PC (abu-abu) 8.00 sak 42,000.00 3 g Pasir beton 0.52 m 72,000.00 h Split (batu pecah) 0.78 m3 210,000.00 i Pembantu tukang 4.85 org 40,000.00 j Tukang batu 0.40 org 55,000.00 k Tukang kayu 1.75 org 55,000.00 l Tukang besi 1.45 org 55,000.00 Jumlah
2,234,939.00 1,312,500.00 4,137,839.00 4,137,800.00 590,400.00 1,789,561.00 1,050,000.00 3,429,961.00 3,429,900.00 590,400.00 2,012,250.00 1,207,500.00 3,810,150.00 3,810,100.00 329,400.00 29,400.00 6,000.00 1,540,000.00 57,000.00 336,000.00 37,440.00 163,800.00 194,000.00 22,000.00 96,250.00 79,750.00 2,891,040.00
Dibulatkan
V 1
2
3
4
PEKERJAAN DINDING 1 M2 PASANGAN Bata merah TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps a Bata merah 140.00 bh b Semen PC (abu-abu) 0.65 sak c Pasir pasang 0.09 m3 d Pembantu tukang 0.65 org e Tukang batu 0.20 org Jumlah Dibulatkan 1 M2 PASANGAN Bata merah TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps a Bata merah 140.00 bh b Semen PC (abu-abu) 0.55 sak c Pasir pasang 0.09 m3 d Pembantu tukang 0.65 org e Tukang batu 0.20 org Jumlah Dibulatkan 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps a Bata merah 140.00 bh b Semen PC (abu-abu) 0.45 sak c Pasir pasang 0.10 m3 d Pembantu tukang 0.65 org e Tukang batu 0.20 org Jumlah Dibulatkan 1 M2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 3 Ps a Bata merah 70.00 bh
2,891,000.00
600.00 42,000.00 68,000.00 40,000.00 55,000.00
84,000.00 27,300.00 6,120.00 26,000.00 11,000.00 154,420.00 154,400.00
600.00 42,000.00 68,000.00 40,000.00 55,000.00
84,000.00 23,100.00 6,120.00 26,000.00 11,000.00 150,220.00 150,200.00
600.00 42,000.00 68,000.00 40,000.00 55,000.00
84,000.00 18,900.00 6,800.00 26,000.00 11,000.00 146,700.00 146,700.00
600.00
42,000.00
5
6
7
b Semen PC (abu-abu) 0.29 sak c Pasir pasang 0.04 m3 d Pembantu tukang 0.32 org e Tukang batu 0.10 org Jumlah Dibulatkan 1 M2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 4 Ps a Bata merah 70.00 bh b Semen PC (abu-abu) 0.25 sak c Pasir pasang 0.05 m3 d Pembantu tukang 0.32 org e Tukang batu 0.10 org Jumlah Dibulatkan 1 M2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 5 Ps a Bata merah 70.00 bh b Semen PC (abu-abu) 0.22 sak c Pasir pasang 0.05 m3 d Pembantu tukang 0.32 org e Tukang batu 0.10 org Jumlah Dibulatkan 1 M2 PASANG DINDING BATA ROOSTER / BATA TERAWANG a Rooster / Terawang ukuran 12 x 11 x 24 37.00 bh b Semen PC (abu-abu) 0.27 sak c Pasir pasang 0.04 m3 d Pembantu tukang 0.30 org e Tukang batu 0.10 org Jumlah Dibulatkan
42,000.00 68,000.00 40,000.00 55,000.00
12,180.00 2,720.00 12,800.00 5,500.00 75,200.00 75,200.00
600.00 42,000.00 68,000.00 40,000.00 55,000.00
42,000.00 10,500.00 3,400.00 12,800.00 5,500.00 74,200.00 74,200.00
600.00 42,000.00 68,000.00 40,000.00 55,000.00
42,000.00 9,240.00 3,400.00 12,800.00 5,500.00 72,940.00 72,900.00
4,100.00 42,000.00 68,000.00 40,000.00 55,000.00
151,700.00 11,340.00 2,720.00 12,000.00 5,500.00 183,260.00 183,200.00
8
9
10
11
1 M2 PASANG DINDING GLASSBLOCK a Glassblock ukuran 18 x 18 cm 30.00 bh b Semen putih 0.27 sak c Pembantu tukang 0.30 org d Tukang batu 0.10 org Jumlah Dibulatkan 1 M2 PASANGAN BATACO PUTIH, CAMPURAN 1 Pc : 5 Ps a Bataco putih 15.00 bh b Semen PC (abu-abu) 0.25 sak c Pasir pasang 0.03 m3 d Pembantu tukang 0.30 org e Tukang batu 0.15 org Jumlah Dibulatkan 1 M2 PASANGAN BATACO PRES SEMEN, CAMPURAN 1 Pc : 5 Ps a Bataco press semen 15.00 bh b Semen PC (abu-abu) 0.20 sak c Pasir pasang 0.02 m3 d Pembantu tukang 0.30 org e Tukang batu 0.15 org Jumlah Dibulatkan 1 M2 PASANGAN BATA RINGAN ( HEBEL/CELCON ). a Bata Ringan ( hebel/celcon ) 8.00 bh b Semen Instan 11.45 kg c Pembantu tukang 0.30 org d Tukang batu 0.20 org Jumlah Dibulatkan
20,000.00 12,700.00 40,000.00 55,000.00
600,000.00 3,429.00 12,000.00 5,500.00 620,929.00 620,900.00
4,200.00 42,000.00 68,000.00 40,000.00 55,000.00
63,000.00 10,500.00 2,040.00 12,000.00 8,250.00 95,790.00 95,700.00
4,300.00 42,000.00 68,000.00 40,000.00 55,000.00
64,500.00 8,400.00 1,360.00 12,000.00 8,250.00 94,510.00 94,500.00
3,800.00 2,450.00 40,000.00 55,000.00
30,400.00 28,052.50 12,000.00 11,000.00 81,452.50 81,400.00
VI 1
2
3
4
PEKERJAAN PLESTERAN/ACCI 1 M2 PLESTERAN CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.14 b Pasir pasang 0.02 c Pembantu tukang 0.20 d Tukang batu 0.15 Jumlah Dibulatkan 1 M2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.13 b Pasir pasang 0.02 c Pembantu tukang 0.20 d Tukang batu 0.15 Jumlah Dibulatkan 1 M2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.10 b Pasir pasang 0.02 c Pembantu tukang 0.20 d Tukang batu 0.15 Jumlah Dibulatkan 1 M2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.09 b Pasir pasang 0.02 c Pembantu tukang 0.20 d Tukang batu 0.15 Jumlah
sak m3 org org
42,000.00 68,000.00 40,000.00 55,000.00
5,880.00 1,360.00 8,000.00 8,250.00 23,490.00 23,400.00
sak m3 org org
42,000.00 68,000.00 40,000.00 55,000.00
5,460.00 1,360.00 8,000.00 8,250.00 23,070.00 23,000.00
sak m3 org org
42,000.00 68,000.00 40,000.00 55,000.00
4,200.00 1,360.00 8,000.00 8,250.00 21,810.00 21,800.00
sak m3 org org
42,000.00 68,000.00 40,000.00 55,000.00
3,780.00 1,360.00 8,000.00 8,250.00 21,390.00
5
6
7
8
9
Dibulatkan 1 M2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm a Semen PC (abu-abu) 0.17 sak b Pasir pasang 0.03 m3 c Pembantu tukang 0.22 org d Tukang batu 0.16 org Jumlah Dibulatkan 1 M2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 2,0 cm a Semen PC (abu-abu) 0.15 sak b Pasir pasang 0.03 m3 c Pembantu tukang 0.25 org d Tukang batu 0.20 org Jumlah Dibulatkan 1 M2 BERAPEN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.11 sak b Pasir pasang 0.03 m3 c Pembantu tukang 0.15 org d Tukang batu 0.07 org Jumlah Dibulatkan 1 M2 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm a Semen PC (abu-abu) 0.19 sak b Pasir pasang 0.02 m3 c Pembantu tukang 0.26 org d Tukang batu 0.20 org Jumlah Dibulatkan 1 M2 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm
21,300.00 42,000.00 68,000.00 40,000.00 55,000.00
7,140.00 2,040.00 8,800.00 8,800.00 26,780.00 26,700.00
42,000.00 68,000.00 40,000.00 55,000.00
6,300.00 2,040.00 10,000.00 11,000.00 29,340.00 29,300.00
42,000.00 68,000.00 40,000.00 55,000.00
4,620.00 1,700.00 6,000.00 3,850.00 16,170.00 16,100.00
42,000.00 68,000.00 40,000.00 55,000.00
7,980.00 1,360.00 10,400.00 11,000.00 30,740.00 30,700.00
10
11
12
VII 1
a Semen PC (abu-abu) b Pasir pasang c Pembantu tukang d Tukang batu Jumlah Dibulatkan 1 M2 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps a Semen PC (abu-abu) b Pasir pasang c Pembantu tukang d Tukang batu Jumlah Dibulatkan 1 M2 ACCIAN PLESTERAN a Semen PC (abu-abu) b Pembantu tukang c Tukang batu Jumlah Dibulatkan 1 M2 PLESTERAN SIAR CAMPURAN 1 Pc : 2 Ps a Semen PC (abu-abu) b Pasir pasang c Pembantu tukang d Tukang batu Jumlah Dibulatkan
0.15 0.02 0.26 0.20
sak m3 org org
42,000.00 68,000.00 40,000.00 55,000.00
6,300.00 1,360.00 10,400.00 11,000.00 29,060.00 29,000.00
0.01 0.01 0.06 0.04
sak m3 org org
42,000.00 68,000.00 40,000.00 55,000.00
420.00 680.00 2,400.00 2,200.00 5,700.00 5,700.00
0.08 0.14 0.11
sak org org
42,000.00 40,000.00 55,000.00
3,360.00 5,600.00 6,050.00 15,010.00 15,000.00
0.09 0.02 0.15 0.07
sak m3 org org
42,000.00 68,000.00 40,000.00 55,000.00
