PEKERJAAN: PERENCANAAN PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype : T-24 /5 RUSUN PNS KDS/E
Lokasi
:
Jl. Soekarno Hatta, Kab. Mamuju
ANGGARAN PENDAPATAN BELANJA NEGARA (APBN) TAHUN ANGGARAN 2016
REKAPITULASI R E NC A NA A N GG A RA N B I AY A ( R AB ) Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: TT-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
N o.
I.
I.A. I.A.
II.
II.A.
JENIS PEKERJAAN
PEKERJAAN PERSIAPAN
JUMLAH HARGA( Rp. )
TOTAL I :
Rp
340.894.765,09
Rp
340.894.765,09
TOTAL II :
Rp
17.497.355.878,35
SUB TOTAL II.A :
Rp
14.224.578.793,51
Rp
4.289.855.707,43
Rp
4.289.855.707,43
Rp
8.315.814.044,42
PEKERJ PEKERJAAN AAN PERS PERSIAP IAPAN AN STAND STANDART ART
PEKERJAAN STRUKTUR, ARSITEKTUR DAN ME
PEKERJAAN STANDART
2.1.A. PEKERJAAN STRUKTUR STANDART A.1.
PEKERJAAN STRUKTUR STRUKTUR ATAS (UPPER (UPPER STURCTURE)
2.2.A. PEKERJAAN ARSITEKTUR STANDART A.1.
PEKERJAAN LANTAI LANTAI
Rp
1.687.634.224,72
A.2.
PEKERJAAN DINDING DINDING
Rp
4.243.846.408,47
A.3.
PEKERJAAN PLAFOND PLAFOND
Rp
1.127.982.481,06
A.4.
PEKERJAAN ATAP ATAP
Rp
223.591.518,45
A.5.
PEKERJAAN UTILITAS UTILITAS
Rp
403.007.055,00
A.6.
PEKERJAAN FINISHING FINISHING
Rp
629.752.356,72
Rp
1.618.909.041,66
2.3.A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
II.B.
A.1.
PEKERJAAN INSTALASI INSTALASI PLAMBING PLAMBING
Rp
525.081.563,92
A.2.
PEKERJAAN INSTALASI INSTALASI ELEKTRIKAL ELEKTRIKAL
Rp
1.093.827.477,74
Rp
3.272.777.084,85
Rp
1.744.713.943,75
PEKERJAAN NON STANDART
2.1.B. PE PEKERJAAN STRUKTUR NON STANDART
SUB TOTAL II.B :
B.1.
PEKERJAAN STRUKTUR BAWAH (SUB STURCTURE)
Rp
1.484.492.366,67
B.2.
PEKERJAAN STRUKTUR GROUND WATER TANK
Rp
260.221.577,08
Rp
143.677.780,60
2.2.B. PEKERJAAN ARSITEKTUR NON STANDART B.1.
PEK.BAK SAMPAH
Rp
6.732.000,00
B.2.
PEK. PERKERASAN KELILING BAGIAN LUAR BANGUNAN
Rp
30.950.084,00
B.3.
PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.(*)
Rp
43.542.139,95
B.4.
PEKERJAAN GROUND WATER TANK
Rp
62.453.556,64
Rp
1.384.385.360,50
2.3.B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL B.1.
PEKERJAAN PEMADAM KEBAKARAN
Rp
75.350.320,71
B.2.
PEKERJAAN VENTILASI UDARA
Rp
91.040.796,24
REKAPITULASI PEK. PERSIAPAN, STRUKTUR, ARSITEKTUR, M/E
Page 1
REKAPITULASI R E NC A NA A N GG A RA N B I AY A ( R AB ) Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: TT-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
N o.
JENIS PEKERJAAN
JUMLAH HARGA( Rp. )
B.3.
PEKERJAAN INSTALASI ELEKTRONIK
Rp
84.768.541,19
B.3.
PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)
Rp
1.133.225.702,37
TOTAL I + II : Rp
17.838.250.643,45
DIBULATKAN : Rp
17.838.250.000,00
PPN 10 % : Rp
1.783.825.000,00
Terbilang :
TOTAL :
Rp
19.622.075.000,00
DI BULATKAN :
Rp
19.622.075.000,00
SEMBILAN BELAS MILYAR ENAM RATUS DUA PULUH DUA JUTA TUJUH PULUH LIMA RIBU RUPIAH.
REKAPITULASI PEK. PERSIAPAN, STRUKTUR, ARSITEKTUR, M/E
Page 2
REKAPITULASI R E NC AN A A NG GA RA N B IA YA ( RA B) - P E KE RJ AA N P E RS IA PA N Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe P ro ro to totyp e
: TT-24 /5 R US USU N P NS NS KD S/ S/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
I. PERSIAPAN STANDART N o.
URAIAN PEKERJAAN
I.A.
PEKERJAAN PERSIAPAN STANDART
REKAP PEK. PERSIAPAN
JUMLAH HARGA
(Rp.)
340.894.765,09
Page 1
RENCANA ANGGARAN BIAYA
P E KE R JA A N P E RS I AP A N
Pekerjaan Tipe Prototype Jumlah Lantai Lokasi Tahun Anggaran
RAB
: PERENCANAAN PROTOTYPE RUSUN PUPERA : T-24/5 LT RUSUN PNS : 5 LANTAI : Jl.Soekarno Hatta Mamuju : 2015
I. PERSIAPAN STANDART NO.
URAIAN PEKERJAAN
IA
PEKERJAAN PERSIAPAN STANDART
1 2 3 4 5 6 7 8 9 10 11
Pengukuran dan Pemasangan Bouwplank Direksi Keet Gudang Kerja Papan Nama Proyek Foto Proyek 3 Fase (warna) Air Kerja Listrik Kerja Pagar Seng Keliling Proyek Mobile Crane (2 unit) > 10 ton Pekerjaan Soil Test, Sondir kapasitas 2,5 ton dan bor dalam Pekerjaan Perancah keliling +Jaring pengaman
PEK. PERSIAPAN
VOL.
SAT.
HARGA SATUAN ( Rp. )
JUMLAH HARGA ( Rp. )
340.894.765,09 1.211,60 50,00 24,00 1,00 3,00 8,00 8,00 256,00
M' 2
M 2 M Buah Set Bulan Bulan M' Bulan Unit M
2
69.936,24 1.553.784,38 1.442.678,88 350.000,00 220.000,00 550.000,00 625.000,00 521.236,35 108.000.000,00 30.000.000,00 127.442,59
84.734.748,38 77.689.218,75 34.624.293,00 350.000,00 660.000,00 4.400.000,00 5.000.000,00 133.436.504,96 -
Page 1
REKAPITULASI R E N C AN A A N G G AR A N B I A Y A (R A B ) -P E K E R J AA N S T R U K TU R
Pekerjaan Tipe Prototype Jumlah Lantai Lokasi
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR : T-24 /5 RUSUN PNS KDS/E : 5 LANTAI : Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR
A.
PEKERJAAN STRUKTUR BAWAH (SUB STURCTURE)
C.
(
1.484.492.366,67
1 Pekerjaan Pondasi Sumuran
Rp
1.128.361.512,96
2 Pekerjaan Pilecap
Rp
116.310.987,32
3 Peker jaan T ie Beam (sloof)
Rp
187.806.283,25
4 Pekerjaan Galian Tanah
Rp
7.370.882,74
5 Pekerjaan Urugan Pasir
Rp
3.065.109,26
6 Pekerjaan Lantai Kerja
Rp
7.817.816,37
7 Urugan tanah kembali bekas galian
Rp
3.759.774,77
8 Tanah urug peninggian lantai t=45 cm (dalam bangunan)
Rp
-
9 Pasir urug diatas tanah urug t=10 cm (dalam bangunan)
Rp
-
10 Pekerjaan Test PDA Tiang
B.
JUMLAH HARGA Rp)
URAIAN PEKERJAAN
NO.
Rp
30.000.000,00
PEKERJAAN STRUKTUR ATAS (UPPER STURCTURE)
4.289.855.707,43
1 Pekerjaan Struktur Lantai Dasar elv. -0.50 m
Rp
338.876.257,40
2 Pekerjaan Struktur Lantai 2 elv. +3.52 m
Rp
860.605.677,58
3 Pekerjaan Struktur Lantai 3 elv. +6.75 m
Rp
860.605.677,58
4 Pekerjaan Struktur Lantai 4. +9.98 m
Rp
903.913.870,91
5 Pekerjaan Struktur Lantai 5 elv. +10.98 m
Rp
790.016.714,43
6 Pekerjaan Struktur Lantai Atap elv. +12.55 m
Rp
535.837.509,53
PEKERJAAN STRUKTUR GROUND WATER TANK
260.221.577,08
Jumlah Total Harga Pekerjaan Struktur (A + B + C )
6.034.569.651,18 2
Luas Bangunan ( D ) m 2
Harga/m (A+B+C/D)
C:\Users\Owner\Downloads\4.RAB STRUKTUR GED KDS E-mamuju-.xlsx1.Rekap Rab STr
4574,6 1.319.146,95
1/1
RENCANA ANGGARAN BIAYA (RAB) P E KE R JA A N - S T RU K T UR Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR URAIAN PEKERJAAN
NO.
A.
UNIT
VOLUME
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
PEKERJAAN STRUKTUR BAWAH (SUB STURCTURE)
1.484.492.366,67
1 Pekerjaan Pondasi Sumuran Tipe Pondasi sumuran d 60 cm, L = 6 m
m'
Pemotongan kepala tiang
nos
3
3.168,000
356.174,72
528,000
0,00
1.128.361.512,96 -
2 Pekerjaan Pilecap Tipe PC-1 750x800 mm Beton K-225
m
27,648
1.236.357,99
34.182.825,79
Besi beton
kg
1.282,215
11.996,82
15.382.504,69
Bekisting
2
108,544
100.958,77
10.958.468,73
3
m
Tipe PC-2 1250x1150 mm Beton K-225
m
13,824
1.236.357,99
17.091.412,89
Besi beton
kg
2.768,779
11.996,82
33.216.540,86
2
54,272
100.958,77
5.479.234,37
Bekisting
m
3 Pekerjaan Tie Beam (sloof) Tipe TB-1 25x50 cm L = 2.1 m 3
Beton K-225
m
17,600
1.236.357,99
21.759.900,67
Besi beton
kg
5.199,689
11.996,82
62.379.736,64
Bekisting
2
132,000
100.958,77
13.326.557,64
3
m
L=3m Beton K-225
m
15,300
1.236.357,99
18.916.277,29
Besi beton
kg
3.678,784
11.996,82
44.133.707,41
Bekisting
2
122,400
100.958,77
12.357.353,45
m
L = 4.5 m Beton K-225
m
3
3,000
1.236.357,99
3.709.073,98
Besi beton
kg
733,583
11.996,82
8.800.665,68
24,000
100.958,77
2.423.010,48
Bekisting
2
m
4 Pekerjaan Galian Tanah Galian Tanah Pondasi < 1 m Tipe PC-1 750x800 mm Tipe PC-2 1250x1150 mm
3
40,448
56.356,30
2.279.499,62
3
20,224
56.356,30
1.139.749,81
6,094
56.356,30
343.421,20
51,675
56.356,30
2.912.211,80
3
12,350
56.356,30
696.000,31
3
5,120
180.598,00
924.661,76
3
2,560
180.598,00
462.330,88
3
0,938
180.598,00
169.310,63
m m
Galian Tanah Pondasi < 1 m Tipe TB-1 25x50 cm L = 2.1 m
3
m
3
L=3m
m
L = 4.5 m
m
5 Pekerjaan Urugan Pasir Urugan Pasir dibawah Pondasi t = 10 cm Tipe PC-1 750x800 mm Tipe PC-2 1250x1150 mm
m m
Urugan Pasir dibawah Tie Beam t = 10 cm Tipe TB-1 25x50 cm L = 2.1 m
PEK. STRUKTUR
m
Page 1
RENCANA ANGGARAN BIAYA (RAB) P E KE R JA A N - S T RU K T UR Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR URAIAN PEKERJAAN
NO. L=3m L = 4.5 m
UNIT
VOLUME
3
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
7,950
180.598,00
1.435.754,10
0,405
180.598,00
73.051,89
3
2,560
921.260,47
2.358.426,81
3
1,280
921.260,47
1.179.213,40
3
0,469
921.260,47
431.840,85
3
3,975
921.260,47
3.662.010,38
3
0,202
921.260,47
186.324,93
113,819
33.033,00
3.759.774,77
m
3
m
6 Pekerjaan Lantai Kerja Lantai Kerja dibawah Pondasi t = 5 cm Tipe PC-1 750x800 mm Tipe PC-2 1250x1150 mm
m m
Lantai Kerja dibawah Tie Beam t = 5 cm Tipe TB-1 25x50 cm L = 2.1 m L=3m
m
L = 4.5 m
m
7 Urugan tanah kembali bekas galian 8 Tanah urug peninggian lantai t=45 cm (dalam bangunan) 9 Pasir urug diatas tanah urug t=10 cm (dalam bangunan) 10 Pekerjaan Test PDA Tiang B.
m
3
3
-
91.333,00
-
3
-
154.088,00
-
m m m
ttk
3,000
10.000.000,00
PEKERJAAN STRUKTUR ATAS (UPPER STURCTURE)
30.000.000,00 4.405.092.727,43
1 Pekerjaan Struktur Lantai Dasar elv. -0.50 m
338.876.257,40
a Komponen Kolom Tipe K1 30x40 cm 3
Beton K-225
m
40,800
1.236.357,99
50.443.406,11
Besi beton
kg
10.330,657
11.996,82
123.935.035,48
435,200
159.141,77
69.258.496,85
0,612
1.236.357,99
756.651,09
Bekisting
2
m
Tipe K2 30x30 cm 3
Beton K-225
m
Besi beton
kg
142,581
11.996,82
1.710.519,83
2
409,600
159.141,77
65.184.467,63
Bekisting
m
c Komponen Tangga Tangga Darurat Beton K-225
m
3
6,027
1.236.357,99
7.451.599,17
Besi beton
kg
566,826
11.996,82
6.800.115,18
10,269
184.108,65
1.890.611,73
Bekisting
2
m
Tangga Utama Beton K-225
m
3
4,291
1.236.357,99
5.305.273,97
Besi beton
kg
407,806
11.996,82
4.892.376,05
6,777
184.108,65
1.247.704,32
Bekisting
2
m
2 Pekerjaan Struktur Lantai 2 elv. +3.52 m
872.051.031,91
a Komponen Kolom Tipe K1 30x50 cm 3
Beton K-225
m
38,400
1.236.357,99
47.476.146,93
Besi beton
kg
2.956,800
11.996,82
35.472.197,38
159.141,77
65.184.467,63
Bekisting
2
m
409,600
b. Komponen Balok
PEK. STRUKTUR
Page 2
RENCANA ANGGARAN BIAYA (RAB) P E KE R JA A N - S T RU K T UR Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR URAIAN PEKERJAAN
NO.
