RENCANA ANGGARAN ANGGARAN BEAYA Proyek : Rumah Tinggal Type 70 Lokasi : Sleman Yogyakarta NO
URAIAN PEKERJAAN
A.
BANGUNAN UTAMA
I
Pekerjaan Persiapan
VOLUME
SAT
1
Pembersihan lokasi
180.00
m2
2
Brak Kerja
12.00
m2
3
Uitzet dan Bauplank
58.00
m2
1.00
ls
1.00
ls
4 5
II
Air Kerja Keamanan Proyek Sub.Jumlah
HARGA SA SAT (Rp)
10,000. 00 300,000. 00 15,000. 00 450,000. 00 1,200,000. 00
JUMLAH HA HARGA (Rp)
1,800,000.00 3,600,000.00 870,000.00 450,000.00 1,200,000.00 7,920,000.00
Pekerjaan Tanah 1
Galian ta tanah
2
Urug Urugan an tana tanah h kem kemba bali li
3
Urug Urugan an pasi pasirr baw bawah ah pond pondas asii Sub.Jumlah
III
42.21
m3
10.55
m3
6.03
m3
12,500. 00 3,125. 00 60,000. 00
527,625.00 32,968.75 361,800.00 922,393.75
Pekerjaan Be Beton Be Bertulang 1
Slof 15/20
2
Kolo Kolom m prak prakti tis s 15/1 15/15 5
3
Ring Ba Balk 15/ 15/15 15 Sub Jumlah
IV.
2.01
m3
1.61
m3
1.50
m3
2,250,000. 00 2,500,000. 00 2,500,000. 00
4,522,500.00 4,025,000.00 3,750,000.00 12,297,500.00
Peker ekerjjaan aan Pa Pasan sangan +Ples Pleste tera ran n 1
Pas. Pas. Bat Batu u bela belah h 1Pc 1Pc : 3Kp 3Kp : 10Ps 10Ps
2
Pas. Pas. Bata Bata tras trasra ram m 1:2 1:2
3
Pasa Pasang ngan an Bata Bata 1Pc 1Pc :3 :3 Kp: Kp:10 10 Ps Ps
4
Ples Pleste tera ran n din dindi ding ng 1:3 1:3
5
Plest esteran eran 1: 3 :10 :10
6 7
Spon Sponeng engan an sud sudut ut dan dan ban ban-b -ban anan an Sub.Jumlah
18.09
m3
37.30
m2
107.30
m2
74.60
m2
214.60
m2
114.50
m1
275,000. 00 43,943. 00 40,940. 00 20,500. 00 14,600. 00 2,450. 00
4,974,750.00 1,639,073.90 4,392,862.00 1,529,300.00 3,133,160.00 280,525.00 15,949,670.90
Pekerjaan Keramik dan pelapis dinding
V. 1
Keramik lantai ruang
2
Keramik lantai teras+selasar Belakang
3
Keramik lantai kamar mandi Utama
4
Keramik dinding
5
Lstello
6
Keramik meja dapur
7
Pasangan batu alam Sub.Jumlah
VI.
56.50
m2
10.50
m2
3.00
m2
11.00
m2
13.00
bh
1.00
m2
18.50
m2
105,000. 00 105,000. 00 120,000. 00 115,000. 00 17,500. 00 92,000. 00 185,000. 00
5,932,500.00 1,102,500.00 360,000.00 1,265,000.00 227,500.00 92,000.00 3,422,500.00 12,402,000.00
Pekerjaan Pintu dan Jendela 1
Kusen pintu jendela 6/12 kayu jati
2
Pintu double teakwood
3
Daun jendela kaca
4
Engsel pintu 4"
5
Engsel jendela 3"
6
Handel pintu
7
Slot pintu kamar dll
8
Hak angin jendela
9
Grendel jendela Sub.Jumlah
VII.
70.00
m1
6.00
bh
11.00
bh
12.00
bh
6.00
bh
7.00
ps
12.00
bh
42.00
bh
3.00
bh
60,000. 00 600,000. 00 650,000. 00 15,000. 00 12,000. 00 200,000. 00 220,000. 00 25,000. 00 12,500. 00
4,200,000.00 3,600,000.00 7,150,000.00 180,000.00 72,000.00 1,400,000.00 2,640,000.00 1,050,000.00 37,500.00 20,329,500.00
Pekerjaan Plafon dan atap 1
Plafon
2
Gunung-gunung
3
Nok, murplat, gording, jurai
4
Papan talang dan seng
5
Lisplank
6 7
Genteng kodok Godean Kerpus /bubungan
70.00
m2
33.25
m2
6.48
m3
15.00
m1
43.00
m1
125.75
m2
35.00
m1
70,000. 00 46,000. 00 325,000. 00 32,000. 00 45,000. 00 25,500. 00 47,200.