3,780.00 1,360.00 6,000.00 3,850.00 14,990.00 14,900.00
PEKERJAAN PELAPIS LANTAI 1 M2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm POLISHED
2
3
4
a Keramik ukuran 40 x 40 cm 1.00 m2 b Semen PC (abu-abu) 0.16 sak c Pasir pasang 0.02 m3 d Semen warna 0.02 kg e Pembantu tukang 0.25 org f Tukang batu 0.12 org Jumlah Dibulatkan 1 M2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm UNPOLISH a Keramik ukuran 40 x 40 cm 1.00 m2 b Semen PC (abu-abu) 0.16 sak c Pasir pasang 0.02 m3 d Semen warna 0.02 kg e Pembantu tukang 0.26 org f Tukang batu 0.13 org Jumlah Dibulatkan 1 M2 PASANG LANTAI KERAMIK UKURAN 60 x 60 cm a Keramik ukuran 60 x 60 cm 1.00 m2 b Semen PC (abu-abu) 0.18 sak c Pasir pasang 0.02 m3 d Semen warna 0.01 kg e Pembantu tukang 0.25 org f Tukang batu 0.12 org Jumlah Dibulatkan 1 M2 PASANG LANTAI KERAMIK UKURAN 60 x 90 cm a Keramik ukuran 60 x 90 cm 1.00 m2 b Semen PC (abu-abu) 0.17 sak c Pasir pasang 0.02 m3
246,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
246,000.00 6,720.00 1,462.00 254.00 10,000.00 6,600.00 271,036.00 271,030.00
205,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
205,000.00 6,720.00 1,360.00 254.00 10,400.00 6,875.00 230,609.00 230,600.00
290,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
290,000.00 7,560.00 1,462.00 165.10 10,000.00 6,600.00 315,787.10 315,780.00
336,000.00 42,000.00 68,000.00
336,000.00 7,140.00 1,462.00
5
6
7
d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan 1 M2 PASANG LANTAI KERAMIK 10 x 20 cm a Keramik lantai 10 x 20 cm b Semen PC ( abu-abu ) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan 1 M2 PASANG LANTAI KERAMIK POLOS 20 x 20 cm a Keramik polos 20 x 20 cm b Semen PC (abu-abu) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan 1 M2 PASANG LANTAI KERAMIK MOTIF 20 x 20 cm a Keramik motif 20 x 20 cm b Semen PC (abu-abu) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu
0.02 0.26 0.14
kg org org
12,700.00 40,000.00 55,000.00
254.00 10,400.00 7,700.00 362,956.00 362,950.00
1.00 0.18 0.02 0.02 0.22 0.40
m2 sak m3 kg org org
32,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
32,000.00 7,560.00 1,360.00 254.00 8,800.00 22,000.00 71,974.00 71,970.00
1.00 0.17 0.02 0.02 0.30 0.15
m2 sak m3 kg org org
38,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
38,000.00 7,140.00 1,462.00 254.00 12,000.00 8,250.00 67,106.00 67,100.00
1.00 0.17 0.02 0.02 0.30 0.15
m2 sak m3 kg org org
38,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
38,000.00 7,140.00 1,462.00 254.00 12,000.00 8,250.00
8
9
10
11
Jumlah Dibulatkan 1 M2 PASANG LANTAI KERAMIK POLOS 30 x 30 cm a Keramik polos 30 x 30 cm b Semen PC (abu-abu) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan 1 M2 PASANG LANTAI KERAMIK MOTIF 30 x 30 cm a Keramik motif 30 x 30 cm b Semen PC (abu-abu) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan 1 M2 PASANG LANTAI MARMER a marmer standar b Semen PC (abu-abu) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan 1 M2 PASANG LANTAI PARQUET JATI
67,106.00 67,100.00 1.00 0.16 0.02 0.02 0.25 0.12
m2 sak m3 kg org org
38,500.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
38,500.00 6,720.00 1,360.00 254.00 10,000.00 6,600.00 63,434.00 63,430.00
1.00 0.16 0.02 0.02 0.25 0.12
m2 sak m3 kg org org
41,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
41,000.00 6,720.00 1,360.00 254.00 10,000.00 6,600.00 65,934.00 65,930.00
1.00 0.48 0.10 0.20 0.62 0.35
m2 sak m3 sak org org
200,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
200,000.00 20,160.00 6,800.00 2,540.00 24,800.00 19,250.00 273,550.00 273,550.00
12
VIII 1
2
a Parquet jati b Lem vinyl c Pembantu tukang d Tukang Jumlah Dibulatkan 1 M2 PASANG LANTAI GRANIT a Granit standar b Semen PC (abu-abu) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan
1.05 0.60 0.65 0.35
m2 kg org org
278,000.00 35,000.00 40,000.00 55,000.00
291,900.00 21,000.00 26,000.00 19,250.00 358,150.00 358,150.00
1.00 0.48 0.08 0.10 0.60 0.48
m2 sak m3 sak org org
750,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
750,000.00 20,160.00 5,440.00 1,270.00 24,000.00 26,400.00 827,270.00 827,270.00
m2 sak m3 kg org org
38,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
38,000.00 7,560.00 1,360.00 254.00 8,800.00 22,000.00 77,974.00 77,970.00
m2
34,000.00
34,000.00
PEKERJAAN PELAPIS DINDING 1 M2 PASANG DINDING KERAMIK MOTIF 10 x 20 cm a Keramik motif 10 x 20 cm 1.00 b Semen PC ( abu-abu ) 0.18 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu tukang 0.22 f Tukang batu 0.40 Jumlah Dibulatkan 1 M2 PASANG DINDING KERAMIK POLOS 10 x 20 cm a Keramik polos 10 x 20 cm 1.00
3
4
5
b Semen PC ( abu-abu ) 0.18 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu tukang 0.22 f Tukang batu 0.40 Jumlah Dibulatkan 1 M2 PASANG DINDING KERAMIK MOTIF 20 x 20 cm a Keramik motif 20 x 20 cm 1.00 b Semen PC ( abu-abu ) 0.17 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu tukang 0.20 f Tukang batu 0.39 Jumlah Dibulatkan 1 M2 PASANG DINDING KERAMIK POLOS 20 x 20 cm a Keramik polos 20 x 20 cm 1.00 b Semen PC ( abu-abu ) 0.17 c Pasir pasang 0.02 d Semen warna 0.02 e Pembantu tukang 0.20 f Tukang batu 0.39 Jumlah Dibulatkan 1 M2 PASANG DINDING KERAMIK POLOS 20 x 25 cm a Keramik polos 20 x 25 cm 1.00 b Semen PC ( abu-abu ) 0.16 c Pasir pasang 0.02 d Semen warna 0.01
sak m3 kg org org
42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
7,560.00 1,360.00 254.00 8,800.00 22,000.00 73,974.00 73,970.00
m2 sak m3 kg org org
38,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
38,000.00 7,140.00 1,360.00 254.00 8,000.00 21,450.00 76,204.00 76,200.00
m2 sak m3 kg org org
38,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
38,000.00 7,140.00 1,360.00 254.00 8,000.00 21,450.00 76,204.00 76,200.00
m2 sak m3 kg
38,000.00 42,000.00 68,000.00 12,700.00
38,000.00 6,720.00 1,224.00 165.10
6
7
8
e Pembantu tukang f Tukang batu Jumlah Dibulatkan 1 M2 PASANG DINDING KERAMIK MOTIF 20 x 25 cm a Keramik motif 20 x 25 cm b Semen PC ( abu-abu ) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan 1 M2 PASANG DINDING MARMER a Marmer standar b Paku sekrup c Semen PC ( abu-abu ) d Pasir pasang e Semen warna f Kawat ikat g Paku h Pembantu tukang i Tukang batu Jumlah Dibulatkan 1 M2 PASANG DINDING GRANIT a Granit standar b Paku sekrup c Semen PC ( abu-abu ) d Pasir pasang
0.19 0.38
org org
40,000.00 55,000.00
7,500.00 20,625.00 74,234.10 74,230.00
1.00 0.16 0.02 0.01 0.19 0.38
m2 sak m3 kg org org
39,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
39,000.00 6,720.00 1,224.00 165.10 7,500.00 20,625.00 75,234.10 75,230.00
1.00 4.00 0.25 0.03 1.50 0.03 0.03 0.72 0.65
m2 bh sak m3 kg kg kg org org
200,000.00 750.00 42,000.00 68,000.00 12,700.00 19,000.00 14,700.00 40,000.00 55,000.00
200,000.00 3,000.00 10,500.00 1,700.00 19,050.00 475.00 367.50 28,800.00 35,750.00 299,642.50 299,640.00
1.00 2.00 0.25 0.03
m2 bh sak m3
750,000.00 750.00 42,000.00 68,000.00
750,000.00 1,500.00 10,500.00 1,700.00
9
10
11
e Semen warna f Kawat ikat g Paku h Pembantu tukang i Tukang batu Jumlah Dibulatkan 1 M2 PASANG DINDING BATU TEMPEL HITAM a Batu tempel hitam b Semen PC ( abu-abu ) c Pasir pasang d Pembantu tukang e Tukang batu Jumlah Dibulatkan 1 M2 PASANG DINDING BATU ALAM a Batu alam b Semen PC ( abu-abu ) c Pasir pasang d Pembantu tukang e Tukang batu Jumlah Dibulatkan 1 M¹ PASANG PLINT KERAMIK UKURAN 10 x 40 cm a Plint Keramik ukuran 10 x 40 cm b Semen PC (abu-abu) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu
1.50 0.03 0.03 0.72 0.65
kg kg kg org org
12,700.00 19,000.00 14,700.00 40,000.00 55,000.00
19,050.00 475.00 367.50 28,800.00 35,750.00 848,142.50 848,140.00
1.00 0.24 0.04 0.32 0.25
m2 sak m3 org org
140,000.00 42,000.00 68,000.00 40,000.00 55,000.00
140,000.00 10,080.00 2,380.00 12,800.00 13,750.00 179,010.00 179,010.00
1.00 0.25 0.04 0.32 0.25
m2 sak m3 org org
185,000.00 42,000.00 68,000.00 40,000.00 55,000.00
185,000.00 10,500.00 2,380.00 12,800.00 13,750.00 224,430.00 224,430.00
2.65 0.02 0.01 0.10 0.06 0.03
bh sak m3 kg org org
9,000.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
23,850.00 840.00 680.00 1,270.00 2,400.00 1,650.00
12
IX 1
2
3
Jumlah Dibulatkan 1 m¹ PASANG PLINT KERAMIK UKURAN 10 x 30 cm a Plint Keramik ukuran 10 x 30 cm b Semen PC (abu-abu) c Pasir pasang d Semen warna e Pembantu tukang f Tukang batu Jumlah Dibulatkan
30,690.00 30,690.00 3.30 0.02 0.01 0.12 0.06 0.03
bh sak m3 kg org org
7,500.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI 1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER SAMARINDA a Balok kayu kamper samarinda 1.20 m3 5,766,800.00 b Pembantu tukang 6.00 org 40,000.00 c Tukang kayu 15.00 org 55,000.00 Jumlah Dibulatkan 1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER MEDAN / KRUING a Balok kayu kamper medan 1.20 m3 3,950,000.00 b Pembantu tukang 6.00 org 40,000.00 c Tukang kayu 15.00 org 55,000.00 Jumlah Dibulatkan 1 M3 PASANG KUSEN PINTU & JENDELA KAYU BORNEO SUPER a Kayu balok borneo super 1.20 m3 3,600,000.00 b Pembantu tukang 6.00 org 40,000.00
24,750.00 840.00 680.00 1,524.00 2,400.00 1,650.00 31,844.00 31,840.00
6,920,160.00 240,000.00 825,000.00 7,985,160.00 7,985,160.00 4,740,000.00 240,000.00 825,000.00 5,805,000.00 5,805,000.00 4,320,000.00 240,000.00
4
5
6
7
8
c Tukang kayu 15.00 org Jumlah Dibulatkan 1 M2 PASANG PINTU PANEL KAYU KAMPER SAMARINDA a Papan kayu kamper samarinda 0.04 m3 b Pembantu tukang 1.00 org c Tukang kayu 2.50 org Jumlah Dibulatkan 1 M2 PASANG PINTU PANEL KAYU KAMPER MEDAN / KRUING a Papan kayu kamper medan 0.04 m3 b Pembantu tukang 1.00 org c Tukang kayu 2.50 org Jumlah Dibulatkan 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER MEDAN a Papan kayu kamper medan 0.04 m3 b Pembantu tukang 0.80 org c Tukang kayu 2.00 org Jumlah Dibulatkan 1 M2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO a Papan kayu borneo super 0.04 m3 b Pembantu tukang 0.80 org c Tukang kayu 2.00 org Jumlah Dibulatkan 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.06 m3 b Pembantu tukang 1.00 org
55,000.00
825,000.00 5,385,000.00 5,385,000.00
5,000,000.00 40,000.00 55,000.00
200,000.00 40,000.00 137,500.00 377,500.00 377,500.00
3,800,000.00 40,000.00 55,000.00
152,000.00 40,000.00 137,500.00 329,500.00 329,500.00
3,800,000.00 40,000.00 55,000.00
154,000.00 57,750.00 154,000.00 365,750.00 365,700.00
4,000,000.00 40,000.00 55,000.00
47,040.00 16,000.00 110,000.00 173,040.00 173,000.00
3,800,000.00 40,000.00
243,200.00 40,000.00
9
10
11
12
c Tukang kayu 3.00 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU KAMPER MEDAN a Papan kayu kamper medan 0.02 m3 3,800,000.00 b Paku 1 s/d 5 cm 0.03 kg 14,700.00 c Lem Kayu 0.30 Ltr 28,000.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 47,500.00 e Pembantu tukang 0.60 org 40,000.00 f Tukang kayu 2.00 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG JALUSI MATI KUSEN KAYU KAMPER MEDAN a Papan kayu kamper medan 0.06 m3 3,800,000.00 b Paku 1 s/d 5 cm 0.15 kg 14,700.00 c Pembantu tukang 0.50 org 40,000.00 d Tukang kayu 2.00 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU BORNEO SUPER a Papan kayu borneo super 0.02 m3 4,000,000.00 b Paku 1 s/d 5 cm 0.03 kg 14,700.00 c Lem kayu 0.30 Ltr 28,000.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 47,500.00 e Pembantu tukang 0.60 org 40,000.00 f Tukang kayu 2.00 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG PINTU TEAKWOOD RANGKAP , RANGKA KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.02 m3 3,800,000.00
165,000.00 448,200.00 448,200.00 74,480.00 441.00 8,400.00 47,500.00 24,000.00 110,000.00 264,821.00 264,800.00 228,000.00 2,205.00 20,000.00 110,000.00 360,205.00 360,200.00 78,400.00 441.00 8,400.00 47,500.00 24,000.00 110,000.00 268,741.00 268,700.00 74,480.00
13
14
15
b Paku 1 s/d 5 cm 0.30 kg 14,700.00 c Lem Kayu 0.30 Ltr 28,000.00 d Teakwood 120 x 240 x 0,4 cm 1.00 lbr 80,000.00 e Pembantu tukang 0.60 org 40,000.00 f Tukang kayu 2.00 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG PINTU TRIPLEK & FORMIKA RANGKA KAYU KAMPER MEDAN a Papan kayu kamper medan 0.02 m3 3,800,000.00 b Paku 1 s/d 5 cm 0.30 kg 14,700.00 c Lem kayu 0.80 Ltr 28,000.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 47,500.00 e Formica 3" x 6" 0.50 lbr 150,000.00 f Pembantu tukang 0.80 org 40,000.00 g Tukang kayu 2.50 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER MEDAN a Papan kayu kamper medan 0.02 m3 3,800,000.00 b Paku 1 s/d 5 cm 0.30 kg 14,700.00 c Lem Kayu 0.80 Ltr 28,000.00 d Teakwood 120 x 240 x 0,4 cm 0.50 lbr 80,000.00 e Vernis 0.50 Ltr 40,000.00 a Formica 4" x 8" 0.50 lbr 150,000.00 b Pembantu tukang 0.80 org 40,000.00 c Tukang kayu 2.50 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG DINDING PEMISAH DOUBLE TEAKWOOD, RANGKA KAYU KAMPER MEDAN a Balok kayu Kamper Medan 0.02 m3 3,950,000.00
4,410.00 8,400.00 80,000.00 24,000.00 110,000.00 301,290.00 301,200.00 74,480.00 4,410.00 22,400.00 47,500.00 75,000.00 32,000.00 137,500.00 393,290.00 393,200.00 74,480.00 4,410.00 22,400.00 40,000.00 20,000.00 75,000.00 32,000.00 137,500.00 405,790.00 405,700.00 77,025.00
16
17
18
b Papan kayu Kamper Medan 0.01 m3 3,800,000.00 c Paku 5 - 12 cm 0.10 kg 14,700.00 d Lem Kayu 0.56 Ltr 28,000.00 e Teakwood 120 x 240 x 0,4 cm 1.00 lbr 80,000.00 f Pembantu tukang 0.15 org 40,000.00 g Tukang kayu 0.45 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG DINDING PEMISAH DOUBLE GRC, RANGKA KAYU KAMPER MEDAN a Balok kayu Kamper Medan 0.02 m3 3,950,000.00 3 b Papan kayu Kamper Medan 0.01 m 3,800,000.00 c Paku 5 - 12 cm 0.10 kg 14,700.00 d Lem Kayu 0.56 Ltr 28,000.00 e Triplek 0,4 cm ukuran pintu 1.00 lbr 47,500.00 f Pembantu tukang 0.20 org 40,000.00 g Tukang kayu 0.60 org 55,000.00 Jumlah Dibulatkan 1 BH PASANG PINTU ALUMINIUM / PINTU PVC a Pintu Aluminium / Pintu PVC 1.00 bh 400,000.00 b Alat bantu 10 % harga material 1.00 ls 40,000.00 c Tukang kayu 0.02 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG KUSEN PARTISI DOUBLE TRIPLEK a Balok kayu borneo super 0.11 m3 3,600,000.00 b Triplek 0,4 cm ukuran pintu 5.00 lbr 47,500.00 c Paku 1 s/d 3 cm 2.00 kg 14,700.00 d Ampelas 2.00 lbr 2,500.00 e Engsel 4.00 bh 25,000.00
26,600.00 1,470.00 15,680.00 80,000.00 6,000.00 24,750.00 231,525.00 231,500.00 77,025.00 26,600.00 1,470.00 15,680.00 47,500.00 8,000.00 33,000.00 209,275.00 209,200.00 400,000.00 40,000.00 1,155.00 441,155.00 441,100.00 378,000.00 237,500.00 29,400.00 5,000.00 100,000.00
19
20