UNIT
VOLUME
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
B-1 20x40 cm, L = 3 m 3
Beton K-225
m
24,140
1.236.357,99
29.845.063,77
Besi beton
kg
5.528,723
11.996,82
66.327.094,72
Bekisting
2
193,116
171.260,65
33.073.171,69
3
m
B-2 20x30 cm, L = 4.25 m Beton K-225
m
3,604
1.236.357,99
4.455.339,66
Besi beton
kg
1.072,366
11.996,82
12.864.986,94
2
36,036
171.260,65
6.171.548,78
Bekisting
m
B-3 25x40 cm, L = 1.55 m Beton K-225
m
3
2,622
1.236.357,99
3.241.730,66
Besi beton
kg
Bekisting
724,548
11.996,82
8.692.273,03
2
20,976
171.260,65
3.592.363,39
3
0,482
1.236.357,99
595.491,83
m
B-5 15x50 cm, L = 8.75 m Beton K-225
m
Besi beton
kg
Bekisting
97,691
11.996,82
1.171.986,58
2
6,422
171.260,65
1.099.835,89
3
0,304
1.236.357,99
375.852,83
83,802
11.996,82
1.005.353,90
2,432
171.260,65
416.505,90
m
B-6 10x20 cm, L = 15.5 m Beton K-225
m
Besi beton
kg
Bekisting
2
m
c Komponen Pelat Lantai Pelat t = 130 mm 3
Beton K-225
m
116,619
1.236.357,99
144.182.956,40
Besi beton
kg
15.149,445
11.996,82
181.745.170,35
2
897,070
220.132,00
197.473.813,24
Bekisting
m
d Komponen Tangga Tangga Darurat Beton K-225
m
3
6,027
1.236.357,99
7.451.599,17
Besi beton
kg
566,826
11.996,82
6.800.115,18
10,269
184.108,65
1.890.611,73
Bekisting
2
m
Tangga Utama Beton K-225
m
3
4,291
1.236.357,99
5.305.273,97
Besi beton
kg
407,806
11.996,82
4.892.376,05
6,777
184.108,65
1.247.704,32
Bekisting
2
m
3 Pekerjaan Struktur Lantai 3 elv. +6.75 m
860.605.677,58
a Komponen Kolom Tipe K1 30x40 cm 3
Beton K-225
m
38,400
1.236.357,99
47.476.146,93
Besi beton
kg
2.956,800
11.996,82
35.472.197,38
Bekisting
2
409,600
159.141,77
65.184.467,63
3
24,140
1.236.357,99
29.845.063,77
m
b. Komponen Balok B-1 25x50 cm, L = 4.25 m Beton K-225
PEK. STRUKTUR
m
Page 3
RENCANA ANGGARAN BIAYA (RAB) P E KE R JA A N - S T RU K T UR Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR URAIAN PEKERJAAN
NO. Besi beton Bekisting
UNIT
VOLUME
kg
5.528,723
2
3
m
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
11.996,82
66.327.094,72
193,116
171.260,65
33.073.171,69
B-2 20x30 cm, L = 4.25 m Beton K-225
m
3,604
1.236.357,99
4.455.339,66
Besi beton
kg
1.072,366
11.996,82
12.864.986,94
2
36,036
171.260,65
6.171.548,78
Bekisting
m
B-3 25x40 cm, L = 1.55 m Beton K-225
m
3
2,622
1.236.357,99
3.241.730,66
Besi beton
kg
Bekisting
724,548
11.996,82
8.692.273,03
2
20,976
171.260,65
3.592.363,39
3
0,482
1.236.357,99
595.491,83
m
B-5 15x50 cm, L = 8.75 m Beton K-225
m
Besi beton
kg
Bekisting
97,691
11.996,82
1.171.986,58
2
6,422
171.260,65
1.099.835,89
3
0,304
1.236.357,99
375.852,83
83,802
11.996,82
1.005.353,90
2,432
171.260,65
416.505,90
m
B-6 10x20 cm, L = 15.5 m Beton K-225
m
Besi beton
kg
Bekisting
2
m
c Komponen Pelat Lantai Pelat t = 130 mm 3
Beton K-225
m
116,619
1.236.357,99
144.182.956,40
Besi beton
kg
15.149,445
11.996,82
181.745.170,35
2
897,070
220.132,00
197.473.813,24
Bekisting
m
d Komponen Tangga Tangga Darurat Beton K-225
m
3
6,027
1.236.357,99
7.451.599,17
Besi beton
kg
566,826
11.996,82
6.800.115,18
10,269
184.108,65
1.890.611,73
Bekisting
2
m
4 Pekerjaan Struktur Lantai 4. +9.98 m
903.913.870,91
a Komponen Kolom Tipe K3 25x25 cm 3
Beton K-225
m
38,400
1.236.357,99
47.476.146,93
Besi beton
kg
7.912,323
11.996,82
94.922.716,78
Bekisting
2
409,600
159.141,77
65.184.467,63
3
m
b. Komponen Balok B-1 25x50 cm, L = 4.25 m Beton K-225
m
24,140
1.236.357,99
29.845.063,77
Besi beton
kg
5.528,723
11.996,82
66.327.094,72
Bekisting
2
193,116
171.260,65
33.073.171,69
3
m
B-2 20x30 cm, L = 4.25 m Beton K-225
m
3,604
1.236.357,99
4.455.339,66
Besi beton
kg
1.072,366
11.996,82
12.864.986,94
2
36,036
171.260,65
6.171.548,78
Bekisting
PEK. STRUKTUR
m
Page 4
RENCANA ANGGARAN BIAYA (RAB) P E KE R JA A N - S T RU K T UR Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR URAIAN PEKERJAAN
NO.
UNIT
VOLUME
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
B-3 25x40 cm, L = 1.55 m Beton K-225
m
3
2,622
1.236.357,99
3.241.730,66
Besi beton
kg
Bekisting
724,548
11.996,82
8.692.273,03
2
20,976
171.260,65
3.592.363,39
3
0,482
1.236.357,99
595.491,83
m
B-5 15x50 cm, L = 8.75 m Beton K-225
m
Besi beton
kg
Bekisting
97,691
11.996,82
1.171.986,58
2
6,422
171.260,65
1.099.835,89
3
0,304
1.236.357,99
375.852,83
83,802
11.996,82
1.005.353,90
2,432
171.260,65
416.505,90
m
B-6 10x20 cm, L = 15.5 m Beton K-225
m
Besi beton
kg
Bekisting
2
m
c Komponen Pelat Lantai Pelat t = 130 mm 3
Beton K-225
m
116,619
1.236.357,99
144.182.956,40
Besi beton
kg
15.149,445
11.996,82
181.745.170,35
2
897,070
220.132,00
197.473.813,24
Bekisting
m
6 Pekerjaan Struktur Lantai 5 elv. +10.98 m
790.016.714,43
a Komponen Kolom Tipe K3 25x25 cm 3
Beton K-225
m
38,400
1.236.357,99
47.476.146,93
Besi beton
kg
7.912,323
11.996,82
94.922.716,78
Bekisting
2
409,600
159.141,77
65.184.467,63
m
a Komponen Balok RB-1 20x35 cm, L = 3.05 m Beton K-225
m
3
89,463
1.236.357,99
110.607.676,94
Besi beton
kg
83,802
11.996,82
1.005.353,90
715,700
171.260,65
122.571.247,21
Bekisting
2
m
RB-1 20x35 cm, L = 1.9 m 3
Beton K-225
m
3,452
1.236.357,99
4.267.907,79
Besi beton
kg
1.064,511
11.996,82
12.770.745,97
69,040
171.260,65
11.823.835,28
0,312
1.236.357,99
385.743,69
205,873
11.996,82
2.469.819,35
4,160
171.260,65
712.444,30
Bekisting
2
m
RB-1 20x35 cm, L = 4.795 m 3
Beton K-225
m
Besi beton
kg
Bekisting
2
m
b Komponen Pelat Lantai Pelat t = 120 mm 3
Beton K-225
m
116,619
1.236.357,99
144.182.956,40
Besi beton
kg
15.149,445
11.996,82
181.745.170,35
2
897,070
220.132,00
197.473.813,24
Bekisting
PEK. STRUKTUR
m
Page 5
RENCANA ANGGARAN BIAYA (RAB) P E KE R JA A N - S T RU K T UR Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR URAIAN PEKERJAAN
NO.
UNIT
VOLUME
HARGA SATUAN (Rp)
6 Pekerjaan Struktur Lantai Atap elv. +12.55 m
JUMLAH HARGA (Rp) 535.837.509,53
a Komponen Balok G-1 25x40 cm, L = 4.5 m Beton K-225
m
3
89,463
1.236.357,99
110.607.676,94
Besi beton
kg
83,802
11.996,82
1.005.353,90
715,700
171.260,65
122.571.247,21
Bekisting
2
m
G-1 25x40 cm, L = 4.55 m 3
Beton K-225
m
3,452
1.236.357,99
4.267.907,79
Besi beton
kg
1.064,511
11.996,82
12.770.745,97
69,040
171.260,65
11.823.835,28
0,312
1.236.357,99
385.743,69
205,873
11.996,82
2.469.819,35
4,160
171.260,65
712.444,30
Bekisting
2
m
G-2 25x40 cm, L = 1.95 m 3
Beton K-225
m
Besi beton
kg
Bekisting
2
m
RB-1 20x35 cm, L = 1.95 m 3
Beton K-225
m
21,560
1.236.357,99
26.655.878,33
Besi beton
kg
4.021,623
11.996,82
48.246.689,73
Bekisting
2
172,480
171.260,65
29.539.036,91
3
m
RB-1 20x35 cm, L = 4.5 m Beton K-225
m
9,660
1.236.357,99
11.943.218,21
Besi beton
kg
1.689,008
11.996,82
20.262.723,88
77,280
171.260,65
13.235.023,03
681,944
175.000,00
119.340.165,00
Bekisting
2
m
b Komponen Rangka Atap Rangka Atap Baja Ringan
C.
