REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PERENCANAAN KANTOR BADAN NARKOTIKA NASIONAL (BNN) PADA KAWASAN MOI DI MAKASSAR
PEKERJAAN ANGGARAN NO
: PERENCANAAN KANTOR BNN : TAHUN 2011 2011 JENIS PEKERJAAN
TOTAL HARGA (Rp.)
A LANT LANTAI AI I (DAS (DASAR AR)) I PEK. PERSIAPAN I PEK. PONDASI KONSTRUKSI SARANG LABA - LABA (KSLL) II PEK. STRUKTUR BETON IV PE PEKERJAAN DINDING V PEKERJAAN PINTU DAN JENDELA VI PEK. PLAFOND VII PEKERJAAN LANTAI VIII PEK. PENGECATAN IX PEK. INSTALASI LISTRIK X PEK. SANITASI DAN INSTALASI
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
73,639,822.50 2,031,803,097.50 377,441,899.78 224,960,911.89 563,673,128.53 74,011,152.43 322,230,292.47 67,349,299.18 162,985,500.00 103,303,658.54
B LAN LANTAI IIII (D (DUA) I PEK. STRUKTUR BETON II PEKERJAAN DINDING III PEKERJAAN PINTU DAN JENDELA IV PEK. PLAFOND V PE PEKERJAAN LANTAI VI PEK. PENGECATAN VII PEK. KONSTRUKSI ATAP VIII PEK. INSTALASI LISTRIK IX PEK. SANITASI DAN INSTALASI X PEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR RE REAL COST TOTAL PP PPN 10% TO TOTAL COST DI DIBULATKAN
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
1,208,477,521.53 235,693,072.46 628,066,868.62 113,692,742.73 301,403,830.67 82,749,104.09 523,439,934.21 107,771,500.00 27,511,627.50 81,222,583.05 7,311,427,547.68 731,142,754.77 8,042,570,302.44 8,042,570,000.00
TERBILANG : Tujuh milyar enam ratus tujuh puluh tiga juta dua ratus lima puluh sembilan ribu rupiah,-
Makassar, Diketahui/Disetujui : PEJABAT PELAKSANA TEKNIS KEGIATAN
Konsultan Perencana, CV. BAJIRUPA CONSULTANT
Ir. H. JUMRAS, M.Si Nip. 19620707 199203 1 012
BADARUDDIN, ST Direktur
Mengetahui/Menyetujui : KEPALA BIDANG PENATAAN BANGUNAN DAN LINGKUNGAN DINAS TATARUANG DAN PERMUKIMAN PROVINSI SULAWESI SELATAN
Ir. H. DANIYAL DARABA, M.Si Nip. 19560407 198303 1 012
2011
RENCANA ANGGARAN BIAYA (RAB) PERENCANAAN KANTOR BADAN NARKOTIKA NASIONAL (BNN) PADA KAWASAN MOI DI MAKASSAR
PEKERJAAN
: PERENCANAAN KANTOR BNN
ANGGARAN
: TAHUN 2011
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
A. PEKERJAAN PERSIAPAN I
PEK. PERSIAPAN
1. Pek. Pengukur Pengukuran an dan Pas. Bowplank Bowplank
138.30 138.30
M' M'
108,575.00
15,015,922.50
2. Pek. Penyediaan P3K, Listrik Dan Air Kerja
3. Pek. Kantor Sementara Dengan Lantai Plesteran/Direksi Keet
1.00
LLss
5,000,000.00
5,000,000.00
12.00
M2 M2
2,266,375.00
27,196,500.00
4. Pe Pek. Papan Nama Proyek
1.00
LLss
500,000.00
500,000.00
5. Pek. Anti Rayap (Sistem Semprot)
697.58
M2 M2
30,000.00
20,927,400.00
6. Administrasi, Dokumentasi Dan Quality Control
1.00
LLss
5,000,000.00
5,000,000.00
Jumlah
73,639,822.50
B. LANTAI I (DASAR) I
PEK. PEK. PONDA PONDASI SI KONS KONSTRU TRUKSI KSI SARAN SARANG G LABA LABA - LAB LABA A (KSLL (KSLL))
1. Pekerjaan Pondasi Sarang Laba - Laba (Luas Tapak)
697.02
m2 m2
2,915,000.00
2,031,803,097.50
Jumlah
2,031,803,097.50
Terdiri Dari : - Engineering Fee KSLL - Pekerjaan Pondasi / Sub Struktur KSLL - Plat Lantai KSLL - Plat Penutup Septictank
II
PEK. PEK. STRUK TRUKTU TUR R BE BETON TON
1. Pek. Pembesian Pembesian Stek Pada Pondasi Pondasi KSLL KSLL a. Besi Besi Beto Betonn Stek Stek Kolom Kolom - Stek Kolom K0
162.62
Kg Kg
13,251.00
2,154,930.62
- Stek Kolom K1
151.68
Kg Kg
13,251.00
2,009,911.68
- Stek Kolom K2
834.24
Kg Kg
13,251.00
11,054,514.24
- Stek Kolom K3
185.86
Kg Kg
13,251.00
2,462,777.86
- Stek Kolom KP
459.82
Kg Kg
13,251.00
6,093,085.42
b. Be Besi Beton Stek Tangga
58.08
Kg Kg
13,251.00
769,618.08
2. Pek. Pek. Kolo Kolom m a. Type Type Kolo Kolom m K0 K0 (25/ (25/54) 54) -Beton K.225
4.86
m3 m3
930,676.90
4,523,089.76
-Besi Beton
777.35
Kg Kg
13,251.00
10,300,695.59
-Bekisting 2x Pakai
56.88
m2 m2
252,640.00
14,370,163.20
b. Type Type Kolo Kolom m K1 K1 (50/ (50/50) 50) -Beton K.225
4.25
m3 m3
930,676.90
3,955,376.85
-Besi Beton
638.75
Kg Kg
13,251.00
8,464,092.15
-Bekisting 2x Pakai
34.00
m2 m2
252,640.00
8,589,760.00
-Beton K.225
15.40
m3 m3
930,676.90
14,332,424.33
-Besi Beton
3,288.03
Kg Kg
13,251.00
43,569,712.03
-Bekisting 2x Pakai
211.20
m2 m2
252,640.00
53,357,568.00
-Beton K.225
4.13
m3 m3
930,676.90
3,839,042.23
-Besi Beton
794.51
Kg Kg
13,251.00
10,528,025.51
-Bekisting 2x Pakai
66.00
m2 m2
252,640.00
16,674,240.00
c. Type Type Kolo Kolom m K2 (25/35 (25/35))
d. Type Type Kolo Kolom m K3 K3 (25/ (25/25) 25)
RENCANA ANGGARAN BIAYA (RAB) PERENCANAAN KANTOR BADAN NARKOTIKA NASIONAL (BNN) PADA KAWASAN MOI DI MAKASSAR
PEKERJAAN
: PERENCANAAN KANTOR BNN
ANGGARAN
: TAHUN 2011
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
A. PEKERJAAN PERSIAPAN I
PEK. PERSIAPAN
1. Pek. Pengukur Pengukuran an dan Pas. Bowplank Bowplank
138.30 138.30
M' M'
108,575.00
15,015,922.50
2. Pek. Penyediaan P3K, Listrik Dan Air Kerja
3. Pek. Kantor Sementara Dengan Lantai Plesteran/Direksi Keet
1.00
LLss
5,000,000.00
5,000,000.00
12.00
M2 M2
2,266,375.00
27,196,500.00
4. Pe Pek. Papan Nama Proyek
1.00
LLss
500,000.00
500,000.00
5. Pek. Anti Rayap (Sistem Semprot)
697.58
M2 M2
30,000.00
20,927,400.00
6. Administrasi, Dokumentasi Dan Quality Control
1.00
LLss
5,000,000.00
5,000,000.00
Jumlah
73,639,822.50
B. LANTAI I (DASAR) I
PEK. PEK. PONDA PONDASI SI KONS KONSTRU TRUKSI KSI SARAN SARANG G LABA LABA - LAB LABA A (KSLL (KSLL))
1. Pekerjaan Pondasi Sarang Laba - Laba (Luas Tapak)
697.02
m2 m2
2,915,000.00
2,031,803,097.50
Jumlah
2,031,803,097.50
Terdiri Dari : - Engineering Fee KSLL - Pekerjaan Pondasi / Sub Struktur KSLL - Plat Lantai KSLL - Plat Penutup Septictank
II
PEK. PEK. STRUK TRUKTU TUR R BE BETON TON
1. Pek. Pembesian Pembesian Stek Pada Pondasi Pondasi KSLL KSLL a. Besi Besi Beto Betonn Stek Stek Kolom Kolom - Stek Kolom K0
162.62
Kg Kg
13,251.00
2,154,930.62
- Stek Kolom K1
151.68
Kg Kg
13,251.00
2,009,911.68
- Stek Kolom K2
834.24
Kg Kg
13,251.00
11,054,514.24
- Stek Kolom K3
185.86
Kg Kg
13,251.00
2,462,777.86
- Stek Kolom KP
459.82
Kg Kg
13,251.00
6,093,085.42
b. Be Besi Beton Stek Tangga
58.08
Kg Kg
13,251.00
769,618.08
2. Pek. Pek. Kolo Kolom m a. Type Type Kolo Kolom m K0 K0 (25/ (25/54) 54) -Beton K.225
4.86
m3 m3
930,676.90
4,523,089.76
-Besi Beton
777.35
Kg Kg
13,251.00
10,300,695.59
-Bekisting 2x Pakai
56.88
m2 m2
252,640.00
14,370,163.20
b. Type Type Kolo Kolom m K1 K1 (50/ (50/50) 50) -Beton K.225
4.25
m3 m3
930,676.90
3,955,376.85
-Besi Beton
638.75
Kg Kg
13,251.00
8,464,092.15
-Bekisting 2x Pakai
34.00
m2 m2
252,640.00
8,589,760.00
-Beton K.225
15.40
m3 m3
930,676.90
14,332,424.33
-Besi Beton
3,288.03
Kg Kg
13,251.00
43,569,712.03
-Bekisting 2x Pakai
211.20
m2 m2
252,640.00
53,357,568.00
-Beton K.225
4.13
m3 m3
930,676.90
3,839,042.23
-Besi Beton
794.51
Kg Kg
13,251.00
10,528,025.51
-Bekisting 2x Pakai
66.00
m2 m2
252,640.00
16,674,240.00
c. Type Type Kolo Kolom m K2 (25/35 (25/35))
d. Type Type Kolo Kolom m K3 K3 (25/ (25/25) 25)
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
e. Type Type Kolom Kolom Prakt Praktis is Kp (12/ (12/20) 20) -Beton K.175
11.20
m3 m3
881,921.19
9,873,989.65
-Besi Beton
2,734.93
kkgg
13,251.00
36,240,610.43
-Bekisting 2x Pakai
149.28
m2 m2
252,640.00
37,714,099.20
-Beton K.175
7.32
m3 m3
881,921.19
6,453,017.35
-Besi Beton
1,094.30
Kg Kg
13,251.00
14,500,542.80
-Bekisting 2x Pakai
121.95
m2 m2
259,465.00
31,641,756.75
-Beton K.225
2.33
m3 m3
930,676.90
2,172,814.14
-Besi Beton
404.87
Kg Kg
13,251.00
5,364,948.27
-Bekisting 2x Pakai
10.59
m2 m2
236,090.00
2,499,626.48
-Beton K.225
2.23
m3 m3
930,676.90
2,074,218.23
-Besi Beton
379.28
Kg Kg
13,251.00
5,025,873.73
-Bekisting 2x Pakai
10.29
m2 m2
236,090.00
2,430,216.02
-Beton K.175
0.46
m3 m3
881,921.19
405,683.75
-Besi Beton
84.46
Kg Kg
13,251.00
1,119,187.41
-Bekisting 2x Pakai
9.20
m2 m2
312,640.00
2,876,288.00
-Beton K.175
4.85
m3 m3
881,921.19
4,274,707.29
-Besi Beton
635.14
Kg Kg
13,251.00
8,416,263.46
-Bekisting 2x Pakai
52.51
m2 m2
3. Balok Balok Latei Latei BL2 BL2 (12/25 (12/25))
4. Pek. Pek. Tang Tangga ga Beto Betonn = 2 Bh A.
B.
Pek. Tangga A
Pek. ek. Tan Tangg ggaa B
5. Pekerj Pekerjaan aan Plat Plat Meja Meja Beton Beton
6. Balok Dudukan Dudukan Kosen Kosen Luar/P Luar/Profila rofilann (24/15) (24/15)
259,465.00 Jumlah
IV
PEKE PEKERJ RJAA AAN N DIND DINDIN ING G
1. Pas. Pasangan Batu 1/2 Bata (1:5)
807.70
m2 m2
92,087.00
74,378,311.93
2. Pek. Plesteran Biasa( 1 : 5 )
1,615.39
m2 m2
43,145.60
69,697,066.80
3. Pek. Plesteran Beton ( 1 : 3 )
530.53
m2 m2
45,724.40
24,258,165.93
4. Pek. Acian
2,045.23
m2 m2
27,687.50
56,627,367.24
Jumlah V
13,624,403.36 377,441,899.78
224,960,911.89
PEKE PEKERJ RJAA AAN N PIN PINTU TU DAN DAN JEN JENDE DELA LA
1. Pek. Kuseng Aluminium 4" x 1 3/4"
946.23
m' m'
182,551.50
172,735,705.85
2. Pek. Bingkai Pintu Aluminium 4" x 1 1/2"
185.72
m' m'
169,684.83
31,513,867.25
3. Pek. Bingkai jendela Aluminium 2" x 1"
120.44
m' m'
136,684.83
16,462,321.33
4. Pek. Pintu kaca Tempret 12 mm, Uk. 90 x 230 ((P Pintu Utama)
2.00
Bh Bh
4,577,406.25
9,154,812.50
5. Pek. Pintu Aluminium (Toilet/Km)
5.00
Bh Bh
960,000.00
4,800,000.00
6. Pek. Pas. Kaca 5 mm Daun Pintu Dan Daun Jendela
46.21
m2 m2
551,706.25
25,495,338.88
7. Pek. Pas. Kaca 5 mm Curtain Wall Dan Ka K aca Mati Jendela
162.17
m2 m2
551,706.25
89,471,305.98
8. Pek. Aluminium Composit Panel + Rangka 9. Pek. Partisi Dobel (rangka Kayu Kls. II + Lapis Multipleks 9mm, Finishing HPL)
269.88
m2 m2
591,091.67
159,523,095.50
10.12
m2 m2
785,000.00
7,942,237.50
10. Pas. Floring Ensel 11. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 4 bh engsel, Kecuali Pintu KM = 3 bh)
2.00
P Pssg
1,835,156.25
3,670,312.50
131.00
Bh Bh
53,706.25
7,035,518.75
12. Pas. Engsel Jendela 13. Pas. Engsel Expanyolet (Pintu Utama, P1, P2, P3, P4 Dan P5)
104.00
Bh Bh
38,137.50
3,966,300.00
31.00
S Seet
310,687.50
9,631,312.50
14. Pas. Hak Angin
104.00
Bh Bh
33,706.25
3,505,450.00
15. Pas. Tarikan Stainless
31.00
Bh Bh
410,687.50
12,731,312.50
16. Pas. Grendel Jendela
52.00
Bh Bh
27,637.50
1,437,150.00
17. Pas. Kunci Pelor
1.00
S Seet
279,275.00
279,275.00
18. Pas. Kunci tanam silinder
5.00
S Seet
266,462.50
1,332,312.50
19. Pas. Kunci Pelor Biasa
20.00
S Seet
149,275.00
2,985,500.00
Jumlah
563,673,128.53
NO VI
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
PEK. PLAFOND
1. Pek. Plafond Gypsum 9 mm + Rangka Hollow
471.20
m2
142,147.08
66,980,018.39
2. Pek. Plafond Calsyboard + Rangka Hollow
47.63
m2
147,615.83
7,031,134.04
Jumlah VII
PEKERJAAN LANTAI 1. Pek. Urugan Pasir Di Bawah Lantai (Sisi Luar Konst. Utama Sarang Laba-laba)
30.03
m3
177,850.00
5,341,301.29
2. Pek. Lantai Kerja Beton Tebal 7 cm
4.89
m3
735,120.63
3,594,027.57
3. Pek. Rabat Beton Keliling Gedung & Ram = 7 Cm
1.26
m3
796,660.71
1,003,792.50
4. Pek. Lantai Utama Dan entrance Granit 60/60 cm
484.64
m2
480,673.50
232,952,499.49
5. Pek. Lantai Tangga Granit 60/60 Cm
29.01
m2
480,673.50
13,945,876.39
6. Pek. Plint Lantai Utama Dan entrance Uk. 10 x 60
484.10
m'
79,458.00
38,465,617.80
7. Pek. Lantai Keramik Toilet/KM/WC & Dapur, Uk. 20 x 20
33.94
m2
172,548.00
5,857,090.10
8. Pek. Keramik Dinding Meja Beton Uk. 20 x 40
8.13
m2
209,257.00
1,701,259.41
9. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 40
92.56
m2
209,257.00
19,368,827.92
1. Pek. Cat Tembok
1,775.35
m2
29,356.50
52,118,163.53
2. Pek. Cat Plafond
m2
29,356.50
15,231,135.64
518.83
67,349,299.18
PEK. INSTALASI LISTRIK
1. Pek. Instalasi Titik Mata Lampu
91.00
ttk
418,500.00
38,083,500.00
2. Pek. Instalasi Titik Stop Kontak
34.00
ttk
333,000.00
11,322,000.00
3. Pek. Pas. Lampu RM 2 x 36
49.00
Bh
390,000.00
19,110,000.00
4. Pek. Pas. Lampu Downlight DL 18 Watt
42.00
Bh
95,000.00
3,990,000.00
5. Pek. Pas. Lampu Downlight DL 25 Watt
11.00
Bh
125,000.00
1,375,000.00
6. Pas. Saklar Tunggal
5.00
Bh
65,000.00
325,000.00
7. Pas. Saklar Ganda
24.00
Bh
68,500.00
1,644,000.00
8. Pas. Stop Kontak
22.00
Bh
65,000.00
1,430,000.00
9. Pas. Stop Kontak AC
12.00
Bh
75,000.00
900,000.00
10. Pas. Panel Induk + MCB, Lengkap
1.00
Unit
17,000,000.00
17,000,000.00
11. Pemasukan Daya Listrik 33000 Watt
1.00
Ls
40,590,000.00
40,590,000.00
12. Pek. Penangkal Petir, terdiri dari :
1.00
Set
27,216,000.00
27,216,000.00
Jumlah
162,985,500.00
10,022,520.00
- Elektroda penangkap
X
322,230,292.47
PEK. PENGECATAN
Jumlah IX
74,011,152.43
Jumlah VIII
JML. HARGA
2.00
Bh
- Pengantar Tembaga BCC 50 mm
60.00
m'
- Klem dari bahan Copper
30.00
Bh
- Penyambung Pengantar dari Bahan Kopper
4.00
Bh
- pipa PPC Ø 1" , Pembungkus BCC 50 mm pada Ground Road
6.00
m'
- Pentanahan
1.00
Bh
PEK. SANITASI DAN INSTALASI
1. Pas. Klosed Duduk + Acs, Lengkap 2. Pas. Washtafel + Kaca, Acs Lengkap
3. Pas. Washbasin 2 mata + Acs, lengkap
4. Pas. Urinoir Lengkap
4.00
Set
2,505,630.00
3.00
Set
733,840.00
2,201,520.00
2.00
Set
386,412.50
772,825.00
3.00
Set
2,198,490.00
6,595,470.00
5. Pas. Kran Air Biasa
12.00
Bh
63,512.50
762,150.00
6. Pas. Floordrain Stainless
7.00
Bh
62,925.00
440,475.00
7. Pas. Stop Kran
2.00
Bh
89,012.50
178,025.00
8. Pek. Pas. Pipa Air Bersih AW 1" (dari Tower Air dan PDAM)
65.00
m'
19,095.00
1,241,175.00
9. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
88.00
m'
16,899.17
1,487,126.67
10. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
73.00
m'
18,513.75
1,351,503.75
11. Pek. Pipa Buangan Air Washtafel/Washbasin Dia. 2" (AW)
60.50
m'
73,786.25
4,464,068.13
12. Pek. Pipa Buangan Air Mandi Dia. 3" (D)
60.00
m'
144,110.00
8,646,600.00
13. Pek. Pipa Buangan Air Kotor Dia. 4" (D)
120.00
m'
205,335.00
24,640,200.00
14. Pek. Pas. Reservoir stainless Kap. 1 m3
2.00
Bh
4,000,000.00
8,000,000.00
15. Pas. Pompa Air 1"
1.00
Unit
2,500,000.00
2,500,000.00
16. Pek. Septic tank + Peresapan
2.00
Unit
15,000,000.00
30,000,000.00
Jumlah
103,303,658.54
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
C. LANTAI II (DUA) I
PEK. STRUKTUR BETON
1. Pek. Balok Lantai, Ringbalk Dan Balok Latei a. Balok Plat Lantai B0 (30/60) -Beton K.225
5.38
m3
930,676.90
5,005,552.66
-Besi Beton
863.41
Kg
13,251.00
11,441,030.78
-Bekisting 2x Pakai
44.82
m2
259,465.00
11,629,221.30
b. Balok Plat Lantai B1 (25/40) -Beton K.225
16.69
m3
930,676.90
15,533,928.22
-Besi Beton
3,179.00
Kg
13,251.00
42,124,905.24
-Bekisting 2x Pakai
175.26
m2
259,465.00
45,472,668.31
-Beton K.225
14.19
m3
930,676.90
13,208,911.17
-Besi Beton
2,622.12
Kg
-Bekisting 2x Pakai
177.41
m2
-Beton K.225
0.94
m3
-Besi Beton
155.05
Kg
-Bekisting 2x Pakai
11.88
m2
-Beton K.225
6.94
m3
-Besi Beton
982.04
Kg
-Bekisting 2x Pakai
92.54
m2
-Beton K.225
0.55
m3
-Besi Beton
101.69
Kg
-Bekisting 2x Pakai
6.88
m2
-Beton K.225
7.65
m3
-Besi Beton
1,205.79
Kg
-Bekisting 2x Pakai
168.30
m2
-Beton K.225
2.82
m3
-Besi Beton
373.10
Kg
-Bekisting 2x Pakai
24.44
m2
c. Balok Plat Lantai B2 (20/40) 13,251.00
34,745,709.47
259,465.00
46,031,685.65
930,676.90
871,113.58
d. Balok Plat Lantai B1* (25/40+10/30) 13,251.00
2,054,568.03
259,465.00
3,082,444.20
930,676.90
6,459,083.85
13,251.00
13,012,989.51
259,465.00
24,009,853.24
930,676.90
512,244.57
13,251.00
1,347,446.49
259,465.00
1,785,119.20
930,676.90
7,119,678.32
13,251.00
15,977,963.04
297,640.00
50,092,812.00
930,676.90
2,624,508.87
13,251.00
4,944,011.70
259,465.00
6,341,324.60
e. Balok Plat Lantai B3 (20/30)
f. Balok Konsol Lantai BK (20/40)
g. Plat Level BLS (10/50)
h. Ringbalk RB0 (25/60)
i. Ringbalk RB1 (15/40)
j.