f Grendel / slot 4.00 bh 32,500.00 g Pembantu tukang 0.30 org 40,000.00 h Tukang kayu terampil 1.30 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYU a Balok kayu borneo super 0.11 m3 3,600,000.00 b Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 78,000.00 c Paku 1 s/d 3 cm 2.00 kg 14,700.00 d Ampelas 2.00 lbr 2,500.00 e Engsel 4.00 bh 25,000.00 f Grendel / Slot 4.00 bh 32,500.00 g Pembantu tukang 0.30 org 40,000.00 h Tukang kayu 1.30 org 55,000.00 Jumlah Dibulatkan 1 M2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOW a Hollow 4/4 Zincromate 0.42 btg 48,000.00 b Hollow 2/4 Zincromate 0.15 btg 35,000.00 c Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 78,000.00 d Paku sekrup 25.00 bh 750.00 e Ramset / dina bolt 4.00 bh 2,200.00 f Cotton plaster 0.10 bh 58,000.00 g Compoun 0.13 kg 32,000.00 h Pembantu tukang 0.10 org 40,000.00 i Tukang kayu 0.05 org 55,000.00 Jumlah Dibulatkan
130,000.00 12,000.00 71,500.00 963,400.00 129,530.00 378,000.00 56,160.00 29,400.00 5,000.00 100,000.00 130,000.00 12,000.00 71,500.00 782,060.00 129,530.00 20,160.00 5,250.00 56,160.00 18,750.00 8,800.00 5,800.00 4,160.00 4,000.00 2,750.00 125,830.00 125,830.00
X A 1
2
3
4
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP PEKERJAAN RANGKA ATAP 1 M3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU KAMPER MEDAN a Balok kayu kamper medan 1.10 m3 b Besi strip 15.00 kg c Paku ukuran besar 0.80 kg d Meni kayu 0.40 kg e Pembantu tukang 4.00 org f Tukang kayu 12.00 org Jumlah Dibulatkan 1 M3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU BORNEO SUPER a Balok kayu borneo super 1.10 m3 b Besi strip 15.00 kg c Paku ukuran besar 0.80 kg d Meni kayu 0.40 kg e Pembantu tukang 4.00 org f Tukang kayu 12.00 org Jumlah Dibulatkan 1 M2 PASANG KASO + RENG GENTENG PLENTONG KAYU BORNEO SUPER a Balok kayu borneo super 0.01 m3 b Paku 7 - 10 cm 0.15 kg c Pembantu tukang 0.10 org d Tukang kayu 0.10 org Jumlah Dibulatkan 1 M2 PASANG KASO + RENG GENTENG BETON KAYU BORNEO SUPER
3,950,000.00 17,500.00 14,700.00 16,000.00 40,000.00 55,000.00
4,345,000.00 262,500.00 11,760.00 6,400.00 160,000.00 660,000.00 5,445,660.00 5,445,600.00
3,600,000.00 17,500.00 14,700.00 16,000.00 40,000.00 55,000.00
3,960,000.00 262,500.00 11,760.00 6,400.00 160,000.00 660,000.00 5,060,660.00 5,060,600.00
3,600,000.00 14,700.00 40,000.00 55,000.00
43,200.00 2,205.00 4,000.00 5,500.00 54,905.00 54,900.00
5
6
7
B 1
a Balok kayu borneo super 0.01 m3 b Paku 7 - 10 cm 0.15 kg c Pembantu tukang 0.10 org d Tukang kayu 0.10 org Jumlah Dibulatkan 1 M1 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 20 cm a Papan kayu kamper medan 0.01 m3 b Paku 7 - 10 cm 0.05 kg c Pembantu tukang 0.10 org d Tukang kayu 0.20 org Jumlah Dibulatkan 1 M2 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 30 cm a Papan kayu kamper medan 0.01 m3 b Paku 7 - 10 cm 0.05 kg c Pembantu tukang 0.11 org d Tukang kayu 0.22 org Jumlah Dibulatkan 1 M3 PEKERJAAN NOK/GORDING/JURAY KAYU BORNEO SUPER a Balok kayu borneo super 1.05 m3 b Paku 10 - 15 cm 0.20 kg c Pembantu tukang 2.00 org d Tukang kayu 2.00 org Jumlah Dibulatkan PEKERJAAN PENUTUP ATAP 1 M2 PASANG ATAP GENTENG PLENTONG a Genteng palentong 25.00 bh
3,600,000.00 14,700.00 40,000.00 55,000.00
50,400.00 2,205.00 4,000.00 5,500.00 62,105.00 62,100.00
3,800,000.00 14,700.00 40,000.00 55,000.00
27,360.00 735.00 4,000.00 11,000.00 43,095.00 43,000.00
3,800,000.00 14,700.00 40,000.00 55,000.00
41,800.00 735.00 4,400.00 12,100.00 59,035.00 59,000.00
3,600,000.00 14,700.00 40,000.00 55,000.00
3,780,000.00 2,940.00 80,000.00 110,000.00 3,972,940.00 3,972,900.00
800.00
20,000.00
2
3
4
5
b Pembantu tukang 0.15 org c Tukang kayu 0.08 org Jumlah Dibulatkan 1 M2 PASANG NOK/BUBUNGAN GENTENG KERAMIK GLAZUR a Genteng nok/bubungan plentong 5.00 bh b Semen PC (abu-abu) 0.16 sak c Pasir pasang 0.03 m3 d Pembantu tukang 0.30 org e Tukang kayu 0.20 org Jumlah Dibulatkan 1 M2 PASANG ATAP FIBREGLASS UKURAN 180 X 90 cm a Atap fibreglass 0.60 lbr b Paku 2 - 5 cm 0.05 kg c Pembantu tukang 0.14 org d Tukang kayu 0.07 org Jumlah Dibulatkan 1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,05 m TEBAL 4 mm a Asbes gelombang 0.35 lbr b Paku payung 0.12 kg c Pembantu tukang 0.14 org d Tukang kayu 0.07 org Jumlah Dibulatkan 1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,05 m TEBAL 4 mm a Asbes gelombang 0.42 lbr b Paku payung 0.12 kg c Pembantu tukang 0.14 org
40,000.00 55,000.00
6,000.00 4,125.00 30,125.00 30,120.00
26,500.00 42,000.00 68,000.00 40,000.00 55,000.00
132,500.00 6,720.00 2,176.00 12,000.00 11,000.00 164,396.00 164,390.00
68,000.00 14,700.00 40,000.00 55,000.00
40,800.00 735.00 5,600.00 3,685.00 50,820.00 50,820.00
72,000.00 14,700.00 40,000.00 55,000.00
25,200.00 1,764.00 5,600.00 3,850.00 36,414.00 36,410.00
65,000.00 14,700.00 40,000.00
27,300.00 1,764.00 5,600.00
6
7
8
9
d Tukang kayu 0.07 org Jumlah Dibulatkan 1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,02 m TEBAL 5 mm a Asbes gelombang 0.44 lbr b Paku payung 0.12 kg c Pembantu tukang 0.14 org d Tukang kayu 0.07 org Jumlah Dibulatkan 1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,02 m TEBAL 5 mm a Asbes gelombang 0.51 lbr b Paku payung 0.12 kg c Pembantu tukang 0.14 org d Tukang kayu 0.07 org Jumlah Dibulatkan 1 M2 PASANG ATAP ASBES GELOMBANG ( 1,50 x 1,02 m ) x 5 mm a Asbes gelombang 0.80 lbr b Paku payung 0.12 kg c Pembantu tukang 0.14 org d Tukang kayu 0.07 org Jumlah Dibulatkan 1 M¹ PASANG ATAP SIRAP a Genteng sirap 80.00 bh b Paku 0.20 kg c Pembantu tukang 0.10 org d Tukang kayu 0.20 org Jumlah
55,000.00
3,850.00 38,514.00 38,510.00
90,000.00 14,700.00 40,000.00 55,000.00
39,600.00 1,764.00 5,600.00 3,685.00 50,649.00 50,640.00
81,000.00 14,700.00 40,000.00 55,000.00
41,310.00 1,764.00 5,600.00 3,685.00 52,359.00 52,350.00
48,000.00 14,700.00 40,000.00 55,000.00
38,400.00 1,764.00 5,600.00 3,850.00 49,614.00 49,610.00
600.00 14,700.00 40,000.00 55,000.00
48,000.00 2,940.00 4,000.00 11,000.00 65,940.00
10
11
12
13
Dibulatkan 1 M2 PASANG ATAP GENTENG BETON a Genteng beton b Paku 5 - 12 cm c Pembantu tukang d Tukang kayu Jumlah Dibulatkan 1 M2 PASANG ATAP GENTENG METAL + C301 a Genteng metal b Paku 5 - 12 cm c Pembantu tukang d Tukang kayu Jumlah Dibulatkan 1 M¹ PASANG NOK GENTENG BETON a Nok genteng beton b Paku 5 - 12 cm c Semen PC (abu-abu) d Pasir pasang e Semen warna f Pembantu tukang g Tukang kayu Jumlah Dibulatkan 1 M¹ PASANG NOK GENTENG METAL a Nok genteng metal b Paku payung c Pembantu tukang d Tukang kayu
65,940.00 1.10 0.03 0.20 0.10
bh kg org org
65,000.00 14,700.00 40,000.00 55,000.00
71,500.00 441.00 8,000.00 5,500.00 85,441.00 85,440.00
1.02 0.20 0.20 0.10
lbr kg org org
129,800.00 14,700.00 40,000.00 55,000.00
132,396.00 2,940.00 8,000.00 5,500.00 148,836.00 148,830.00
3.50 0.05 0.22 0.03 1.00 0.40 0.20
bh kg sak m3 kg org org
16,000.00 14,700.00 42,000.00 68,000.00 12,700.00 40,000.00 55,000.00
56,000.00 735.00 9,072.00 2,176.00 12,700.00 16,000.00 11,000.00 107,683.00 107,680.00
1.10 0.05 0.25 0.15
bh kg org org
58,000.00 14,700.00 40,000.00 55,000.00
63,800.00 735.00 10,000.00 8,250.00
14
15
16
17