2
m
PEKERJAAN STRUKTUR GROUND WATER TANK
260.221.577,08
Pekerjaan Struktur Bawah
105.441.833,88
1 Pekerjaan Pondasi Sumuran Tipe Tiang Pondasi 25x25 cm, L = 18 m
m'
Pemotongan kepala tiang
nos
144,000
356.174,72
51.289.159,68
8,000
78.000,00
624.000,00
2 Pekerjaan Pilecap Tipe PC-1 750x750 mm Beton K-225
m
3
1,575
1.546.427,47
2.435.623,26
Besi beton
kg
Bekisting
602,739
11.996,82
7.230.952,20
2
8,400
181.270,65
1.522.673,46
3
0,195
1.236.357,99
241.089,81
m
3 Pekerjaan Tie Beam (sloof) Tipe TB-1 25x40 cm L = 2.05 m Beton K-225
m
Besi beton
kg
Bekisting
120,609
11.996,82
1.446.925,19
2
1,560
181.270,65
282.782,21
3
0,195
1.236.357,99
241.089,81
97,241
11.996,82
1.166.581,88
m
L = 3.1 m Beton K-225
m
Besi beton
kg
PEK. STRUKTUR
Page 6
RENCANA ANGGARAN BIAYA (RAB) P E KE R JA A N - S T RU K T UR Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR URAIAN PEKERJAAN
NO. Bekisting
UNIT
VOLUME
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
2
1,560
181.270,65
282.782,21
m
L = 4.1 m Beton K-225
m
3
0,126
1.236.357,99
155.317,47
Besi beton
kg
63,424
11.996,82
760.886,20
2
1,005
181.270,65
182.177,00
3
0,720
1.236.357,99
890.177,75
Bekisting
m
L = 7.15 m Beton K-225
m
Besi beton
kg
Bekisting
312,230
11.996,82
3.745.772,81
2
5,760
181.270,65
1.044.118,94
3
3,375
56.356,30
190.202,51
m
4 Pekerjaan Galian Tanah Galian Tanah Pondasi < 1 m Tipe PC-1 750x750 mm
m
Tipe TB-1 25x40 cm L = 2.05 m
3
1,128
56.356,30
63.541,73
3
0,715
56.356,30
40.294,75
3
0,461
56.356,30
25.959,12
2,640
56.356,30
148.780,63
m
L = 3.1 m
m
L = 4.1 m
m
L = 7.15 m
3
m
5 Pekerjaan Urugan Pasir Urugan Pasir dibawah Pondasi t = 10 cm Tipe PC-1 750x750 mm
3
0,450
180.598,00
81.269,10
3
0,205
180.598,00
37.022,59
3
0,130
180.598,00
23.477,74
3
0,084
180.598,00
15.125,08
3
0,480
180.598,00
86.687,04
0,225
921.260,47
207.283,61
m
Urugan Pasir dibawah Tie Beam t = 10 cm Tipe TB-1 25x40 cm L = 2.05 m L = 3.1 m L = 4.1 m L = 7.15 m
m m m m
6 Pekerjaan Lantai Kerja Lantai Kerja dibawah Pondasi t = 5 cm Tipe PC-1 750x750 mm
3
m
Lantai Kerja dibawah Tie Beam t = 5 cm Tipe TB-1 25x40 cm L = 2.05 m
3
0,103
921.260,47
94.429,20
3
0,065
921.260,47
59.881,93
3
m
L = 3.1 m
m
L = 4.1 m
m
L = 7.15 m 7 Urugan tanah kembali bekas galian 8 Pasir urug diatas tanah urug t=10 cm (dalam bangunan)
0,042
921.260,47
38.577,78
3
0,240
921.260,47
221.102,51
3
6,969
33.033,00
230.219,36
3
8,741
154.088,00
1.346.921,73
m m m
9 Komponen Pelat Lantai Pelat t = 250 mm 3
Beton K-225
m
11,234
1.236.357,99
13.888.936,60
Besi beton
kg
1.258,668
11.996,82
15.100.010,95
Pekerjaan Struktur Atas
154.779.743,20
1 Komponen Kolom
PEK. STRUKTUR
Page 7
RENCANA ANGGARAN BIAYA (RAB) P E KE R JA A N - S T RU K T UR Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
II. PEKERJAAN STRUKTUR URAIAN PEKERJAAN
NO.
UNIT
VOLUME
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
Tipe KP 15x15 cm 3
Beton K-225
m
Besi beton
kg
Bekisting
0,567
1.236.357,99
701.014,98
201,681
11.996,82
2.419.529,14
2
15,120
159.141,77
2.406.223,51
m
2 Komponen Balok Tipe B-1 150x250 mm L = 2.05 m Beton K-225
m
3
0,148
1.236.357,99
183.228,25
Besi beton
kg
74,566
11.996,82
894.560,51
2
1,976
171.260,65
338.411,04
Bekisting
m
L = 3.1 m Beton K-225
m
3
0,115
1.236.357,99
142.242,99
Besi beton
kg
56,243
11.996,82
674.740,86
2
1,534
171.260,65
262.713,84
0,077
1.236.357,99
95.230,47
Bekisting
m
L = 4.1 m 3
Beton K-225
m
Besi beton
kg
37,283
11.996,82
447.280,25
2
1,027
171.260,65
175.884,69
3
0,410
1.236.357,99
506.288,60
195,259
11.996,82
2.342.490,60
5,460
171.260,65
935.083,15
Bekisting
m
L = 7.15 m Beton K-225
m
Besi beton
kg
Bekisting
2
m
3 Komponen Dinding Geser SW-1 3
Beton K-225
m
23,084
1.236.357,99
28.540.087,91
Besi beton
kg
3.796,042
11.996,82
45.540.431,10
Bekisting
2
230,840
194.118,65
44.810.349,17
m
4 Komponen Pelat Lantai Pelat t = 120 mm Beton K-225
m
3
5,392
1.236.357,99
6.666.689,57
Besi beton
kg
567,286
11.996,82
6.805.631,15
44,935
220.132,00
9.891.631,42
Bekisting
PEK. STRUKTUR
2
m
Page 8
REKAPITULASI R EN CA N A A NG GA R AN B IA YA ( R AB ) - P EK ER JA A N A RS IT EK T UR
Pekerjaan : PERENCANAAN PROTOTYPE RUSUN PUPERA Tipe Protot : T-24/5 LT RUSUN PNS Jumlah Lan : 5 LANTAI Lokasi
: Jl.Soekarno Hatta Mamuju
Tahun Ang : 2015
URAIAN PEKERJAAN
No.
2.2.A. A.1.
A.2. A.2.A.
A.2.B.
A.3.
A.4.
A. PEKERJAAN ARSITEKTUR STANDART
A.6. A.6.A.
Rp
I
LANTAI DASAR
Rp
992.703.074,78
II
LANTAI DUA
Rp
173.732.787,49
III
LANTAI TIGA
Rp
173.732.787,49
IV
LANTAI EMPAT
Rp
173.732.787,49
V
LANTAI LIMA
Rp
173.732.787,49
1.687.634.224,72
PEKERJAAN DINDING
4.243.846.408,47
PEKERJAAN PASANGAN DAN PLESTERAN I
LANTAI DASAR
Rp
439.894.004,37
II
LANTAI DUA
Rp
457.762.416,16
III
LANTAI TIGA
Rp
457.762.416,16
IV
LANTAI EMPAT
Rp
457.762.416,16
V
LANTAI LIMA
Rp
457.119.159,02
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES I
LANTAI DASAR
Rp
421.055.316,50
II
LANTAI DUA
Rp
388.122.670,02
III
LANTAI TIGA
Rp
388.122.670,02
IV
LANTAI EMPAT
Rp
388.122.670,02
V
LANTAI LIMA
Rp
388.122.670,02
PEKERJAAN PLAFOND I
LANTAI DASAR
Rp
225.596.496,21
II
LANTAI DUA
Rp
225.596.496,21
III
LANTAI TIGA
Rp
225.596.496,21
IV
LANTAI EMPAT
Rp
225.596.496,21
V
LANTAI LIMA
Rp
225.596.496,21
PEKERJAAN ATAP LANTAI ATAP
Rp
Rp
2.270.300.411,88
Rp
1.973.545.996,59
Rp
1.127.982.481,06
Rp
223.591.518,45
Rp
403.007.055,00
223.591.518,45
PEKERJAAN UTILITAS I
LANTAI DASAR
Rp
63.938.655,00
II
LANTAI DUA
Rp
84.767.100,00
III
LANTAI TIGA
Rp
84.767.100,00
IV
LANTAI EMPAT
Rp
84.767.100,00
V
LANTAI LIMA
Rp
84.767.100,00
PEKERJAAN FINISHING
629.752.356,72
PEKERJAAN PENGECATAN
Rp
I
LANTAI DASAR
Rp
126.496.122,44
II
LANTAI DUA
Rp
125.814.058,57
III
LANTAI TIGA
Rp
125.814.058,57
IV
LANTAI EMPAT
Rp
125.814.058,57
V
LANTAI LIMA
Rp
125.814.058,57
REKAP PEK. ARSITEKTUR
(Rp.)
8.315.814.044,42
PEKERJAAN LANTAI
I
A.5.
JUMLAH HARGA
629.752.356,72
Page 1
REKAPITULASI R EN CA N A A NG GA R AN B IA YA ( R AB ) - P EK ER JA A N A RS IT EK T UR
Pekerjaan : PERENCANAAN PROTOTYPE RUSUN PUPERA Tipe Protot : T-24/5 LT RUSUN PNS Jumlah Lan : 5 LANTAI Lokasi
: Jl.Soekarno Hatta Mamuju
Tahun Ang : 2015
URAIAN PEKERJAAN
No.
2.2.B.
A 1 PEKERJAAN ARSITEKTUR NON STANDART
A.1 a.
PEK.BAK SAMPAH I
Bak Sampah
A.1 b.
PEK. PERKERASAN KELILING BAGIAN LUAR BANGUNAN
A.1 c.
PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.(*)
I
A.1 d.
PEKERJAAN PERKERASAN DI BANGUNAN
JUMLAH HARGA
(Rp.)
143.677.780,60
Rp
6.732.000,00
30.950.084,00 Rp
30.950.084,00
43.542.139,95
I
DRAINASE LUAR/SEKELILING BANGUNAN
Rp
40.136.846,41
II
BAK KONT ROL
Rp
3.4 05 .29 3,5 5
Rp
62.453.556,64
PEKERJAAN GROUND WATER TANK I
GROUND WATER TANK
62.453.556,64
SUB TOTAL :
REKAP PEK. ARSITEKTUR
8.459.491.825,02
Page 2
R EN CA NA A NG GA RA N B IA YA ( RA B) P EK ER JA A N A RS IT EK T UR Pekerjaan Tipe Prototype Jumlah Lantai Lokasi Tahun Anggaran
NO
: PERENCANAAN PROT OT YPE RUMAH SUSUN PU-PR : T-24 /5 RUSUN PNS KDS/E : 5 LANTAI : Jl. Soekarno Hatta, Kab. Mamuju : 2016
URAIAN PEKERJAAN
SAT
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
VOLUME
II.A.1 A1 I 1 2 3 4 5 6 7 8 9 10
PEKERJAAN ARSITEKTUR STANDART PEKERJAAN LANTAI LANTAI DASAR ( LANTAI I ) Pek Lantai Keramik Corak 40/40 Pek Lantai Keramik Tekture 40/40 motif lantai utama Pek Lantai Keramik Tekture 40/40 area Jemur Pek Lantai Km/ Wc (toilet) keramik 20/20 Corak anti slip Roman Pek Lantai Tangga keramik 30/30 corak ,anti slip Roman Pek Plint Keramik 10/40 Pek Stepnosing Tangga anti slip Pek Water profing area tempat jemur + di nding tinggi 15 cm , bitudin Pek Water profing Lantai km/wc Pek Screding lantai t.5cm
m2 m2 m2 m2 m2 m1 m1 m2 m2 m2
859,94 24,18 85,00 103,68 18,51 1.211,60 34,20 99,75 103,68 1.048,62
125.042,50 147.042,50 147.042,50 173.937,50 147.042,50 45.988,25 27.388,63 93.500,00 93.500,00 74.151,00
7.620.882.894,48 992.703.074,78 297.771.924,84 107.528.820,10 3.555.755,00 12.498.612,50 18.033.840,00 2.722.050,76 55.719.363,70 936.690,98 9.326.625,00 9.694.080,00 77.756.086,80
II 1 2 3 4 5 6 7 8 9
LANTAI 2 ( DUA ) Pek Lantai Keramik Corak 40/40 Pek Lantai Keramik Tekture 40/40 motif lantai utama Pek Lantai Keramik Tekture 40/40 area Jemur Pek Lantai Km/ Wc (toilet) keramik 20/20 Corak anti slip Roman Pek Lantai Tangga keramik 30/30 corak ,anti slip Roman Pek Plint Keramik 10/40 Pek Stepnosing Tangga anti slip Pek Water profing area tempat jemur + di nding tinggi 15 cm , bitudin Pek Water profing Lantai km/wc
m2 m2 m2 m2 m2 m1 m1 m2 m2
859,94 24,18 85,00 138,24 18,51 34,20 34,20 85,00 138,24
125.042,50 147.042,50 147.042,50 173.937,50 147.042,50 45.988,25 27.388,63 93.500,00 93.500,00
173.732.787,49 107.528.820,10 3.555.755,00 12.498.612,50 24.045.120,00 2.722.050,76 1.572.798,15 936.690,98 7.947.500,00 12.925.440,00
III 1 2 3 4 5 6 7 8 9
LANTAI 3 ( TIGA ) Pek Lantai Keramik Corak 40/40 Pek Lantai Keramik Tekture 40/40 motif lantai utama Pek Lantai Keramik Tekture 40/40 area Jemur Pek Lantai Km/ Wc (toilet) keramik 20/20 Corak anti slip Roman Pek Lantai Tangga keramik 30/30 corak ,anti slip Roman Pek Plint Keramik 10/40 Pek Stepnosing Tangga anti slip Pek Water profing area tempat jemur + di nding tinggi 15 cm , bitudin Pek Water profing Lantai km/wc
m2 m2 m2 m2 m2 m1 m1 m2 m2
859,94 24,18 85,00 138,24 18,51 34,20 34,20 85,00 138,24
125.042,50 147.042,50 147.042,50 173.937,50 147.042,50 45.988,25 27.388,63 93.500,00 93.500,00
173.732.787,49 107.528.820,10 3.555.755,00 12.498.612,50 24.045.120,00 2.722.050,76 1.572.798,15 936.690,98 7.947.500,00 12.925.440,00
IV 1 2 3 4 5 6 7 8 9
LANTAI 4 ( EMPAT ) Pek Lantai Keramik Corak 40/40 Pek Lantai Keramik Tekture 40/40 motif lantai utama Pek Lantai Keramik Tekture 40/40 area Jemur Pek Lantai Km/ Wc (toilet) keramik 20/20 Corak anti slip Roman Pek Lantai Tangga keramik 30/30 corak ,anti slip Roman Pek Plint Keramik 10/40 Pek Stepnosing Tangga anti slip Pek Water profing area tempat jemur + di nding tinggi 15 cm , bitudin Pek Water profing Lantai km/wc
m2 m2 m2 m2 m2 m1 m1 m2 m2
859,94 24,18 85,00 138,24 18,51 34,20 34,20 85,00 138,24
125.042,50 147.042,50 147.042,50 173.937,50 147.042,50 45.988,25 27.388,63 93.500,00 93.500,00