-Beton K.225
13.24
m3
930,676.90
12,322,348.35
-Besi Beton
2,193.46
Kg
13,251.00
29,065,535.81
-Bekisting 2x Pakai
176.54
m2
259,465.00
45,804,913.24
-Beton K.225
0.51
m3
930,676.90
471,853.19
-Besi Beton
75.82
Kg
13,251.00
1,004,752.66
-Bekisting 2x Pakai
8.45
m2
259,465.00
2,192,479.25
-Beton K.225
3.19
m3
930,676.90
2,965,136.62
-Besi Beton
421.53
Kg
13,251.00
5,585,681.31
-Bekisting 2x Pakai
27.61
m2
259,465.00
7,164,347.58
-Beton K.225
7.34
m3
930,676.90
6,829,307.13
-Besi Beton
1,215.66
Kg
13,251.00
16,108,737.16
-Bekisting 2x Pakai
97.84
m2
259,465.00
25,386,055.60
-Beton K.225
3.60
m3
930,676.90
3,350,436.86
-Besi Beton
538.40
Kg
13,251.00
7,134,338.40
-Bekisting 2x Pakai
60.00
m2
259,465.00
15,567,900.00
Ringbalk RB2 (12/25)
k. Balok Latei BL0 (25/60)
l. Balok Latei BL1 (15/40)
m. Balok Latei BL2 (12/25)
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
n. Balok Latei BL3 (20/40) -Beton K.225
2.83
m3
930,676.90
2,629,720.66
-Besi Beton
398.06
Kg
13,251.00
5,274,645.36
-Bekisting 2x Pakai
30.02
m2
259,465.00
7,789,658.23
-Beton K.225
55.59
m3
930,676.90
51,734,843.78
-Besi Beton
6,948.55
Kg
13,251.00
92,075,242.68
-Bekisting 2x Pakai
463.24
m2
312,640.00
144,826,321.89
-Beton K.225
5.67
m3
930,676.90
5,276,938.05
-Besi Beton
906.91
Kg
13,251.00
12,017,478.19
-Bekisting 2x Pakai
66.36
m2
252,640.00
16,765,190.40
2. Pekerjaan Plat Beton Lantai, t = 12 cm
3. Pek. Kolom a. Type Kolom K0 (25/54)
b. Type Kolom K1 (50/50) -Beton K.225
5.20
m3
930,676.90
4,839,519.90
-Besi Beton
781.53
Kg
13,251.00
10,356,065.69
-Bekisting 2x Pakai
41.60
m2
252,640.00
10,509,824.00
c. Type Kolom K2 (25/35) -Beton K.225
10.01
m3
930,676.90
9,316,075.82
-Besi Beton
2,137.22
Kg
13,251.00
28,320,312.82
-Bekisting 2x Pakai
137.28
m2
252,640.00
34,682,419.20
-Beton K.225
10.29
m3
930,676.90
9,574,338.66
-Besi Beton
1,981.45
Kg
13,251.00
26,256,257.55
-Bekisting 2x Pakai
164.60
m2
252,640.00
41,584,544.00
-Beton K.225
1.23
m3
930,676.90
1,146,593.95
-Besi Beton
177.34
Kg
13,251.00
2,349,868.74
-Bekisting 2x Pakai
17.92
m2
252,640.00
4,527,308.80
-Beton K.175
8.70
m3
881,921.19
7,670,597.75
-Besi Beton
2,124.63
kg
13,251.00
28,153,477.43
-Bekisting 2x Pakai
115.97
m2
252,640.00
29,298,155.52
-Beton K.225
0.49
m3
930,676.90
456,031.68
-Besi Beton
96.81
Kg
13,251.00
1,282,891.15
-Bekisting 2x Pakai
8.96
m2
252,640.00
2,263,654.40
-Beton K.225
11.38
m3
930,676.90
10,593,448.48
-Besi Beton
1,881.91
Kg
13,251.00
24,937,189.06
-Bekisting 2x Pakai
m2
312,640.00
35,586,310.53
d. Type Kolom K3 (25/25)
e. Type Kolom K4 (20/44)
f. Type Kolom Praktis Kp (12/20)
g. Type Kolom Untuk Logo (14/50)
5. Pekerjaan Plat Dak/level , t = 10 cm
113.83
Jumlah II
PEKERJAAN DINDING
1. Pas. Pasangan Batu 1/2 Bata (1:5)
781.65
m2
92,087.00
71,979,573.33
2. Pek. Plesteran Biasa( 1 : 5 )
1,563.30
m2
43,145.60
67,449,300.75
3. Pek. Plesteran Beton ( 1 : 3 )
750.71
m2
45,724.40
34,325,810.05
4. Pek. Acian
2,237.05
m2
27,687.50 Jumlah
III
1,208,477,521.53
61,938,388.33 235,693,072.46
PEKERJAAN PINTU DAN JENDELA
1. Pek. Kuseng Aluminium 4" x 1 3/4"
722.50
m'
182,551.50
131,893,458.75
2. Pek. Bingkai Pintu Aluminium 4" x 1 1/2"
106.62
m'
169,684.83
18,091,796.93
3. Pek. Bingkai jendela Aluminium 2" x 1"
135.60
m'
136,684.83
18,534,463.40
4. Pek. Pintu Aluminium (Toilet/Km)
4.00
Bh
960,000.00
3,840,000.00
5. Pek. Pas. Kaca 5 mm Daun Pintu Dan Daun Jendela
35.69
m2
551,706.25
19,689,071.97
6. Pek. Pas. Kaca 5 mm Curtain Wall Dan Kaca Mati Jendela
135.78
m2
551,706.25
74,908,467.80
7. Pek. Aluminium Composit Panel + Rangka
563.41
m2
591,091.67
333,024,709.77
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
8. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 4 bh engsel, Kecuali Pintu KM = 3 bh)
84.00
Bh
53,706.25
4,511,325.00
9. Pas. Engsel Jendela 10. Pas. Engsel Expanyolet (Pintu P1, P2, P3, P4 Dan P5)
92.00
Bh
38,137.50
3,508,650.00
18.00
Set
310,687.50
5,592,375.00
11. Pas. Hak Angin
92.00
Bh
33,706.25
3,100,975.00
12. Pas. Tarikan Stainless
18.00
Bh
410,687.50
7,392,375.00
13. Pas. Grendel Jendela
46.00
Bh
27,637.50
1,271,325.00
14. Pas. Kunci tanam silinder
4.00
Set
266,462.50
1,065,850.00
15. Pas. Kunci Pelor Biasa
11.00
Set
149,275.00
1,642,025.00
Jumlah IV
1. Pek. Plafond Gypsum 9 mm + Rangka Hollow
554.08
m2
142,147.08
78,760,415.28
2. Pek. Plafond Calsyboard + Rangka Hollow
236.64
m2
147,615.83
34,932,327.46
1. Pek. Lantai Utama Dan Balkon Granit 60/60 cm
523.28
m2
480,673.50
251,528,271.10
2. Pek. Plint Granit Lantai Utama Dan Balkon Uk. 10 x 60
375.40
m'
79,458.00
29,828,533.20
3. Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 20
22.86
m2
172,548.00
3,943,946.89
4. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 40
76.95
m2
209,257.00
16,103,079.48
1. Pek. Cat Tembok
1,956.58
m2
29,356.50
57,438,334.90
2. Pek. Cat Plafond
790.72
m2
29,356.50
23,212,783.42
3. Pek. Cat Kayu (Lesplank Woodplank)
61.02
m2
34,382.50
2,097,985.77
1. Pek. Rangka Atap Baja Ringan
946.81
m2
180,000.00
170,425,854.00
2. Pek. Penutup Atap Genteng Keramik
946.81
m2
277,190.00
262,446,347.06
3. Nok/Bubungan Atap Genteng Keramik
97.75
m'
168,938.00
16,514,425.48
4. Pek. Pas. Aluminium Foil/Sisalation Lapis Atap
946.81
m2
31,425.00
29,753,513.68
5. Pek. Listplank Woodplank
174.34
m'
254,100.00
44,299,794.00 523,439,934.21
PEK. INSTALASI LISTRIK
1. Pek. Instalasi Titik Mata Lampu
159.00
ttk
418,500.00
66,541,500.00
2. Pek. Instalasi Titik Stop Kontak
14.00
ttk
333,000.00
4,662,000.00
3. Pek. Instalasi Titik Stop Kontak AC
16.00
ttk
333,000.00
5,328,000.00
4. Pek. Pas. Lampu RM 2 x 36
40.00
Bh
390,000.00
15,600,000.00
5. Pek. Pas. Lampu Downlight DL 18 Watt
97.00
Bh
95,000.00
9,215,000.00
6. Pek. Pas. Lampu Downlight DL 25 Watt
22.00
Bh
125,000.00
2,750,000.00
7. Pas. Saklar Tunggal
3.00
Bh
65,000.00
195,000.00
8. Pas. Saklar Ganda
20.00
Bh
68,500.00
1,370,000.00
9. Pas. Stop Kontak
14.00
Bh
65,000.00
910,000.00
10. Pas. Stop Kontak AC
16.00
Bh
75,000.00
1,200,000.00
Jumlah IX
82,749,104.09
PEK. KONSTRUKSI ATAP
Jumlah VIII
301,403,830.67
PEK. PENGECATAN
Jumlah VII
113,692,742.73
PEKERJAAN LANTAI
Jumlah VI
628,066,868.62
PEK. PLAFOND
Jumlah V
JML. HARGA
107,771,500.00
PEK. SANITASI DAN INSTALASI
1. Pas. Klosed Duduk + Acs, Lengkap 2. Pas. Washtafel + Kaca, Acs Lengkap
3. Pas. Urinoir Lengkap
3.00
Set
2,505,630.00
7,516,890.00
3.00
Set
733,840.00
2,201,520.00
3.00
Set
2,198,490.00
6,595,470.00
4. Pas. Kran Air Biasa
8.00
Bh
63,512.50
508,100.00
5. Pas. Floordrain Stainless
6.00
Bh
62,925.00
377,550.00
6. Pas. Stop Kran
1.00
Bh
89,012.50
89,012.50
8. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
48.00
m'
16,899.17
811,160.00
9. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
25.00
m'
18,513.75
462,843.75
10. Pek. Pipa Buangan Air Washtafel/Washbasin Dia. 2" (AW)
21.00
m'
73,786.25
1,549,511.25
11. Pek. Pipa Buangan Air Mandi Dia. 3" (D)
20.00
m'
144,110.00
2,882,200.00
12. Pek. Pipa Buangan Air Kotor Dia. 4" (D)
22.00
m'
205,335.00
4,517,370.00
Jumlah
27,511,627.50
NO X
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
PEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR
1. Pek. Saluran Air Keliling Gedung
113.58
2. Pek. Tower air Uk. 2,00 x 2,00 m , Tinggi 8,00 m
3. Pek. Reling Tangga dan Balkon 4. Pek. Penyelesaian Akhir/Pembersihan Realcost Lt. I Dan II
m'
242,615.74
27,555,083.05
1.00
Unit
16,000,000.00
16,000,000.00
42.55
m'
850,000.00
36,167,500.00
1.00
Ls
1,500,000.00 Jumlah
1,500,000.00 81,222,583.05
Rp
7,311,427,547.68
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN PONDOK PESANTREN TAHFIZHUL QURAN AL - IMAM ASHIM KOTA MAKASSAR PEKERJAAN LOKASI ANGGARAN NO
: PEMB. PONDOK PESANTREN TAHFIZHUL QURAN AL-IMAN ASHIM : KEL. BANGKALA, KEC. MANGGALA, KOTA MAKASSAR : TAHUN 2014 JENIS P EKERJAAN
A PEKERJAAN PERSIAPAN I PEK. PERSIAPAN B PEKERJAAN LANTAI I (SATU) I PEK. TANAH DAN PONDASI II PEK. STRUKTUR BETON III PEKERJAAN DINDING IV PEKERJAAN PINTU DAN JENDELA V PEK. PLAFOND VI PEKERJAAN LANTAI VII PEK. PENGECATAN VIII PEK. INSTALASI LISTRIK IX PEK. SANITASI DAN INSTALASI C PEKERJAAN LANTAI II (DUA) I PEK. STRUKTUR BETON II PEKERJAAN DINDING III PEKERJAAN PINTU DAN JENDELA IV PEK. PLAFOND V PEKERJAAN LANTAI VI PEK. PENGECATAN VII PEK. INSTALASI LISTRIK VIII PEK. SANITASI DAN INSTALASI D PEKERJAAN LANTAI III (TIGA) I PEK. STRUKTUR BETON II PEKERJAAN DINDING III PEKERJAAN PINTU DAN JENDELA IV PEK. PLAFOND V PEKERJAAN LANTAI VI PEK. PENGECATAN VII PEK. INSTALASI LISTRIK VIII PEK. SANITASI DAN INSTALASI E PEKERJAAN LANTAI IV (EMPAT) I PEK. STRUKTUR BETON II PEKERJAAN DINDING III PEKERJAAN PINTU DAN JENDELA IV PEK. PLAFOND V PEKERJAAN LANTAI VI PEK. PENGECATAN VII PEK. INSTALASI LISTRIK VIII PEK. SANITASI DAN INSTALASI F PEKERJAAN ATAP (PLAT ATAP) I PEK. STRUKTUR BETON II PEKERJAAN DINDING III PEKERJAAN PINTU DAN JENDELA IV PEKERJAAN LANTAI V PEK. PENGECATAN VI PEK. INSTALASI LISTRIK VII PEK. SANITASI DAN INSTALASI G PEKERJAAN LAIN-LAIN DAN PENYELESAIAN AKHIR I PEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR REAL COST TOTAL DIBULATKAN
TOTAL HARGA (Rp.)
Rp.
47,782,625.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
119,078,224.63 271,153,114.55 126,973,751.62 96,188,677.82 75,497,827.28 230,623,335.16 49,407,447.46 96,377,000.00 40,835,020.33
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
919,665,118.96 161,045,459.04 116,624,110.15 90,486,896.59 137,197,669.98 58,681,588.55 48,473,600.00 12,775,445.83
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
890,263,135.11 150,686,202.22 107,469,297.65 90,486,896.59 137,197,669.98 54,539,051.40 46,473,600.00 19,861,073.33
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
890,263,135.11 150,686,202.22 107,469,297.65 90,486,896.59 137,197,669.98 54,539,051.40 46,473,600.00 19,861,073.33
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
766,962,484.65 58,934,324.87 4,182,347.95 1,433,986.65 86,211,322.62 873,500.00 6,372,461.67
Rp. Rp. Rp.
1,573,072,000.00 8,190,863,193.90 8,190,863,000.00
TERBILANG : Delapan milyar seratus sembilan puluh juta delapan ratus enam puluh tiga ribu rupiah,-
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN PONDOK PESANTREN TAHFIZHUL QURAN AL - IMAM ASHIM KOTA MAKASSAR
PEKERJAAN
: PEMB. PONDOK PESANTREN TAHFIZHUL QURAN AL-IMAN ASHIM
LOKASI
: KEL. BANGKALA, KEC. MANGGALA, KOTA MAKASSAR
ANGGARAN
: TAHUN 2014
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
A. PEKERJAAN PERSIAPAN I
PEK. PERSIAPAN
1. Pek. Pengukuran dan Pas. Bowplank
115.00
M'
108,575.00
12,486,125.00
2. Pek. Penyediaan P3K, Listrik Dan Air Kerja
1.00
Ls
5,000,000.00
5,000,000.00
3. Pek. Kantor Sementara Dengan Lantai Plesteran/Direksi Keet
12.00
M2
2,266,375.00
27,196,500.00
4. Pek. Papan Nama Proyek
1.00
Ls
600,000.00
600,000.00
5. Pek. Pembersihan Lahan
1.00
Ls
2,500,000.00
2,500,000.00
Jumlah
47,782,625.00
B. LANTAI I (DASAR) I
PEK. TANAH DAN PONDASI
1. Pek. Galian Tanah Pondasi Poer
76.80
m3
75,375.00
5,788,800.00
2. Pek. Galian Tanah Pondasi Garis 3. Pek. Urugan Tanah Kembali (Pondasi Poer)
97.06
m3
60,625.00
5,884,020.00
25.60
m3
25,125.00
643,200.00
4. Pek. Urugan Tanah Kembali (Pondasi Garis)
32.35
m3
20,208.33
653,780.00
5. Pek. Urugan Pasir Bawah Pondasi Poer
2.56
m3
177,850.00
455,296.00
6. Pek. Urugan Pasir Bawah Pondasi Garis
12.13
m3
177,850.00
2,157,676.20
7. Pek. Pas. Batu Kosong
24.26
m3
365,091.00
8,858,568.02
8. Pek. Pas. Pondasi Batu Gunung, Camp. 1pc : 5ps
53.92
m3
673,455.00
36,312,693.60
9. Pek. Lantai Kerja Pondasi Poer, T = 5 Cm (Beton Lantai Kerja K100)
2.56
m3
735,120.63
1,881,908.83
20.00
Bh
-Beton K.225
12.92
m3
930,676.90
12,019,692.23
-Besi Beton
1,780.56
Kg
13,251.00
23,594,200.56
-Bekisting 2x Pakai
30.00
m2
144,030.00
4,320,900.00
85.60
m2
192,844.50
16,507,489.20
10. Pek. Pondasi Poer a.
Pondasi Poer Type P1, Uk. 150 x 150
11. Pek. Pondasi Trasram 1 Bt, Camp. 1pc : 4ps
Jumlah II
119,078,224.63
PEK. STRUKTUR BETON
1. Pek. Stek Poer a. Pek. Stek Poer P1, Uk. 60 x 60
20.00
Bh
-Beton K.225
10.80
m3
930,676.90
10,051,310.57
-Besi Beton
1,277.58
Kg
13,251.00
16,929,240.67
-Bekisting 2x Pakai
72.00
m2
252,640.00
18,190,080.00
-Beton K.225
15.53
m3
930,676.90
14,448,758.95
-Besi Beton
2,106.26
Kg
13,251.00
27,910,106.68
-Bekisting 2x Pakai
124.20
m2
152,217.50
18,905,413.50
-Beton K.225
0.87
m3
930,676.90
809,688.91
-Besi Beton
137.29
Kg
13,251.00
1,819,205.22
-Bekisting 2x Pakai
11.60
m2
152,217.50
1,765,723.00
2. Pek. Sloef Beton a. Sloef Beton Type S1, Uk. 25 x 30
b. Sloef Beton Type S2, Uk. 15 x 20
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
3. Pek. Kolom a. Type Kolom K1 (60/60) -Beton K.225
28.80
m3
930,676.90
26,803,494.86
-Besi Beton
2,530.51
Kg
13,251.00
33,531,818.75
-Bekisting 2x Pakai
192.00
m2
252,640.00
48,506,880.00
-Beton K.175
2.23
m3
881,921.19
1,968,448.10
-Besi Beton
502.70
kg
13,251.00
6,661,224.70
-Bekisting 2x Pakai
33.48
m2
252,640.00
8,458,387.20
-Beton K.175
2.26
m3
881,921.19
1,995,964.04
-Besi Beton
390.59
Kg
13,251.00
5,175,716.04
37.72
m2
259,465.00
9,787,019.80
1.00
Bh
b. Type Kolom Praktis Kp (12/15)
4. Balok Latei a. Balok Latei (12/20)
-Bekisting 2x Pakai 5. Pek. Tangga Beton A.
Pek. Pondasi Tangga
-Beton K.225
0.77
m3
930,676.90
711,967.83
-Besi Beton
114.75
Kg
13,251.00
1,520,552.25
-Bekisting 2x Pakai
1.35
m2
236,090.00
317,871.58
-Beton K.225
4.02
m3
930,676.90
3,738,417.45
-Besi Beton
417.17
Kg
13,251.00
5,527,921.26
-Bekisting 2x Pakai
23.80
m2
236,090.00
5,617,903.20
B.