Jumlah Dibulatkan 1 M2 PASANG ATAP SENG GELOMBANG a Seng gelombang 0.70 lbr b Paku payung 0.02 kg c Pembantu tukang 0.12 org d Tukang kayu 0.06 org Jumlah Dibulatkan 1 M2 PASANG NOK SENG UNTUK ATAP SENG GELOMBANG a Seng plat BJLS 1.05 M1 b Paku payung 0.04 kg c Pembantu tukang 0.15 org d Tukang kayu 0.07 org Jumlah Dibulatkan 1 M2 PASANG ATAP POLYCARBONATE a Polycarbonate 1.05 m2 b Besi Hollow 1.50 btg c Alat bantu 20 % harga material 1.00 ls d Pembantu tukang 0.15 org e Tukang kayu 0.05 org Jumlah Dibulatkan 1 M2 PASANG ALUMINIUM FOIL a Aluminium foil 1.05 m2 b Alat bantu 20 % harga material 1.00 ls c Pembantu tukang 0.15 org d Tukang kayu 0.05 org Jumlah
82,785.00 82,780.00 53,800.00 14,700.00 40,000.00 55,000.00
37,660.00 294.00 4,800.00 3,300.00 46,054.00 46,050.00
33,000.00 14,700.00 40,000.00 55,000.00
34,650.00 588.00 6,000.00 3,850.00 45,088.00 45,080.00
222,000.00 48,000.00 46,620.00 40,000.00 55,000.00
233,100.00 72,000.00 46,620.00 6,000.00 2,750.00 360,470.00 360,470.00
5,600.00 1,176.00 40,000.00 55,000.00
5,880.00 1,176.00 6,000.00 2,750.00 15,806.00
Dibulatkan
XI 1
2
3
4
PEKERJAAN PENUTUP PLAFON 1 M2 PASANG RANGKA PLAFON ( UKRN 0,50 X 1,00 ) M, KAYU BORNEO SUPER a Balok kayu borneo super 4 x 6 cm 0.01 m3 3,600,000.00 b Paku 5 - 12 cm 0.10 kg 14,700.00 c Pembantu tukang 0.15 org 40,000.00 d Tukang kayu 0.25 org 55,000.00 Jumlah Dibulatkan 1 M2 PLAFON GRC ( 60 X 1,20 ) M, TEBAL 4 MM a Pelat GRC tebal 4 mm 1.10 lbr 47,500.00 b Paku 1 cm 0.01 kg 14,700.00 c Pembantu tukang 0.03 org 40,000.00 d Tukang kayu 0.07 org 55,000.00 Jumlah Dibulatkan 1 M2 PLAFON Asbes ( 1,00 x 1,00 ) m, tebal 5 mm a Pelat asbes tebal 5 mm 1.10 lbr 13,500.00 b Paku 1 cm 0.01 kg 14,700.00 c Pembantu tukang 0.03 org 40,000.00 d Tukang kayu 0.07 org 55,000.00 Jumlah Dibulatkan 1 M2 PLAFON Akustik ( 60 x 120 ) cm a Akustik 600 x 1200 x 15 mm 1.50 lbr 78,000.00 b Paku 2 - 5 cm 0.05 kg 14,700.00 c Pembantu tukang 0.06 org 40,000.00
15,800.00
43,200.00 1,470.00 6,000.00 13,750.00 64,420.00 64,400.00 52,250.00 147.00 1,200.00 3,850.00 57,447.00 57,440.00 14,850.00 147.00 1,200.00 3,850.00 20,047.00 20,040.00 117,000.00 735.00 2,400.00
5
6
7
8
d Tukang kayu 0.10 org Jumlah Dibulatkan 1 M2 PLAFON AKUSTIK ( 60 X 120 ) CM + RANGKA ALLUMINIUM a Profil Alluminium "T" 3.60 M¹ b Kawat seng polos 0.15 kg c Ramset / dina bolt 1.00 bh d Akustik 600 x 1200 x 15 mm 1.50 lbr e Pembantu tukang 0.15 org f Tukang kayu 0.20 org Jumlah Dibulatkan 1 M¹ LIST PLAFON PROFIL KAYU a Listp profil kayu 1.10 M¹ b Paku 2 cm 0.01 kg c Pembantu tukang 0.05 org d Tukang kayu 0.05 org Jumlah Dibulatkan 1 M¹ LIST PLAFON KAYU 1/4 a List kayu 1/4 1.10 M¹ b Paku 2 cm 0.01 kg c Pembantu tukang 0.05 org d Tukang kayu 0.05 org Jumlah Dibulatkan 1 M2 PLAFON TRIPLEK 4 MM + RANGKA KAYU BORNEO SUPER a Balok kayu borneo super 0.02 m3 b Paku 1- 12 cm 0.06 kg c Triplek 120 cm x 240 cm x 0,4 cm 0.39 lbr
55,000.00
5,500.00 125,635.00 125,630.00
33,000.00 19,000.00 2,200.00 78,000.00 40,000.00 55,000.00
118,800.00 2,850.00 2,200.00 117,000.00 6,000.00 11,000.00 257,850.00 257,850.00
7,700.00 14,700.00 40,000.00 55,000.00
8,470.00 147.00 2,000.00 2,750.00 13,367.00 13,360.00
1,925.00 14,700.00 40,000.00 55,000.00
2,117.50 147.00 2,000.00 2,750.00 7,014.50 7,010.00
3,600,000.00 14,700.00 47,500.00
82,800.00 882.00 18,525.00
9
10
11
d Pembantu tukang 0.27 org e Tukang kayu 0.40 org Jumlah Dibulatkan 1 M2 PLAFON TEAKWOOD 4 MM + RANGKA KAYU BORNEO SUPER a Balok kayu borneo super 0.02 m3 b Paku 1 - 12 cm 0.06 kg c Teakwood 120 cm x 240 cm x 0,4 cm 0.39 lbr d Pembantu tukang 0.27 org e Tukang kayu 0.40 org Jumlah Dibulatkan 1 M2 Plafon PAPAN 10 CM, TEBAL 1 CM + RANGKA KAYU BORNEO SUPER a Balok kayu borneo super 0.02 m3 b Paku 2 - 12 cm 0.20 kg c Papan kayu kamper 0.02 m3 d Pembantu tukang 0.35 org e Tukang kayu 0.50 org Jumlah Dibulatkan 1 M2 Plafon GYPSUM BOARD, TEBAL 9 MM + RANGKA BESI HOLLOW a Hollow 4/4 Zincromate 0.42 btg b Hollow 2/4 Zincromate 0.15 btg c Gypsum board ( 120 x 240 x 9 ) mm 0.36 lbr d Paku sekrup 25.00 bh e Ramset / dina bolt 4.00 bh f Cotton plaster 0.07 bh g Compoun 0.13 kg h Pembantu tukang 0.10 org i Tukang kayu 0.05 org
40,000.00 55,000.00
10,800.00 22,000.00 135,007.00 135,000.00
3,600,000.00 14,700.00 80,000.00 40,000.00 55,000.00
82,800.00 882.00 31,200.00 10,800.00 22,000.00 147,682.00 147,680.00
3,600,000.00 14,700.00 5,000,000.00 40,000.00 55,000.00
82,800.00 2,940.00 100,000.00 14,000.00 27,500.00 227,240.00 227,240.00
48,000.00 35,000.00 78,000.00 750.00 2,200.00 58,000.00 32,000.00 40,000.00 55,000.00
19,920.00 5,250.00 28,392.00 18,750.00 8,800.00 4,176.00 4,000.00 4,000.00 2,750.00
Jumlah Dibulatkan XII 1
2
3
4
PEKERJAAN SANITAIR MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK a Kloset duduk / monoblok 1.00 b Perlengkapan ( 10% hrg kloset ) c Pembantu tukang 3.30 d Tukang batu 1.10 Jumlah Dibulatkan MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN a Kloset jongkok porselen 1.00 b Semen PC (abu-abu) 0.12 c Pasir pasang 0.01 d Pembantu tukang 1.00 e Tukang batu 1.50 Jumlah Dibulatkan MEMASANG 1 BUAH URINOIR a Urinoir 1.00 b Perlengkapan ( 30% hrg urinoir ) c Semen PC (abu-abu) 0.12 d Pasir pasang 0.01 e Pembantu tukang 1.00 f Tukang batu 1.00 Jumlah Dibulatkan MEMASANG 1 BUAH WASTAFEL DINDING a Wastafel 1.00
96,038.00 96,030.00
bh org org
2,350,000.00 235,000.00 40,000.00 55,000.00
2,350,000.00 235,000.00 132,000.00 60,500.00 2,777,500.00 2,777,500.00
bh sak m3 org org
173,000.00 42,000.00 68,000.00 40,000.00 55,000.00
173,000.00 5,040.00 680.00 40,000.00 82,500.00 301,220.00 301,220.00
bh sak m3 org org
400,000.00 120,000.00 42,000.00 68,000.00 40,000.00 55,000.00
400,000.00 120,000.00 5,040.00 680.00 40,000.00 55,000.00 620,720.00 620,720.00
bh
215,000.00
215,000.00
5
6
7
8
b Perlengkapan ( 12% hrg kloset ) 25,800.00 c Semen PC ( abu-abu ) 0.12 sak 42,000.00 3 d Pasir pasang 0.01 m 68,000.00 e Pembantu tukang 1.20 org 40,000.00 f Tukang batu 1.45 org 55,000.00 Jumlah Dibulatkan MEMASANG 1 BUAH WASTAFEL KAKI a Wastafel 1.00 bh 260,000.00 b Perlengkapan ( 12% hrg kloset ) 31,200.00 c Semen PC ( abu-abu ) 0.12 sak 42,000.00 3 d Pasir pasang 0.01 m 68,000.00 e Pembantu tukang 1.20 org 40,000.00 f Tukang batu 1.45 org 55,000.00 Jumlah Dibulatkan MEMASANG 1 BH SHOWER DINDING a Shower dinding 1.00 bh 145,000.00 b Pembantu tukang 0.01 org 40,000.00 c Tukang batu 0.10 org 55,000.00 Jumlah Dibulatkan MEMASANG BAK MANDI FIBERGLASS UKURAN SEDANG a Bak fibreglass 1.00 bh 182,000.00 b Perlengkapan ( 20% hrg bak ) 32,760.00 c Pembantu tukang 1.80 org 40,000.00 d Tukang batu 2.70 org 55,000.00 Jumlah Dibulatkan MEMASANG BAK KONTROL PASANGAN BATU BATA UKURAN 30 X 30 CM, TINGGI 35 CM
25,800.00 5,040.00 680.00 48,000.00 79,750.00 374,270.00 374,270.00 260,000.00 31,200.00 5,040.00 680.00 48,000.00 79,750.00 424,670.00 424,670.00 145,000.00 400.00 5,500.00 150,900.00 150,900.00 182,000.00 32,760.00 72,000.00 148,500.00 435,260.00 435,260.00
9
10
11
a Batu bata 0.15 m3 b Semen PC (abu-abu) 0.88 sak c Pasir pasang 0.07 m3 d Batu kerikil 0.07 m3 e Besi beton 1.60 kg f Pasir beton 0.06 m3 g Pembantu tukang 3.20 org h Tukang batu 1.02 org Jumlah Dibulatkan MEMASANG KICHEN ZINK/BAK CUCI PIRING STAINLESS STEEL a Bak cuci stainless steel 1.00 bh b Water Drain + Asesories 1.00 Set c Pembantu tukang 0.03 org d Tukang batu 0.30 org Jumlah Dibulatkan MEMASANG 1 BH KRAN DIAMETER 3/4 " ATAU 1/2 " a Kran air 1.00 bh b Perlengkapan ( 2% hrg kran ) 1.00 ls c Pembantu tukang 0.01 org d Tukang batu 0.10 org Jumlah Dibulatkan MEMASANG 1 BH KRAN AIR ANGSA a Kran air angsa 1.00 bh b Perlengkapan ( 2% hrg kran ) 1.00 ls c Pembantu tukang 0.01 org d Tukang batu 0.10 org Jumlah