173.732.787,49 107.528.820,10 3.555.755,00 12.498.612,50 24.045.120,00 2.722.050,76 1.572.798,15 936.690,98 7.947.500,00 12.925.440,00
V 1 2 3 4 5 6 7 8 9
LANTAI 5 ( LIMA ) Pek Lantai Keramik Corak 40/40 Pek Lantai Keramik Tekture 40/40 motif lantai utama Pek Lantai Keramik Tekture 40/40 area Jemur Pek Lantai Km/ Wc (toilet) keramik 20/20 Corak anti slip Roman Pek Lantai Tangga keramik 30/30 corak ,anti slip Roman Pek Plint Keramik 10/40 Pek Stepnosing Tangga anti slip Pek Water profing area tempat jemur + di nding tinggi 15 cm , bitudin Pek Water profing Lantai km/wc
m2 m2 m2 m2 m2 m1 m1 m2 m2
859,94 24,18 85,00 138,24 18,51 34,20 34,20 85,00 138,24
125.042,50 147.042,50 147.042,50 173.937,50 147.042,50 45.988,25 27.388,63 93.500,00 93.500,00
173.732.787,49 107.528.820,10 3.555.755,00 12.498.612,50 24.045.120,00 2.722.050,76 1.572.798,15 936.690,98 7.947.500,00 12.925.440,00
A2 I 1 2 3 4
PEKERJAAN PASANGAN DAN PLESTERAN L AN TAI I ( SAT U ) Pasangan Dinding Bata Ringan 60x20x10cm Pekerjaan Plesteran Dinding bata Pekerjaan Acian dinding bata Pekerjaan Finishing Balok Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Finishing Kolom Beton :
5
PEK. ARSITEKTUR
m2 m2 m2
1.787,00 3.574,00 3.574,00
118.709,71 21.678,25 16.955,81
2.270.300.411,88 439.894.004,37 212.134.408,48 77.478.121,43 60.600.117,62
m2 m2
203,04 203,04
21.678,25 16.955,81
4.401.551,88 3.442.708,17
Page 1
R EN CA NA A NG GA RA N B IA YA ( RA B) P EK ER JA A N A RS IT EK T UR Pekerjaan Tipe Prototype Jumlah Lantai Lokasi Tahun Anggaran
NO
6
7 8 9 10 11 II 1 2 3 4
5
6
7 8 9 10 11 III 1 2 3 4
5
6
7 8 9 10 11 IV 1 2 3 4
: PERENCANAAN PROT OT YPE RUMAH SUSUN PU-PR : T-24 /5 RUSUN PNS KDS/E : 5 LANTAI : Jl. Soekarno Hatta, Kab. Mamuju : 2016
URAIAN PEKERJAAN Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Dinding Km/Wc Keramik : Keramik 20/25 Roman, t.2,10m Keramik Border 10/20 Roman Pekerjaan Dinding Meja Pantry Keramik 20/25 Roman Pekerjaan Dinding Ruang Janitor Keramik 20/25 Roman Pekerjaan Plesteran Dibawah tangga Pekerjaan Dinding partisi rangka hollow, penutup Calsiboard Pekerjaan Topi dibawah dan di atas kusen jendela ( openingan ) LANTAI 2 ( DUA ) Pasangan Dinding Bata Ringan 60x20x10cm Pekerjaan Plesteran Dinding bata Pekerjaan Acian dinding bata Pekerjaan Finishing Balok Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Finishing Kolom Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Dinding Km/Wc Keramik : Keramik 20/25 Roman, t.2,10m Keramik Border 10/20 Roman Pekerjaan Dinding Meja Pantry Keramik 20/25 Roman Pekerjaan Dinding Ruang Janitor Keramik 20/25 Roman Pekerjaan Plesteran Dibawah tangga Pekerjaan Dinding partisi rangka hollow, penutup Calsiboard Pekerjaan Topi dibawah dan di atas kusen jendela ( openingan ) LANTAI 3 ( TIGA ) Pasangan Dinding Bata Ringan 60x20x10cm Pekerjaan Plesteran Dinding bata Pekerjaan Acian dinding bata Pekerjaan Finishing Balok Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Finishing Kolom Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Dinding Km/Wc Keramik : Keramik 20/25 Roman, t.2,10m Keramik Border 10/20 Roman Pekerjaan Dinding Meja Pantry Keramik 20/25 Roman Pekerjaan Dinding Ruang Janitor Keramik 20/25 Roman Pekerjaan Plesteran Dibawah tangga Pekerjaan Dinding partisi rangka hollow, penutup Calsiboard Pekerjaan Topi dibawah dan di atas kusen jendela ( openingan )
SAT
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
VOLUME
m2 m2
85,68 85,68
21.678,25 16.955,81
m2 m1 m2 m2 m2 m2 m1
421,20 210,60 12,00 16,80 16,65 66,00 97,20
112.497,00 50.319,50 112.497,00 112.497,00 38.634,06 195.568,27 38.634,06
1.857.392,46 1.452.774,02 47.383.736,40 10.597.286,70 1.349.964,00 1.889.949,60 643.257,14 12.907.505,60 3.755.230,88
m2 m2 m2
1.778,00 3.556,00 3.574,00
118.709,71 21.678,25 16.955,81
457.762.416,16 211.066.021,07 77.087.912,93 60.600.117,62
m2 m2
21.678,25 16.955,81
4.401.551,88 3.442.708,17
m2 m2
203,04 203,04 85,68 85,68
21.678,25 16.955,81
1.857.392,46 1.452.774,02
m2 m1 m2 m2 m2 m2 m1
561,60 280,80 12,00 16,80 16,65 66,00 97,20
112.497,00 50.319,50 112.497,00 112.497,00 38.634,06 195.568,27 38.634,06
63.178.315,20 14.129.715,60 1.349.964,00 1.889.949,60 643.257,14 12.907.505,60 3.755.230,88
m2 m2 m2
1.778,00 3.556,00 3.574,00
118.709,71 21.678,25 16.955,81
457.762.416,16 211.066.021,07 77.087.912,93 60.600.117,62
m2 m2
21.678,25 16.955,81
4.401.551,88 3.442.708,17
m2 m2
203,04 203,04 85,68 85,68
21.678,25 16.955,81
1.857.392,46 1.452.774,02
m2 m1 m2 m2 m2 m2 m1
561,60 280,80 12,00 16,80 16,65 66,00 97,20
112.497,00 50.319,50 112.497,00 112.497,00 38.634,06 195.568,27 38.634,06
63.178.315,20 14.129.715,60 1.349.964,00 1.889.949,60 643.257,14 12.907.505,60 3.755.230,88
m2 m2 m2
1.778,00 3.556,00 3.574,00
118.709,71 21.678,25 16.955,81
457.762.416,16 211.066.021,07 77.087.912,93 60.600.117,62
m2 m2
21.678,25 16.955,81
4.401.551,88 3.442.708,17
21.678,25 16.955,81
1.857.392,46 1.452.774,02
m2 m2
203,04 203,04 85,68 85,68
7 8 9 10 11
LANTAI 4 ( EMPAT ) Pasangan Dinding Bata Ringan 60x20x10cm Pekerjaan Plesteran Dinding bata Pekerjaan Acian dinding bata Pekerjaan Finishing Balok Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Finishing Kolom Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Dinding Km/Wc Keramik : Keramik 20/25 Roman, t.2,10m Keramik Border 10/20 Roman Pekerjaan Dinding Meja Pantry Keramik 20/25 Roman Pekerjaan Dinding Ruang Janitor Keramik 20/25 Roman Pekerjaan Plesteran Dibawah tangga Pekerjaan Dinding partisi rangka hollow, penutup Calsiboard Pekerjaan Topi dibawah dan di atas kusen jendela ( openingan )
m2 m1 m2 m2 m2 m2 m1
561,60 280,80 12,00 16,80 16,65 66,00 97,20
112.497,00 50.319,50 112.497,00 112.497,00 38.634,06 195.568,27 38.634,06
63.178.315,20 14.129.715,60 1.349.964,00 1.889.949,60 643.257,14 12.907.505,60 3.755.230,88
V 1
LANTAI 5 ( LIMA ) Pasangan Dinding Bata Ringan 60x20x10cm
m2
1.778,00
118.709,71
457.119.159,02 211.066.021,07
5
6
PEK. ARSITEKTUR
Page 2
R EN CA NA A NG GA RA N B IA YA ( RA B) P EK ER JA A N A RS IT EK T UR Pekerjaan Tipe Prototype Jumlah Lantai Lokasi Tahun Anggaran
NO
2 3 4
5
6
7 8 9 10
: PERENCANAAN PROT OT YPE RUMAH SUSUN PU-PR : T-24 /5 RUSUN PNS KDS/E : 5 LANTAI : Jl. Soekarno Hatta, Kab. Mamuju : 2016
URAIAN PEKERJAAN Pekerjaan Plesteran Dinding bata Pekerjaan Acian dinding bata Pekerjaan Finishing Balok Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Finishing Kolom Beton : Pekerjaan Plesteran Pekerjaan Acian Pekerjaan Dinding Km/Wc Keramik : Keramik 20/25 Roman, t.2,10m Keramik Border 10/20 Roman Pekerjaan Dinding Meja Pantry Keramik 20/25 Roman Pekerjaan Dinding Ruang Janitor Keramik 20/25 Roman Pekerjaan Dinding partisi rangka hollow, penutup Calsiboard Pekerjaan Topi dibawah dan di atas kusen jendela ( openingan )
A3 PEKERJAAN KUSEN, PINTU DAN JENDELA I L AN TAI 1 ( SAT U ) Pasang Kusen Pintu, Jendela Allumunium 3 inc X 1,5 inc, t.1,2 mm ,Anodize Natural Color , - PJ1 1 Kusen Type - PJ2 2 Kusen Type - PJ3 3 Kusen Type - PJ4 4 Kusen Type - P1 5 Kusen Type - P1' 6 Kusen Type - P2 7 Kusen Type - P3 8 Kusen Type - P3' 9 Kusen Type - J1 10 Kusen Type - PJ6 11 Kusen Type 12 Pasang Kusen Type TR II 1 2 3 4 5 6 7 8 9 10 10 11 III 1 2 3 4 5 6 7 8 9 10 10 11 IV 1 2 3 4 5 6
LANTAI 2 ( DUA ) Pasang Kusen Pintu, Jendela Allumunium 3 inc X 1,5 inc, t.1,2 mm ,Anodize Natural Color , Kusen Type - PJ2 Kusen Type - PJ3 Kusen Type - PJ5 Kusen Type - P1 Kusen Type - P1' Kusen Type - P2 Kusen Type - P3 Kusen Type - P3' Kusen Type - J1 Kusen Type - J2 Kusen Type - PJ6 Pasang Kusen Type TR LANTAI 3 ( TIGA ) Pasang Kusen Pintu, Jendela Allumunium 3 inc X 1,5 inc, t.1,2 mm ,Anodize Natural Color , Kusen Type - PJ2 Kusen Type - PJ3 Kusen Type - PJ5 Kusen Type - P1 Kusen Type - P1' Kusen Type - P2 Kusen Type - P3 Kusen Type - P3' Kusen Type - J1 Kusen Type - J2 Kusen Type - PJ6 Pasang Kusen Type TR LANTAI 4 ( EMPAT ) Pasang Kusen Pintu, Jendela Allumunium 3 inc X 1,5 inc, t.1,2 mm ,Anodize Natural Color , Kusen Type - PJ2 Kusen Type - PJ3 Kusen Type - PJ5 Kusen Type - P1 Kusen Type - P1' Kusen Type - P2
PEK. ARSITEKTUR
SAT
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
VOLUME
m2 m2
3.556,00 3.574,00
21.678,25 16.955,81
77.087.912,93 60.600.117,62
m2 m2
21.678,25 16.955,81
4.401.551,88 3.442.708,17
m2 m2
203,04 203,04 85,68 85,68
21.678,25 16.955,81
1.857.392,46 1.452.774,02
m2 m1 m2 m2 m2 m1
561,60 280,80 12,00 16,80 66,00 97,20
112.497,00 50.319,50 112.497,00 112.497,00 195.568,27 38.634,06
63.178.315,20 14.129.715,60 1.349.964,00 1.889.949,60 12.907.505,60 3.755.230,88
9.516.193,70 9.516.193,70 9.516.193,70 9.516.193,70 3.768.862,10 3.768.862,10 3.362.515,56 3.362.515,56 3.909.969,72 3.144.641,83 9.516.193,70 814.098,36
1.973.545.996,59 421.055.316,50 19.032.387,41 19.032.387,41 9.516.193,70 19.032.387,41 71.608.379,90 7.537.724,20 10.087.546,67 107.600.497,76 7.819.939,43 108.286.370,42 19.032.387,41 22.469.114,79
9.516.193,70 9.516.193,70 9.516.193,70 3.768.862,10 3.768.862,10 3.362.515,56 3.362.515,56 3.909.969,72 3.144.641,83 3.555.298,92 9.516.193,70 814.098,36
388.122.670,02 19.032.387,41 9.516.193,70 9.516.193,70 71.608.379,90 15.075.448,40 10.087.546,67 107.600.497,76 7.819.939,43 108.286.370,42 7.110.597,84 22.469.114,79
9.516.193,70 9.516.193,70 9.516.193,70 3.768.862,10 3.768.862,10 3.362.515,56 3.362.515,56 3.909.969,72 3.144.641,83 3.555.298,92 9.516.193,70 814.098,36
388.122.670,02 19.032.387,41 9.516.193,70 9.516.193,70 71.608.379,90 15.075.448,40 10.087.546,67 107.600.497,76 7.819.939,43 108.286.370,42 7.110.597,84 22.469.114,79
9.516.193,70 9.516.193,70 9.516.193,70 3.768.862,10 3.768.862,10 3.362.515,56
388.122.670,02 19.032.387,41 9.516.193,70 9.516.193,70 71.608.379,90 15.075.448,40 10.087.546,67
unit unit unit unit unit unit unit unit unit unit unit m2
unit unit unit unit unit unit unit unit unit unit unit m2
unit unit unit unit unit unit unit unit unit unit unit m2
unit unit unit unit unit unit
2,00 2,00 1,00 2,00 19,00 2,00 3,00 32,00 2,00 34,44 2,00 27,60
2,00 1,00 1,00 19,00 4,00 3,00 32,00 2,00 34,44 2,00 27,60
2,00 1,00 1,00 19,00 4,00 3,00 32,00 2,00 34,44 2,00 0,00 27,60
2,00 1,00 1,00 19,00 4,00 3,00
Page 3