Pek. Tangga
Jumlah III
PEKERJAAN DINDING
1. Pas. Pasangan Batu 1/2 Bata (1pc : 5ps)
462.00
m2
92,087.00
42,544,194.00
2. Pek. Plesteran Biasa ( 1pc : 5ps )
924.00
m2
43,145.60
39,866,534.40
3. Pek. Plesteran Beton ( 1pc : 3ps )
272.12
m2
45,724.40
12,442,322.54
4. Pek. Acian
1,160.12
m2
27,687.50 Jumlah
IV
32,120,700.68 126,973,751.62
PEKERJAAN PINTU DAN JENDELA
1. Pek. Kuseng Aluminium 4" x 1 3/4"
146.60
m'
182,551.50
26,762,049.90
2. Pek. Bingkai Pintu Aluminium 4" x 1 1/2" 3. Pek. Bingkai jendela Aluminium 2" x 1"
59.40
m'
169,684.83
10,079,279.10
103.04
m'
136,684.83
14,084,005.23
4. Pek. Pintu Aluminium (Toilet/Km)
4.00
Bh
960,000.00
3,840,000.00
5. Pek. Pas. Kaca 5 mm Daun Pintu Dan Daun Jendela 6. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 4 bh engsel, Kecuali Pintu KM = 3 bh)
29.18
m2
551,706.25
16,097,243.60
52.00
Bh
53,706.25
2,792,725.00
7. Pas. Engsel Jendela
56.00
Bh
38,137.50
2,135,700.00
8. Pas. Hak Angin
56.00
Bh
33,706.25
1,887,550.00
9. Pas. Grendel Jendela
28.00
Bh
27,637.50
773,850.00
10. Pas. Kunci Pelor
7.00
Set
279,275.00
1,954,925.00
11. Pas. Kunci tanam silinder
4.00
Set
266,462.50
1,065,850.00
12. Pek. Reling Tangga
13.80
m'
850,000.00
11,730,000.00
Jumlah V
271,153,114.55
96,188,677.82
PEK. PLAFOND
1. Pek. Plafond Gypsum 9 mm + Rangka Hollow
522.90
m2
142,147.08
74,328,709.88
2. Pek. Plafond Calsyboard + Rangka Hollow
7.92
m2
147,615.83
1,169,117.40
Jumlah
75,497,827.28
NO VI
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
PEKERJAAN LANTAI
1. Pek. Urugan Tanah Di Bawah Lantai + Pemadatan
239.90
m3
252,900.00
60,670,710.00
2. Pek. Urugan Pasir Di Bawah Lantai
89.96
m3
177,850.00
15,999,830.63
3. Pek. Lantai Kerja Beton Tebal 7 cm
41.98
m3
735,120.63
30,862,202.06
4. Pek. Lantai Utama Keramik 40/40 cm
522.90
m2
178,540.00
93,358,566.00
5. Pek. Lantai Tangga Keramik 40/40 Cm
21.30
m2
178,540.00
3,802,902.00
6. Pek. Plint Lantai Utama, Uk. 10 x 40
153.50
m'
27,643.00
4,243,200.50
7. Pek. Plint Lantai Tangga, Uk. 10 x 40
17.34
m'
27,643.00
479,329.62
8. Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 20
7.92
m2
172,548.00
1,366,580.16
9. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 40
36.00
m2
209,257.00
7,533,252.00
10. Pek. Lantai Utama Keramik 40/40 cm (Selasar/Teras Depan)
68.93
m2
178,540.00
12,306,762.20
Jumlah VII
1. Pek. Cat Tembok
1,160.12
m2
29,356.50
34,056,933.61
2. Pek. Cat Plafond
m2
29,356.50
15,350,513.85
522.90
49,407,447.46
PEK. INSTALASI LISTRIK
1. Pek. Instalasi Titik Mata Lampu
32.00
ttk
418,500.00
13,392,000.00
2. Pek. Instalasi Titik Stop Kontak
21.00
ttk
333,000.00
6,993,000.00
3. Pek. Pas. Lampu RM 2 x 36
17.00
Bh
390,000.00
6,630,000.00
4. Pek. Pas. Lampu Downlight DL 25 Watt
12.00
Bh
125,000.00
1,500,000.00
5. Pek. Pas. Lampu SL 18 Watt
15.00
Bh
39,600.00
594,000.00
6. Pas. Saklar Tunggal
6.00
Bh
65,000.00
390,000.00
7. Pas. Saklar Ganda
22.00
Bh
68,500.00
1,507,000.00
8. Pas. Stop Kontak
21.00
Bh
65,000.00
1,365,000.00
9. Pas. Panel Induk + MCB, Lengkap
1.00
Unit
8,500,000.00
8,500,000.00
10. Pemasukan Daya Listrik
1.00
Ls
28,290,000.00
28,290,000.00
11. Pek. Penangkal Petir, terdiri dari :
1.00
Set
27,216,000.00
27,216,000.00
2.00
Bh
- Elektroda penangkap - Pengantar Tembaga BCC 50 mm
60.00
m'
- Klem dari bahan Copper
30.00
Bh
- Penyambung Pengantar dari Bahan Kopper
4.00
Bh
- pipa PPC Ø 1" , Pembungkus BCC 50 mm pada Ground Road
6.00
m'
- Pentanahan
1.00
Bh
Jumlah IX
230,623,335.16
PEK. PENGECATAN
Jumlah VIII
JML. HARGA
96,377,000.00
PEK. SANITASI DAN INSTALASI
1. Pas. Klosed Duduk + Acs, Lengkap
2.00
Set
2,505,630.00
5,011,260.00
2. Pas. Washtafel + Kaca, Acs Lengkap
2.00
Set
733,840.00
1,467,680.00
3. Pas. Kran Air Biasa
4.00
Bh
63,512.50
254,050.00
4. Pas. Floordrain Stainless
2.00
Bh
62,925.00
125,850.00
5. Pas. Stop Kran
2.00
Bh
89,012.50
178,025.00
6. Pek. Pas. Pipa Air Bersih AW 1" (dari Tower Air dan PDAM)
34.40
m'
19,095.00
656,868.00
7. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
20.00
m'
16,899.17
337,983.33
8. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
6.00
m'
18,513.75
111,082.50
9. Pek. Pipa Buangan Air Washtafel/Washbasin Dia. 2" (AW)
2.00
m'
73,786.25
147,572.50
10. Pek. Pipa Buangan Air Mandi Dia. 3" (D)
26.40
m'
144,110.00
3,804,504.00
11. Pek. Pipa Buangan Air Hujan Dia. 3" (D)
49.50
m'
144,110.00
7,133,445.00
12. Pek. Pipa Buangan Air Kotor Dia. 4" (D)
20.00
m'
205,335.00
4,106,700.00
13. Pas. Pompa Air 1"
1.00
Unit
2,500,000.00
2,500,000.00
1.00
Unit
15,000,000.00
15,000,000.00
Jumlah
40,835,020.33
14. Pek. Septic tank + Peresapan
Jumlah Lt. I
1,106,134,398.85
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
C. LANTAI II (DUA) I
PEK. STRUKTUR BETON
1. Pek. Balok Lantai, Ringbalk Dan Balok Latei a. Balok Plat Lantai B1 (40/75) -Beton K.225
9.00
m3
930,676.90
8,376,092.14
-Besi Beton
3,524.12
Kg
13,251.00
46,698,076.26
57.00
m2
259,465.00
14,789,505.00
32.18
m3
930,676.90
29,944,529.41
-Bekisting 2x Pakai b. Balok Plat Lantai B2 (30/65) -Beton K.225
-Besi Beton
3,999.98
Kg
264.00
m2
-Bekisting 2x Pakai
13,251.00
53,003,697.12
259,465.00
68,498,760.00
c. Balok Plat Lantai B3 (40/60) -Beton K.225
9.00
m3
930,676.90
8,376,092.14
-Besi Beton
917.51
Kg
13,251.00
12,157,887.15
60.00
m2
259,465.00
15,567,900.00
-Bekisting 2x Pakai d. Balok Plat Lantai B4 (30/40) -Beton K.225
14.40
m3
930,676.90
13,401,747.43
-Besi Beton
1,826.33
Kg
13,251.00
24,200,717.76
132.00
m2
259,465.00
34,249,380.00
-Bekisting 2x Pakai e. Balok Lesplank BL (10/70) -Beton K.225
6.32
m3
930,676.90
5,882,808.72
-Besi Beton
421.88
Kg
13,251.00
5,590,353.08
135.45
m2
259,465.00
35,144,534.25
-Bekisting 2x Pakai f. Balok Latei (12/25) -Beton K.175
5.93
m3
881,921.19
5,233,320.34
-Besi Beton
1,033.47
Kg
13,251.00
13,694,450.55
-Bekisting 2x Pakai
98.90
m2
259,465.00
25,661,088.50
-Beton K.225
65.68
m3
930,676.90
61,125,370.02
-Besi Beton
9,654.72
Kg
13,251.00
127,934,758.32
-Bekisting 2x Pakai
547.32
m2
312,640.00
171,114,124.80
-Beton K.225
20.16
m3
930,676.90
18,762,446.40
-Besi Beton
1,771.36
Kg
13,251.00
23,472,273.13
-Bekisting 2x Pakai
134.40
m2
252,640.00
33,954,816.00
-Beton K.225
4.32
m3
930,676.90
4,020,524.23
-Besi Beton
546.67
Kg
13,251.00
7,243,859.81
-Bekisting 2x Pakai
43.20
m2
252,640.00
10,914,048.00
-Beton K.175
3.31
m3
881,921.19
2,920,922.98
-Besi Beton
776.97
kg
13,251.00
10,295,638.30
-Bekisting 2x Pakai
49.68
m2
252,640.00
12,551,155.20
1.00
Bh
2. Pekerjaan Plat Beton Lantai, t = 12 cm
3. Pek. Kolom a. Type Kolom K1 (60/60)
b. Type Kolom K2 (30/60)
c. Type Kolom Praktis Kp (12/15)
5. Pek. Tangga Beton A.
Pek. Tangga
-Beton K.225
4.02
m3
930,676.90
3,738,417.45
-Besi Beton
417.17
Kg
13,251.00
5,527,921.26
-Bekisting 2x Pakai
23.80
m2
236,090.00 Jumlah
5,617,903.20 919,665,118.96
NO II
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
PEKERJAAN DINDING
1. Pas. Pasangan Batu 1/2 Bata (1:5)
590.78
m2
92,087.00
54,403,157.86
2. Pek. Plesteran Biasa( 1 : 5 )
1,181.56
m2
43,145.60
50,979,115.14
3. Pek. Plesteran Beton ( 1 : 3 )
326.18
m2
45,724.40
14,914,384.79
4. Pek. Acian
1,471.74
m2
27,687.50 Jumlah
III
1. Pek. Kuseng Aluminium 4" x 1 3/4"
164.80
m'
182,551.50
30,084,487.20
2. Pek. Bingkai Pintu Aluminium 4" x 1 1/2"
95.04
m'
169,684.83
16,126,846.56
3. Pek. Bingkai jendela Aluminium 2" x 1"
88.32
m'
136,684.83
12,072,004.48
4. Pek. Pintu Aluminium (Toilet/Km)
4.00
Bh
960,000.00
3,840,000.00
5. Pek. Pas. Kaca 5 mm Daun Pintu Dan Daun Jendela 6. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 4 bh engsel, Kecuali Pintu KM = 3 bh)
37.79
m2
551,706.25
20,847,434.41
76.00
Bh
53,706.25
4,081,675.00
7. Pas. Engsel Jendela
48.00
Bh
38,137.50
1,830,600.00
8. Pas. Hak Angin
48.00
Bh
33,706.25
1,617,900.00
9. Pas. Grendel Jendela
24.00
Bh
27,637.50
663,300.00
10. Pas. Kunci Pelor
8.00
Set
279,275.00
2,234,200.00
12. Pas. Kunci tanam silinder
4.00
Set
266,462.50
1,065,850.00
13. Pek. Reling Tangga + Balkon
15.30
m'
850,000.00
13,005,000.00
1. Pek. Plafond Gypsum 9 mm + Rangka Hollow
527.19
m2
142,147.08
74,938,520.86
2. Pek. Plafond Calsyboard + Rangka Hollow
105.33
m2
147,615.83
15,548,375.73
1. Pek. Lantai Utama Dan Balkon Keramik 40/40 cm
628.56
m2
178,540.00
112,223,102.40
2. Pek. Lantai Tangga Keramik 40/40 Cm
21.30
m2
178,540.00
3,802,902.00
3. Pek. Plint Keramik Lantai Utama Dan Balkon Uk. 10 x 40
426.60
m'
27,643.00
11,792,503.80
4. Pek. Plint Keramik Tangga Uk. 10 x 40
17.34
m'
27,643.00
479,329.62
5. Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 20
7.92
m2
172,548.00
1,366,580.16
6. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 40
36.00
m2
209,257.00
7,533,252.00
VIII
137,197,669.98
PEK. PENGECATAN
1. Pek. Cat Tembok
1,471.74
m2
29,356.50
43,205,135.31
2. Pek. Cat Plafond
m2
29,356.50
15,476,453.24
527.19
Jumlah VII
90,486,896.59
PEKERJAAN LANTAI
Jumlah VI
116,624,110.15
PEK. PLAFOND
Jumlah V
40,748,801.25 161,045,459.04
PEKERJAAN PINTU DAN JENDELA
Jumlah IV
JML. HARGA
58,681,588.55
PEK. INSTALASI LISTRIK
1. Pek. Instalasi Titik Mata Lampu
44.00
ttk
418,500.00
18,414,000.00
2. Pek. Instalasi Titik Stop Kontak
36.00
ttk
333,000.00
11,988,000.00
3. Pek. Pas. Lampu RM 2 x 36
28.00
Bh
390,000.00
10,920,000.00
4. Pek. Pas. Lampu Downlight DL 25 Watt
16.00
Bh
125,000.00
2,000,000.00
5. Pek. Pas. Lampu SL 18 Watt
16.00
Bh
39,600.00
633,600.00
6. Pas. Saklar Tunggal
4.00
Bh
65,000.00
260,000.00
7. Pas. Saklar Ganda
28.00
Bh
68,500.00
1,918,000.00
8. Pas. Stop Kontak
36.00
Bh
65,000.00
2,340,000.00
Jumlah
48,473,600.00
PEK. SANITASI DAN INSTALASI
1. Pas. Klosed Duduk + Acs, Lengkap
4.00
Set
2,505,630.00
10,022,520.00
2. Pas. Kran Air Biasa
4.00
Bh
63,512.50
254,050.00
3. Pek. Pas. Pipa Air Bersih AW 1" (dari Tower Air dan PDAM)
7.00
m'
19,095.00
133,665.00
4. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
14.00
m'
16,899.17
236,588.33
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
5. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
6.00
m' m'
18,513.75
111,082.50
6. Pek. Pipa Buangan Air Hujan Dia. 3" (D)
14.00
m' m'
144,110.00
2,017,540.00
Jumlah Jumlah Lt Lt. IIII
12,775,445.83 1,544,949,889.09
D. LANTAI III (TIGA) I
PEK. ST STRUKTUR BE BETON
1. Pek. Balok Balok Lantai Lantai,, Ringbalk Ringbalk Dan Dan Balok Balok Latei Latei a. Balok Balok Plat Plat Lanta Lantaii B2 (30/6 (30/65) 5) -Beton K.225
38.03
m3 m3
930,676.90
35,388,989.30
-Besi Beton
4,727.25
Kg Kg
13,251.00
62,640,732.96
312.00
m2
259,465.00
80,953,080.00
-Bekisting 2x Pakai b. Balok Balok Plat Plat Lanta Lantaii B4 (30/4 (30/40) 0) -Beton K.225
15.48
m3 m3
930,676.90
14,406,878.49
-Besi Beton
1,963.31
Kg Kg
13,251.00
26,015,771.59
141.90
m2
259,465.00
36,818,083.50
-Bekisting 2x Pakai c. Balok Balok Plat Plat Lant Lantai ai B5 B5 (30/5 (30/50) 0) -Beton K.225
10.13
m3 m3
930,676.90
9,423,103.66
-Besi Beton
1,413.62
Kg Kg
13,251.00
18,731,925.95
87.75
m2
259,465.00
22,768,053.75
m3 m3
930,676.90
5,374,659.13
-Bekisting 2x Pakai d. Balok Balok Lesp Lesplan lankk BL (10/ (10/70) 70) -Beton K.225
5.78
-Besi Beton
385.44
Kg Kg
123.75
m2
-Bekisting 2x Pakai
13,251.00
5,107,465.44
259,465.00
32,108,793.75
f. Balo Balokk Lat Latei ei (12 (12/2 /25) 5) -Beton K.175
5.93
m3 m3
881,921.19
5,233,320.34
-Besi Beton
1,033.47
Kg Kg
13,251.00
13,694,450.55
-Bekisting 2x Pakai
98.90
m2 m2
259,465.00
25,661,088.50
-Beton K.225
65.08
m3 m3
930,676.90
60,572,547.94
-Besi Beton
9,567.41
Kg Kg
13,251.00
126,777,707.51
-Bekisting 2x Pakai
542.37
m2 m2
312,640.00
169,566,556.80
2. Pekerjaan Pekerjaan Plat Beton Beton Lantai, Lantai, t = 12 cm
3. Pek. Pek. Kolo Kolom m a. Type Type Kolo Kolom m K1 K1 (60/ (60/60) 60) -Beton K.225
20.16
m3 m3
930,676.90
18,762,446.40
-Besi Beton
1,771.36
Kg Kg
13,251.00
23,472,273.13
-Bekisting 2x Pakai
134.40
m2 m2
252,640.00
33,954,816.00
-Beton K.225
4.32
m3 m3
930,676.90
4,020,524.23
-Besi Beton
546.67
Kg Kg
13,251.00
7,243,859.81
-Bekisting 2x Pakai
43.20
m2 m2
252,640.00
10,914,048.00
-Beton K.175
3.31
m3 m3
881,921.19
2,920,922.98
-Besi Beton
776.97
kg kg
13,251.00
10,295,638.30
-Bekisting 2x Pakai
49.68
m2 m2
252,640.00
12,551,155.20
1.00 1.00
Bh
b. Type Type Kolo Kolom m K2 K2 (30/ (30/60) 60)
c. Type Type Kolom Kolom Prakt Praktis is Kp (12/ (12/15) 15)
5. Pek. Pek. Tangga Tangga Beton Beton A.
Pek. Tangga
-Beton K.225
4.02
m3 m3
930,676.90
3,738,417.45
-Besi Beton
417.17
Kg Kg
13,251.00
5,527,921.26
-Bekisting 2x Pakai
23.80
m2 m2
236,090.00
5,617,903.20
Jumlah
890,263,135.11
NO II
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
PEKE PEKER RJAA JAAN DIND INDING ING
1. Pas. Pasangan Batu 1/2 Bata (1:5)
590.78
m2 m2
92,087.00
54,403,157.86
2. Pek. Plesteran Biasa( 1 : 5 )
1,181.56
m2 m2
43,145.60
50,979,115.14
3. Pek. Plesteran Beton ( 1 : 3 )
185.07
m2 m2
45,724.40
8,462,150.17
4. Pek. Acian
1,330.63
m2 m2
27,687.50 Jumlah
III III
1. Pek. Kuseng Aluminium 4" x 1 3/4"
164.80
m' m'
182,551.50
30,084,487.20
2. Pek. Bingkai Pintu Aluminium 4" x 1 1/2"
95.04
m' m'
169,684.83
16,126,846.56
3. Pek. Bingkai jendela Aluminium 2" x 1"
88.32
m' m'
136,684.83
12,072,004.48
4. Pek. Pintu Aluminium (Toilet/Km)
4.00
B Bhh
960,000.00
3,840,000.00
5. Pek. Pas. Kaca 5 mm Daun Pintu Dan Daun Jendela 6. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 4 bh engsel, Kecuali Pintu KM = 3 bh)
37.79
m2 m2
551,706.25
20,847,434.41
76.00
Bh Bh
53,706.25
4,081,675.00
7. Pas. Engsel Jendela
48.00
Bh Bh
38,137.50
1,830,600.00
8. Pas. Hak Angin
48.00
Bh Bh
33,706.25
1,617,900.00
9. Pas. Grendel Jendela
24.00
Bh Bh
27,637.50
663,300.00
10. Pas. Kunci Pelor
8.00
S Seet
279,275.00
2,234,200.00
11. Pas. Kunci tanam silinder
4.00
S Seet
266,462.50
1,065,850.00
12. Pe Pek. Reling Tangga + Balkon
15.30
m' m'
850,000.00
13,005,000.00
1. Pek. Plafond Gypsum 9 mm + Rangka Hollow
527.19
m2 m2
142,147.08
74,938,520.86
2. Pek. Plafond Calsyboard + Rangka Hollow
105.33
m2 m2
147,615.83
15,548,375.73
1. Pek. Lantai Utama Dan Balkon Keramik 40/40 cm
628.56
m2 m2
178,540.00
112,223,102.40
2. Pek. Lantai Tangga Keramik 40/40 Cm
21.30
m2 m2
178,540.00
3,802,902.00
3. Pek. Plint Keramik Lantai Utama Dan Balkon Uk. 10 x 40
426.60
m' m'
27,643.00
11,792,503.80
4. Pek. Plint Keramik Tangga Uk. 10 x 40
17.34
m' m'
27,643.00
479,329.62
5. Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 20
7.92
m2 m2
172,548.00
1,366,580.16
6. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 40
36.00
m2 m2
209,257.00
7,533,252.00
VIII VIII
137,197,669.98
PEK. PEK. PENGE ENGEC CATAN TAN
1. Pek. Pek. Cat Tembok Tembok
1,330. 1,330.63 63
m2 m2
29,356.50
39,062,598.16
2. Pek. Cat Plafond
m2 m2
29,356.50
15,476,453.24
527.19
Jumlah VII VII
90,486,896.59
PEKE PEKER RJAA JAAN LANTA ANTAII
Jumlah VI
107,469,297.65
PEK. PL PLAFOND
Jumlah V
36,841,779.05 150,686,202.22
PEKE PEKERJ RJAA AAN N PIN PINTU TU DAN DAN JEND JENDEL ELA A
Jumlah IV
JML. HARGA
54,539,051.40
PEK. PEK. INST INSTAL ALAS ASII LIST LISTRI RIK K
1. Pek. Instalasi Titik Mata Lampu
44.00
ttttk
418,500.00
18,414,000.00
2. Pek. Instalasi Titik Stop Kontak
36.00
ttttk
333,000.00
11,988,000.00
3. Pe Pek. Pas. Lampu RM 2 x 36
28.00
B Bhh
390,000.00
10,920,000.00
4. Pek. Pas. Lampu SL 18 Watt
16.00
Bh Bh
39,600.00
633,600.00
5. Pas. Saklar Tunggal
4.00
Bh Bh
65,000.00
260,000.00
6. Pas. Saklar Ganda
28.00
Bh Bh
68,500.00
1,918,000.00
7. Pas. Stop Kontak
36.00
Bh Bh
65,000.00
2,340,000.00
Jumlah
46,473,600.00
PEK. PEK. SANI SANITAS TASII DAN DAN INSTAL INSTALASI ASI
1. Pas. Klosed Duduk + Acs, Lengkap
4.00
S Seet
2,505,630.00
10,022,520.00
2. Pas. Kran Air Biasa
4.00
Bh Bh
63,512.50
254,050.00
3. Pek. Pas. Pipa Air Bersih AW 1" (dari Tower Air dan PDAM)
7.00
m' m'
19,095.00
133,665.00
4. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
14.00
m' m'
16,899.17
236,588.33
5. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
6.00
m' m'
18,513.75
111,082.50
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
6. Pek. Pipa Buangan Air Washtafel/Washbasin Dia. 2" (AW)
14.00
m' m'
73,786.25
1,033,007.50
7. Pek. Pipa Buangan Air Hujan Dia. 3" (D)
56.00
m' m'
144,110.00
8,070,160.00
Jumlah Jumlah Lt. III
19,861,073.33 1,496,976,926.28
E. LANTAI IV (EMPAT) I
PEK. ST STRUKTUR BE BETON
1. Pek. Balok Balok Lantai Lantai,, Ringbalk Ringbalk Dan Dan Balok Balok Latei Latei a. Balok Balok Plat Plat Lanta Lantaii B2 (30/6 (30/65) 5) -Beton K.225
38.03
m3 m3
930,676.90
35,388,989.30
-Besi Beton
4,727.25
Kg Kg
13,251.00
62,640,732.96
312.00
m2
259,465.00
80,953,080.00
-Bekisting 2x Pakai b. Balok Balok Plat Plat Lanta Lantaii B4 (30/4 (30/40) 0) -Beton K.225
15.48
m3 m3
930,676.90
14,406,878.49
-Besi Beton
1,963.31
Kg Kg
13,251.00
26,015,771.59
141.90
m2
259,465.00
36,818,083.50
-Bekisting 2x Pakai c. Balok Balok Plat Plat Lant Lantai ai B5 B5 (30/5 (30/50) 0) -Beton K.225
10.13
m3 m3
930,676.90
9,423,103.66
-Besi Beton
1,413.62
Kg Kg
13,251.00
18,731,925.95
87.75
m2
259,465.00
22,768,053.75
m3 m3
930,676.90
5,374,659.13
-Bekisting 2x Pakai d. Balok Balok Lesp Lesplan lankk BL (10/ (10/70) 70) -Beton K.225
5.78
-Besi Beton
385.44
Kg Kg
123.75
m2
-Bekisting 2x Pakai
13,251.00
5,107,465.44
259,465.00
32,108,793.75
f. Balo Balokk Lat Latei ei (12 (12/2 /25) 5) -Beton K.175
5.93
m3 m3
881,921.19
5,233,320.34
-Besi Beton
1,033.47
Kg Kg
13,251.00
13,694,450.55
-Bekisting 2x Pakai
98.90
m2 m2
259,465.00
25,661,088.50
-Beton K.225
65.08
m3 m3
930,676.90
60,572,547.94
-Besi Beton
9,567.41
Kg Kg
13,251.00
126,777,707.51
-Bekisting 2x Pakai
542.37
m2 m2
312,640.00
169,566,556.80
2. Pekerjaan Pekerjaan Plat Beton Beton Lantai, Lantai, t = 12 cm
3. Pek. Pek. Kolo Kolom m a. Type Type Kolo Kolom m K1 K1 (60/ (60/60) 60) -Beton K.225
20.16
m3 m3
930,676.90
18,762,446.40
-Besi Beton
1,771.36
Kg Kg
13,251.00
23,472,273.13
-Bekisting 2x Pakai
134.40
m2 m2
252,640.00
33,954,816.00
-Beton K.225
4.32
m3 m3
930,676.90
4,020,524.23
-Besi Beton
546.67
Kg Kg
13,251.00
7,243,859.81
-Bekisting 2x Pakai
43.20
m2 m2
252,640.00
10,914,048.00
-Beton K.175
3.31
m3 m3
881,921.19
2,920,922.98
-Besi Beton
776.97
kg kg
13,251.00
10,295,638.30
-Bekisting 2x Pakai
49.68
m2 m2
252,640.00
12,551,155.20
1.00 1.00
Bh
b. Type Type Kolo Kolom m K2 K2 (30/ (30/60) 60)
c. Type Type Kolom Kolom Prakt Praktis is Kp (12/ (12/15) 15)