4,900,000.00 1,529,500.00 2,106,000.00 480,000.00 1,935,000.00 3,206,625.00 1,652,000.00
00 15,809,125.00
Sub.Jumlah VIII.
Pekerjaan pipa dan Sanitair
1
Pipa tinja PVC 4" Wavin D
2
Pipa air kotor PVC 3" Wafin D
3
Pipa air bersih PVC 3/4 Wafin AW
4
Pipa air bersih PVC 1/2 " Wafin AW
5
Bak kontrol
6
Sumur dan air bersih
7
Water torn Penguin 500 l+ Radar
8
Pompa air Jet Pump
9
Septitank
10
Peresapan
11
Monoblok INA
12
Bak Mandi
13
Hand Sower
14
Kran Cabang
15
Kran tembok
16
Floor drain Sub.Jumlah
IX.
6.00
m1
34.00
m1
3.15
m1
21.00
m1
1.00
bh
1.00
unit
1.00
unit
1.00
unit
1.00
unit
1.00
unit
1.00
unit
1.00
unit
1.00
bh
1.00
bh
3.00
bh
1.00
bh
28,500. 00 20,500. 00 11,000. 00 10,000. 00 150,000. 00 3,000,000. 00 1,100,000. 00 1,200,000. 00 1,300,000. 00 600,000. 00 1,500,000. 00 700,000. 00 340,000. 00 425,000. 00 130,000. 00 160,000. 00
171,000.00 697,000.00 34,650.00 210,000.00 150,000.00 3,000,000.00 1,100,000.00 1,200,000.00 1,300,000.00 600,000.00 1,500,000.00 700,000.00 340,000.00 425,000.00 390,000.00 160,000.00 11,977,650.00
Pekerjaan Instalasi Listrik 1
Instalasi titik lampu
2
Instalasi titik lampu TL
3
Sambung Daya 2200 wat
4
MCB + box
5
Stop kontak Broco
6
Saklar tunggal Broco
7
Saklar Doble Broco Sub.Jumlah
10.00
ttk
1.00
ttk
1.00
ls
1.00
unit
6.00
bh
5.00
bh
3.00
bh
110,000. 00 165,000. 00 4,000,000. 00 275,000. 00 182,500. 00 50,000. 00 55,000. 00
1,100,000.00 165,000.00 4,000,000.00 275,000.00 1,095,000.00 250,000.00 165,000.00 7,050,000.00
X.
Pekerjaan Cat /finising 1
Cat dinding
2
Cat Plafon
3
Melamin Kusen
4
Melamin daun pintu
5
Melamin daun jendela Sub. Jumlah
XI.
214.60
m2
70.00
m2
70.00
m1
19.20
m2
9.90
m1
20,500. 00 20,500. 00 35,000. 00 65,000. 00 35,000. 00
4,399,300.00 1,435,000.00 2,450,000.00 1,248,000.00 346,500.00 9,878,800.00
Pekerjaan Lain-lain 1
XII.
Pembersihan akir Sub.Jumlah
1.00
ls
500,000. 00
500,000.00 500,000.00
Pekerjaan Tambahan 1
Pompa pedorong
2
Carport Sub.Jumlah
1.00
unit
16.50
m2
850,000. 00 42,500. 00
850,000.00 701,250.00 1,551,250.00
Jauhari Arif Pratama 3TGB2/20
REKAPITULASI RENCANA ANGGARAN BEAYA
Proyek : Rumah Tinggal Type 70 Lokasi : Sleman Yogyakarta
NO A.
JUMLAH HARGA (RP)
URAIAN PEKERJAAN BANGUNAN UTAMA
1
Pekerjaan Persiapan
7.920.000.00
2
Pekerjaan Tanah
3
Pekerjaan Beton Bertulang
12.297.500,00
4
Pekerjaan Pasangan +Plesteran
15.949.671,00
5
Pekerjaan Keramik dan pelapis dinding
12.402.000,00
6
Pekerjaan Pintu dan Jendela
20.329.500,00
7
Pekerjaan Plafon dan atap
15.809.125,00
8
Pekerjaan pipa dan Sanitair
11.977.650,00
9
Pekerjaan Instalasi Listrik
7.050.000,00
10
Pekerjaan Cat/Finishing
9.878.800,00
11
Pekerjaan Lain-lain
11
Pekerjaan Tambahan
922.394,00
.
500.000,00 1.551.250,00
Jumlah Dibulatkan
116.587,890,00
Rp
116.587.000,00