R EN CA NA A NG GA RA N B IA YA ( RA B) P EK ER JA A N A RS IT EK T UR Pekerjaan Tipe Prototype Jumlah Lantai Lokasi Tahun Anggaran
: PERENCANAAN PROT OT YPE RUMAH SUSUN PU-PR : T-24 /5 RUSUN PNS KDS/E : 5 LANTAI : Jl. Soekarno Hatta, Kab. Mamuju : 2016
NO
URAIAN PEKERJAAN
SAT
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
VOLUME
7 8 9 10 10 11
Kusen Type - P3 Kusen Type - P3' Kusen Type - J1 Kusen Type - J2 Kusen Type - PJ6 Pasang Kusen Type TR
3.362.515,56 3.909.969,72 3.144.641,83 3.555.298,92 9.516.193,70 814.098,36
107.600.497,76 7.819.939,43 108.286.370,42 7.110.597,84 22.469.114,79
V 1 2 3 4 5 6 7 8 9 10 10 11
LANTAI 5 ( LIMA ) Pasang Kusen Pintu, Jendela Allumunium 3 inc X 1,5 inc, t.1,2 mm ,Anodize Natural Color , Kusen Type - PJ2 Kusen Type - PJ3 Kusen Type - PJ5 Kusen Type - P1 Kusen Type - P1' Kusen Type - P2 Kusen Type - P3 Kusen Type - P3' Kusen Type - J1 Kusen Type - J2 Kusen Type - PJ6 Pasang Kusen Type TR
9.516.193,70 9.516.193,70 9.516.193,70 3.768.862,10 3.768.862,10 3.362.515,56 3.362.515,56 3.909.969,72 3.144.641,83 3.555.298,92 9.516.193,70 814.098,36
388.122.670,02 19.032.387,41 9.516.193,70 9.516.193,70 71.608.379,90 15.075.448,40 10.087.546,67 107.600.497,76 7.819.939,43 108.286.370,42 7.110.597,84 22.469.114,79
A4 I 1 2 3 4 5 6
PEKERJAAN PLAFOND , PARTISI DAN REILING TANGGA L AN TAI 1 ( SAT U ) Pekerjaan Rangka Hollow 4x4, 2x4 cm Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, 2x4 cm G alvalumb Pekerjaan Plafond Calciboard 9mm, Rangka Hollow 4x4, 2x4 cm Galvalumb Pekerjaan List Plafond Type LP 2 Pekerjaan List Plafond Type LP 1 Km/Wc Pek Reiling Tangga , Besi GIP 1,5", 2"
1.041,05 833,69 207,36 790,40 421,20 8,20
126.096,67 47.949,00 34.735,80 38.890,50 31.112,40 402.750,00
1.127.982.481,06 225.596.496,21 131.272.934,83 39.974.601,81 7.202.815,49 30.739.051,20 13.104.542,88 3.302.550,00
m2 m2 m2 m1 m1 m1
II 1 2 3 4 5 6
LANTAI 2 ( DUA ) Pekerjaan Rangka Hollow 4x4, 2x4 cm Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, 2x4 cm G alvalumb Pekerjaan Plafond Calciboard 9mm, Rangka Hollow 4x4, 2x4 cm Galvalumb Pekerjaan List Plafond Type LP 2 Pekerjaan List Plafond Type LP 1 Km/Wc Pek Reiling Tangga , Besi GIP 1,5", 2"
m2 m2 m2 m1 m1 m1
1.041,05 833,69 207,36 790,40 421,20 8,20
126.096,67 47.949,00 34.735,80 38.890,50 31.112,40 402.750,00
225.596.496,21 131.272.934,83 39.974.601,81 7.202.815,49 30.739.051,20 13.104.542,88 3.302.550,00
III 1 2 3 4 5 6
LANTAI 3 (TIGA ) Pekerjaan Rangka Hollow 4x4, 2x4 cm Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, 2x4 cm G alvalumb Pekerjaan Plafond Calciboard 9mm, Rangka Hollow 4x4, 2x4 cm Galvalumb Pekerjaan List Plafond Type LP 2 Pekerjaan List Plafond Type LP 1 Km/Wc Pek Reiling Tangga , Besi GIP 1,5", 2"
m2 m2 m2 m1 m1 m1
1.041,05 833,69 207,36 790,40 421,20 8,20
126.096,67 47.949,00 34.735,80 38.890,50 31.112,40 402.750,00
225.596.496,21 131.272.934,83 39.974.601,81 7.202.815,49 30.739.051,20 13.104.542,88 3.302.550,00
IV 1 2 3 4 5 6
LANTAI 4 (EMPAT ) Pekerjaan Rangka Hollow 4x4, 2x4 cm Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, 2x4 cm G alvalumb Pekerjaan Plafond Calciboard 9mm, Rangka Hollow 4x4, 2x4 cm Galvalumb Pekerjaan List Plafond Type LP 2 Pekerjaan List Plafond Type LP 1 Km/Wc Pek Reiling Tangga , Besi GIP 1,5", 2"
m2 m2 m2 m1 m1 m1
1.041,05 833,69 207,36 790,40 421,20 8,20
126.096,67 47.949,00 34.735,80 38.890,50 31.112,40 402.750,00
225.596.496,21 131.272.934,83 39.974.601,81 7.202.815,49 30.739.051,20 13.104.542,88 3.302.550,00
V 1 2 3 4 5 6
LANTAI 5 (LIMA ) Pekerjaan Rangka Hollow 4x4, 2x4 cm Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, 2x4 cm G alvalumb Pekerjaan Plafond Calciboard 9mm, Rangka Hollow 4x4, 2x4 cm Galvalumb Pekerjaan List Plafond Type LP 2 Pekerjaan List Plafond Type LP 1 Km/Wc Pek Reiling Tangga , Besi GIP 1,5", 2"
m2 m2 m2 m1 m1 m1
1.041,05 833,69 207,36 790,40 421,20 8,20
126.096,67 47.949,00 34.735,80 38.890,50 31.112,40 402.750,00
225.596.496,21 131.272.934,83 39.974.601,81 7.202.815,49 30.739.051,20 13.104.542,88 3.302.550,00
1.149.500,00 269.761,25 531.011,25 27.610,00 1.465.915,00
403.007.055,00 63.938.655,00 20.691.000,00 4.855.702,50 9.558.202,50 993.960,00 26.386.470,00
A5 PEKERJAAN UTILITAS I LANTAI 1 ( SATU ) 1 Pasang closet duduk type standart (lengkap terpasang) 2 Pasang kran 0,5" 3 Pasang shower + kran type double (terpasang) 4 Pasangan floor drain stainless 5 Wastafel
PEK. ARSITEKTUR
unit unit unit unit unit m2
32,00 2,00 34,44 2,00 0,00 27,60
unit unit unit unit unit unit unit unit unit unit unit m2
bh bh bh bh bh
2,00 1,00 1,00 19,00 4,00 3,00 32,00 2,00 34,44 2,00 0,00 27,60
18,00 18,00 18,00 36,00 18,00
Page 4
R EN CA NA A NG GA RA N B IA YA ( RA B) P EK ER JA A N A RS IT EK T UR Pekerjaan Tipe Prototype Jumlah Lantai Lokasi Tahun Anggaran
: PERENCANAAN PROT OT YPE RUMAH SUSUN PU-PR : T-24 /5 RUSUN PNS KDS/E : 5 LANTAI : Jl. Soekarno Hatta, Kab. Mamuju : 2016
NO
URAIAN PEKERJAAN
SAT
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
VOLUME
6
Kitchen zing + kran
bh
4,00
363.330,00
1.453.320,00
II 1 2 3 4 5 6
LANTAI 2 ( DUA ) Pasang closet duduk type standart (lengkap terpasang) Pasang kran 0,5" Pasang shower + kran type double (terpasang) Pasangan floor drain stainless Wastafel Kitchen zing + kran
bh bh bh bh bh bh
24,00 24,00 24,00 48,00 24,00 4,00
1.149.500,00 269.761,25 531.011,25 27.610,00 1.465.915,00 363.330,00
84.767.100,00 27.588.000,00 6.474.270,00 12.744.270,00 1.325.280,00 35.181.960,00 1.453.320,00
III 1 2 3 4 5 6
LANTAI 3 ( TIGA ) Pasang closet duduk type standart (lengkap terpasang) Pasang kran 0,5" Pasang shower + kran type double (terpasang) Pasangan floor drain stainless Wastafel Kitchen zing + kran
bh bh bh bh bh bh
24,00 24,00 24,00 48,00 24,00 4,00
1.149.500,00 269.761,25 531.011,25 27.610,00 1.465.915,00 363.330,00
84.767.100,00 27.588.000,00 6.474.270,00 12.744.270,00 1.325.280,00 35.181.960,00 1.453.320,00
IV 1 2 3 4 5 6
LANTAI 4 (EMPAT ) Pasang closet duduk type standart (lengkap terpasang) Pasang kran 0,5" Pasang shower + kran type double (terpasang) Pasangan floor drain stainless Wastafel Kitchen zing + kran
bh bh bh bh bh bh
24,00 24,00 24,00 48,00 24,00 4,00
1.149.500,00 269.761,25 531.011,25 27.610,00 1.465.915,00 363.330,00
84.767.100,00 27.588.000,00 6.474.270,00 12.744.270,00 1.325.280,00 35.181.960,00 1.453.320,00
V 1 2 3 4 5 6
LANTAI 5 ( LIMA ) Pasang closet duduk type standart (lengkap terpasang) Pasang kran 0,5" Pasang shower + kran type double (terpasang) Pasangan floor drain stainless Wastafel Kitchen zing + kran
bh bh bh bh bh bh
24,00 24,00 24,00 48,00 24,00 4,00
1.149.500,00 269.761,25 531.011,25 27.610,00 1.465.915,00 363.330,00
84.767.100,00 27.588.000,00 6.474.270,00 12.744.270,00 1.325.280,00 35.181.960,00 1.453.320,00
A6 I 1 2 3 4 5
PEKERJAAN FINISHING / PENGECATAN L AN TAI I ( SAT U ) Pengecatan Dinding bagian dalam ICI Emulsion Pengecatan Dinding Bagian Luar ICI Weathersheld Pengecatan Plafond ICI Emulsion Pengecatan List Plafond Type LP 2, Plafond ICI Emulsion Pengecatan List Plafond Type LP 1, Plafond ICI Emulsion
m2 m2 m2 m2 m2
II 1 2 3 4 5
LANTAI II ( DUA ) Pengecatan Dinding bagian dalam ICI Emulsion Pengecatan Dinding Bagian Luar ICI Weathersheld Pengecatan Plafond ICI Emulsion Pengecatan List Plafond Type LP 2, Plafond ICI Emulsion Pengecatan List Plafond Type LP 1, Plafond ICI Emulsion
III 1 2 3 4 5
2.757,88 816,12 1.041,05 104,33 30,33
25.616,25 28.091,25 28.003,25 28.003,25 28.003,25
629.752.356,72 126.496.122,44 70.646.576,59 22.925.867,19 29.152.783,41 2.921.657,48 849.237,76
m2 m2 m2 m2 m2
3.319,40 254,60 1.041,05 104,33 55,60
25.616,25 28.091,25 28.003,25 28.003,25 28.003,25
125.814.058,57 85.030.613,29 7.152.068,49 29.152.783,41 2.921.657,48 1.556.935,89
LANTAI III ( TIGA ) Pengecatan Dinding bagian dalam ICI Emulsion Pengecatan Dinding Bagian Luar ICI Weathersheld Pengecatan Plafond ICI Emulsion Pengecatan List Plafond Type LP 2, Plafond ICI Emulsion Pengecatan List Plafond Type LP 1, Plafond ICI Emulsion
m2 m2 m2 m2 m2
3.319,40 254,60 1.041,05 104,33 55,60
25.616,25 28.091,25 28.003,25 28.003,25 28.003,25
125.814.058,57 85.030.613,29 7.152.068,49 29.152.783,41 2.921.657,48 1.556.935,89
IV 1 2 3 4 5
LANTAI IV ( EMPAT ) Pengecatan Dinding bagian dalam ICI Emulsion Pengecatan Dinding Bagian Luar ICI Weathersheld Pengecatan Plafond ICI Emulsion Pengecatan List Plafond Type LP 2, Plafond ICI Emulsion Pengecatan List Plafond Type LP 1, Plafond ICI Emulsion
m2 m2 m2 m2 m2
3.319,40 254,60 1.041,05 104,33 55,60
25.616,25 28.091,25 28.003,25 28.003,25 28.003,25
125.814.058,57 85.030.613,29 7.152.068,49 29.152.783,41 2.921.657,48 1.556.935,89
V 1 2 3 4 5
LANTAI V ( LIMA ) Pengecatan Dinding bagian dalam ICI Emulsion Pengecatan Dinding Bagian Luar ICI Weathersheld Pengecatan Plafond ICI Emulsion Pengecatan List Plafond Type LP 2, Plafond ICI Emulsion Pengecatan List Plafond Type LP 1, Plafond ICI Emulsion
m2 m2 m2 m2 m2
3.319,40 254,60 1.041,05 104,33 55,60
25.616,25 28.091,25 28.003,25 28.003,25 28.003,25
125.814.058,57 85.030.613,29 7.152.068,49 29.152.783,41 2.921.657,48 1.556.935,89
PEK. ARSITEKTUR
Page 5
R EN CA NA A NG GA RA N B IA YA ( RA B) P EK ER JA A N A RS IT EK T UR Pekerjaan Tipe Prototype Jumlah Lantai Lokasi Tahun Anggaran
NO
: PERENCANAAN PROT OT YPE RUMAH SUSUN PU-PR : T-24 /5 RUSUN PNS KDS/E : 5 LANTAI : Jl. Soekarno Hatta, Kab. Mamuju : 2016
URAIAN PEKERJAAN
A7 PEKERJAAN ATAP LANTAI 5 (LIMA ) Rangka atap bajaringan t.75 zinkcalum
Atap genteng metal T=0.35 MM Nok genteng (termasuk jurai) Lisplang GRC tebal 9 mm lebar 30 cm Cat walk Pintu aluminium 60x60 cm Tangga M ke roof tank
PEK. ARSITEKTUR
SAT
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
VOLUME 223.591.518,45
m2 m2 m2 m2 m2 bh bh
1.607,58 1.607,58 87,50 152,00
121.880,00 120.474,28 79.724,79
2,00 2,00
1.000.000,00 1.500.000,00
195.931.850,40 10.541.499,72 12.118.168,33 2.000.000,00 3.000.000,00
Page 6
R EN CA NA A NG GA RA N B IA YA ( RA B) P EK ER JA A N A RS IT EK T UR
Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tip e Pro totyp e
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
NO.