5. Pek. Pek. Tangga Tangga Beton Beton A.
Pek. Tangga
-Beton K.225
4.02
m3 m3
930,676.90
3,738,417.45
-Besi Beton
417.17
Kg Kg
13,251.00
5,527,921.26
-Bekisting 2x Pakai
23.80
m2 m2
236,090.00
5,617,903.20
Jumlah
890,263,135.11
NO II
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
PEKERJAAN DINDING
1. Pas. Pasangan Batu 1/2 Bata (1:5)
590.78
m2
92,087.00
54,403,157.86
2. Pek. Plesteran Biasa( 1 : 5 )
1,181.56
m2
43,145.60
50,979,115.14
3. Pek. Plesteran Beton ( 1 : 3 )
185.07
m2
45,724.40
8,462,150.17
4. Pek. Acian
1,330.63
m2
27,687.50 Jumlah
III
1. Pek. Kuseng Aluminium 4" x 1 3/4"
164.80
m'
182,551.50
30,084,487.20
2. Pek. Bingkai Pintu Aluminium 4" x 1 1/2"
95.04
m'
169,684.83
16,126,846.56
3. Pek. Bingkai jendela Aluminium 2" x 1"
88.32
m'
136,684.83
12,072,004.48
4. Pek. Pintu Aluminium (Toilet/Km)
4.00
Bh
960,000.00
3,840,000.00
5. Pek. Pas. Kaca 5 mm Daun Pintu Dan Daun Jendela 6. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 4 bh engsel, Kecuali Pintu KM = 3 bh)
37.79
m2
551,706.25
20,847,434.41
76.00
Bh
53,706.25
4,081,675.00
7. Pas. Engsel Jendela
48.00
Bh
38,137.50
1,830,600.00
8. Pas. Hak Angin
48.00
Bh
33,706.25
1,617,900.00
9. Pas. Grendel Jendela
24.00
Bh
27,637.50
663,300.00
10. Pas. Kunci Pelor
8.00
Set
279,275.00
2,234,200.00
11. Pas. Kunci tanam silinder
4.00
Set
266,462.50
1,065,850.00
12. Pek. Reling Tangga + Balkon
15.30
m'
850,000.00
13,005,000.00
1. Pek. Plafond Gypsum 9 mm + Rangka Hollow
527.19
m2
142,147.08
74,938,520.86
2. Pek. Plafond Calsyboard + Rangka Hollow
105.33
m2
147,615.83
15,548,375.73
1. Pek. Lantai Utama Dan Balkon Keramik 40/40 cm
628.56
m2
178,540.00
112,223,102.40
2. Pek. Lantai Tangga Keramik 40/40 Cm
21.30
m2
178,540.00
3,802,902.00
3. Pek. Plint Keramik Lantai Utama Dan Balkon Uk. 10 x 40
426.60
m'
27,643.00
11,792,503.80
4. Pek. Plint Keramik Tangga Uk. 10 x 40
17.34
m'
27,643.00
479,329.62
5. Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 20
7.92
m2
172,548.00
1,366,580.16
6. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 40
36.00
m2
209,257.00
7,533,252.00
VIII
137,197,669.98
PEK. PENGECATAN
1. Pek. Cat Tembok
1,330.63
m2
29,356.50
39,062,598.16
2. Pek. Cat Plafond
m2
29,356.50
15,476,453.24
527.19
Jumlah VII
90,486,896.59
PEKERJAAN LANTAI
Jumlah VI
107,469,297.65
PEK. PLAFOND
Jumlah V
36,841,779.05 150,686,202.22
PEKERJAAN PINTU DAN JENDELA
Jumlah IV
JML. HARGA
54,539,051.40
PEK. INSTALASI LISTRIK
1. Pek. Instalasi Titik Mata Lampu
44.00
ttk
418,500.00
18,414,000.00
2. Pek. Instalasi Titik Stop Kontak
36.00
ttk
333,000.00
11,988,000.00
3. Pek. Pas. Lampu RM 2 x 36
28.00
Bh
390,000.00
10,920,000.00
4. Pek. Pas. Lampu SL 18 Watt
16.00
Bh
39,600.00
633,600.00
5. Pas. Saklar Tunggal
4.00
Bh
65,000.00
260,000.00
6. Pas. Saklar Ganda
28.00
Bh
68,500.00
1,918,000.00
7. Pas. Stop Kontak
36.00
Bh
65,000.00
2,340,000.00
Jumlah
46,473,600.00
PEK. SANITASI DAN INSTALASI
1. Pas. Klosed Duduk + Acs, Lengkap
4.00
Set
2,505,630.00
10,022,520.00
2. Pas. Kran Air Biasa
4.00
Bh
63,512.50
254,050.00
3. Pek. Pas. Pipa Air Bersih AW 1" (dari Tower Air dan PDAM)
7.00
m'
19,095.00
133,665.00
4. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
14.00
m'
16,899.17
236,588.33
5. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
6.00
m'
18,513.75
111,082.50
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
6. Pek. Pipa Buangan Air Washtafel/Washbasin Dia. 2" (AW)
14.00
m'
73,786.25
1,033,007.50
7. Pek. Pipa Buangan Air Hujan Dia. 3" (D)
56.00
m'
144,110.00
8,070,160.00
Jumlah Jumlah Lt. IV
19,861,073.33 1,496,976,926.28
F. LANTAI ATAP I
PEK. STRUKTUR BETON
1. Pek. Balok Lantai, Ringbalk Dan Balok Latei 1. Pek. Balok Lantai, Ringbalk Dan Balok Latei a. Balok Plat Lantai B2 (30/65) -Beton K.225
38.03
m3
930,676.90
35,388,989.30
-Besi Beton
4,727.25
Kg
13,251.00
62,640,732.96
312.00
m2
259,465.00
80,953,080.00
-Bekisting 2x Pakai b. Balok Plat Lantai B4 (30/40) -Beton K.225
15.48
m3
930,676.90
14,406,878.49
-Besi Beton
1,963.31
Kg
13,251.00
26,015,771.59
141.90
m2
259,465.00
36,818,083.50
-Bekisting 2x Pakai c. Balok Plat Lantai B5 (30/50) -Beton K.225
10.13
m3
930,676.90
9,423,103.66
-Besi Beton
1,413.62
Kg
13,251.00
18,731,925.95
87.75
m2
259,465.00
22,768,053.75
-Bekisting 2x Pakai d. Balok Lesplank BL (10/70) -Beton K.225
5.78
m3
930,676.90
5,374,659.13
-Besi Beton
385.44
Kg
13,251.00
5,107,465.44
123.75
m2
259,465.00
32,108,793.75
-Bekisting 2x Pakai f. Balok Ringbalk (12/20) -Beton K.175
2.45
m3
881,921.19
2,158,943.07
-Besi Beton
506.21
Kg
13,251.00
6,707,730.41
-Bekisting 2x Pakai
51.00
m2
259,465.00
13,232,715.00
-Beton K.225
65.08
m3
930,676.90
60,572,547.94
-Besi Beton
9,567.41
Kg
13,251.00
126,777,707.51
-Bekisting 2x Pakai
542.37
m2
312,640.00
169,566,556.80
-Beton K.225
2.43
m3
930,676.90
2,261,991.60
-Besi Beton
303.81
Kg
13,251.00
4,025,786.31
-Bekisting 2x Pakai
20.25
m2
312,640.00
6,332,210.56
-Beton K.175
0.98
m3
881,921.19
865,958.42
-Besi Beton
230.35
kg
13,251.00
3,052,321.03
-Bekisting 2x Pakai
14.73
m2
252,640.00
3,721,008.24
-Beton K.175
2.80
m3
881,921.19
2,469,379.33
-Besi Beton
500.92
kg
13,251.00
6,637,690.92
-Bekisting 2x Pakai
35.00
m2
252,640.00
8,842,400.00
2. Pekerjaan Plat Beton Lantai, t = 12 cm
3. Pekerjaan Plat Beton Lantai Atap Tangga, t = 12 cm
4. Pek. Kolom a. Type Kolom Praktis Kp (12/15)
b. Type Kolom Dudukan Plat Atap Tangga (20/20)
Jumlah
766,962,484.65
NO II
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
PEKERJAAN DINDING
1. Pas. Pasangan Batu 1/2 Bata (1:5)
227.81
m2
92,087.00
20,978,155.30
3. Pek. Plesteran Biasa (1 : 5)
455.62
m2
43,145.60
19,657,825.69
4. Pek. Plesteran Beton (1 : 3)
77.42
m2
45,724.40
3,539,937.32
5. Pek. Acian
533.04
m2
27,687.50
14,758,406.56
Jumlah III
2. Pek. Pintu Panil Aluminium (Arah Ke Atap) 3. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 4 bh engsel, Kecuali Pintu KM = 3 bh)
5.30
m'
182,551.50
967,522.95
1.00
Bh
3,000,000.00
3,000,000.00
4.00
Bh
53,706.25
214,825.00
Jumlah
1. Pek. Lantai Utama Dan Balkon Keramik 40/40 cm
6.58
m2
178,540.00
1,174,971.74
2. Pek. Plint Keramik Lantai Utama Dan Balkon Uk. 10 x 40
9.37
m'
27,643.00
259,014.91
1. Pek. Cat Tembok
147.60
m2
29,356.50
4,332,872.62
2. Pek. Waterproofing Plat Atap
655.03
m2
125,000.00
81,878,450.00 86,211,322.62
PEK. INSTALASI LISTRIK
1. Pek. Instalasi Titik Mata Lampu
1.00
ttk
418,500.00
418,500.00
3. Pek. Pas. Lampu RM 2 x 36
1.00
Bh
390,000.00
390,000.00
4. Pas. Saklar Tunggal
1.00
Bh
65,000.00
65,000.00
Jumlah VII
1,433,986.65
PEK. PENGECATAN
Jumlah VI
4,182,347.95
PEKERJAAN LANTAI
Jumlah V
58,934,324.87
PEKERJAAN PINTU DAN JENDELA
1. Pek. Kuseng Aluminium 4" x 1 3/4" (Arah Ke Atap)
IV
JML. HARGA
873,500.00
PEK. SANITASI DAN INSTALASI
1. Pas. Kran Air Biasa
1.00
Bh
63,512.50
63,512.50
2. Pas. Roof drain Stainless
14.00
Bh
137,925.00
1,930,950.00
3. Pas. Stop Kran
1.00
Bh
89,012.50
89,012.50
4. Pek. Pas. Pipa Air Bersih AW 1" (dari Tower Air dan PDAM)
7.00
m'
19,095.00
133,665.00
5. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
7.00
m'
16,899.17
118,294.17
6. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
2.00
m'
18,513.75
37,027.50
1.00
Bh
4,000,000.00
4,000,000.00
Jumlah
6,372,461.67
7. Pek. Pas. Reservoir stainless Kap. 1 m3
Jumlah Lt. Atap
924,970, 428.41
G. PEK. LAIN-LAIN DAN PENYELESAIAN AKHIR I
PEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR
1. Pek. Penyelesaian Akhir/Pembersihan
1.00
Ls
1,000,000.00
1,000,000.00
2. Pek. Rangka Baja Berat + Atap Spandek (Atas Plat Atap)
1.00
Ls
1,572,072,000.00
1,572,072,000.00
Jumlah
1,573,072,000.00
Realcost
Rp
6,693,886,267.63
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GEDUNG KANTOR PERKEBUNAN INDUK DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
PEKERJAAN ANGGARAN NO
: PEMBANGUNAN GEDUNG KANTOR PERKEBUNAN : TAHUN 2011 JENIS PEKERJAAN
A LANTAI I (DASAR) I PEK. PERSIAPAN I PEK. TANAH DAN PONDASI II PEK. STRUKTUR BETON IV PEKERJAAN DINDING V PEKERJAAN PINTU DAN JENDELA VI PEK. PLAFOND VII PEKERJAAN LANTAI VIII PEK. PENGECATAN IX PEK. INSTALASI LISTRIK X PEK. SANITASI DAN INSTALASI B LANTAI II (DUA) I PEK. STRUKTUR BETON II PEKERJAAN DINDING III PEKERJAAN PINTU DAN JENDELA IV PEK. PLAFOND V PEKERJAAN LANTAI VI PEK. PENGECATAN VII PEK. KONSTRUKSI ATAP VIII PEK. INSTALASI LISTRIK IX PEK. SANITASI DAN INSTALASI X PEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR REAL COST TOTAL PPN 10% TOTAL COST DIBULATKAN
TOTAL HARGA (Rp.)
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
52,712,422.50 234,894,253.73 473,282,228.28 119,050,287.62 27,216,000.00 -
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
1,087,359,528.62 523,439,934.21 2,517,954,654.97 251,795,465.50 2,769,750,120.46 2,769,750,000.00
TERBILANG : Dua milyar sembilan ratus empat puluh tiga juta enam puluh sembilan ribu rupiah,-
Mamuju, Mengetahui/Menyetujui : KEPALA DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
Diketahui/Disetujui PEJABAT PELAKSANA TEKNIS KEGIATAN
Drs. H. MUHTAR BELO, MM Nip. 19551012 198203 1 006
KIMOTO BADO Nip. 19641231 199402 1 026
Mengetahui/Menyetujui : KEPALA DINAS PU PROVINSI SULAWESI BARAT
Ir. H. IDHAM HASIB, M.Si Nip. 19570116 198503 1 010
2011
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG KANTOR PERKEBUNAN INDUK DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
PEKERJAAN
: PEMBANGUNAN GEDUNG KANTOR PERKEBUNAN
ANGGARAN
: TAHUN 2011
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
A. PEKERJAAN PERSIAPAN I
PEK. PERSIAPAN
1. Pek. Pengukuran dan Pas. Bowplank
2. Pek. Penyediaan P3K, Listrik Dan Air Kerja
3. Pek. Kantor Sementara Dengan Lantai Plesteran/Direksi Keet
4. Pek. Papan Nama Proyek
1.00
Ls
697.58
M2
30,000.00
1.00
Ls
5,000,000.00
5,000,000.00
Jumlah
52,712,422.50
5. Pek. Anti Rayap (Sistem Semprot) 6. Administrasi, Dokumentasi Dan Quality Control
138.30
M'
1.00
Ls
5,000,000.00
5,000,000.00
12.00
M2
2,266,375.00
27,196,500.00
108,575.00
500,000.00
15,015,922.50
500,000.00 -
B. LANTAI I (DASAR) I
PEK. TANAH DAN PONDASI
1. Pek. Galian Tanah Pondasi Poer
149.34
m3
75,375.00
11,256,502.50
2. Pek. Galian Tanah Pondasi Garis 3. Pek. Urugan Tanah Kembali (Pondasi Poer)
295.59
m3
60,625.00
17,920,380.19
108.95
m3
25,125.00
2,737,318.50
4. Pek. Urugan Tanah Kembali (Pondasi Garis)
36.43
m3
20,208.33
736,120.87
5. Pek. Urugan Pasir Bawah Pondasi Poer
3.73
m3
177,850.00
664,002.98
6. Pek. Urugan Pasir Bawah Pondasi Garis
28.66
m3
177,850.00
5,096,932.01
7. Pek. Pas. Batu Kosong
57.32
m3
365,091.00
20,925,993.87
8. Pek. Pas. Pondasi Batu Gunung, Camp. 1pc : 5ps
173.19
m3
673,455.00
116,636,681.63
9. Pek. Lantai Kerja Pondasi Poer, T = 5 Cm (Beton Lantai Kerja K100)
3.73
m3
735,120.63
2,744,572.89
4.00
Bh
-Beton K.225
3.00
m3
930,676.90
2,792,030.71
-Besi Beton
242.73
Kg
13,251.00
3,216,441.73
-Bekisting 2x Pakai
6.00
m2
144,030.00
864,180.00
8.00
Bh
10. Pek. Pondasi Poer a.
b.
c.
d.
Pondasi Poer Type P1, Uk. 150 x 150
Pondasi Poer Type P2, Uk. 150 x 75 -Beton K.225
3.01
m3
930,676.90
2,797,614.78
-Besi Beton
258.92
Kg
13,251.00
3,430,975.42
-Bekisting 2x Pakai
9.00
m2
144,030.00
1,296,270.00
12.00
Bh m3
930,676.90
2,094,023.04
Pondasi Poer Type P3, Uk. 75 x 75 -Beton K.225
2.25
-Besi Beton
238.46
Kg
13,251.00
3,159,886.46
-Bekisting 2x Pakai
9.00
m2
144,030.00
1,296,270.00
48.00
Bh
12.02
m3
930,676.90
11,182,083.01
Pondasi Poer Type P4, Uk. 100 x 75 -Beton K.225
-Besi Beton
1,358.14
Kg
13,251.00
17,996,713.14
-Bekisting 2x Pakai
m2
144,030.00
6,049,260.00
42.00
Jumlah II
234,894,253.73
PEK. STRUKTUR BETON
1. Pek. Stek Poer a. Pek. Stek Poer P1, Uk. 50 x 50
4.00
Bh
-Beton K.225
1.85
m3
930,676.90
1,721,752.27
-Besi Beton
372.84
Kg
13,251.00
4,940,564.32
-Bekisting 2x Pakai
14.80
m2
252,640.00
3,739,072.00
8.00
Bh
-Beton K.225
2.00
m3
930,676.90
1,859,492.46
-Besi Beton
421.22
Kg
13,251.00
5,581,562.05
-Bekisting 2x Pakai
23.38
m2
252,640.00
5,907,733.76
b. Pek. Stek Poer P2, Uk. 25 x 54
NO
URAIAN PEKERJAAN
VOL.
c. Pek. Stek Poer P3, Uk. 25 x 25
SAT
HRG. SAT. (Rp.)
JML. HARGA
12.00
Bh
-Beton K.225
1.39
m3
930,676.90
1,291,314.21
-Besi Beton
354.36
Kg
13,251.00
4,695,672.06
-Bekisting 2x Pakai
22.20
m2
252,640.00
5,608,608.00
d. Pek. Stek Poer P4, Uk. 25 x 35
48.00
Bh
7.77
m3
930,676.90
7,231,359.55
-Besi Beton
2,227.76
Kg
13,251.00
29,520,068.96
-Bekisting 2x Pakai
106.56
m2
252,640.00
26,921,318.40
-Beton K.225
29.41
m3
930,676.90
27,366,787.05
-Besi Beton
5,228.56
Kg
13,251.00
69,283,594.28
-Bekisting 2x Pakai
235.24
m2
152,217.50
35,807,949.14
-Beton K.225
0.76
m3
930,676.90
707,500.58
-Besi Beton
182.66
Kg
13,251.00
2,420,439.00
-Bekisting 2x Pakai
10.14
m2
152,217.50
1,542,876.58
-Beton K.225
5.40
m3
930,676.90
5,025,655.29
-Besi Beton
863.72
Kg
13,251.00
11,445,217.32
-Bekisting 2x Pakai
63.20
m2
252,640.00
15,966,848.00
-Beton K.225
4.50
m3
930,676.90
4,188,046.07
-Besi Beton
676.32
Kg
13,251.00
8,961,979.92
-Bekisting 2x Pakai
36.00
m2
252,640.00
9,095,040.00
-Beton K.225
18.90
m3
930,676.90
17,589,793.50
-Besi Beton
4,035.31
Kg
13,251.00
53,471,919.31
-Bekisting 2x Pakai
259.20
m2
252,640.00
65,484,288.00
-Beton K.225
3.50
m3
930,676.90
3,257,369.17
-Besi Beton
674.13
Kg
13,251.00
8,932,870.13
-Bekisting 2x Pakai
56.00
m2
252,640.00
14,147,840.00
-Beton K.225
2. Pek. Sloef Beton a. Sloef Beton Type S1, Uk. 25 x 35
b. Sloef Beton Type S2, Uk. 15 x 20
3. Pek. Kolom a. Type Kolom K0 (25/54)
b. Type Kolom K1 (50/50)
c. Type Kolom K2 (25/35)
d. Type Kolom K3 (25/25)
e. Type Kolom Praktis Kp (12/20) -Beton K.175 -Besi Beton -Bekisting 2x Pakai
12.49
m3
881,921.19
-
3,051.52
kg
13,251.00
-
166.56
m2
252,640.00
-
4. Balok Latei BL2 (12/25) -Beton K.175 -Besi Beton -Bekisting 2x Pakai
7.32
m3
881,921.19
-
1,094.30
Kg
13,251.00
-
121.95
m2
259,465.00
-
5. Pek. Tangga Beton = 2 Bh A.
Pek. Tangga A
-Beton K.225
2.33
m3
930,676.90
2,172,814.14
-Besi Beton
404.87
Kg
13,251.00
5,364,948.27
-Bekisting 2x Pakai
10.59
m2
236,090.00
2,499,626.48
-Beton K.225
2.23
m3
930,676.90
2,074,218.23
-Besi Beton
379.28
Kg
13,251.00
5,025,873.73
-Bekisting 2x Pakai
10.29
m2
236,090.00
2,430,216.02
B.