600.00 42,000.00 68,000.00 185,000.00 16,300.00 72,000.00 40,000.00 55,000.00
90.00 36,960.00 4,760.00 12,950.00 26,080.00 4,320.00 128,000.00 56,100.00 269,260.00 269,260.00
192,000.00 85,000.00 40,000.00 55,000.00
192,000.00 85,000.00 1,200.00 16,500.00 294,700.00 294,700.00
56,000.00 1,120.00 40,000.00 55,000.00
56,000.00 1,120.00 400.00 5,500.00 63,020.00 63,020.00
155,500.00 3,110.00 40,000.00 55,000.00
155,500.00 3,110.00 400.00 5,500.00 164,510.00
12
13
Dibulatkan MEMASANG 1 BH FLOOR DRAIN a Floor drain b Pembantu tukang c Tukang batu Jumlah Dibulatkan MEMASANG 1 BH TEMPAT SABUN a Tempat Sabun b Pembantu tukang c Tukang batu Jumlah Dibulatkan
XIII PEKERJAAN PERPIPAAN DAN POMPA 1 MEMASANG 1 M¹ PIPA GALVANIS DIAMETER ½" a Pipa galvanis dia 1/2" b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan 2 MEMASANG 1 M¹ PIPA GALVANIS DIAMETER ¾" a Pipa galvanis b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan
164,510.00 1.00 0.01 0.10
bh org org
63,000.00 40,000.00 55,000.00
63,000.00 400.00 5,500.00 68,900.00 68,900.00
1.00 0.01 0.10
bh org org
33,000.00 40,000.00 55,000.00
33,000.00 400.00 5,500.00 38,900.00 38,900.00
1.10
M¹
0.05 0.09
org org
11,000.00 3,300.00 40,000.00 55,000.00
12,100.00 3,300.00 2,160.00 4,950.00 22,510.00 22,510.00
1.10
M¹
0.05 0.09
org org
18,500.00 5,550.00 40,000.00 55,000.00
20,350.00 5,550.00 2,160.00 4,950.00 33,010.00 33,010.00
3
4
5
6
7
MEMASANG 1 M¹ PIPA GALVANIS DIAMETER 1" a Pipa galvanis b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan MEMASANG 1 M¹ PIPA GALVANIS DIAMETER 1½" a Pipa galvanis b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan MEMASANG 1 M¹ PIPA PVC TYPE D DIAMETER 3" a Pipa PVC type D b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan MEMASANG 1 M¹ PIPA PVC TYPE D DIAMETER 4" a Pipa PVC type D b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan MEMASANG 1 M¹ PVC TIPE AW DIAMETER ½" a Pipa PVC
1.10
M¹
30,250.00 9,075.00 40,000.00 55,000.00
33,275.00 9,075.00 2,160.00 4,950.00 49,460.00 49,460.00
0.05 0.09
org org
1.10
M¹
33,000.00 9,900.00 40,000.00 55,000.00
36,300.00 9,900.00 4,320.00 9,900.00 60,420.00 60,420.00
0.11 0.18
org org
1.10
M¹
6,700.00 2,010.00 40,000.00 55,000.00
7,370.00 2,010.00 4,000.00 9,900.00 23,280.00 23,280.00
0.10 0.18
org org
1.10
M¹ org org
9,000.00 2,700.00 40,000.00 55,000.00
9,900.00 2,700.00 5,200.00 12,100.00 29,900.00 29,900.00
0.13 0.22
1.10
M¹
3,400.00
3,740.00
8
9
10
11
b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan MEMASANG 1 M¹ PVC TIPE AW DIAMETER ¾" a Pipa PVC b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan MEMASANG 1 M¹ PVC TIPE AW DIAMETER 1" a Pipa PVC b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan MEMASANG 1 M¹ PVC TIPE AW DIAMETER 2" a Pipa PVC b Perlengkapan ( 30% harga pipa ) c Pembantu tukang d Tukang pipa Jumlah Dibulatkan MEMASANG 1 M¹ PVC TIPE AW DIAMETER 4" a Pipa PVC b Perlengkapan ( 30% harga pipa ) c Pembantu tukang
0.04 0.06
org org
1.10
M¹
0.03 0.06
org org
1.10
M¹
0.04 0.06
org org
1.10
M¹
0.05 0.09
org org
1.10
M¹
0.08
org
1,020.00 40,000.00 55,000.00
1,020.00 1,440.00 3,300.00 9,500.00 9,500.00
6,675.00 2,002.50 40,000.00 55,000.00
7,342.50 2,002.50 1,200.00 3,300.00 13,845.00 13,840.00
13,400.00 4,020.00 40,000.00 55,000.00
14,740.00 4,020.00 1,440.00 3,300.00 23,500.00 23,500.00
18,000.00 5,400.00 40,000.00 55,000.00
19,800.00 5,400.00 2,160.00 4,950.00 32,310.00 32,310.00
39,000.00 11,700.00 40,000.00
42,900.00 11,700.00 3,240.00
12
13
XIV
d Tukang pipa 0.14 org Jumlah Dibulatkan MEMBUAT 1 BH SEPTICTANK PASANGAN BATU BATA DAN REMBESAN a Galian tanah Septictank & rembesan 7.5 m3 b Pasir urug 0.21 m3 c Lantai kerja 2.25 m3 d Pasang bata 1 Pc : 2 Psr 15.00 m2 e Pelat beton penutup dan balok 0.30 m3 f Pipa PVC 4 inci AW & perlengkapannya 5.40 M1 g Plesteran 1 Pc : 3 Psr 30.00 m2 h Pasangan ijuk 5.00 IKAT i Urugan kerikil 3,5 cm 1.05 m3 j Pipa PVC 4 inci AW dilobang 9.00 M1 k Urugan kembali 1.13 m3 l Pembantu tukang 4.00 org m Tukang batu 3.00 org Jumlah Dibulatkan MEMASANG 1 BH POMPA AIR a Pompa Air 100 Watt 1.00 bh b Perlengkapan ( 25% harga pompa ) c Pembantu tukang 0.08 org d Tukang Pipa 0.14 org Jumlah Dibulatkan
PEKERJAAN PENUTUP BESI DAN BAJA
55,000.00
7,425.00 65,265.00 65,260.00
30,500.00 66,000.00 502,500.00 75,200.00 4,032,800.00 39,000.00 23,000.00 6,000.00 157,300.00 39,000.00 8,500.00 40,000.00 55,000.00
228,750.00 13,860.00 1,130,625.00 1,128,000.00 1,209,840.00 210,600.00 690,000.00 30,000.00 165,165.00 351,000.00 9,605.00 160,000.00 165,000.00 5,492,445.00 5,492,440.00
925,000.00 231,250.00 40,000.00 55,000.00
925,000.00 231,250.00 3,240.00 7,425.00 1,166,915.00 1,166,910.00
1
2
3
4
1 KG PASANG RANGKA ATAP BAJA a Besi profil WF b Meni besi c Peralatan las ( 5 % material ) d Elektroda e Tukang besi f Pembantu tukang Jumlah Dibulatkan 1 KG PASANG RANGKA ATAP BESI SIKU a Besi Siku b Meni besi c Peralatan las ( 5 % material ) d Elektroda e Baud f Tukang besi g Pembantu tukang Jumlah Dibulatkan 1 KG PASANG GORDING BESI C a Besi C b Meni besi c Peralatan las ( 5 % material ) d Elektroda e Baud f Tukang besi g Pembantu tukang Jumlah Dibulatkan 1 M2 PASANG PINTU ROLLING DOOR BESI
1.10 0.08 1.00 0.20 0.04 0.06
kg kg ls ls org org
12,000.00 19,000.00 660.00 18,000.00 55,000.00 40,000.00
13,200.00 1,520.00 660.00 3,600.00 2,200.00 2,400.00 23,580.00 23,580.00
1.10 0.10 1.00 0.15 0.20 0.04 0.06
kg kg ls ls kg org org
12,000.00 19,000.00 660.00 18,000.00 16,300.00 55,000.00 40,000.00
13,200.00 1,900.00 660.00 2,700.00 3,260.00 2,200.00 2,400.00 26,320.00 26,320.00
1.10 0.10 1.00 0.15 0.20 0.04 0.06
kg kg ls ls kg org org
17,500.00 19,000.00 962.50 18,000.00 16,300.00 55,000.00 40,000.00
19,250.00 1,900.00 962.50 2,700.00 3,260.00 2,200.00 2,400.00 32,672.50 32,670.00
5
6
7
8
a Rolling door besi b Tukang besi c Pembantu tukang Jumlah Dibulatkan 1 BH PASANG PINTU BESI UKURAN 0,8 X 2 M a Pintu besi jadi b Tukang besi c Pembantu tukang Jumlah Dibulatkan 1 M2 PASANG TERALIS BESI a Besi strip 2 mm x 3 cm b Tukang las c Pembantu tukang Jumlah Dibulatkan 1 M2 PASANG KAWAT HARMONIKA a Kawat harmonika b Paku 2 - 5 cm c Papan kayu kamper medan d Pembantu tukang e Tukang kayu Jumlah Dibulatkan 1 M1 PASANG TALANG DATAR, SENG PLAT BJLS a Seng plat BJLS b Paku 2 - 5 cm c Papan kayu borneo super d Flincote / meni besi
1.00 1.50 1.05
m2 org org
680,000.00 55,000.00 40,000.00
680,000.00 82,500.00 42,000.00 804,500.00 804,500.00
1.00 1.05 1.05
bh org org
400,000.00 55,000.00 40,000.00
400,000.00 57,750.00 42,000.00 499,750.00 499,750.00
11.50 1.20 1.20
M¹ org org
17,500.00 55,000.00 40,000.00
201,250.00 66,000.00 48,000.00 315,250.00 315,250.00
1.10 0.02 0.10 0.10
m2 kg m3 org org
18,000.00 14,700.00 3,800,000.00 40,000.00 55,000.00
19,800.00 294.00 6,840.00 4,000.00 5,500.00 36,434.00 36,430.00
1.00 0.02 0.01 0.25
M1 kg m3 kg
33,000.00 14,700.00 4,000,000.00 20,000.00
33,000.00 220.50 38,400.00 5,000.00
9
XV 1
2
3
e Pembantu tukang f Tukang kayu Jumlah Dibulatkan 1 M1 PASANG TALANG MIRING, SENG PLAT BJLS a Seng plat BJLS b Paku 2 - 5 cm c Papan kayu borneo super d Flincote / meni besi e Pembantu tukang f Tukang kayu Jumlah Dibulatkan
0.15 0.40
org org
40,000.00 55,000.00