A.1 A.1 a.
J E N IS P E KE R J AA N
1
Bak Sampah (tiap lantai 6 buah)
PEKERJAAN PERKERASAN DI BANGUNAN
1
Pasir urug t = 7 cm di bawah paving
2
Paving blok t = 8 cm (standart) sekeliling bangunan
A.1 c.
Kanstein uk. 8.40.20 sekeliling bangunan
DRAINASE LUAR/SEKELILING BANGUNAN
1
Pasangan 1/2 bata saluran Plester + aci saluran
60,00
UNIT
173.371,00
28.866.271,50
1
221.375,00
553.437,50
M
2,50
M
SUB TOTAL
79,50
79,50
2
87.642,50
6.967.578,75
2
58.256,00
4.631.352,00
3
356.053,07
8.491.865,66
3
192.500,00
4.591.125,00
3
52.800,00
2.098.800,00
3
12.833,33
510.125,00
1
115.000,00
736.000,00
1
147.000,00
7.350.000,00
1
350.000,00
4.760.000,00
M M
M
Gorong-gorong dia. 60 cm menuju ke riol kota
9
Grill penutup saluran, besi siku 50.50.5 + plat strip
II
BAK KONTROL
43.542.139,95
40.136.846,41
23,85
8
30.950.084,00
2
166,50
Pasir urug t = 5 cm
Gorong-gorong dia. 30 cm di bawah Entrance
6.732.000,00
1.530.375,00
4
7
6.732.000,00
192.500,00
M
M
Urugan tanah kembali
143.677.780,60
3
7,95
23,85
6
(Rp.)
30.950.084,00
Lantai kerja ad. 1:3:5, t = 5 cm
Galian tanah saluran
112.200,00
SUB TOTAL
3
5
JUMLAH HARGA
6.732.000,00
PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.(*)
I
2
SUB TOTAL
PEK. PERKERASAN KELILING BAGIAN LUAR BANGUNAN
I
HARGA SATUAN (Rp.)
TOTAL
PEK.BAK SAMPAH Bak Sampah
3
SAT.
PEKERJAAN ARSITEKTUR NON STANDART
I
A.1 b.
VOL.
39,75
M
39,75
M
6,40
M
50,00 13,60
M M
3.405.293,55
BAK KONTROL 1 2 3
Pasangan 1/2 bata Bak Kontrol ( 4 unit ) Ple ster + aci Pasir urug t = 5 cm
20,640 20,640 0,242
2
87.642,50
1.808.941,20
2
58.256,00
1.202.403,84
3
192.500,00
46.585,00
3
356.053,07
86.164,84
3
52.800,00
255.552,00
3
12.833,33
5.646,67
M M M
4
Lantai kerja ad. 1:3:5 t = 5 cm
0,242
M
5
Galian tanah
4,840
M
6
Urugan tanah kembali
PEK. ARSITEKTUR
0,440
M
Page 1
R EN CA NA A NG GA RA N B IA YA ( RA B) P EK ER JA A N A RS IT EK T UR
Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tip e Pro totyp e
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
NO.
A.1 d.
J E N IS P E KE R J AA N
VOL.
SAT.
PEKERJAAN GROUND WATER TANK
HARGA SATUAN (Rp.) SUB TOTAL
JUMLAH HARGA
(Rp.)
62.453.556,64
GROUND WATER TANK 1
Pasang batu kali Teras
2,07
M3
482.536,00
998.849,52
2
Pondasi batu kali rumah pompa
3,08
M3
482.536,00
1.485.245,81
3
Pasangan dinding batako rumah pompa
38,12
M
2
27.388,63
1.044.054,39
2
58.256,00
4.441.437,44
3
2.879.183,31
661.924,24
2
16.955,81
457.806,94
4
Plester + aci dinding batako
5
Kolom praktis & balok praktis 11x11
76,24
M
0,23
M
6
Perapihan kolom beton
27,00
M
7
Perapihan balok beton
22,25
M
2
16.955,81
377.232,92
8
Perapihan dinding bagian luar GWT / Exterior
30,00
M2
16.955,81
508.674,38
9
Perapihan pelat + canopy + dak beton
36,06
M2
16.955,81
611.426,60
10
Screed lantai 1:3 tebal 5 cm termasuk aci di R. Pompa dan teras
23,56
M2
222.453,00
5.240.992,68
11
Cat dinding dan kolom bag. Luar (exterior)
106,24
M2
28.091,25
2.984.414,40
12
Cat dinding dan kolom bag. Dalam (interior)
38,12
M2
25.616,25
976.491,45
13
Cat plafond expose di R. Pompa dan Ground Tank
23,56
M2
25.616,25
603.518,85
14
Waterproofing (membrane) + screed daerah dak beton
36,06
M2
237.638,72
8.569.252,24
15
Kusen Aluminium + Louver baja (terpasang) type LV1-80X60
4,00
Unit
740.983,32
2.963.933,28
16
Kusen Aluminium + Louver baja (terpasang) type LV2-120X60
2,00
Unit
994.839,12
1.989.678,24
17
Kusen Aluminium + Louver baja (terpasang) type LV3-40X60
3,00
Unit
466.297,92
1.398.893,76
16
Kusen Rangka CNP + Daun Pintu Plat Baja T = 1,5 mm (terpasang)
2,00
Unit
4.181.245,93
8.362.491,87
17
R. GWT : - Pasang lantai keramik 20x20 ad.5 cm (kasar)
12,50
M2
173.937,50
2.174.218,75
- Pasang keramik dinding 20x25, T = 3,00 M
45,00
M2
112.497,00
5.062.365,00
- Waterproofing (coating tahan asam, anti toxid + serat fiber) lantai dan dinding
57,50
M2
178.487,72
10.263.043,90
19
Tangga 'M' GWT + cat ( model gantung lengkap terpasang )
2,00
Unit
375.000,00
750.000,00
20
Penutup mainhole baja (terpasang)
2,00
Unit
250.000,00
500.000,00
20
Pemasangan floor drain stainless di R. Pompa
1,00
Buah
27.610,00
27.610,00
PEK. ARSITEKTUR
Page 2
REKAPITULASI R E NC A NA A NG G AR AN B I AY A ( RA B ) - P E KE R JA AN M E KA NI K AL D AN E L E KT R IK AL Pekerjaan
: PERENCANAAN PROT OT YPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
A
A.1.
A.2.
B
B.1.
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
B.4.
525.081.563,92
I
INSTALASI AIR BERSIH
Rp
243.414.499,15
II
INSTALASI AIR KOTOR & AIR BEKAS
Rp
212.399.004,48
III
INSTALASI AIR HUJAN
Rp
54.901.001,05
IV
INSTALASI VENT
Rp
14.367.059,24
PEKERJAAN INSTALASI ELEKTRIKAL
1.093.827.477,74
I
PEKERJAAN PANEL
Rp
241.002.050,02
II
PEKERJAAN INSTALASI KABEL FEEDER
Rp
164.229.705,75
III
PEKERJAAN KABEL LADDER (RAK KABEL)
Rp
58.323.559,97
IV
PEKERJAAN ARMATUR LAMPU, SAKLAR & STOP KON Rp
94.064.563,79
V
PEKERJAAN INSTALASI FINAL
Rp
493.684.289,34
VI
PEKERJAAN SISTEM PENTANAHAN
Rp
13.336.654,44
VII
PEKERJAAN PENANGKAL PETIR
Rp
29.186.654,44
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART
1.384.385.360,50
PEKERJAAN PEMADAM KEBAKARAN
75.350.320,71
INSTALASI PEMIPAAN HYDRANT
Rp
75.350.320,71
PEKERJAAN VENTILASI UDARA I
B.3.
1.618.909.041,66
PEKERJAAN INSTALASI PLAMBING
I B.2
JUMLAH HARGA (Rp.)
URAIAN PEKERJAAN
No.
