P ipe and Fitt Fi ttings ings Handling, S torage torage and Preservation
SAIC S-4056
SAIC S-4056
W2
S
3.0
DISCIPLINE:
Saudi Aramco shall be notified on initial delivery of Piping and fittings by type or manufacturer Contractor to perform weekly Inspection
INSTA L L A TION
Saudi Aramco shall be notified on start of this activity for each location Therm Thermopla oplast stic ic Piping Piping Installat allation ion and and Assemb Ass embly ly Inspection
3.1
SAIC S-4057
SAIC S-4057
H2
W2
Contractor Contractor QA/QC QA /QC shall be notified notified on the start of this this activity and inspect the first five joints made in each location / area Saudi Aramco shall be notified on start of this activity for each location
3.2
RTR piping Laying and Assembly Inspection
3.3
Application of Safety Color Coding & Stenciling of E quipment/ quipment/P P iping Identification
4.0 4.0 4.1
PREPRE-CO COMM MMIS ISSI SION ONIN ING G
Not Applicable
SAIC S-4058
SAIC S-4058
See Remarks
See Remarks
H2
W2
Contractor Contractor QA/QC QA /QC shall be notified notified on the start of this this activity and inspect the first five joints made of each location / area See SATIP-H-100-01 paint Application of Liquid Coating System for Industrial Facilities
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004) SATIP No.
SAUDI ARAMCO TYPICAL INSPECTION PLAN THERMOPLASTIC AND RTR PIPING
SATIP-S-070-03
PROJ ECT TITLE:
ITEM NO.
PROJECT PHASE & ACTIVITY CODE
APPROVED DATE
WBS/BI/J O/NO.
QUALITY PROCEDURE
TASK / ACTIVITY
QUALITY RECORD
DISCIPLINE:
18-May-05
PLUMBING
CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY ASSIGNMENTS CNTRCTR
REMARKS
SAUDI ARAMCO
GENERAL NOTES
1
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
3
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC representative is not present.
4
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
5
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.