Pek. Tangga B
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
6. Pekerjaan Plat Meja Beton -Beton K.175
0.46
m3
881,921.19
-
-Besi Beton
84.46
Kg
13,251.00
-
9.20
m2
312,640.00
-
4.85
m3
881,921.19
-
635.14
Kg
13,251.00
-
52.51
m2
259,465.00
-
-Bekisting 2x Pakai 7. Balok Dudukan Kosen Luar/Profilan (24/15) -Beton K.175 -Besi Beton -Bekisting 2x Pakai
Jumlah IV
1. Pas. Pasangan Batu 1/2 Bata (1:5) 2. Pek. Plesteran Biasa( 1 : 5 ) 3. Pek. Plesteran Beton ( 1 : 3 ) 4. Pek. Acian
807.70
m2
92,087.00
-
1,615.39
m2
43,145.60
-
575.65
m2
45,724.40
-
2,090.35
m2
27,687.50
-
Jumlah V
1. Pek. Kuseng Aluminium 4" x 1 3/4"
946.23
m'
182,551.50
-
2. Pek. Bingkai Pintu Aluminium 4" x 1 1/2"
185.72
m'
169,684.83
-
3. Pek. Bingkai jendela Aluminium 2" x 1"
120.44
m'
136,684.83
-
4. Pek. Pintu kaca Tempret 12 mm, Uk. 90 x 230 (Pintu Utama)
2.00
Bh
4,577,406.25
-
5. Pek. Pintu Aluminium (Toilet/Km)
5.00
Bh
960,000.00
-
46.21
m2
551,706.25
-
7. Pek. Pas. Kaca 5 mm Curtain Wall Dan Kaca Mati Jendela
162.17
m2
551,706.25
-
8. Pek. Aluminium Composit Panel + Rangka 9. Pek. Partisi Dobel (rangka Kayu Kls. II + Lapis Multipleks 9mm, Finishing HPL)
269.88
m2
591,091.67
-
10.12
m2
785,000.00
-
2.00
Psg
1,835,156.25
-
131.00
Bh
53,706.25
-
10. Pas. Floring Ensel 11. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 4 bh engsel, Kecuali Pintu KM = 3 bh) 12. Pas. Engsel Jendela 13. Pas. Engsel Expanyolet (Pintu Utama, P1, P2, P3, P4 Dan P5)
104.00
Bh
38,137.50
-
31.00
Set
310,687.50
-
14. Pas. Hak Angin
104.00
Bh
33,706.25
-
15. Pas. Tarikan Stainless
31.00
Bh
410,687.50
-
16. Pas. Grendel Jendela
52.00
Bh
27,637.50
-
17. Pas. Kunci Pelor
1.00
Set
279,275.00
-
18. Pas. Kunci tanam silinder
5.00
Set
266,462.50
-
20.00
Set
149,275.00
-
19. Pas. Kunci Pelor Biasa
Jumlah
2. Pek. Plafond Calsyboard + Rangka Hollow
471.20
m2
142,147.08
-
47.63
m2
147,615.83
-
Jumlah
-
PEKERJAAN LANTAI
1. Pek. Urugan Tanah Di Bawah Lantai + Pemadatan
470.74
m3
2. Pek. Urugan Pasir Di Bawah Lantai
117.69
m3
177,850.00
-
3. Pek. Lantai Kerja Beton Tebal 7 cm
41.19
m3
735,120.63
-
4. Pek. Rabat Beton Keliling Gedung & Ram = 7 Cm
1.26
m3
796,660.71
-
5. Pek. Lantai Utama Dan entrance Granit 60/60 cm
484.64
m2
480,673.50
-
6. Pek. Lantai Tangga Granit 60/60 Cm 7. Pek. Plint Lantai Utama Dan entrance Uk. 10 x 60 8. Pek. Lantai Keramik Toilet/KM/WC & Dapur, Uk. 20 x 20 9. Pek. Keramik Dinding Meja Beton Uk. 20 x 40 10. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 40
252,900.00
119,050,287.62
29.01
m2
480,673.50
-
484.10
m'
79,458.00
-
33.94
m2
172,548.00
-
8.13
m2
209,257.00
-
92.56
m2
209,257.00 Jumlah
VIII
-
PEK. PLAFOND
1. Pek. Plafond Gypsum 9 mm + Rangka Hollow
VII
-
PEKERJAAN PINTU DAN JENDELA
6. Pek. Pas. Kaca 5 mm Daun Pintu Dan Daun Jendela
VI
473,282,228.28
PEKERJAAN DINDING
119,050,287.62
PEK. PENGECATAN
1. Pek. Cat Tembok
1,820.47
m2
29,356.50
-
2. Pek. Cat Plafond
518.83
m2
29,356.50
-
Jumlah
-
NO IX
URAIAN PEKERJAAN
VOL.
HRG. SAT. (Rp.)
JML. HARGA
PEK. INSTALASI LISTRIK
1. Pek. Instalasi Titik Mata Lampu
91.00
ttk
418,500.00
-
2. Pek. Instalasi Titik Stop Kontak
34.00
ttk
333,000.00
-
3. Pek. Pas. Lampu RM 2 x 36
49.00
Bh
390,000.00
-
4. Pek. Pas. Lampu Downlight DL 18 Watt
42.00
Bh
95,000.00
-
5. Pek. Pas. Lampu Downlight DL 25 Watt
11.00
Bh
125,000.00
-
6. Pas. Saklar Tunggal
5.00
Bh
65,000.00
-
7. Pas. Saklar Ganda
24.00
Bh
68,500.00
-
8. Pas. Stop Kontak
22.00
Bh
65,000.00
-
9. Pas. Stop Kontak AC 10. Pas. Panel Induk + MCB, Lengkap
11. Pemasukan Daya Listrik 33000 Watt 12. Pek. Penangkal Petir, terdiri dari :
- Elektroda penangkap
X
SAT
12.00
Bh
75,000.00
-
1.00
Unit
17,000,000.00
-
1.00
Ls
40,590,000.00
-
1.00
Set
27,216,000.00
27,216,000.00
2.00
Bh
Jumlah
27,216,000.00
- Pengantar Tembaga BCC 50 mm
60.00
m'
- Klem dari bahan Copper
30.00
Bh
- Penyambung Pengantar dari Bahan Kopper
4.00
Bh
- pipa PPC Ø 1" , Pembungkus BCC 50 mm pada Ground Road
6.00
m'
- Pentanahan
1.00
Bh
PEK. SANITASI DAN INSTALASI
1. Pas. Klosed Duduk + Acs, Lengkap
4.00
Set
2,505,630.00
-
2. Pas. Washtafel + Kaca, Acs Lengkap
3.00
Set
733,840.00
-
3. Pas. Washbasin 2 mata + Acs, lengkap
2.00
Set
386,412.50
-
4. Pas. Urinoir Lengkap
3.00
Set
2,198,490.00
-
5. Pas. Kran Air Biasa
12.00
Bh
63,512.50
-
6. Pas. Floordrain Stainless
7.00
Bh
62,925.00
-
7. Pas. Stop Kran
2.00
Bh
89,012.50
-
8. Pek. Pas. Pipa Air Bersih AW 1" (dari Tower Air dan PDAM)
65.00
m'
19,095.00
-
9. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
88.00
m'
16,899.17
-
10. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
73.00
m'
18,513.75
-
11. Pek. Pipa Buangan Air Washtafel/Washbasin Dia. 2" (AW)
60.50
m'
73,786.25
-
12. Pek. Pipa Buangan Air Mandi Dia. 3" (D)
60.00
m'
144,110.00
-
13. Pek. Pipa Buangan Air Kotor Dia. 4" (D)
120.00
m'
205,335.00
-
14. Pek. Pas. Reservoir stainless Kap. 1 m3
2.00
Bh
4,000,000.00
-
15. Pas. Pompa Air 1"
1.00
Unit
2,500,000.00
-
16. Pek. Septic tank + Peresapan
2.00
Unit
15,000,000.00
-
Jumlah
-
C. LANTAI II (DUA) I
PEK. STRUKTUR BETON
1. Pek. Balok Lantai, Ringbalk Dan Balok Latei a. Balok Plat Lantai B0 (30/60) -Beton K.225
5.38
m3
930,676.90
5,005,552.66
-Besi Beton
863.41
Kg
13,251.00
11,441,030.78
-Bekisting 2x Pakai
44.82
m2
259,465.00
11,629,221.30
b. Balok Plat Lantai B1 (25/40) -Beton K.225
16.69
m3
930,676.90
15,533,928.22
-Besi Beton
3,179.00
Kg
13,251.00
42,124,905.24
-Bekisting 2x Pakai
175.26
m2
259,465.00
45,472,668.31
c. Balok Plat Lantai B2 (20/40) -Beton K.225
14.19
m3
930,676.90
13,208,911.17
-Besi Beton
2,622.12
Kg
13,251.00
34,745,709.47
-Bekisting 2x Pakai
m2
259,465.00
46,031,685.65
177.41
NO
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
d. Balok Plat Lantai B1* (25/40+10/30) -Beton K.225
0.94
m3
930,676.90
871,113.58
-Besi Beton
155.05
Kg
13,251.00
2,054,568.03
-Bekisting 2x Pakai
11.88
m2
259,465.00
3,082,444.20
-Beton K.225
6.94
m3
930,676.90
6,459,083.85
-Besi Beton
982.04
Kg
13,251.00
13,012,989.51
-Bekisting 2x Pakai
92.54
m2
259,465.00
24,009,853.24
e. Balok Plat Lantai B3 (20/30)
f. Balok Konsol Lantai BK (20/40) -Beton K.225
0.55
m3
930,676.90
512,244.57
-Besi Beton
101.69
Kg
13,251.00
1,347,446.49
-Bekisting 2x Pakai
6.88
m2
259,465.00
1,785,119.20
-Beton K.225
7.65
m3
930,676.90
7,119,678.32
-Besi Beton
1,205.79
Kg
-Bekisting 2x Pakai
168.30
m2
-Beton K.225
2.82
m3
-Besi Beton
373.10
Kg
-Bekisting 2x Pakai
24.44
m2
-Beton K.225
13.24
m3
-Besi Beton
2,193.46
Kg
-Bekisting 2x Pakai
176.54
-Beton K.225 -Besi Beton
g. Plat Level BLS (10/50) 13,251.00
15,977,963.04
297,640.00
50,092,812.00
930,676.90
2,624,508.87
h. Ringbalk RB0 (25/60) 13,251.00
4,944,011.70
259,465.00
6,341,324.60
930,676.90
12,322,348.35
13,251.00
29,065,535.81
m2
259,465.00
45,804,913.24
0.51
m3
930,676.90
-
75.82
Kg
13,251.00
-
8.45
m2
259,465.00
-
i. Ringbalk RB1 (15/40)
j.
Ringbalk RB2 (12/25)
-Bekisting 2x Pakai k. Balok Latei BL0 (25/60) -Beton K.225
3.19
m3
930,676.90
2,965,136.62
-Besi Beton
421.53
Kg
13,251.00
5,585,681.31
-Bekisting 2x Pakai
27.61
m2
259,465.00
7,164,347.58
7.34
m3
930,676.90
-
1,215.66
Kg
13,251.00
-
97.84
m2
259,465.00
-
l. Balok Latei BL1 (15/40) -Beton K.225 -Besi Beton -Bekisting 2x Pakai m. Balok Latei BL2 (12/25) -Beton K.225
3.60
m3
930,676.90
3,350,436.86
-Besi Beton
538.40
Kg
13,251.00
7,134,338.40
-Bekisting 2x Pakai
60.00
m2
259,465.00
15,567,900.00
n. Balok Latei BL3 (20/40) -Beton K.225
2.83
m3
930,676.90
2,629,720.66
-Besi Beton
398.06
Kg
13,251.00
5,274,645.36
-Bekisting 2x Pakai
30.02
m2
259,465.00
7,789,658.23
-Beton K.225
55.59
m3
930,676.90
51,734,843.78
-Besi Beton
6,948.55
Kg
13,251.00
92,075,242.68
-Bekisting 2x Pakai
463.24
m2
312,640.00
144,826,321.89
2. Pekerjaan Plat Beton Lantai, t = 12 cm
3. Pek. Kolom a. Type Kolom K0 (25/54) -Beton K.225
5.67
m3
930,676.90
5,276,938.05
-Besi Beton
906.91
Kg
13,251.00
12,017,478.19
-Bekisting 2x Pakai
66.36
m2
252,640.00
16,765,190.40
NO V
URAIAN PEKERJAAN
VOL.
SAT
HRG. SAT. (Rp.)
JML. HARGA
PEKERJAAN LANTAI
1. Pek. Lantai Utama Dan Balkon Granit 60/60 cm
523.28
m2
480,673.50
-
2. Pek. Plint Granit Lantai Utama Dan Balkon Uk. 10 x 60
375.40
m'
79,458.00
-
3. Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 20
22.86
m2
172,548.00
-
4. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 40
76.95
m2
209,257.00
-
Jumlah VI
PEK. PENGECATAN
1. Pek. Cat Tembok
1,956.58
m2
29,356.50
-
2. Pek. Cat Plafond
790.72
m2
29,356.50
-
61.02
m2
34,382.50
-
3. Pek. Cat Kayu (Lesplank Woodplank)
Jumlah VII
-
PEK. KONSTRUKSI ATAP
1. Pek. Rangka Atap Baja Ringan
946.81
m2
180,000.00
170,425,854.00
2. Pek. Penutup Atap Genteng Keramik
946.81
m2
277,190.00
262,446,347.06
3. Nok/Bubungan Atap Genteng Keramik
97.75
m'
168,938.00
16,514,425.48
4. Pek. Pas. Aluminium Foil/Sisalation Lapis Atap
946.81
m2
31,425.00
29,753,513.68
5. Pek. Listplank Woodplank
174.34
m'
254,100.00
44,299,794.00
Jumlah VIII
-
523,439,934.21
PEK. INSTALASI LISTRIK
1. Pek. Instalasi Titik Mata Lampu
159.00
ttk
418,500.00
-
2. Pek. Instalasi Titik Stop Kontak
14.00
ttk
333,000.00
-
3. Pek. Instalasi Titik Stop Kontak AC
16.00
ttk
333,000.00
-
4. Pek. Pas. Lampu RM 2 x 36
40.00
Bh
390,000.00
-
5. Pek. Pas. Lampu Downlight DL 18 Watt
97.00
Bh
95,000.00
-
6. Pek. Pas. Lampu Downlight DL 25 Watt
22.00
Bh
125,000.00
-
7. Pas. Saklar Tunggal
3.00
Bh
65,000.00
-
8. Pas. Saklar Ganda
20.00
Bh
68,500.00
-
9. Pas. Stop Kontak
14.00
Bh
65,000.00
-
10. Pas. Stop Kontak AC
16.00
Bh
75,000.00
-
Jumlah IX
PEK. SANITASI DAN INSTALASI
1. Pas. Klosed Duduk + Acs, Lengkap
3.00
Set
2,505,630.00
-
2. Pas. Washtafel + Kaca, Acs Lengkap
3.00
3. Pas. Urinoir Lengkap
3.00
Set
733,840.00
-
Set
2,198,490.00
-
4. Pas. Kran Air Biasa
8.00
Bh
63,512.50
-
5. Pas. Floordrain Stainless
6.00
Bh
62,925.00
-
6. Pas. Stop Kran
1.00
Bh
89,012.50
-
8. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)
48.00
m'
16,899.17
-
9. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)
25.00
m'
18,513.75
-
10. Pek. Pipa Buangan Air Washtafel/Washbasin Dia. 2" (AW)
21.00
m'
73,786.25
-
11. Pek. Pipa Buangan Air Mandi Dia. 3" (D)
20.00
m'
144,110.00
-
12. Pek. Pipa Buangan Air Kotor Dia. 4" (D)
22.00
m'
205,335.00
-
Jumlah X
-
-
PEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR
1. Pek. Saluran Air Keliling Gedung
113.58
2. Pek. Tower air Uk. 2,00 x 2,00 m , Tinggi 8,00 m 3. Pek. Reling Tangga dan Balkon 4. Pek. Penyelesaian Akhir/Pembersihan Realcost Lt. I Dan II
m'
242,615.74
-
16,000,000.00
-
1.00
Unit
42.55
m'
850,000.00
-
1.00
Ls
1,500,000.00 Jumlah
-
Rp
2,517,954,654.97
RENCANA ANGGARAN BIAYA PEKERJAAN LAND CLEARING GEDUNG KANTOR DINAS PERKEBUNAN PROVINSI SULAWESI BARAT TAHUN ANGGARAN 2011 NO.
URIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
I.
PEKERJAAN PERSIAPAN
1
Pek. Pengukuran
Ls
1.00
5,000,000.00
5,000,000.00
2
Pek. Mobilisasi Dan Demobilisasi
Ls
1.00
12,000,000.00
12,000,000.00
3
Pek. Dokumentasi/Foto - Foto Proyek
Ls
1.00
2,500,000.00
2,500,000.00
Jumlah
19,500,000.00
II.
PEKERJAAN LAND CLEARING
1
Pek. Cutting Lahan/Cut (Menggunakan Alat)
M3
2,579.76
37,389.47
96,455,851.13
2
Pek. Penimbunan/Fill (Menggunakan Alat)
M3
922.04
120,159.77
110,792,114.33
3
Pek. Urugan Tanah (Alat) (Untuk Jalan Lokasi)
M3
1,657.72
120,159.77
199,191,253.92
(Penghamparan Sisa Cutting Pada Jalan Menuju Lokasi)
Jumlah
406,439,219.38
III.
PEKERJAAN TALUD PENAHAN TANAH
1
Pek. Galian Tanah
M3
12.00
60,625.00
727,500.00
2
Pek. Pasir Urug Alas Pondasi
M3
3.00
177,850.00
533,550.00
3
Pek. Pondasi Talud Bt. Gunung, Camp. 1pc : 4ps
M3
86.63
673,455.00
58,338,039.38
Jumlah
59,599,089.38
REAL COST
Rp.
485,538,308.76
PPN ( 10 % )
Rp.
48,553,830.88
TOTAL COST ( A + B )
Rp.
534,092,139.63
DIBULATKAN
Rp.
534,092,100.00
TERBILANG Lima ratus dua puluh tujuh juta tujuh ratus sembilan puluh tujuh ribu rupiah,-
Mamuju, Mengetahui/Menyetujui : KEPALA DINAS PERKEBUNAN
2011.
Diketahui/Disetujui PEJABAT PELAKSANA TEKNIS KEGIATAN
PROVINSI SULAWESI BARAT
Drs. H. MUHTAR BELO, MM
KIMOTO BADO
Nip. 19551012 198203 1 006
Nip. 19641231 199402 1 026
REKAPITULASI ANGGARAN BIAYA PEMBANGUNAN GEDUNG KANTOR PERKEBUNAN DINAS PERKEBUNAN PROVINSI SULAWESI BARAT PEKERJAAN LOKASI TAHUN
: PEMBANGUNAN GEDUNG KANTOR PERKEBUNAN : PROVINSI SULAWESI BARAT : ANGGARAN 2011
NO
URAIAN PEKERJAAN
JUMLAH BIAYA
I
PEKERJAAN LAND CLEARING GEDUNG
Rp.
534,092,100.00
II
PEKERJAAN PEMBANGUNAN GEDUNG
Rp.
2,769,750,000.00
TOTAL COST + PPN
Rp. =
DIBULATKAN
Rp. =
3,303,842,100.00 3,303,842,100.00
TERBILANG
Tiga milyar empat ratus tujuh puluh juta delapan ratus enam puluh enam ribu rupiah,-
Mamuju,
2011.
Mengetahui/Menyetujui : KEPALA DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
Diketahui/Disetujui PEJABAT PELAKSANA TEKNIS KEGIATAN
Drs. H. MUHTAR BELO, MM Nip. 19551012 198203 1 006
KIMOTO BADO Nip. 19641231 199402 1 026
Mengetahui/Menyetujui : KEPALA DINAS PU PROVINSI SULAWESI BARAT
Ir. H. IDHAM HASIB, M.Si Nip. 19570116 198503 1 001
REKAPITULASI ANGGARAN BIAYA PEMBANGUNAN PERKEBUNAN BARU DINAS PERKEBUNAN PROVINSI SULAWESI BARAT PEKERJAAN LOKASI TAHUN
: PEMBANGUNAN PERKEBUNAN BARU : PROVINSI SULAWESI BARAT : ANGGARAN 2011
NO
URAIAN PEKERJAAN
JUMLAH BIAYA
I
PEKERJAAN PERSIAPAN
Rp.
62,376,000.00
II
PEKERJAAN LAND CLEARING AREA PAGAR
Rp.
63,335,492.92
III
PEK. PAGAR BETON PREECAST, T = 240 Cm
Rp.
3,050,617,449.98
IV
PEK. PAGAR DURI, T = 240 Cm
Rp.
28,157,809.85
V
PEK. GERBANG DAN PAPAN NAMA KOMPLEKS
Rp.
54,320,112.87
VI
PEK. JEMBATAN BETON, P = 5 M, L = 6 M
Rp.
210,951,248.30
VII
PEK. JEMBATAN BETON, P = 1.5 M, L = 3 M
Rp.
46,448,977.12
VIII
PEK. SALURAN AIR, L = 70 CM
Rp.