6,000.00 22,000.00 104,620.50 104,620.00
0.50 0.02 0.02 0.30 0.04 0.40
M1 kg m3 kg org org
33,000.00 14,700.00 4,000,000.00 20,000.00 40,000.00 55,000.00
16,500.00 220.50 76,000.00 6,000.00 1,600.00 22,000.00 122,320.50 122,320.00
PEKERJAAN ALUMINIUM 1 M2 PASANG PINTU ROLLING DOOR ALUMINIUM a Rolling door aluminium 1.00 m2 680,000.00 b Tukang besi konstruksi 1.50 org 55,000.00 c Pembantu tukang 1.05 org 40,000.00 Jumlah Dibulatkan 1 M2 PASANG PINTU ALUMINIUM PABRIKAN a Pintu alluminium 1.00 bh 400,000.00 b Tukang batu 1.05 org 75,671.00 c Pembantu tukang 1.05 org 40,000.00 Jumlah Dibulatkan 1 UNIT KUSEN JENDELA ALUMINIUM 2 LUBANG DGN 2 DAUN JENDELA (UKURAN 1,6 X 1,5 M)
680,000.00 82,500.00 42,000.00 804,500.00 804,500.00 400,000.00 79,454.55 42,000.00 521,454.55 521,450.00
4
5
a Profil aluminium 4" natural (+ spare 20 %) 9.24 M1 86,000.00 794,640.00 b Profil daun jendela alm.( + spare 20%) 11.04 M1 80,000.00 883,200.00 2 c Kaca polos 3 mm 2.40 m 63,000.00 151,200.00 d Engsel jendela 4.00 ps 22,000.00 88,000.00 e Grendel jendela 2.00 bh 19,500.00 39,000.00 f Kait angin 2.00 bh 14,000.00 28,000.00 g Acesories ( 6 % harga bahan) 1.00 ls 109,742.40 109,742.40 h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 158,928.00 158,928.00 i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 176,640.00 176,640.00 Jumlah 2,429,350.40 Dibulatkan 2,429,350.00 1 UNIT KUSEN JENDELA ALUMINIUM 3 LUBANG DGN 2 DAUN JENDELA DAN 1 KACA MATI (UKURAN 2 X 1,5 M) a Profil aluminium 4" natural (+ spare 20 %) 12.00 M1 86,000.00 1,032,000.00 b Profil daun jendela alm.( + spare 20%) 11.04 M1 80,000.00 883,200.00 2 c Kaca polos 3 mm 3.00 m 63,000.00 189,000.00 d Engsel jendela 4.00 ps 22,000.00 88,000.00 e Grendel jendela 2.00 bh 19,500.00 39,000.00 f Kait angin 2.00 bh 14,000.00 28,000.00 g Acesories ( 6 % harga bahan ) 1.00 ls 126,252.00 126,252.00 h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 206,400.00 206,400.00 i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 176,640.00 176,640.00 Jumlah 2,385,452.00 Dibulatkan 2,385,450.00 1 UNIT KUSEN PINTU JENDELA GENDONG ALUMINIUM DGN 2 JNDL DAN 1 PNT TEAKWOOD (UKR 2,2 X 2,7 M) a Profil aluminium 4" natural (+ spare 20 %) 17.04 M1 86,000.00 1,465,440.00 b Profil daun jendela alm.( + spare 20%) 14.88 M1 80,000.00 1,190,400.00 2 c Kaca polos 3 mm 3.96 m 63,000.00 249,480.00 2 d Daun pintu teakwood 1.80 m 301,200.00 542,160.00
6
7
8
e Engsel jendela 4.00 ps 22,000.00 f Grendel jendela 2.00 bh 19,500.00 g Kait angin 4.00 bh 14,000.00 h Engsel pintu 3.00 ps 25,000.00 i Grendel pintu 1.00 bh 32,500.00 j Kunci tanam 1.00 bh 20,000.00 k Acesories ( 6 % harga bahan ) 1.00 ls 145,266.00 l Upah pembuatan profil ( 20 % bahan ) 1.00 ls 17,600.00 m Upah pembuatan daun jendela (20 % bahan) 1.00 ls 7,800.00 Jumlah Dibulatkan 1 UNIT KUSEN PINTU ALUMINIUM UKR 0.9 X 2,7 M a Profil aluminium 4" natural (+ spare 20 %) 7.56 M1 86,000.00 2 b Kaca polos 3 mm untuk bovenlight 0.45 m 63,000.00 2 c Daun pintu tekwood 1.68 m 301,200.00 d Engsel pintu 3.00 ps 25,000.00 e Grendel pintu 1.00 bh 32,500.00 f Kunci tanam 1.00 bh 20,000.00 g Acesories ( 6 % ) 1.00 ls 40,710.60 h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 130,032.00 Jumlah Dibulatkan 1 BH BOVENLIGHT ALMUNIUM DENGAN KISI-KISI ALMUNIUM PLAT (UKURAN 0,5 X 1 M) a Profil Aluminium 4" natural + upah 20% 3.60 M1 63,000.00 b Plat Aluminium untuk Jalusi 5.00 M1 18,000.00 c Acesories ( 6 % ) 1.00 ls 13,608.00 d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 26,006.40 Jumlah Dibulatkan 1 BH BOVENLIGHT ALMUNIUM UKURAN 0,5 X 1 M DENGAN BAGIAN DALAM KACA
88,000.00 39,000.00 56,000.00 75,000.00 32,500.00 20,000.00 145,266.00 17,600.00 7,800.00 3,928,646.00 3,928,640.00 650,160.00 28,350.00 506,016.00 75,000.00 32,500.00 20,000.00 40,710.60 130,032.00 1,482,768.60 1,482,760.00 226,800.00 90,000.00 13,608.00 26,006.40 356,414.40 356,410.00
a Profil Aluminium 4" natural + upah 20% b Kaca Polos 3 mm c Acesories ( 6 % ) d Upah pembuatan profil ( 20 % bahan ) Jumlah Dibulatkan
3.60 0.50 1.00 1.00
XVI PEKERJAAN KACA & PENGGANTUNG 1 1 BUAH PASANG KUNCI TANAM BESAR a Kunci tanam besar 1.00 b Pembantu tukang 0.06 c Tukang kayu 0.60 Jumlah Dibulatkan 2 1 BUAH PASANG KUNCI TANAM SEDANG a Kunci tanam sedang 1.00 b Pembantu tukang 0.01 c Tukang kayu 0.50 Jumlah Dibulatkan 3 1 BUAH PASANG KUNCI BULAT PUTAR KAMAR MANDI a Kunci bulat putar kamar mandi 1.00 b Pembantu tukang 0.01 c Tukang kayu 0.50 Jumlah Dibulatkan
M1 m2 ls ls
86,000.00 63,000.00 18,576.00 5,201.28
309,600.00 31,500.00 18,576.00 5,201.28 364,877.28 364,870.00
bh org org
175,000.00 40,000.00 55,000.00
175,000.00 2,400.00 33,000.00 210,400.00 210,400.00
bh org org
55,000.00 40,000.00 55,000.00
55,000.00 400.00 27,500.00 82,900.00 82,900.00
bh org org
55,000.00 40,000.00 55,000.00
55,000.00 200.00 27,500.00 82,700.00 82,700.00
4
5
6
7
8
1 BUAH PASANG ENGSEL PINTU a Engsel pintu 1.00 b Pembantu tukang 0.02 c Tukang kayu 0.15 Jumlah Dibulatkan 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU a Engsel jendela 1.00 b Pembantu tukang 0.01 c Tukang kayu 0.10 Jumlah Dibulatkan 1 BUAH PASANG KAIT ANGIN a Kait angin 1.00 b Pembantu tukang 0.02 c Tukang kayu 0.15 Jumlah Dibulatkan 1 BUAH PASANG DOOR CLOSER a Door closer 1.00 b Pembantu tukang 0.05 c Tukang kayu 0.50 Jumlah Dibulatkan 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER a Door holder 1.00 b Pembantu tukang 0.05 c Tukang kayu 0.50 Jumlah Dibulatkan
bh org org
25,000.00 40,000.00 55,000.00
25,000.00 600.00 8,250.00 33,850.00 33,850.00
bh org org
22,000.00 40,000.00 55,000.00
22,000.00 400.00 5,500.00 27,900.00 27,900.00
bh org org
14,000.00 40,000.00 55,000.00
14,000.00 600.00 8,250.00 22,850.00 22,850.00
bh org org
412,000.00 40,000.00 55,000.00
412,000.00 2,000.00 27,500.00 441,500.00 441,500.00
bh org org
50,000.00 40,000.00 55,000.00
50,000.00 2,000.00 27,500.00 79,500.00 79,500.00
9
10
11
12
13
1 BUAH PASANG PENAHAN PINTU / DOOR STOPER a Door stoper b Pembantu tukang c Tukang kayu Jumlah Dibulatkan 1 BUAH PASANG GRENDEL / SLOOT PINTU a Grendel / sloot pintu b Pembantu tukang c Tukang kayu Jumlah Dibulatkan 1 BUAH PASANG GRENDEL / SLOOT JENDELA a Grendel / sloot jendela b Pembantu tukang c Tukang kayu Jumlah Dibulatkan 1 BUAH PASANG TARIKAN JENDELA a Tarikan jendela b Pembantu tukang c Tukang kayu Jumlah Dibulatkan 1 M2 PASANG KACA POLOS, TEBAL 3 MM a Kaca polos b Pembantu tukang c Tukang kayu Jumlah Dibulatkan
1.00 0.05 0.50
bh org org
65,000.00 40,000.00 55,000.00
65,000.00 2,000.00 27,500.00 94,500.00 94,500.00
1.00 0.05 0.50
bh org org
32,500.00 40,000.00 55,000.00
32,500.00 2,000.00 27,500.00 62,000.00 62,000.00
1.00 0.05 0.50
bh org org
19,500.00 40,000.00 55,000.00
19,500.00 2,000.00 27,500.00 49,000.00 49,000.00
1.00 0.05 0.50
bh org org
17,600.00 40,000.00 55,000.00
17,600.00 2,000.00 27,500.00 47,100.00 47,100.00
1.10 0.02 0.15
m2 org org
63,000.00 40,000.00 55,000.00
69,300.00 600.00 8,250.00 78,150.00 78,150.00
14
15
1 M2 PASANG KACA POLOS, TEBAL 5 MM a Kaca polos b Pembantu tukang c Tukang kayu Jumlah Dibulatkan 1 M2 PASANG KACA RAY BAND, TEBAL 5 MM a Kaca b Pembantu tukang c Tukang kayu Jumlah Dibulatkan
1.10 0.02 0.15
m2 org org
85,000.00 40,000.00 55,000.00
93,500.00 600.00 8,250.00 102,350.00 102,350.00
1.10 0.02 0.15
m2 org org