91.040.796,24
INSTALASI VENTILASI UDARA
Rp
91.040.796,24
PEKERJAAN INSTALASI ELEKTRONIK
84.768.541,19
I
PEKERJAAN SYSTEM TV
Rp
31.094.173,99
II
PEKERJAAN FIRE ALARM
Rp
53.674.367,20
PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)
1.133.225.702,37
I
INSTALASI AIR BERSIH
Rp
130.480.935,02
II
INSTALASI AIR KOTOR & AIR BEKAS
Rp
302.646.334,68
III
PEKERJAAN PEMADAM KEBAKARAN
Rp
454.748.655,48
IV
PENYAMBUNGAN DAYA PLN
Rp
234.480.000,00
0,00 Rp
10.869.777,18
V
SUB TOTAL :
REKAP PEK. M/E
3.003.294.402,16
Page 1
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
A
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART
A.1. I
1.618.909.041,66
PEKERJAAN INSTALASI PLAMBING
525.081.563,92
INSTALASI AIR BERSIH
243.414.499,15
Pipa PPR PN 10 (Incl. Fitting & Accessories) INSTALASI PEMIPAAN
a
LANTAI 1
- PPR PN10 dia. 15
m
129,60
26.228,08
3.399.159,03
- PPR PN10 dia. 20
m
65,20
30.872,35
2.012.877,15
- PPR PN10 dia. 20
m
36,00
30.872,35
1.111.404,56
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas)
m
25,00
127.621,19
3.190.529,70
- PPR PN10 dia. 65 (Riser ke tanki air atas)
m
74,50
190.048,29
14.158.597,82
- dia. 20
bh
3,00
141.500,84
424.502,52
- Meter Air c/w BV dia. 20
bh
5,00
347.995,41
1.739.977,05
- PPR PN10 dia. 15
m
201,60
26.228,08
5.287.580,72
- PPR PN10 dia. 20
m
77,20
30.872,35
2.383.345,34
- PPR PN10 dia. 20
m
24,00
37.311,20
895.468,85
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas)
m
40,00
127.621,19
5.104.847,52
- PPR PN10 dia. 65 (Riser ke tanki air atas)
m
24,80
190.048,29
4.713.197,66
- dia. 20
bh
8,00
141.500,84
1.132.006,73
- Meter Air c/w BV dia. 20
bh
24,00
347.995,41
8.351.889,84
- PPR PN10 dia. 15
m
201,60
26.228,08
5.287.580,72
- PPR PN10 dia. 20
m
89,20
30.872,35
2.753.813,53
- PPR PN10 dia. 20
m
72,00
37.311,20
2.686.406,55
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas)
m
55,00
127.621,19
7.019.165,34
- PPR PN10 dia. 65 (Riser ke tanki air atas)
m
36,80
190.048,29
6.993.777,18
Peralatan Katup-katup (Ball Valve & Gate Valve)
b
LANTAI 2
Peralatan Katup-katup (Ball Valve & Gate Valve)
c
LANTAI 3
Peralatan Katup-katup (Ball Valve & Gate Valve) PEK. M/E
Page 1
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
d
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
- dia. 20
bh
11,00
141.500,84
1.556.509,26
- Meter Air c/w BV dia. 20
bh
24,00
347.995,41
8.351.889,84
- PPR PN10 dia. 15
m
273,60
26.228,08
7.176.002,40
- PPR PN10 dia. 20
m
101,20
30.872,35
3.124.281,71
- PPR PN10 dia. 20
m
120,00
37.311,20
4.477.344,24
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas)
m
70,00
127.621,19
8.933.483,15
- PPR PN10 dia. 65 (Riser ke tanki air atas)
m
48,80
190.048,29
9.274.356,69
- dia. 20
bh
14,00
141.500,84
1.981.011,78
- Meter Air c/w BV dia. 20
bh
24,00
347.995,41
8.351.889,84
- PPR PN10 dia. 15
m
345,60
26.228,08
9.064.424,09
- PPR PN10 dia. 20
m
113,20
30.872,35
3.494.749,90
- PPR PN10 dia. 20
m
168,00
37.311,20
6.268.281,94
- PPR PN10 dia. 50 (Riser dari Tangki Air Atas)
m
85,00
127.621,19
10.847.800,97
- PPR PN10 dia. 65 (Riser ke tanki air atas)
m
60,80
190.048,29
11.554.936,21
- dia. 20
bh
17,00
141.500,84
2.405.514,31
- Meter Air c/w BV dia. 20
bh
24,00
347.995,41
8.351.889,84
unit
1,00
1.819.006,94
1.819.006,94
- PPR PN10 dia. 65
m
100,00
190.048,29
19.004.829,29
- PPR PN10 dia. 50
m
240,00
127.621,19
30.629.085,10
- PVC AW dia. 32 (Pipa Drain)
m
30,00
22.418,40
672.552,08
- dia. 50
bh
22,00
298.114,28
6.558.514,08
- dia. 32
bh
4,00
217.504,42
870.017,68
LANTAI 4
Peralatan Katup-katup (Ball Valve & Gate Valve)
e
LANTAI 5
Peralatan Katup-katup (Ball Valve & Gate Valve)
f LANTAI ATAP & TANGKI AIR ATAS - PPR PN 10 dia. 100 ( pipa header )
Peralatan Katup-katup (Ball Valve & Gate Valve)
II
INSTALASI AIR KOTOR & AIR BEKAS
212.399.004,48
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
PEK. M/E
Page 2
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
INSTALASI PEMIPAAN
a
LANTAI 1
- dia. 150 ( horisontal pipa air kotor)
m
140,00
156.346,12
21.888.457,17
- dia. 150 ( horisontr pipa air Bekas)
m
140,00
156.346,12
21.888.457,17
- dia. 100 ( riser pipa air kotor)
m
120,00
62.565,08
7.507.810,09
- dia. 100 ( riser pipa air bekas )
m
120,00
62.565,08
7.507.810,09
- dia. 100
m
27,70
62.565,08
1.733.052,83
- dia. 65
m
252,00
34.311,24
8.646.431,28
- CO, dia. 150
bh
8,00
380.915,65
3.047.325,19
- CO, dia. 100
bh
8,00
125.465,95
1.003.727,57
- Portable Grease Trap
bh
2,00
533.956,32
1.067.912,64
- dia. 100 ( riser pipa air kotor)
m
60,00
62.565,08
3.753.905,04
- dia. 100 ( riser pipa air bekas )
m
60,00
62.565,08
3.753.905,04
- dia. 100
m
72,00
62.565,08
4.504.686,05
- dia. 65
m
72,00
34.311,24
2.470.408,94
- dia. 50
m
27,70
26.374,20
730.565,35
- Portable Grease Trap
bh
24,00
533.956,32
12.814.951,70
- dia. 100 ( riser pipa air kotor)
m
72,00
62.565,08
4.504.686,05
- dia. 100 ( riser pipa air bekas )
m
72,00
62.565,08
4.504.686,05
- dia. 100
m
120,00
62.565,08
7.507.810,09
- dia. 65
m
120,00
34.311,24
4.117.348,23
- dia. 50
m
29,70
26.374,20
783.313,75
- Portable Grease Trap
bh
24,00
533.956,32
12.814.951,70
- dia. 100 ( riser pipa air kotor)
m
84,00
62.565,08
5.255.467,06
- dia. 100 ( riser pipa air bekas )
m
84,00
62.565,08
5.255.467,06
- dia. 100
m
168,00
62.565,08
10.510.934,12
- dia. 65
m
168,00
34.311,24
5.764.287,52
- dia. 50
m
59,70
26.374,20
1.574.539,76
- Portable Grease Trap
bh
24,00
533.956,32
12.814.951,70
m
92,00
62.565,08
5.755.987,73
Clean Out (CO)
b
c
d
e
LANTAI 2
LANTAI 3
LANTAI 4
LANTAI 5
- dia. 100 ( riser pipa air kotor) PEK. M/E
Page 3
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
III
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
- dia. 100 ( riser pipa air bekas )
m
92,00
62.565,08
5.755.987,73
- dia. 100
m
216,00
62.565,08
13.514.058,16
- dia. 65
m
216,00
34.311,24
7.411.226,81
- dia. 50
m
60,70
26.374,20
1.600.913,96
- Portable Grease Trap
bh
24,00
26.374,20
632.980,81
INSTALASI AIR HUJAN
54.901.001,05
Pipa PVC Kelas AW (Incl. Fitting & Accessories) INSTALASI PEMIPAAN
a
b
LANTAI 1
- dia. 100 ( pipa tegak )
m
120,00
62.565,08
7.507.810,09
- dia. 80 ( pipa dapur/tempat jemur )
m
10,00
41.083,08
410.830,81
- dia. 100 ( pipa tegak )
m
76,80
62.565,08
4.804.998,46
- dia. 80 ( pipa dapur/tempat jemur )
m
70,00
41.083,08
2.875.815,66
- dia. 80 ( pipa selasar )
m
48,00
41.083,08
1.971.987,88
bh
4,00
153.103,61
612.414,44
- dia. 100 ( pipa tegak )
m
76,80
62.565,08
4.804.998,46
- dia. 80 ( pipa dapur/tempat jemur )
m
60,00
41.083,08
2.464.984,85
- dia. 150 ( pipa tegak )
m
76,80
62.565,08
4.804.998,46
- dia. 80 ( pipa dapur/tempat jemur )
m
60,00
153.103,61
9.186.216,64
- dia. 150 ( pipa tegak )
m
76,80
62.565,08
4.804.998,46
- dia. 80 ( pipa dapur/tempat jemur )
m
60,00
41.083,08
2.464.984,85
m
80,00
41.083,08
3.286.646,47
bh
24,00
153.103,61
3.674.486,66
LANTAI 2
Roof Drain, Cast Iron - dia. 80 c
d
e
LANTAI 3
LANTAI 4
LANTAI 5
f LANTAI ATAP - dia. 80 (roof tank ) Roof Drain, Cast Iron - dia. 100 PEK. M/E
Page 4
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
- dia. 50 ( Buangan Tanki Air Atas ) IV
SAT
bh
VOL
8,00
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
153.103,61
1.224.828,89
INSTALASI VENT
14.367.059,24
Pipa PVC Kelas AW (Incl. Fitting & Accessories) INSTALASI PEMIPAAN
a
b
c
d
e
A.2.
LANTAI 1 - Dia. 50 ( pipa riser )
m
76,80
26.374,20
2.025.538,59
- Dia. 32
m
20,64
20.446,86
422.023,26
- Dia. 50 ( pipa riser )
m
76,80
26.374,20
2.025.538,59
- Dia. 32
m
20,64
20.446,86
422.023,26
- Dia. 50 ( pipa riser )
m
76,80
26.374,20
2.025.538,59
- Dia. 32
m
20,64
20.446,86
422.023,26
- Dia. 50 ( pipa riser )
m
76,80
26.374,20
2.025.538,59
- Dia. 32
m
20,64
20.446,86
422.023,26
- Dia. 50 ( pipa riser )
m
76,80
26.374,20
2.025.538,59
- Dia. 32
m
20,64
20.446,86
422.023,26
- Vent cup Dia. 50
bh
24,00
88.718,75
2.129.250,00
LANTAI 2
LANTAI 3
LANTAI 4
LANTAI 5
PEKERJAAN INSTALASI ELEKTRIKAL
I
PEKERJAAN PANEL
a.
INSTALASI 1
241.002.050,02
unit
P-PLN
- MCCB 3P, 320 A
1.093.827.477,74
by pln
by pln
: 1 bh
- Accessories & Termi : 1 lot - Box Panel 2
: 1 unit
PEKERJAAN MDP
PEK. M/E
Page 5
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
Pengadaan dan pemasangan
MDP , dengan komponen panel,
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
unit
1
52.109.602,98
52.109.602,98
unit
1
8.856.757,75
8.856.757,75
sbb :
- Mgs 3P, 630 A - Mgs 3P, 630 A - MCCB 3P, 400 A - MCCB 3P,250 A - MCCB 3P,125 A - MCCB 3P,125 A - MCCB 3P,125 A - MCCB 3P,125 A - MCCB 3P,125 A - MCCB 3P,125 A - MCCB 3P, 20 A - MCCB 3P, 20 A - MCCB 3P, 20 A - Contacto, (timer switch) - Earth Fault Relay - Over Current Relay - Over / Under Voltage Relay - Power Factor-meter - Frequency-metr - Ampere-meter 300/5 A - Ampere-meter 50/5 A - Volt-meter 0-500 Volt - Volt Selector Switch - CT 300/5 A - CT 50/5 A - Fuse Carrier 4 A - Indicator Lamp - Rel MCCB 3P - CU Bar 5 x 400 A - CU Bar 5 x 63 A - Accessories & Termination - Box Panel 3
PP LANTAI 1 Pengadaan dan pemasangan PP LANTAI 1
PEK. M/E
Page 6
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
dengan komponen panel, sbb :
- MCCB 3P, 125 A - MCB 3P, 12 A - MCB 1P, 6 A - Ampere-meter 50/5 A - Volt-meter 0-500 Volt - Volt Selector Switch - Fuse 2 A - Indicator Lamp - Rel MCB 3P - Cu Bar 5 x 63 A - Accessories & Termination - Box Panel - KW-meter/3ph/63A 4
bh
1
1.252.500,00
1.252.500,00
unit
1
12.210.362,27
12.210.362,27
bh
5
647.125,00
3.235.625,00
P-KWH LT.1 Pengadaan dan pemasangan P-KWH-LT/1, dengan komponen panel, sbb :
- MCCB 3P, 125 A - MCB 1P, 12 A - MCB 1P, 12 A - MCB 1P, 12 A - MCB 1P, 6 A - Ampere-meter 50/5 A - Volt-meter 0-500 Volt - Volt Selector Switch - Fuse 2 A - Indicator Lamp - Rel MCB 3P - Cu Bar 5 x 32 A - Accessories & Termination - Box Panel - KW-meter/1ph/6A 5
P-KWH/LT.2 s/d lt 5
PEK. M/E
Page 7
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
Pengadaan dan pemasangan P-KWH-LT/2 s/d Lt 5
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
unit
4
10.964.104,58
43.856.418,33
bh
96
647.125,00
62.124.000,00
unit
1
9.134.290,16
9.134.290,16
unit
1
5.083.161,22
5.083.161,22
dengan komponen panel, sbb :
- MCCB 3P, 125 A - MCB 1P, 12 A - MCB 1P, 12 A - Ampere-meter 50/5 A - Volt-meter 0-500 Volt - Volt Selector Switch - Fuse 2 A - Indicator Lamp - Rel MCB 3P - Cu Bar 5 x 63 A - Accessories & Termination - Box Panel - KW-meter/1ph/6A 9
P-POMPA AIR BERSIH Pengadaan dan pemasangan
P-POMPA AIR BERSIH ,
dengan kompo-
nen panel, sbb :
- MCB 3P, 20 A - MCB 3P, 10 A - WLC 61F G-AP 220 Volt - DOL ( Direct On Line ) - Radar diantaki air atas - Ampere-meter 50/5 A - Volt-meter 0-500 Volt - Volt Selector Switch - Fuse 2 A - Indicator Lamp - Rel MCB 3P - Cu Bar 5 x 32 A - Accessories & Termination - Box Panel 10
P-KEBAKARAN Pengadaan dan pemasangan
PEK. M/E
P-KEBAKARAN , dengan kompo-
Page 8
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
nen panel, sbb :
- MCB 3P, 250 A - MCB 3P, 16 A - MCB 1P, 6 A - Ampere-meter 50/5 A - Volt-meter 0-500 Volt - Volt Selector Switch - Fuse 2 A - Indicator Lamp - Rel MCB 3P - Cu Bar 5 x 25 A - Accessories & Termination - Box Panel 11
P-ELC Pengadaan dan pemasangan
P-ELC ,
dengan kompo-
unit
1
P-ELC ,
dengan kompo-
unit
1
9.134.290,16
9.134.290,16
-
-
nen panel, sbb :
- MCB 3P, 20 A - MCB 3P, 16 A - MCB 1P, 6 A - Ampere-meter 50/5 A - Volt-meter 0-500 Volt - Volt Selector Switch - Fuse 2 A - Indicator Lamp - Rel MCB 3P - Cu Bar 5 x 25 A - Accessories & Termination - Box Panel 12
P-DPW Pengadaan dan pemasangan nen panel, sbb :
- MCB 3P, 20 A - MCB 3P, 16 A - MCB 1P, 6 A - Ampere-meter 50/5 A PEK. M/E
Page 9
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
- Volt-meter 0-500 Volt - Volt Selector Switch - Fuse 2 A - Indicator Lamp - Rel MCB 3P - Cu Bar 5 x 25 A - Accessories & Termination - Box Panel P-UNIT Pengadaan dan pemasangan P-UNIT , dengan komponen panel, sbb : 13
14
LANTAI-1
- MCB 1P, 6 A
: 1 bh
- MCB 1P, 4 A
: 4 bh
- Box Hanger
: 1 bh
LANTAI-2 s/d 5
- MCB 1P, 6 A
: 1 bh
- MCB 1P, 4 A
: 4 bh
- Box Hanger
: 1 bh
II
PEKERJAAN INSTALASI KABEL FEEDER
a.