500,419,832.53
IX
PEKERJAAN PERINTISAN JALAN PERKEBUNAN, L = 4 M
Rp.
1,397,124,777.78
X
PEKERJAAN LAIN - LAIN
Rp.
61,379,833.33
TOTAL COST
Rp. =
PPN 10%
Rp. =
JUMLAH
Rp. =
DIBULATKAN
Rp. =
5,475,131,534.70 547,513,153.47 6,022,644,688.17 6,022,644,000.00
TERBILANG Lima milyar delapan ratus sembilan puluh sembilan juta empat ratus sembilan puluh lima ribu rupiah,-
Mamuju,
2011.
Mengetahui/Menyetujui : KEPALA DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
Diketahui/Disetujui PEJABAT PELAKSANA TEKNIS KEGIATAN
Drs. H. MUHTAR BELO, MM Nip. 19551012 198203 1 006
KIMOTO BADO Nip. 19641231 199402 1 026
Mengetahui/Menyetujui : KEPALA DINAS PU PROVINSI SULAWESI BARAT
Ir. H. IDHAM HASIB, M.Si Nip. 19570116 198503 1 001
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBANGUNAN PERKEBUNAN BARU PROVINSI SULAWESI BARAT TAHUN ANGGARAN 2011 NO.
URIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN (Rp.)
I.
PEKERJAAN PERSIAPAN
1
Pek. Pengukuran + Bouwplank
Ls
1.00
22,326,000.00
2
Pek. Direksi Keet
M2
12.00
500,000.00
3
Pek. Dokumentasi/Foto - Foto Proyek
Ls
1.00
2,500,000.00
4
Papan Nama Proyek
Ls
1.00
550,000.00
5
Pek. Air Kerja Dan P3K
Ls
1.00
6,000,000.00
6
Pek. Mobilisasi Dan Demobilisasi
Ls
1.00
25,000,000.00
II.
PEKERJAAN LAND CLEARING AREA PAGAR
1
Pek. Pembersihan Area Pekerjaan Pagar (Dari Semak, Pohon, Menggunakan Alat)
M2
6,886.00
1,719.83
2
Pek. Perataan Tanah, Sedalam 20 Cm, Lebar 2 M (Menggali, Meratakan Menggunakan Alat)
M3
1,377.20
37,389.47
III.
PEK. PAGAR BETON PREECAST, T = 240 Cm
M'
1
Pek. Galian Tanah Pondasi Setempat (Undak)
M3
1,218.88
60,625.00
2
Pek. Galian Tanah Pondasi Garis Menerus
M3
486.00
60,625.00
3,443.00
3,443.00
(Pondasi Pagar Depan)
3
Pek. Timbunan Kembali
M3
950.70
20,208.33
4
Pek. Pasir Urug
M3
95.76
177,850.00
5
Pek. Pas. Batu Kosong
M3
97.20
365,091.00
6
Pek. Pas. Pondasi Bt. Gunung Setempat (Undak)
M3
290.88
673,455.00
7
Pek. Pas. Pondasi Bt. Gunung (Pagar Depan)
M3
228.96
673,455.00
8
Pek. Pas. Pagar Beton Panel Pracetak (Preecast)
M'
3,443.00
733,500.00
Spesifikasi Pagar dalam 1 m' (Masuk Dalam Harga Per-M'): - Terdiri dari 6 Bh panel beton untuk dinding - Terdiri dari 1 Bh Tiang Setinggi 320 cm (Tertanam 80 cm Dalam Pondasi) - Tinggi Pagar 240 cm - Panel Beton Berukuran P = 250 cm, L = 40 cm, T = 8 cm - Mutu Beton K - 225 - Kebutuhan Panel Beton = 7950 Lbr - Kebutuhan Tiang Beton = 1325 Bh
NO.
URIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN (Rp.)
IV.
PEK. PAGAR DURI, T = 240 Cm
M'
75.00
1
Pek. Galian Tanah Pondasi Setempat (Undak)
M3
41.47
60,625.00
2
Pek. Timbunan Kembali
M3
27.57
20,208.33
3
Pek. Pasir Urug
M3
1.22
177,850.00
4
Pek. Pas. Pondasi Bt. Gunung Setempat (Undak)
M3
10.76
673,455.00
5
Pek. Pas. Pagar Kawat Duri
M'
75.00
235,030.00
Spesifikasi Pagar dalam 1 m' : - Tinggi Pagar 240 cm - Jarak antara Kawat Duri 20 cm - Tiang yang digunakan dari Kayu Kls. I, Uk. 10 x 10 Cm - Jarak antara Tiang adalah 2 M
V.
PEK. GERBANG DAN PAPAN NAMA KOMPLEKS
1
Pek. Galian Tanah Pondasi
M3
5.26
60,625.00
2
Pek. Urugan Tanah Kembali
M3
1.75
20,208.33
3
Pek. Urugan Pasir Alas Pondasi
M3
0.64
177,850.00
4
Pek. Pas. Bt. Kosong
M3
0.46
365,091.00
5
Pek. Pondasi Bt. Gunung 1 : 4
M3
0.86
673,455.00
6
Pek. Pondasi Bt. Trasram 1/2 Bt. Camp. 1 : 3
M2
2.62
96,810.50
7
Pek. Lantai Kerja Poer
M3
0.14
735,120.63
8
Pek. Pondasi Poer (P1) -Beton K.225
M3
0.56
930,676.90
-Besi Beton
Kg
53.46
13,251.00
-Bekisting 2x Pakai
M2
1.99
144,030.00
-Beton K.225
M3
0.10
930,676.90
-Besi Beton
Kg
14.52
13,251.00
-Bekisting 2x Pakai
M2
0.80
152,217.50
-Beton K.225
M3
0.04
930,676.90
-Besi Beton
Kg
7.32
13,251.00
-Bekisting 2x Pakai
M2
0.53
152,217.50
-Beton K.225
M3
0.74
930,676.90
-Besi Beton
Kg
114.94
13,251.00
-Bekisting 2x Pakai
M2
11.84
252,640.00
-Beton K.225
M3
1.16
930,676.90
-Besi Beton
Kg
157.88
13,251.00
-Bekisting 2x Pakai
M2
17.14
252,640.00
9
10
11
12
Pek. Sloef S1 (25/25)
Pek. Sloef S2 (15/25)
Pek. Kolom K1 (25/25)
Pek. Kolom K2 (25/60)
NO.
13
URIAN PEKERJAAN
SAT.
VOLUME
HARGA SATUAN (Rp.)
Pek. Kolom K3 (15/60) -Beton K.225
M3
0.90
930,676.90
-Besi Beton
Kg
126.97
13,251.00
-Bekisting 2x Pakai
M2
15.00
252,640.00
-Beton K.225
M3
0.18
930,676.90
-Besi Beton
Kg
24.24
13,251.00
-Bekisting 2x Pakai
M2
2.16
259,465.00
-Beton K.225
M3
0.18
930,676.90
-Besi Beton
Kg
32.94
13,251.00
-Bekisting 2x Pakai
M2
1.44
259,465.00
-Beton K.225
M3
0.10
930,676.90
-Besi Beton
Kg
22.73
13,251.00
-Bekisting 2x Pakai
M2
1.00
312,640.00
17
Pek. Pas. Dinding 1 Bt. Camp. 1 : 5
M2
8.28
189,048.00
18
Pek. Pas. Dinding 1/2 Bt. Camp. 1 : 5
M2
5.22
92,087.00
19
Pek. Plesteran Biasa, Camp. 1 : 5
M2
27.00
43,145.60
20
Pek. Plesteran Beton, Camp. 1 : 3
M2
26.70
45,724.40
21
Pek. Acian
M2
53.70
27,687.50
22
Pek. Profilan
M'
25.60
75,000.00
23
Pek. Pengecatan
M2
53.70
29,356.50
24
Pek. Pasir Urug Alas Lantai
M3
0.26
177,850.00
25
Pek. Rabat Beton Alas Lantai, T = 7 Cm
M3
0.36
735,120.63
26
Pek. Lantai Keramik 40 x 40
M2
7.20
178,540.00
27
Pek. Rangka Portal Dan Papan Nama ' - Pek. Pipa BS 1/2" Med. A
M'
11.95
62,520.82
' - Pek. Pipa BS 2" Med. A
M'
25.58
164,584.92
' - Pek. Angkur Baut Ø14
Bh
16.00
15,000.00
' - Acsesories ornamen
Bh
2.00
75,000.00
' - Pek. Huruf Stainless Stell
Bh
50.00
250,000.00
VI.
PEK. JEMBATAN BETON, P = 5 M, L = 6 M
Unit
1
Pek. Galian Tanah Pondasi
M3
4.32
60,625.00
2
Pek. Urugan Tanah Kembali
M3
1.44
20,208.33
3
Pek. Urugan Pasir Alas Pondasi
M3
4.16
177,850.00
4
Pek. Pondasi Bt. Gunung 1 : 4
M3
29.88
673,455.00
14
15
16
Pek. Balok 25/25
Pek. Ringbalk 15/25
Pek. Plat Beton
2.00
NO.
URIAN PEKERJAAN
5
Pek. Pondasi Bt. Gunung 1 : 4 (alas Saluran)
6
Pek. Balok Jembatan, Uk. 40 x 60 (Sisi Dalam Jembatan)
7
8
9
SAT.
VOLUME
HARGA SATUAN (Rp.)
M3
6.94
673,455.00
-Beton K.300
M3
2.88
972,037.54
-Besi Beton
Kg
365.99
13,251.00
-Bekisting 1x Pakai
M2
7.20
418,665.00
-Beton K.300
M3
4.80
972,037.54
-Besi Beton
Kg
703.58
13,251.00
-Bekisting 1x Pakai
M2
32.02
418,665.00
-Beton K.300
M3
6.00
972,037.54
-Besi Beton
Kg
1,064.40
13,251.00
-Bekisting 1x Pakai
M2
30.00
525,015.00
-Beton K.300
M3
2.40
972,037.54
-Bekisting 2x Pakai
M2
12.00
297,640.00
Pek. Balok Jembatan, Uk. 40 x 60 (Gelagar Jembatan)
Pek. Plat Lantai Jembatan, T = 20 Cm
Pek. Dinding Beton Decker Jembatan, T = 60 Cm, L = 40 Cm
Untuk 1 Unit Jembatan Jadi Untuk 2 Unit VII.
PEK. JEMBATAN BETON, P = 1.5 M, L = 3 M
Unit
8.00
(DI ATAS SALURAN AIR SISI JALAN)
1
Pek. Galian Tanah Pondasi
M3
3.30
60,625.00
2
Pek. Urugan Tanah Kembali
M3
1.10
20,208.33
3
Pek. Urugan Pasir Alas Pondasi
M3
0.33
177,850.00
4
Pek. Pondasi Bt. Gunung 1 : 4
M3
1.40
673,455.00
5
Pek. Pondasi Bt. Gunung 1 : 4 (alas Saluran)
M3
0.50
673,455.00
6
Pek. Plat Lantai Jembatan, T = 20 Cm -Beton K.250
M3
0.66
943,410.40
-Besi Beton
Kg
117.08
13,251.00
-Bekisting 1x Pakai
M2
3.30
525,015.00
-Beton K.250
M3
0.07
972,037.54
-Bekisting 2x Pakai
M2
0.91
297,640.00
9
Pek. Dinding Beton Decker Jembatan, T = 20 Cm, L = 15 Cm
Untuk 1 Unit Jembatan Jadi Untuk 8 Unit
NO. VIII.
URIAN PEKERJAAN PEK. SALURAN AIR, L = 70 CM
SAT.
VOLUME
M'
HARGA SATUAN (Rp.)
788.98
(SALURAN AIR SISI JALAN)
1
Pek. Galian Tanah Pondasi
M3
867.88
60,625.00
2
Pek. Urugan Tanah Kembali
M3
289.29
20,208.33
3
Pek. Urugan Pasir Alas Pondasi
M3
86.79
177,850.00
4
Pek. Pondasi Bt. Gunung 1 : 4
M3
370.82
673,455.00
5
Pek. Pondasi Bt. Gunung 1 : 4 (alas Saluran)
M3
134.13
673,455.00
6
Pek. Plesteran Saluran 1 : 5
M2
2,004.01
43,145.60
IX.
PEKERJAAN PERINTISAN JALAN PERKEBUNAN, L = 4 M
M'
3,498.80
1
Pek. Pembersihan Area Jalan
M2
17,494.00
1,719.83
M3
13,120.50
37,389.47
M3
6,560.25
120,159.77
M3
1,486.98
59,309.15
(Dari Semak, Pohon, Menggunakan Alat)
2
Pek. Perataan Tanah Pada Jalan Rata - Rata Ketebalan ± 75 Cm, Lebar 3 M (Menggali, Meratakan Menggunakan Alat)
3
Pek. Urugan Tanah (Alat) (Untuk Jalan Lokasi) (Penghamparan Sisa Cutting Pada Jalan Perkebunan)
3
Pek. Galian Untuk Pembuatan Saluran Sisi Jalan (Pada sisi kiri dan kanan jalan)
X
PEKERJAAN LAIN - LAIN
1
Pek. Pengadaan Genset, Kap. 25 KVA Type Silent
Unit
1.00
45,000,000.00
2
Pek. Pengadaan Pompa Air
Unit
1.00
5,000,000.00
3
Pek. Pengadaan Reservoir Stainless, Kap. 1 m3
Unit
2.00
4,000,000.00
4
Pek. Pemipaan, Pipa PVC AW 3/4"
M'
200.00
16,899.17
REAL COST
Rp.
Mamuju,
Mengetahui/Menyetujui : KEPALA DINAS PERKEBUNAN
Diket PEJABAT PELAK
PROVINSI SULAWESI BARAT
Drs. H. MUHTAR BELO, MM
KIM
Nip. 19551012 198203 1 006
Nip. 19641
JUMLAH HARGA (Rp.)
22,326,000.00 6,000,000.00 2,500,000.00 550,000.00 6,000,000.00 25,000,000.00 62,376,000.00
11,842,719.11 51,492,773.81
63,335,492.92
73,894,529.08 29,463,750.00 19,212,062.50 17,030,916.00 35,486,845.20 195,894,590.40 154,194,256.80 2,525,440,500.00
3,050,617,449.98
JUMLAH HARGA (Rp.)
2,513,869.39 557,066.14 216,265.60 7,243,358.72 17,627,250.00
28,157,809.85
318,887.50 35,431.94 113,824.00 167,941.86 579,171.30 253,643.51 102,916.89 521,179.07 708,366.66 287,138.21 93,067.69 192,431.02 121,774.00 37,227.08 96,992.02 81,162.37 688,700.91 1,523,125.59 2,991,257.60 1,079,585.21 2,092,014.88 4,331,462.27
JUMLAH HARGA (Rp.)
837,609.21 1,682,505.97 3,790,357.92 167,521.84 321,188.34 560,444.40 167,521.84 436,464.09 373,629.60 93,067.69 301,234.98 312,640.00 1,565,317.44 480,694.14 1,164,931.20 1,220,841.48 1,486,818.75 1,920,000.00 1,576,444.05 46,241.00 264,643.43 1,285,488.00 747,123.79 4,210,082.13 240,000.00 150,000.00 12,500,000.00 54,320,112.87
261,900.00 29,100.00 739,856.00 20,122,835.40
JUMLAH HARGA (Rp.)
4,673,777.70 2,799,468.11 4,849,738.79 3,014,388.00 4,665,780.19 9,323,191.58 13,403,978.64 5,832,225.24 14,104,364.40 15,750,450.00 2,332,890.10 3,571,680.00 105,475,624.15 210,951,248.30
200,062.50 22,229.17 58,690.50 942,837.00 336,727.50 622,650.86 1,551,480.08 1,732,549.50 68,042.63 270,852.40 5,806,122.14 46,448,977.12
JUMLAH HARGA (Rp.)
52,615,103.75 5,846,122.64 15,435,210.23 249,730,987.17 90,328,229.40 86,464,179.34 500,419,832.53
30,086,629.12 490,568,500.44
788,278,131.14 88,191,517.08 1,397,124,777.78
45,000,000.00 5,000,000.00 8,000,000.00 3,379,833.33 61,379,833.33
5,475,131,534.70
2011.
ahui/Disetujui ANA TEKNIS KEGIATAN
OTO BADO
231 199402 1 026
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GEDUNG KANTOR BARU DAN PERKEBUNAN INDUK PROVINSI SULAWESI BARAT TAHUN ANGGARAN 2011
JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.)
I
PEK. PEMBANGUNAN PERKEBUNAN BARU
Rp.
6,022,644,000.00
II
PEK. PEMBANGUNAN GEDUNG KANTOR BARU
Rp.
3,303,842,100.00
III IV V
PEK. PERENCANAAN PEK. PENGAWASAN PENGELOLA PROYEK
Rp. Rp. Rp.
312,800,000.00 216,839,000.00 100,000,000.00
Rp. Rp.