155,000.00 40,000.00 55,000.00
170,500.00 600.00 8,250.00 179,350.00 179,350.00
XVII PEKERJAAN PENGECATAN 1 1 M2 MENGIKIS / MENGEROK / MENGELUPAS PERMUKAAN CAT TEMBOK LAMA a Soda api 0.05 kg 45,000.00 b Pembantu tukang 0.05 org 40,000.00 c Tukang cat 0.02 org 55,000.00 Jumlah Dibulatkan 2 1 M2 MENDEMPUL DAN MENGGOSOK KAYU a Dempul jadi 0.10 kg 24,500.00 b Minyak cat 0.03 kg 20,000.00 c Ampelas kasar 0.30 lbr 2,500.00 d Pembantu tukang 0.04 org 40,000.00 e Tukang cat 0.05 org 55,000.00 Jumlah Dibulatkan
2,250.00 2,000.00 1,100.00 5,350.00 5,350.00 2,450.00 600.00 750.00 1,600.00 2,750.00 8,150.00 8,150.00
3
4
5
6
1 M2 PENGECATAN KAYU LAMA a Cat meni b Plamir c Ampelas d Cat dasar e Cat penutup kwalitas baik f Pembantu tukang g Tukang cat Jumlah Dibulatkan 1 M2 PENGECATAN KAYU BARU a Cat meni b Plamir c Ampelas d Cat dasar e Cat penutup kwalitas baik f Pembantu tukang g Tukang cat Jumlah Dibulatkan 1 M2 PENGECATAN KAYU DENGAN POLITUR a Politur b Dempul jadi c Ampelas d Pembantu tukang e Tukang cat Jumlah Dibulatkan 1 M2 PENGECATAN KAYU DENGAN MELAMIK a Melamik
0.25 0.15 1.00 0.15 0.60 0.05 0.15
kg kg lbr kg kg org org
19,000.00 22,500.00 2,500.00 40,000.00 40,000.00 40,000.00 55,000.00
4,750.00 3,375.00 2,500.00 6,000.00 24,000.00 2,000.00 8,250.00 50,875.00 50,870.00
0.50 0.15 1.00 0.15 0.35 0.05 0.15
kg kg lbr kg kg org org
19,000.00 22,500.00 2,500.00 40,000.00 40,000.00 40,000.00 55,000.00
9,500.00 3,375.00 2,500.00 6,000.00 14,000.00 2,000.00 8,250.00 45,625.00 45,620.00
0.15 0.25 2.00 0.05 0.15
Ltr kg lbr org org
35,000.00 24,500.00 2,500.00 40,000.00 55,000.00
5,250.00 6,125.00 5,000.00 2,000.00 8,250.00 26,625.00 26,620.00
0.15
Ltr
32,200.00
4,830.00
7
8
9
b Dempul jadi 0.25 kg c Ampelas 2.00 lbr d Pembantu tukang 0.05 org e Tukang cat 0.15 org Jumlah Dibulatkan 1 M2 PENGECATAN KAYU DENGAN CAT RESIDU/TER a Residu atau ter 0.35 Ltr b Pembantu tukang 0.15 org c Tukang cat 0.02 org Jumlah Dibulatkan 1 M2 PENGECATAN TEMBOK/Plafon BARU KWALITAS SEDANG a Plamir 0.10 kg b Rol cat 0.01 bh c Cat penutup kwalitas sedang 0.45 kg d Steger ( perancah kerja ) 0.01 Ls e Ampelas 0.50 lbr f Pembantu tukang 0.06 org g Tukang cat 0.20 org Jumlah Dibulatkan 1 M2 PENGECATAN TEMBOK/Plafon BARU KWALITAS BAIK a Plamir 0.10 kg b Rol cat 0.01 bh c Cat penutup kwalitas baik 0.50 kg d Steger ( perancah kerja ) 0.01 Ls e Ampelas 0.50 lbr f Pembantu tukang 0.06 org g Tukang cat 0.20 org
24,500.00 2,500.00 40,000.00 55,000.00
6,125.00 5,000.00 2,000.00 8,250.00 26,205.00 26,200.00
4,300.00 40,000.00 55,000.00
1,505.00 6,000.00 1,100.00 8,605.00 8,600.00
27,000.00 27,400.00 15,000.00 70,000.00 2,500.00 40,000.00 55,000.00
2,700.00 274.00 6,750.00 700.00 1,250.00 2,400.00 11,000.00 25,074.00 25,070.00
27,000.00 27,400.00 44,000.00 70,000.00 2,500.00 40,000.00 55,000.00
2,700.00 274.00 22,000.00 700.00 1,250.00 2,400.00 11,000.00
10
11
12
13
Jumlah Dibulatkan 1 M2 PENGECATAN TEMBOK LAMA a Cat penutup kwalitas baik 0.40 kg b Rol cat 0.01 bh c Steger ( perancah kerja ) 0.01 Ls d Ampelas 0.50 lbr e Pembantu tukang 0.06 org f Tukang cat 0.20 org Jumlah Dibulatkan 1 M2 PENGECATAN EXTERIOR a Cat tembok 0.36 kg b Plamir tembok 0.16 kg c Rol cat 0.01 bh d Steger ( perancah kerja ) 0.01 Ls e Ampelas 0.50 lbr f Pembantu tukang 0.20 org g Tukang cat 0.30 org Jumlah Dibulatkan 1 M2 MEMASANG WALLPAPER a Wallpaper 1.20 m2 b Lem Perekat 0.20 kg c Pembantu tukang 0.02 org d Tukang cat 0.15 org Jumlah Dibulatkan 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI a Meni besi 0.10 kg
40,324.00 40,320.00 28,250.00 27,400.00 70,000.00 2,500.00 40,000.00 55,000.00
11,300.00 274.00 700.00 1,250.00 2,400.00 11,000.00 26,924.00 26,920.00
78,000.00 27,000.00 27,400.00 70,000.00 2,500.00 40,000.00 55,000.00
28,080.00 4,320.00 274.00 700.00 1,250.00 8,000.00 16,500.00 59,124.00 59,120.00
17,600.00 35,000.00 40,000.00 55,000.00
21,120.00 7,000.00 800.00 8,250.00 37,170.00 37,170.00
19,000.00
1,900.00
14
XVIII 1
2
b Kuas 0.01 bh c Pembantu tukang 0.02 org d Tukang cat 0.20 org Jumlah Dibulatkan 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN CAT a Meni besi 0.10 kg b Cat besi 0.13 kg c Kuas 0.01 bh d Ampelas 0.50 lbr e Perancah kayu 0.01 m3 f Pembantu tukang 0.20 org g Tukang cat 0.20 org Jumlah Dibulatkan
PEKERJAAN LISTRIK PASANG 1 TITIK STOP KONTAK a Stop kontak b Kabel listrik NYM 3 x 2,5 mm c Aksesoris ( 20 % material ) d Pembantu tukang e Tukang listrik Jumlah Dibulatkan PASANG 1 TITIK LAMPU a Saklar b Kabel Listrik NYM 2 x 2,5 mm c Aksesoris ( 20 % material )
14,000.00 40,000.00 55,000.00
140.00 800.00 11,000.00 13,840.00 13,840.00
19,000.00 38,500.00 14,000.00 2,500.00 70,000.00 40,000.00 55,000.00
1,900.00 5,005.00 140.00 1,250.00 700.00 8,000.00 11,000.00 27,995.00 27,990.00
1.00 0.25 1.00 0.20 0.60
bh rol ls org org
21,200.00 445,000.00 22,250.00 40,000.00 55,000.00
21,200.00 111,250.00 22,250.00 8,000.00 33,000.00 195,700.00 195,700.00
1.00 0.25 1.00
bh rol ls
21,200.00 425,000.00 21,250.00
21,200.00 106,250.00 21,250.00
3
4
5
6
7
d Pembantu tukang e Tukang listrik Jumlah Dibulatkan PASANG 1 BUAH LAMPU SL a Lampu SL b Aksesoris ( 1 % alat ) c Tukang listrik Jumlah Dibulatkan PASANG 1 BUAH LAMPU TL a Lampu TL b Aksesoris ( 1 % alat ) c Tukang listrik Jumlah Dibulatkan PASANG 1 BUAH LAMPU BARET a Lampu Baret b Aksesoris ( 1 % alat ) c Tukang listrik Jumlah Dibulatkan PASANG 1 BUAH LAMPU PIJAR a Lampu Pijar b Aksesoris ( 1 % alat ) c Tukang listrik Jumlah Dibulatkan PASANG 1 BUAH LAMPU TAMAN a Lampu Taman
0.20 0.60
org org
40,000.00 55,000.00
8,000.00 33,000.00 189,700.00 189,700.00
1.00 1.00 0.10
bh ls org
58,000.00 580.00 55,000.00
58,000.00 580.00 5,500.00 64,080.00 64,080.00
1.00 1.00 0.12
bh ls org
58,000.00 580.00 55,000.00
58,000.00 580.00 6,600.00 65,180.00 65,180.00
1.00 1.00 0.15
bh ls org
90,000.00 900.00 55,000.00
90,000.00 900.00 8,250.00 99,150.00 99,150.00
1.00 1.00 0.10
bh ls org
6,000.00 60.00 55,000.00
6,000.00 60.00 5,500.00 11,560.00 11,560.00
1.00
bh
186,000.00
186,000.00
8
b Aksesoris ( 1 % alat ) c Tukang listrik Jumlah Dibulatkan PASANG 1 BUAH PANEL a Panel Listrik standart untuk Rumah b Aksesoris ( 10 % alat ) c Tukang listrik Jumlah Dibulatkan
XIX PEKERJAAN WATERPROOFING 1 PASANG 1 M2 WATERPROOFING MEMBRAN a Material Primer b Waterproofing Membrane c Pengetesan ( 10 % material ) d Pembantu tukang e Tukang batu Jumlah Dibulatkan 2 PASANG 1 M2 WATERPROOFING COATING a Pre treatment / Cleaning ( 10 % material ) b Bahan Waterproofing Coating c Kuas 3 " d Pembantu tukang e Tukang batu Jumlah Dibulatkan 3 PASANG 1 M2 FLOOR HARDERNER a Material Natural non Metalic
1.00 0.35
ls org
1,860.00 55,000.00
1,860.00 19,250.00 207,110.00 207,110.00
1.00 1.00 1.00
bh ls org
300,000.00 30,000.00 55,000.00
300,000.00 30,000.00 55,000.00 385,000.00 385,000.00
2.50 1.10 1.00 0.20 0.60
kg m2 ls org org
2,450.00 70,000.00 7,700.00 40,000.00 55,000.00
6,125.00 77,000.00 7,700.00 8,000.00 33,000.00 131,825.00 131,820.00
1.00 1.00 0.25 0.20 0.60
m2 kg bh org org
4,500.00 45,000.00 14,000.00 40,000.00 55,000.00
4,500.00 45,000.00 3,500.00 8,000.00 33,000.00 94,000.00 94,000.00
1.10
kg
45,000.00
49,500.00
b Aksesoris ( 10 % alat ) c Pembantu tukang d Tukang batu Jumlah Dibulatkan
1.00 0.20 0.60
ls org org
495.00 40,000.00 55,000.00
495.00 8,000.00 33,000.00 90,995.00 90,990.00