INSTALASI
- NYY 4 x 185 mm2 + E-NYA 95 mm2 Dari P-PLN ke MDP
unit
5
441.623,92
2.208.119,62
unit
72
441.623,92
31.796.922,53
164.229.705,75
m'
65,00
757.085,99
49.210.589,36
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-LT/1
m'
20,00
212.307,06
4.246.141,14
- NYY 4 x 6 mm2 + E-NYA 2.5 mm2 ke P-KWH-LT/Dasar
m'
10,00
59.483,31
594.833,11
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/2
m'
30,00
106.479,15
3.194.374,51
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/3
m'
40,00
106.479,15
4.259.166,02
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/4
m'
50,00
106.479,15
5.323.957,52
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/5
m'
60,00
106.479,15
6.388.749,02
- NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih
m'
65,00
59.483,31
3.866.415,22
- FRC 4 x 6 mm2 + E-NYA 6 mm2 ke P-Kebakaran
m'
65,00
212.307,06
13.799.958,70
Kabel Distribusi Daya dari MDP :
Kabel Distribusi Daya dari P-LT-1 :
PEK. M/E
Page 10
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
Kabel Distribusi Daya dari P-KWH-LT/1 ke
- NYM 3 x 4 mm2 ke P-Unit/1 ( Difable )
m'
52,30
23.511,19
1.229.635,45
- NYM 3 x 4 mm2 ke P-Unit/2 ( Difable )
m'
31,30
23.511,19
735.900,38
- NYM 3 x 4 mm2 ke P-Selasar
m'
15,00
23.511,19
352.667,91
- NYM 3 x 4 mm2 ke P-Unit Serba Guna
m'
52,30
23.511,19
1.229.635,45
- NYM 3 x 4 mm2 ke P-Unit Pengelola
m'
33,80
23.511,19
794.678,36
- NYM 3 x 4 mm2 ke P-Unit toko
m'
15,30
23.511,19
359.721,27
- NYM 3 x 4 mm2 ke P-Unit/1
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/2
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/3
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/4
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/5
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/6
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/7
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/8
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Unit/9
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Unit/10
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/11
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/12
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/13
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/14
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/15
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/16
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/17
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/18
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/19
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/20
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/21
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/22
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/23
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/24
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Selasar
m'
15,00
23.511,19
352.667,91
- NYM 3 x 4 mm2 ke P-Unit/1
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/2
m'
55,80
23.511,19
1.311.924,63
Kabel Distribusi Daya dari P-KWH-LT/2 ke
Kabel Distribusi Daya dari P-KWH-LT/3 ke
PEK. M/E
Page 11
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
- NYM 3 x 4 mm2 ke P-Unit/3
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/4
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/5
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/6
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/7
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/8
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Unit/9
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Unit/10
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/11
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/12
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/13
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/14
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/15
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/16
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/17
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/18
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/19
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/20
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/21
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/22
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/23
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/24
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Selasar
m'
15,00
23.511,19
352.667,91
- NYM 3 x 4 mm2 ke P-Unit/1
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/2
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/3
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/4
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/5
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/6
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/7
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/8
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Unit/9
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Unit/10
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/11
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/12
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/13
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/14
m'
52,80
23.511,19
1.241.391,05
Kabel Distribusi Daya dari P-KWH-LT/4 ke
PEK. M/E
Page 12
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
- NYM 3 x 4 mm2 ke P-Unit/15
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/16
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/17
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/18
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/19
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/20
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/21
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/22
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/23
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/24
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Selasar
m'
15,00
23.511,19
352.667,91
- NYM 3 x 4 mm2 ke P-Unit/1
m'
65,80
26.560,31
1.747.668,15
- NYM 3 x 4 mm2 ke P-Unit/2
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/3
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/4
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/5
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/6
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/7
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/8
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Unit/9
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Unit/10
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/11
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/12
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/13
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/14
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/15
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/16
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/17
m'
65,80
23.511,19
1.547.036,57
- NYM 3 x 4 mm2 ke P-Unit/18
m'
55,80
23.511,19
1.311.924,63
- NYM 3 x 4 mm2 ke P-Unit/19
m'
52,80
23.511,19
1.241.391,05
- NYM 3 x 4 mm2 ke P-Unit/20
m'
42,80
23.511,19
1.006.279,11
- NYM 3 x 4 mm2 ke P-Unit/21
m'
37,80
23.511,19
888.723,14
- NYM 3 x 4 mm2 ke P-Unit/22
m'
27,80
23.511,19
653.611,20
- NYM 3 x 4 mm2 ke P-Unit/23
m'
23,30
23.511,19
547.810,82
- NYM 3 x 4 mm2 ke P-Unit/24
m'
13,30
23.511,19
312.698,88
- NYM 3 x 4 mm2 ke P-Selasar
m'
15,00
23.511,19
352.667,91
Kabel Distribusi Daya dari P-KWH-LT/5 ke
PEK. M/E
Page 13
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
III
PEKERJAAN KABEL LADDER (RAK KABEL)
a.
INSTALASI
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp) 58.323.559,97
Pengadaan dan Pemasangan Kabel Ladder lengkap dengan semua fitting, aksesoris, berikut material dan alat bantu pemasangan lainnya sesuai diuraikan dalam Gambar dan Spesifikasi Teknis. 1
Lantai-1
- Kabel Tray W200 x H100
m'
130,00
123.156,41
16.010.333,09
bh
2,00
165.163,00
330.326,00
lot
1,00
750.000,00
750.000,00
m'
260,00
123.156,41
32.020.666,18
bh
4,00
209.042,25
836.169,00
lot
4,00
750.000,00
3.000.000,00
m'
22,00
244.366,62
5.376.065,70
Fitting-Fitting :
- Elbow W200 x H100 Material bantu ( mur, baut, hanger rod, supporting, dll ) 2
Lantai-2 s/d 5
- Kabel Tray W200 x H100 Fitting-Fitting :
- Elbow W200 x H100 Material bantu ( mur, baut, hanger rod, supporting, dll ) 3
Shaft
- Kabel Tray W600 x H100 IV
PEKERJAAN ARMATUR LAMPU, SAKLAR & STOP KONTAK
a.
INSTALASI
1
2
94.064.563,79
Lantai-1
- TL 1 x 36 W, TL Balk Type
bh
14,00
91.278,83
1.277.903,65
- Down Light 18 Watt , Fitting E-27
bh
191,00
47.876,07
9.144.329,61
- Stop Kontak 1P, 220 Volt, 13A, Wall Type
bh
190,00
26.369,18
5.010.144,19
- Saklar 1 gang
bh
28,00
25.269,95
707.558,73
- Saklar 2 gang
bh
10,00
35.224,71
352.247,15
- Saklar Hotel
bh
2,00
35.224,71
70.449,43
Lantai-2
PEK. M/E
Page 14
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
3
4
5
6
7
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
- Down Light 18 Watt , Fitting E-27
bh
172,00
47.876,07
8.234.684,26
- Lampu TL 1 x 18 Watt , Balk Type (Selasar)
bh
13,00
63.842,17
829.948,19
- Stop Kontak 1P, 220 Volt, 13A, Wall Type
bh
205,00
26.369,18
5.405.681,89
- Saklar 1 gang
bh
96,00
25.269,95
2.425.915,64
- Saklar 2 gang
bh
10,00
35.224,71
352.247,15
- TL 1 x 18 W, TL Balk Type c/w battery charger (Selasar)
bh
172,00
47.876,07
8.234.684,26
- Lampu TL 1 x 18 Watt , Balk Type (Selasar)
bh
13,00
63.842,17
829.948,19
- Stop Kontak 1P, 220 Volt, 13A, Wall Type
bh
205,00
26.369,18
5.405.681,89
- Saklar 1 gang
bh
96,00
25.269,95
2.425.915,64
- Saklar 2 gang
bh
10,00
35.224,71
352.247,15
- TL 1 x 18 W, TL Balk Type c/w battery charger (Selasar)
bh
172,00
47.876,07
8.234.684,26
- Lampu TL 1 x 18 Watt , Balk Type (Selasar)
bh
13,00
63.842,17
829.948,19
- Stop Kontak 1P, 220 Volt, 13A, Wall Type
bh
205,00
26.369,18
5.405.681,89
- Saklar 1 gang
bh
96,00
25.269,95
2.425.915,64
- Saklar 2 gang
bh
10,00
35.224,71
352.247,15
- TL 1 x 18 W, TL Balk Type c/w battery charger (Selasar)
bh
172,00
47.876,07
8.234.684,26
- Lampu TL 1 x 18 Watt , Balk Type (Selasar)
bh
13,00
63.842,17
829.948,19
- Stop Kontak 1P, 220 Volt, 13A, Wall Type
bh
205,00
26.369,18
5.405.681,89
- Saklar 1 gang
bh
96,00
25.269,95
2.425.915,64
- Saklar 2 gang
bh
10,00
35.224,71
352.247,15
- TL 1 x 36 W, TL Balk Type
bh
2,00
91.278,83
182.557,66
- Stop Kontak 1P, 220 Volt, 13A, Wall Type
bh
1,00
26.369,18
26.369,18
- Saklar 1 gang
bh
1,00
25.269,95
25.269,95
bh
16,00
517.114,11
8.273.825,74
Lantai-3
Lantai-4
Lantai-5
R.Pompa
PEKERJAAN LAMPU TAMAN
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt V
PEKERJAAN INSTALASI FINAL
a.
INSTALASI
493.684.289,34
Lantai-1 PEK. M/E
Page 15
R EN CA NA A NG GA RA N B IA YA ( RA B) P E KE R J AA N M E K AN I KA L & EL E KT R I KA L Pekerjaan
: PERENCANAAN PROTOTYPE RUMAH SUSUN PU-PR
Tipe Prototype
: T-24 /5 RUSUN PNS KDS/E
Jumlah Lantai
: 5 LANTAI
Lokasi
: Jl. Soekarno Hatta, Kab. Mamuju
Tahun Anggaran
: 2016
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART No.
URAIAN PEKERJAAN
SAT
VOL
HARGA SATUAN
TOTAL HARGA
(Rp)
(Rp)
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
ttk
205,00
225.075,62
46.140.501,33
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
ttk
190,00
266.417,04
50.619.237,70
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
ttk
185,00
225.075,62
41.638.989,00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
ttk
205,00
266.417,04
54.615.493,31
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
ttk
185,00
225.075,62
41.638.989,00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
ttk
205,00
266.417,04
54.615.493,31
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
ttk
185,00
225.075,62
41.638.989,00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
ttk
205,00
266.417,04
54.615.493,31
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
ttk
185,00
225.075,62
41.638.989,00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
ttk
205,00
266.417,04
54.615.493,31
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
ttk
2,00
225.075,62
450.151,23
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
ttk
1,00
266.417,04
266.417,04
- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman
ttk
16,00
449.378,30
7.190.052,79
- Material Bantu
lot
1,00
2.500.000,00
2.500.000,00
- Testing & Commissioning
lot
1,00
1.500.000,00
1.500.000,00
Lantai-2
Lantai-3
Lantai-4
Lantai-5
R.Pompa
PEKERJAAN LAMPU TAMAN
VI
PEKERJAAN SISTEM PENTANAHAN
a.
INSTALASI
13.336.654,44
Pentanahan (Grounding) Netral Sistem & Pentanahan Body
- Body Panel MDP - Body pada semua panel distribusi daya tegangan rendah - Body Peralatan pada Sistem Elektronik Item SBB: PEK. M/E
Page 16