9,956,125,100.00 9,956,125,000.00
Total Cost + PPN 10% Dibulatkan Terbilang : Sepuluh milyar rupiah ,-
Mamuju, Mengetahui/Menyetujui :
KEPALA DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
2011
Diketahui/Disetujui PEJABAT PELAKSANA TEKNIS KEGIATAN
Drs. H. MUHTAR BELO, MM Nip. 19551012 198203 1 006
KIMOTO BADO Nip. 19641231 199402 1 026
Mengetahui/Menyetujui :
KEPALA DINAS PU PROVINSI SULAWESI BARAT
Ir. H. IDHAM HASIB, M.Si Nip. 19570116 198503 1 010
DAFTAR ANALISA HARGA SATUAN PEKERJAAN A.6
PEKERJAAN PERSIAPAN A.6.2
A.6.4
A.6.5
Memasang 1 M' pagar sementara dari seng gelombang tinggi 2 meter 1.250 Btg Dolken kayu Ø8-10/400 cm @ Rp 30,000.00 2.500 Kg Semen Portland @ Rp 1,150.00 0.005 M3 Pasir beton @ Rp 148,000.00 0.009 M3 split/chipping 2-3 cm @ Rp 267,000.00 0.072 M3 Kayu klas II (balok) @ Rp 4,550,000.00 0.060 Kg Paku biasa 2" - 5" @ Rp 17,500.00 0.400 Ltr Residu @ Rp 6,400.00 0.200 Oh Tukang kayu @ Rp 100,000.00 0.400 Oh Pekerja @ Rp 75,000.00 0.020 Oh Kepala Tukang Kayu @ Rp 130,000.00 0.020 Oh Mandor @ Rp 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Mengukur dan memasang 1 M' bouwplank 0.012 M3 Kayu klas II (balok) 0.020 Kg Paku biasa 2" - 5" 0.007 M3 Kayu klas II (papan) 0.100 Oh Tukang kayu 0.100 Oh Pekerja 0.010 Oh Kepala Tukang Kayu 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
4,550,000.00 17,500.00 4,850,000.00 100,000.00 75,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
Membuat1 M2 kantor sementara, dengan lantai plesteran 1.250 Btg Dolken kayu Ø8-10/400 cm 0.180 M3 Kayu klas II (balok) 0.850 Kg Paku biasa 2" - 5" 1.100 Kg Besi strip 35.000 Kg Semen Portland 0.150 M3 Pasir pasang 0.100 M3 Pasir beton 0.150 M3 split/chipping 2-3 cm 30.000 Bh Batu merah 0.250 Lbr Seng plat BJLS 0.30 2.000 set Kaca nako lengkap teralis 0.080 M2 Kaca bening 5 mm 0.150 Bh Kunci tanam biasa 0.060 Lbr Multipleks 1.22 x 2.44 x 6 mm 2.000 Oh Tukang kayu 1.000 Oh Tukang batu 2.000 Oh Pekerja 0.300 Oh Kepala Tukang Kayu 0.050 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
30,000.00 4,550,000.00 17,500.00 12,500.00 1,150.00 134,000.00 148,000.00 267,000.00 550.00 50,000.00 350,000.00 105,000.00 173,000.00 82,500.00 100,000.00 100,000.00 75,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Menggali 1 M3 tanah biasa sedalam 1 m 0.750 Oh Pekerja 0.025 Oh Mandor
@ Rp @ Rp
75,000.00 175,000.00
Rp Rp Rp
Menggali 1 M3 tanah biasa sedalam 2 m 0.900 Oh Pekerja 0.045 Oh Mandor
@ Rp @ Rp
75,000.00 175,000.00
Rp Rp Rp
B.6 PEKERJAAN TANAH B.6.1
B.6.2
B.6.9 Mengurug kembali 1 M3 galian (Dihitung 1/3 Kali Indeks Pekerjaan Galian) a. Untuk Galian Tanah Biasa Sedalam 1 m 0.250 Oh Pekerja @ Rp 75,000.00 0.008 Oh Mandor @ Rp 175,000.00
b. Untuk Galian Tanah Biasa Sedalam 2 m
Rp Rp Rp
0.300 0.015
Oh Oh
Pekerja Mandor
@ Rp @ Rp
75,000.00 175,000.00
Rp Rp Rp
B.6.10 Memadatkan 1 M3 tanah (per 20 cm) 0.500 Oh Pekerja 0.050 Oh Mandor
@ Rp @ Rp
75,000.00 175,000.00
Rp Rp Rp
B.6.11 Mengurug 1 M3 pasir urug 1.200 M3 Pasir urug 0.300 Oh Pekerja 0.010 Oh Mandor
@ Rp @ Rp @ Rp
128,000.00 75,000.00 175,000.00
Rp Rp Rp Rp
@ Rp @ Rp @ Rp
152,000.00 75,000.00 175,000.00
Rp Rp Rp Rp
B.6.15 Mengurug 1 M3 sirtu padat untuk peninggian lantai bangunan 1.200 M3 Sirtu @ Rp 0.250 Oh Pekerja @ Rp 0.025 Oh Mandor @ Rp
177,000.00 75,000.00 175,000.00
Rp Rp Rp Rp
Mengurug 1 M3 Tanah Timbunan 1.200 M3 Tanah timbunan 0.300 Oh Pekerja 0.010 Oh Mandor
An. K
158
M3
GALIAN TANAH BIASA (PAKAI ALAT/PEMBUANGAN SETEMPAT)
(Asumsi : Menggunakan Alat, 80% Galian Dibuang Dilokasi, 20% Galian Dibuang Dan Diangkut Keluar Deng (Asumsi : Jarak 1 Tripp PP < 2 Km, 2.5 rit PP/Jam/Truck)
1.000 1.000 1.000 1.000 1.000 2.000 5.000 5.000 0.240
Oh Oh Oh Oh Oh Oh Jam Jam Set
Mandor Operator terampil Pembantu operator Sopir Terampil Pembantu Sopir Pekerja Excavator Dump Truck, Kap. 5 Ton Alat -alat bantu 1 set (3 alat)
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
175,000.00 107,250.00 60,500.00 71,500.00 50,000.00 75,000.00 639,036.99 414,820.16 100,000.00 Untuk 1 M3
An. K
12
Are
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA (MEN
(Asumsi : Menggunakan Tenaga Manusia, Tak ada pohon besar, Pembersihan 100 m/hari, Hasil kerja 25 m (Uraian : Mengupas dan membuang semak - semak dengan tenaga manusia pada Damija)
1.000 48.000 1.920
Oh Oh Set
Mandor Pekerja Alat -alat bantu 1 set (3 alat)
@ Rp @ Rp @ Rp
175,000.00 75,000.00 100,000.00 Untuk 1 Are Untuk 1 M2
An. K
2400
M2
Rp Rp Rp Rp Rp Rp
PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA (MEN
(Asumsi : Menggunakan Alat Berat, Tak ada pohon besar, Pembersihan 200 m/hari) (Uraian : Alat Berat Mengupas dan membuang semak - semak dari daerah milik jalan)
1.000 1.000 1.000 2.000 5.000 1.000
Oh Oh Oh Oh Jam Set
Mandor Operator terampil Pembantu operator Pekerja Buldozer 110 HP Alat -alat bantu 1 set (3 alat)
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
175,000.00 107,250.00 60,500.00 75,000.00 706,966.29 100,000.00 Untuk 1 M2
An. El
1
M3
Rp Rp Rp Rp Rp Rp Rp Rp
GALIAN UNTUK DRAINASE, SALURAN DAN SALURAN AIR (MENGGUNA
(Asumsi : Menggunakan Alat Berat, Pada Daerah Sepanjang Jalan, Jam kerja Efektif per hari = 7 Jam) (Uraian : Penggalian Oleh Excavator, Hasil Galian Di buang Menggunakan Dump truck Sejauh 2 KM)
0.0075
Jam Mandor
@ Rp
25,000.00
Rp
0.030 0.0075 0.1302 -
(Asumsi : Harga Satuan upah perhari dibagi 7 jam) Jam Pekerja @ Rp (Asumsi : Harga Satuan upah perhari dibagi 7 jam) Jam Excavator @ Rp Jam Dump Truck, Kap. 5 Ton @ Rp Set Alat -alat bantu 1 set (3 alat) @ Rp
10,714.29
Rp
639,036.99 414,820.16 100,000.00
Rp Rp Rp Rp
167,000.00 1,150.00 134,000.00 100,000.00 75,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
167,000.00 128,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
C.6 PEKERJAAN PONDASI C.6.2
C.6.9
D.6
Memasang 1 1.200 163.000 0.520 1.500 0.600 0.060 0.075
M3 pondasi batu belah, campuran 1PC : 4PP M3 Batu gunung @ Rp Kg Semen Portland @ Rp M3 Pasir pasang @ Rp Oh Tukang batu @ Rp Oh Pekerja @ Rp Oh Kepala Tukang Batu @ Rp Oh Mandor @ Rp
Memasang 1 M3 batu kosong (aanstamping) 1.200 M3 Batu gunung 0.432 M3 Pasir urug 0.780 Oh Pekerja 0.390 Oh Tukang batu 0.039 Oh Kepala Tukang Batu 0.039 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
PEKERJAAN DINDING D.6.3
D.6.4
D.6.8
D.6.9
Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 4PP 140.000 Bh Batu merah @ Rp 550.00 26.550 Kg Semen Portland @ Rp 1,150.00 0.093 M3 Pasir pasang @ Rp 134,000.00 0.600 Oh Pekerja @ Rp 75,000.00 0.200 Oh Tukang batu @ Rp 100,000.00 0.020 Oh Kepala Tukang Batu @ Rp 130,000.00 0.030 Oh Mandor @ Rp 175,000.00
Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 5PP 140.000 Bh Batu merah @ Rp 550.00 22.200 Kg Semen Portland @ Rp 1,150.00 0.102 M3 Pasir pasang @ Rp 134,000.00 0.600 Oh Pekerja @ Rp 75,000.00 0.200 Oh Tukang batu @ Rp 100,000.00 0.020 Oh Kepala Tukang Batu @ Rp 130,000.00 0.030 Oh Mandor @ Rp 175,000.00
Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 3PP 70.000 Bh Batu merah @ Rp 550.00 14.370 Kg Semen Portland @ Rp 1,150.00 0.040 M3 Pasir pasang @ Rp 134,000.00 0.300 Oh Pekerja @ Rp 75,000.00 0.100 Oh Tukang batu @ Rp 100,000.00 0.010 Oh Kepala Tukang Batu @ Rp 130,000.00 0.015 Oh Mandor @ Rp 175,000.00
Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 4PP 70.000 Bh Batu merah @ Rp 550.00 11.500 Kg Semen Portland @ Rp 1,150.00 0.043 M3 Pasir pasang @ Rp 134,000.00 0.300 Oh Pekerja @ Rp 75,000.00 0.100 Oh Tukang batu @ Rp 100,000.00 0.010 Oh Kepala Tukang Batu @ Rp 130,000.00 0.015 Oh Mandor @ Rp 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp
Rp D.6.10 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 5PP 70.000 Bh Batu merah @ Rp 550.00 9.680 Kg Semen Portland @ Rp 1,150.00 0.045 M3 Pasir pasang @ Rp 134,000.00 0.300 Oh Pekerja @ Rp 75,000.00 0.100 Oh Tukang batu @ Rp 100,000.00 0.010 Oh Kepala Tukang Batu @ Rp 130,000.00 0.015 Oh Mandor @ Rp 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
E.6 PEKERJAAN PLESTERAN E.6.3
Memasang 1 M2 plesteran 1PC : 3PP, tebal 15 mm 7.776 Kg Semen Portland 0.023 M3 Pasir pasang 0.200 Oh Pekerja 0.150 Oh Tukang batu 0.015 Oh Kepala Tukang Batu 0.010 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,150.00 134,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
Memasang 1 M2 plesteran 1PC : 5PP, tebal 15 mm 5.184 Kg Semen Portland 0.026 M3 Pasir pasang 0.200 Oh Pekerja 0.150 Oh Tukang batu 0.015 Oh Kepala Tukang Batu 0.010 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,150.00 134,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
E.6.20 Memasang 1 M2 plesteran skoning 1PC : 2PP, tebal 10 mm 0.500 Kg Semen Portland @ Rp 0.013 M3 Pasir pasang @ Rp 0.057 Oh Pekerja @ Rp 0.380 Oh Tukang batu @ Rp 0.038 Oh Kepala Tukang Batu @ Rp 0.003 Oh Mandor @ Rp
1,150.00 134,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
E.6.27 Memasang 1 M2 acian 3.250 Kg Semen Portland 0.150 Oh Pekerja 0.100 Oh Tukang batu 0.010 Oh Kepala Tukang Batu 0.008 Oh Mandor
1,150.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
1 M3 Membuat dan memasang kusen pintu dan jendela, kayu kls. I 1.100 M3 Kayu klas I (balok) untuk kosen pintu/jen @ Rp 1.250 Kg Paku biasa 2" - 5" @ Rp 1.000 Kg Lem kayu @ Rp 6.000 Oh Pekerja @ Rp 20.000 Oh Tukang kayu @ Rp 2.000 Oh Kepala Tukang Kayu @ Rp 0.300 Oh Mandor @ Rp
9,550,000.00 17,500.00 12,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
1 M2 Membuat dan memasang daun pintu panel, kayu kls. I atau II 0.040 M3 Kayu klas I (papan) listplank dan pintu/je @ Rp 0.500 Kg Lem kayu @ Rp 1.000 Oh Pekerja @ Rp 2.500 Oh Tukang kayu @ Rp 0.250 Oh Kepala Tukang Kayu @ Rp 0.050 Oh Mandor @ Rp
10,050,000.00 12,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
E.6.5
F.6
@ Rp @ Rp @ Rp @ Rp @ Rp
PEKERJAAN KAYU F.6.1
F.6.5
F.6.6
F.6.8
1 M2 Membuat dan memasang pintu dan jendela kaca, kayu kls. I atau II 0.024 M3 Kayu klas I (papan) listplank dan pintu/je @ Rp 10,050,000.00 0.300 Kg Lem kayu @ Rp 12,500.00 0.800 Oh Pekerja @ Rp 75,000.00 2.000 Oh Tukang kayu @ Rp 100,000.00 0.200 Oh Kepala Tukang Kayu @ Rp 130,000.00 0.040 Oh Mandor @ Rp 175,000.00
1 M2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kls. II 0.025 M3 Kayu klas II (papan) @ Rp 4,850,000.00 0.030 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 0.500 Kg Lem kayu @ Rp 12,500.00 1.000 Lbr Plywood Uk.90x220 cm Tebal 4 mm @ Rp 92,000.00 0.600 Oh Pekerja @ Rp 75,000.00 2.000 Oh Tukang kayu @ Rp 100,000.00 0.200 Oh Kepala Tukang Kayu @ Rp 130,000.00 0.030 Oh Mandor @ Rp 175,000.00
F.6.8 - SPL 1 M2 Membuat daun pintu Teakwood rangkap Lapis HPL, rangka tertutup kayu kls. II 0.025 M3 Kayu klas II (papan) @ Rp 4,850,000.00 0.030 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 0.500 Kg Lem kayu @ Rp 12,500.00 1.000 Lbr Teakwood Uk. 90 x 220 x 4 mm @ Rp 92,000.00 0.700 Lbr HPL Uk. 120 x 240 @ Rp 176,000.00 0.600 Oh Pekerja @ Rp 75,000.00 2.500 Oh Tukang kayu @ Rp 100,000.00 0.250 Oh Kepala Tukang Kayu @ Rp 130,000.00 0.030 Oh Mandor @ Rp 175,000.00
Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
G.6 PEKERJAAN BETON G.6.1
G.6.4
G.6.5
Membuat 1 M3 beton mutu f'c=7,4 Mpa (K100), slump (12 ± 2) cm, w/c=0,87 247.000 Kg Semen Portland @ Rp 1,150.00 869.000 Kg Pasir beton (Kg) @ Rp 105.71 999.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 215.000 Ltr Air @ Rp 250.00 1.650 Oh Pekerja @ Rp 75,000.00 0.275 Oh Tukang batu @ Rp 100,000.00 0.028 Oh Kepala Tukang Batu @ Rp 130,000.00 0.083 Oh Mandor @ Rp 175,000.00
Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87 230.000 Kg Semen Portland @ Rp 1,150.00 893.000 Kg Pasir beton (Kg) @ Rp 105.71 1,027.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 200.000 Ltr Air @ Rp 250.00 1.200 Oh Pekerja @ Rp 75,000.00 0.200 Oh Tukang batu @ Rp 100,000.00 0.020 Oh Kepala Tukang Batu @ Rp 130,000.00 0.060 Oh Mandor @ Rp 175,000.00
Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66 326.000 Kg Semen Portland @ Rp 1,150.00 760.000 Kg Pasir beton (Kg) @ Rp 105.71 1,029.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 215.000 Ltr Air @ Rp 250.00 1.650 Oh Pekerja @ Rp 75,000.00 0.275 Oh Tukang batu @ Rp 100,000.00 0.028 Oh Kepala Tukang Batu @ Rp 130,000.00 0.083 Oh Mandor @ Rp 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp
G.6.7
G.6.8
G.6.9
Membuat 1 M3 beton mutu f'c=19,3 Mpa (K 225), slump (12 ± 2) cm, w/c=0,58 371.000 Kg Semen Portland @ Rp 1,150.00 698.000 Kg Pasir beton (Kg) @ Rp 105.71 1,047.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 215.000 Ltr Air @ Rp 250.00 1.650 Oh Pekerja @ Rp 75,000.00 0.275 Oh Tukang batu @ Rp 100,000.00 0.028 Oh Kepala Tukang Batu @ Rp 130,000.00 0.083 Oh Mandor @ Rp 175,000.00
Membuat 1 M3 beton mutu f'c=21,7 Mpa (K 250), slump (12 ± 2) cm, w/c=0,56 384.000 Kg Semen Portland @ Rp 1,150.00 692.000 Kg Pasir beton (Kg) @ Rp 105.71 1,039.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 215.000 Ltr Air @ Rp 250.00 1.650 Oh Pekerja @ Rp 75,000.00 0.275 Oh Tukang batu @ Rp 100,000.00 0.028 Oh Kepala Tukang Batu @ Rp 130,000.00 0.083 Oh Mandor @ Rp 175,000.00
Membuat 1 M3 beton mutu f'c=24,0 Mpa (K 275), slump (12 ± 2) cm, w/c=0,53 406.000 Kg Semen Portland @ Rp 1,150.00 684.000 Kg Pasir beton (Kg) @ Rp 105.71 1,026.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 215.000 Ltr Air @ Rp 250.00 1.650 Oh Pekerja @ Rp 75,000.00 0.275 Oh Tukang batu @ Rp 100,000.00 0.028 Oh Kepala Tukang Batu @ Rp 130,000.00 0.083 Oh Mandor @ Rp 175,000.00
G.6.10 Membuat 1 M3 beton mutu f'c=26,4 Mpa (K 300), slump (12 ± 2) cm, w/c=0,52 413.000 Kg Semen Portland @ Rp 1,150.00 681.000 Kg Pasir beton (Kg) @ Rp 105.71 1,021.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 215.000 Ltr Air @ Rp 250.00 1.650 Oh Pekerja @ Rp 75,000.00 0.275 Oh Tukang batu @ Rp 100,000.00 0.028 Oh Kepala Tukang Batu @ Rp 130,000.00 0.083 Oh Mandor @ Rp 175,000.00
G.6.17 Pembesian 1 Kg dengan besi polos atau besi ulir 10.500 Kg Besi beton polos 0.150 Kg Kawat beton 0.070 Oh Pekerja 0.070 Oh Tukang besi 0.007 Oh Kepala Tukang Besi 0.004 Oh Mandor
G.6.20 Memasang 1 M2 bekisting untuk pondasi 0.040 M3 Kayu klas III (papan) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang kayu 0.026 Oh Kepala Tukang Kayu 0.026 Oh Mandor
Memasang 1 M2 bekisting untuk pondasi 2 x Pemakaian 0.020 M3 Kayu klas III (papan) (Papan 2 kali Pakai) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp 11,000.00 @ Rp 21,000.00 @ Rp 75,000.00 @ Rp 100,000.00 @ Rp 130,000.00 @ Rp 175,000.00 Untuk Pembesian 10 Kg Untuk Pembesian 1 Kg
Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
3,275,000.00 17,500.00 3,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp
3,275,000.00
Rp
@ Rp @ Rp
17,500.00 3,500.00
Rp Rp
0.520 0.260 0.026 0.026
Oh Oh Oh Oh
Pekerja Tukang kayu Kepala Tukang Kayu Mandor
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp
G.6.21 Memasang 1 M2 bekisting untuk sloof 0.045 M3 Kayu klas III (papan) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang batu 0.026 Oh Kepala Tukang Batu 0.026 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
3,275,000.00 17,500.00 3,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp
3,275,000.00
Rp
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
17,500.00 3,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
3,275,000.00 17,500.00 3,500.00 4,550,000.00 130,000.00 30,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,275,000.00
Rp
17,500.00 3,500.00 4,550,000.00
Rp Rp Rp
130,000.00
Rp
30,000.00
Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp
3,275,000.00 17,500.00 3,500.00 4,550,000.00 130,000.00 30,000.00
Rp Rp Rp Rp Rp Rp
Memasang 1 M2 bekisting untuk sloof 2 Kali Pemakaian 0.023 M3 Kayu klas III (papan) (Papan 2 kali Pakai) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang batu 0.026 Oh Kepala Tukang Batu 0.026 Oh Mandor
G.6.22 Memasang 1 M2 bekisting untuk kolom 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.015 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 2.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
Memasang 1 M2 bekisting untuk kolom Untuk 2x Pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.008 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
G.6.23 Memasang 1 M2 bekisting untuk balok 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.018 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 2.000 Btg Dolken kayu Ø8-10/400 cm
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
0.660 0.330 0.033 0.033
Oh Oh Oh Oh
Pekerja Tukang kayu Kepala Tukang Kayu Mandor
@ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk balok Untuk 2x pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.009 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
G.6.24 Memasang 1 M2 bekisting untuk lantai 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.015 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 6.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk lantai Untuk 2x Pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.008 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 3.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
G.6.25 Memasang 1 M2 bekisting untuk dinding 0.030 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.020 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 3.000 Btg Dolken kayu Ø8-10/400 cm 4.000 Bh Spacer/formite/penjaga jarak bekisting 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk dinding Untuk 2x Pemakaian 0.015 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp
3,275,000.00
Rp
17,500.00 3,500.00 4,550,000.00
Rp Rp Rp
130,000.00
Rp
30,000.00
Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp
3,275,000.00 17,500.00 3,500.00 4,550,000.00 130,000.00 30,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,275,000.00
Rp
17,500.00 3,500.00 4,550,000.00
Rp Rp Rp
130,000.00
Rp
30,000.00
Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp
3,275,000.00 17,500.00 3,500.00 4,550,000.00 130,000.00 30,000.00 17,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,275,000.00
Rp
17,500.00
Rp
0.200 0.010
Ltr M3
0.175
Lbr
1.500
Btg
2.000
Bh
0.660 0.330 0.033 0.033
Oh Oh Oh Oh
Minyak bekisting Kayu klas II (balok) (Balok 2x pakai) Multipleks 1.22 x 2.44 x 9 mm (Multipleks 2x pakai) Dolken kayu Ø8-10/400 cm (dolken 2x pakai) Spacer/formite/penjaga jarak bekisting (spacer 2x pemakaian) Pekerja Tukang kayu Kepala Tukang Kayu Mandor
G.6.26 Memasang 1 M2 bekisting untuk tangga 0.030 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.150 Ltr Minyak bekisting 0.015 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 2.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp
3,500.00 4,550,000.00
Rp Rp
@ Rp
130,000.00
Rp
@ Rp
30,000.00
Rp
@ Rp
17,500.00
Rp
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
3,275,000.00 17,500.00 3,500.00 4,550,000.00 130,000.00 30,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,275,000.00
Rp
17,500.00 3,500.00 4,550,000.00
Rp Rp Rp
130,000.00
Rp
30,000.00
Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp
Memasang 1 M2 bekisting untuk tangga Untuk 2x Pemakaian 0.015 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.150 Ltr Minyak bekisting @ Rp 0.008 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
H.6 PEKERJAAN PENUTUP ATAP H.6.2 - SPL Memasang 1 M2 Atap Genteng Keramik 16.000 Bh Genteng keramik Natural 0.150 Oh Pekerja 0.075 Oh Tukang kayu 0.008 Oh Kepala Tukang Kayu 0.008 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
16,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
H.6.5 - SPL Memasang 1 M' Bubung Genteng Keramik 5.000 Bh Nok genteng keramik Natural 8.000 Kg Semen Portland 0.032 M3 Pasir pasang 0.400 Oh Pekerja 0.200 Oh Tukang kayu 0.020 Oh Kepala Tukang Kayu 0.002 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
20,500.00 1,150.00 134,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
H.6.32 Memasang 1 M2 Atap Genteng Metal 1.020 Lbr Genteng metal 0.200 Kg Paku biasa 2" - 5" 0.200 Oh Pekerja 0.100 Oh Tukang kayu 0.010 Oh Kepala Tukang Kayu 0.001 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
87,000.00 17,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
H.6.36 Memasang 1 M' Nok Genteng Metal 1.100 Lbr Nok genteng Metal 0.050 Kg Paku Biasa 1/2" - 1" 0.250 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.013 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
40,500.00 17,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
H.6.38 - SPL Memasang 1 M2 Atap Seng Spandek 1.000 M2 Long Spandek Type G550 AZ-100 T=0,4 8.000 Bh Paku Sekrup + Mor + Pelapis 0.120 Oh Pekerja 0.060 Oh Tukang kayu 0.006 Oh Kepala Tukang Kayu 0.006 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
68,000.00 2,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
H.6.39 - SPL Memasang 1 M' Atap Nok Seng Spandek 0.900 M Nok Long Spandek Type G550 AZ-100 T 10.000 Bh Paku Sekrup + Mor + Pelapis 0.150 Oh Pekerja 0.070 Oh Tukang kayu 0.008 Oh Kepala Tukang Kayu 0.006 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
41,500.00 2,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
60,000.00 17,500.00 22,500.00 75,000.00 100,000.00 130,000.00 175,000.00 5,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp
12,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
Memasang 1 M2 langit-langit lambriziring kayu, tebal 9 mm 0.015 M3 Kayu klas II (papan) @ Rp 0.010 Kg Paku biasa 1/2" - 1" @ Rp 0.600 Oh Pekerja @ Rp 0.800 Oh Tukang kayu @ Rp 0.080 Oh Kepala Tukang Kayu @ Rp 0.030 Oh Mandor @ Rp
4,850,000.00 17,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
SPL
Memasang Lisplank Ukuran 2x (2x20) cm, woodplank 1.050 Lbr Woodplank 2/20 x 4 M 0.060 Kg Paku Biasa 1/2" - 1" 7.000 M Besi Hollow 4 x 4 0.100 Oh Pekerja 0.100 Oh Tukang kayu 0.010 Oh Kepala Tukang Kayu 0.050 Oh Mandor 1.000 Ls Alat Bantu
H.6.42 Memasang 1 M2 Alluminium Foil/sisalation 1.050 M2 Aluminium foil/sisalation single type 0.150 Oh Pekerja 0.050 Oh Tukang kayu 0.005 Oh Kepala Tukang Kayu 0.008 Oh Mandor
I.6
PEKERJAAN LANGIT - LANGIT/PLAFOND I.6.6
I.6.7
M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Lbr Gypsumboard 9 mm @ Rp 55,000.00 Kg Paku sekrup 3,5" @ Rp 21,500.00 Oh Pekerja @ Rp 75,000.00 Oh Tukang kayu @ Rp 100,000.00 Oh Kepala Tukang Kayu @ Rp 130,000.00 Oh Mandor @ Rp 175,000.00
Rp Rp Rp Rp Rp Rp Rp
SPL
Memasang 1 M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm + rangka 4.000 M Besi Hollow Galvanis 2/4 @ Rp 7,000.00 Rp 1.500 Bh Ramsel nails @ Rp 2,500.00 Rp 0.365 M2 Gypsumboard 9 mm @ Rp 55,000.00 Rp 0.030 Kg UB 888/400 Compoud @ Rp 4,500.00 Rp 0.016 Roll Isolasi Gypsun @ Rp 25,000.00 Rp 11.500 Bh Srews/sekrup @ Rp 1,000.00 Rp 0.010 Lbr Kertas Amplas @ Rp 5,000.00 Rp 0.070 Oh Pekerja @ Rp 75,000.00 Rp 0.700 Oh Tukang besi @ Rp 100,000.00 Rp 0.007 Oh Kepala Tukang Besi @ Rp 130,000.00 Rp 0.012 Oh Mandor @ Rp 175,000.00 Rp Rp
SPL
Memasang 1 M2 langit-langit Calsyboard board ukuran (120x240) mm, tebal 6 mm + rangka 4.000 M Besi Hollow Galvanis 2/4 @ Rp 7,000.00 Rp 1.500 Bh Ramsel nails @ Rp 2,500.00 Rp 0.365 M2 Calsyboard 6 mm @ Rp 70,000.00 Rp 0.030 Kg UB 888/400 Compoud @ Rp 4,500.00 Rp 0.016 Roll Isolasi Gypsun @ Rp 25,000.00 Rp 11.500 Bh Srews/sekrup @ Rp 1,000.00 Rp 0.010 Lbr Kertas Amplas @ Rp 5,000.00 Rp 0.070 Oh Pekerja @ Rp 75,000.00 Rp 0.700 Oh Tukang besi @ Rp 100,000.00 Rp 0.007 Oh Kepala Tukang Besi @ Rp 130,000.00 Rp 0.012 Oh Mandor @ Rp 175,000.00 Rp Rp
SPL
Memasang 1 3.500 1.050 11.500 0.070 0.700 0.007 0.012
M2 langit-langit Lambrasering Aluminium + rangka Hollow M Besi Hollow Galvanis 2/4 @ Rp M2 Lambrasering Aluminium L = 12 Cm @ Rp Bh Srews/sekrup @ Rp Oh Pekerja @ Rp Oh Tukang besi @ Rp Oh Kepala Tukang Besi @ Rp Oh Mandor @ Rp
7,000.00 455,000.00 1,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
Memasang 1 1.050 4.000 0.050 0.050 0.005 0.003
M' list langit-langit Aluminium M' List Alluminium Strip Bh Srews/sekrup Oh Pekerja Oh Tukang kayu Oh Kepala Tukang Kayu Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
7,000.00 1,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
@ Rp
2,000,000.00
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
SPL
J.6
Memasang 1 0.364 0.110 0.100 0.050 0.005 0.005
PEKERJAAN PIPA DAN SANITER J.6.1
Memasang 1 1.000 6 3.300 1.100 0.001 0.160
Bh kloset duduk/monoblok Bh Closet duduk dudblok + Kran Shower % Perlengkapan Oh Pekerja Oh Tukang batu Oh Kepala Tukang Batu Oh Mandor
J.6.4
J.6.5
J.6.9
Memasang 1 Bh urinoir 1.000 Bh Urinoir 3 % Perlengkapan 6.000 Kg Semen Portland 0.010 M3 Pasir pasang 1.000 Oh Pekerja 1.000 Oh Tukang batu 0.300 Oh Kepala Tukang Batu 0.110 Oh Mandor
Memasang 1 1.000 12 6.000 0.010 1.200 1.450 0.150 0.100
Bh wastafel Bh Wastafel keramik % Perlengkapan Kg Semen Portland M3 Pasir pasang Oh Pekerja Oh Tukang batu Oh Kepala Tukang Batu Oh Mandor
Memasang 1 Bh badkip porselen 1.000 Bh Bath tub + Acs 2 % Perlengkapan 0.008 Oh Pekerja 0.075 Oh Tukang pipa 0.008 Oh Kepala Tukang pipa 0.004 Oh Mandor
J.6.25 Memasang 1 M' pipa PVC tipe AW diameter 1/2" 1.200 M' Pipa PVC AW 1/2'' 35 % Perlengkapan 0.036 Oh Pekerja 0.060 Oh Tukang pipa 0.006 Oh Kepala Tukang pipa 0.002 Oh Mandor
@ Rp
1,900,000.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,150.00 134,000.00 75,000.00 100,000.00 130,000.00 175,000.00
@ Rp
405,000.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,150.00 134,000.00 75,000.00 100,000.00 130,000.00 175,000.00
@ Rp
8,500,000.00
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
@ Rp
5,625.00
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
Memasang 1 M' pipa PVC tipe AW diameter 1/2" Untuk Instalasi Air Panas 1.200 M' Pipa PVC Air Panas 1/2'' @ Rp 41,250.00 35 % Perlengkapan 0.036 Oh Pekerja @ Rp 75,000.00 0.060 Oh Tukang pipa @ Rp 100,000.00 0.006 Oh Kepala Tukang pipa @ Rp 130,000.00 0.002 Oh Mandor @ Rp 175,000.00
J.6.26 Memasang 1 M' pipa PVC tipe AW diameter 3/4" 1.200 M' Pipa PVC AW 3/4'' 35 % Perlengkapan 0.036 Oh Pekerja 0.060 Oh Tukang pipa 0.006 Oh Kepala Tukang pipa 0.002 Oh Mandor
J.6.27 Memasang 1 M' pipa PVC tipe AW diameter 1" 1.200 M' Pipa PVC AW 1'' 35 % Perlengkapan 0.036 Oh Pekerja 0.060 Oh Tukang pipa 0.006 Oh Kepala Tukang pipa 0.002 Oh Mandor
@ Rp
4,583.33
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
@ Rp
6,000.00
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp
J.6.29 Memasang 1 M' pipa PVC tipe D diameter 2" 1.200 M' Pipa PVC 2'' (D) 35 % Perlengkapan 0.054 Oh Pekerja 0.090 Oh Tukang pipa 0.009 Oh Kepala Tukang pipa 0.003 Oh Mandor
@ Rp
38,125.00
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
@ Rp
78,750.00
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
@ Rp
118,250.00
@ Rp @ Rp @ Rp @ Rp
75,000.00 100,000.00 130,000.00 175,000.00
J.6.33 Memasang 1 Bh bak cuci piring stainles steel 1.000 Bh Washbasin stainless stel 1.000 Bh Waterdrain + accesoriss 0.030 Oh Pekerja 0.300 Oh Tukang batu 0.030 Oh Kepala Tukang Batu 0.002 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
300,000.00 50,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
J.6.35 Memasang 1 Bh kran diameter 3/4" atau 1/2" 1.000 Bh Kran air biasa 1/2" - 3/4" 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
50,500.00 3,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
Memasang 1 Bh kran air ganda diameter 3/4" atau 1/2" 1.000 Bh Kran air ganda 1/2" - 3/4" 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
250,000.00 3,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
Memasang 1 Bh kran Shower 1.000 Bh Kran Shower 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
125,000.00 3,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
Memasang 1 Bh Shower Tray 1.000 Bh Shower Tray + Acc 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa
@ Rp @ Rp @ Rp @ Rp
265,000.00 3,500.00 75,000.00 100,000.00
Rp Rp Rp Rp
J.6.31 Memasang 1 M' pipa PVC tipe D diameter 3" 1.200 M' Pipa PVC 3'' (D) 35 % Perlengkapan 0.081 Oh Pekerja 0.135 Oh Tukang pipa 0.014 Oh Kepala Tukang pipa 0.004 Oh Mandor
J.6.32 Memasang 1 M' pipa PVC tipe D diameter 3" 1.200 M' Pipa PVC 4'' (D) 35 % Perlengkapan 0.081 Oh Pekerja 0.135 Oh Tukang pipa 0.014 Oh Kepala Tukang pipa 0.004 Oh Mandor
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp
0.010 0.005
Oh Oh
Kepala Tukang pipa Mandor
@ Rp @ Rp
130,000.00 175,000.00
Rp Rp Rp
Memasang 1 Bh Stop kran 1.000 Bh Stop Kran 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
76,000.00 3,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
50,000.00 125,000.00 75,000.00 100,000.00 130,000.00 175,000.00 Juml. A Juml. B
Rp Rp Rp Rp Rp Rp Rp Rp
Memasang 1 Bh kunci tanam biasa 1.000 Bh Kunci tanam biasa (2 x Slag) 0.010 Oh Pekerja 0.500 Oh Tukang kayu 0.010 Oh Kepala Tukang Kayu 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
307,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
Memasang 1 Bh kunci silinder 1.000 Bh Kunci tanam silinder 0.005 Oh Pekerja 0.500 Oh Tukang kayu 0.005 Oh Kepala Tukang Kayu 0.0025 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
215,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
Memasang 1 Bh engsel pintu 1.000 Bh Engsel pintu Kw.1 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.0008 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
35,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
Memasang 1 Psg Flooring Engsel pintu 1.000 Psg Flooring engsel 0.015 Oh Pekerja 0.300 Oh Tukang kayu 0.030 Oh Kepala Tukang Kayu 0.0008 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
1,800,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
Memasang 1 1.000 0.010 0.100 0.010 0.0005
Bh engsel jendela Bh Engsel jendela Kw.1 Oh Pekerja Oh Tukang kayu Oh Kepala Tukang Kayu Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
26,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
Memasang 1 Bh kait angin 1.000 Bh Kait angin 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.00075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
15,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp
J.6.36 Memasang 1 Bh floor drain Dan Roof Drain A 1.000 Bh Floor drain Stainlees B 1.000 Bh Roof drain Stainlees 0.010 Oh Pekerja 0.100 Oh Tukang batu 0.010 Oh Kepala Tukang Batu 0.005 Oh Mandor
L.6 PEKERJAAN KUNCI DAN KACA L.6.2
L.6.4
L.6.5
SPL
L.6.6
L.6.9
Rp SPL
Memasang 1 1.000 0.010 0.100 0.010 0.00050
Bh grendel jendela Bh Grendel jendela Kw.1 Oh Pekerja Oh Tukang kayu Oh Kepala Tukang Kayu Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
15,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
L.6.10 Memasang 1 Bh door closer 1.000 Bh Door closer/espanyolet 0.050 Oh Pekerja 0.500 Oh Tukang kayu 0.050 Oh Kepala Tukang Kayu 0.0025 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
250,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
L.6.11 Memasang 1 Bh kunci selot A 1.000 Bh Kunci selot B 1.000 Bh Kunci selot biasa 0.020 Oh Pekerja 0.200 Oh Tukang kayu 0.020 Oh Kepala Tukang Kayu 0.0010 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
255,000.00 125,000.00 75,000.00 100,000.00 130,000.00 175,000.00 Juml. A Juml. B
Rp Rp Rp Rp Rp Rp Rp Rp
L.6.12 Memasang 1 Bh pegangan pintu/door holder 1.000 Bh Door Holder 0.050 Oh Pekerja 0.500 Oh Tukang kayu 0.050 Oh Kepala Tukang Kayu 0.0025 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
350,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
L.6.17 Memasang 1 M2 kaca, tebal 5 mm 1.100 M2 Kaca Ryben 5mm 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.00075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
150,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
Memasang 1 M2 kaca, tebal 5 mm 1.100 M2 Kaca Panasap 5mm 0.015 Oh Pekerja 0.150 Oh Tukang kayu 0.015 Oh Kepala Tukang Kayu 0.00075 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
485,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
71,480.14 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
M.6 PEKERJAAN PENUTUP LANTAI DAN DINDING M.6.13 Memasang 1 M2 lantai Keramik Anti Noda T = 1 cm, ukuran (60x60) cm 3.100 Bh Tegel keramik Anti noda, T = 1 Cm, 60 x @ Rp 9.600 Kg Semen Portland @ Rp 0.045 M3 Pasir pasang @ Rp 1.500 Kg Semen warna @ Rp 0.250 Oh Pekerja @ Rp 0.120 Oh Tukang batu @ Rp 0.012 Oh Kepala Tukang Batu @ Rp 0.013 Oh Mandor @ Rp
Memasang 1 M2 lantai Keramik Anti Noda T = 1 cm, ukuran (20x60) cm 9.160 Bh Tegel keramik Anti noda, T = 1 Cm, 20 x @ Rp 9.800 Kg Semen Portland @ Rp 0.045 M3 Pasir pasang @ Rp 1.300 Kg Semen warna @ Rp 0.250 Oh Pekerja @ Rp 0.120 Oh Tukang batu @ Rp 0.012 Oh Kepala Tukang Batu @ Rp 0.013 Oh Mandor @ Rp
23,769.51 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
9,666.67 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Memasang 1 M2 lantai keramik ukuran ( 20x20) cm 26.500 Bh Tegel keramik 20 x 20 cm (kasar) 10.400 Kg Semen Portland 0.045 M3 Pasir pasang 1.620 Kg Semen warna 0.620 Oh Pekerja 0.350 Oh Tukang batu 0.035 Oh Kepala Tukang Batu 0.030 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
2,112.00 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Memasang 1 13.000 9.300 0.018 1.940 0.600 0.450 0.045 0.030
M2 dinding keramik ukuran (20x40) cm Bh Tegel keramik 20 x 40 cm ( warna ) Kg Semen Portland M3 Pasir pasang Kg Semen warna Oh Pekerja Oh Tukang batu Oh Kepala Tukang Batu Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
6,640.00 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
Memasang 1 1.700 1.140 0.003 0.100 0.090 0.090 0.009 0.005
M plint Keramik ukuran (10 x 60) cm Bh Plint Keramik 10 x 60 Cm Kg Semen Portland M3 Pasir pasang Kg Semen warna Oh Pekerja Oh Tukang batu Oh Kepala Tukang Batu Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
14,500.00 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
M plint Keramik ukuran (10x40) cm Bh Plint Keramik 10 x 40 cm Kg Semen Portland M3 Pasir pasang Kg Semen warna Oh Pekerja Oh Tukang batu Oh Kepala Tukang Batu Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
2,900.00 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
M.6.14 Memasang 1 M2 lantai Keramik ukuran (40x40) cm 6.630 Bh Tegel keramik 40 x 40 cm (putih) 9.800 Kg Semen Portland 0.045 M3 Pasir pasang 1.300 Kg Semen warna 0.620 Oh Pekerja 0.350 Oh Tukang batu 0.035 Oh Kepala Tukang Batu 0.030 Oh Mandor
SPL
SPL
M.6.26 Memasang 1 2.650 1.140 0.003 0.100 0.090 0.090 0.009 0.005
M.6.43 - SPL Memasang 1 1.060 8.190 0.045 0.650 0.620 0.350 0.035 0.030
M2 lantai Granit Bh Granit Lantai Type Starwhite, t = 2 cm Kg Semen Portland M3 Pasir pasang Kg Semen warna Oh Pekerja Oh Tukang batu Oh Kepala Tukang Batu Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
350,000.00 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
M.6.55 - SPL Memasang 1 1.020 2.000 12.440 0.025 0.650 0.720 0.650 0.065 0.035
M2 dinding Granit M2 Granit Dinding Type Starwhite, t = 2 cm Bh Paku Pancing Kg Semen Portland M3 Pasir pasang Kg Semen warna Oh Pekerja Oh Tukang batu Oh Kepala Tukang Batu Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
350,000.00 27,000.00 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
M.6.58 - SPL Memasang 1 M2 dinding batu Alam Undersheet 1.100 M2 Batu Alam Undersheet 11.750 Kg Semen Portland 0.035 M3 Pasir pasang 0.620 Oh Pekerja 0.350 Oh Tukang batu 0.035 Oh Kepala Tukang Batu 0.030 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
196,000.00 1,150.00 134,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
M.6.28 - SPL Memasang 1 M plint Granit 1.700 Bh Plint Granit Type Starwhite, t = 2 cm 1.140 Kg Semen Portland 0.003 M3 Pasir pasang 0.100 Kg Semen warna 0.090 Oh Pekerja 0.090 Oh Tukang batu 0.009 Oh Kepala Tukang Batu 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
35,000.00 1,150.00 134,000.00 4,500.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
N.6 PEKERJAAN PENGECATAN N.6.8
Mengecat 1 M2 bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup 0.200 Kg Cat meni @ Rp 16,375.00 Rp 0.150 Kg Dempul @ Rp 31,000.00 Rp 0.170 Kg Cat dasar @ Rp 19,000.00 Rp 0.260 Kg Cat kayu @ Rp 61,000.00 Rp 0.070 Oh Pekerja @ Rp 75,000.00 Rp 0.009 Oh Tukang cat @ Rp 100,000.00 Rp 0.006 Oh Kepala Tukang Cat @ Rp 130,000.00 Rp 0.0025 Oh Mandor @ Rp 175,000.00 Rp Rp
N.6.10 - SPL Melabur 1 M2 0.360 0.040 0.063 0.063 0.0025
bidang Batu Alam dengan Coating Ltr Coating Oh Pekerja Oh Tukang cat Oh Kepala Tukang Cat Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
35,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp
N.6.14 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup) 0.100 Kg Plamur tembok @ Rp 15,000.00 Rp 0.100 Kg Cat dasar @ Rp 19,000.00 Rp 0.260 Kg Cat tembok Kw. 1 @ Rp 65,000.00 Rp 0.020 Oh Pekerja @ Rp 75,000.00 Rp 0.063 Oh Tukang cat @ Rp 100,000.00 Rp 0.0063 Oh Kepala Tukang Cat @ Rp 130,000.00 Rp 0.0025 Oh Mandor @ Rp 175,000.00 Rp Rp PEKERJAAN LISTRIK SPL - 01 Mengerjakan 1 Titik Instalasi Penerangan 16.000 M' Kabel NYM (2x2,5) mm 32.000 Bh Klem Kabel No. 10 1.000 Bh Pipa Instalasi Listrik 1.000 Bh Inbow Dos 4.000 Bh Las Dop 4.000 Bh Isolasi 1.000 Bh T - Dos 5/8" 0.100 Ls Alat bantu 0.500 Oh Tukang listrik 0.500 Oh Kepala Tukang listrik
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
10,500.00 500.00 11,500.00 5,000.00 500.00 25,000.00 500.00 5,000.00 100,000.00 130,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
SPL - 02 Mengerjakan 1 Titik Instalasi Stop Kontak 12.000 M' Kabel NYM (2x2,5) mm 20.000 Bh Klem Kabel No. 10 2.000 Bh Pipa Instalasi Listrik 1.000 Bh Inbow Dos 6.000 Bh Las Dop 2.000 Bh Isolasi 1.000 Bh T - Dos 5/8" 0.100 Ls Alat bantu 0.500 Oh Tukang listrik 0.500 Oh Kepala Tukang listrik
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
10,500.00 500.00 11,500.00 5,000.00 500.00 25,000.00 500.00 5,000.00 100,000.00 130,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp
60,625.00 93,912.00 177,850.00 735,120.63 45,724.40
Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp
1,250,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp
1,250,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp
PEKERJAAN SALURAN SPL
Mengerjakan 0.420 1.400 0.035 0.021 1.400
1 M' Saluran Keliling Bangunan M3 Galian Tanah M2 Pas. Trassram 1/2 Bt. 1pc:4pp M3 Pasir Alas M3 Rabat Beton Alas Saluran t=7 cm M2 Plester Trasram
PEKERJAAN KOSEN ALUMINIUM SPL
1 Unit Pasang Pintu Kaca Tempered, Tebal 12 Mm, Uk. 85 x 240 cm 2.174 M2 Pintu Kaca Tempered 12 mm 1.000 Oh Pekerja 2.500 Oh Tukang Besi 0.250 Oh Kepala Tukang Besi 0.050 Oh Mandor 1.000 Set Frame List, Baut / Sekrup DLL 1.000 Ls Alat bantu + Fabrikasi dll
1 Unit Pasang Pintu Kaca Tempered, Tebal 12 Mm, Uk. 80 x 240 cm 2.016 M2 Pintu Kaca Tempered 12 mm 1.000 Oh Pekerja 2.500 Oh Tukang Besi 0.250 Oh Kepala Tukang Besi 0.050 Oh Mandor 1.000 Set Frame List, Baut / Sekrup DLL 1.000 Ls Alat bantu + Fabrikasi dll
Rp K.6.11-SNI Mengerjakan 1 M' Kusen Aluminium 1.100 M' Kusen Aluminium Warna 4" x 1 3/4" 2.000 Bh Sektrup Fixer 0.060 Tube Sielent GE / Dow Coming Non Asam 0.043 Oh Pekerja 0.043 Oh Tukang besi 0.0043 Oh Kepala Tukang Besi 0.0021 Oh Mandor
SPL.1 Mengerjakan 1 M' Bingkai Pintu/Jendela Aluminium A 1.100 M' Bingkai Pintu Aluminium Warna 4" x 1 1/ B 1.100 M' Bingkai Pintu / Rangka Partisi Al umi ni um C 1.100 M' Bingkai Jendela Aluminium W arna (2"x1" 0.060 Tube Sielent GE / Dow Coming Non Asam 0.043 Oh Pekerja 0.043 Oh Tukang besi 0.0043 Oh Kepala Tukang Besi 0.0021 Oh Mandor 1.000 Ls Alat Bantu + Accessories dll
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
150,000.00 1,850.00 90,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
130,000.00 120,000.00 100,000.00 90,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
A B C SPL
Mengerjakan 1 M2 Pek. Cladding Aluminium Composite Panel + Rangka 1.150 M2 Alumunium Composite Panel (PVDF) @ Rp 4.000 M' Besi Hollow Galvanis 4/4 @ Rp 1.000 M' Baja siku 50.50.5 @ Rp 1.000 Bh Stiffener @ Rp 1.000 Tube Sielent GE / Dow Coming Non Asam @ Rp 1.000 Bh Bracket steel Galfanized @ Rp 0.300 Oh Pekerja @ Rp 0.100 Oh Tukang besi @ Rp 0.010 Oh Kepala Tukang Besi @ Rp 0.015 Oh Mandor @ Rp 1.000 Ls Alat bantu @ Rp
280,000.00 12,500.00 37,666.67 15,000.00 90,000.00 35,000.00 75,000.00 100,000.00 130,000.00 175,000.00 5,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Mengerjakan 1 M' Pek. Aluminium Strip 1.000 m' Alumunium Open Back 2,5 x 10 cm 0.250 Tube Sielent GE / Dow Coming Non Asam 1.000 Ls Alat bantu 0.500 Oh Pekerja 0.050 Oh Tukang besi 0.050 Oh Kepala Tukang Besi 0.003 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
115,000.00 90,000.00 5,000.00 75,000.00 100,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
SPL Memasang 1 M' Pipa BS Dia. 1/2" Medium A 2.430 1.100 M' Pipa BS 1/2" Medium A 0.194 Kg Cat meni 0.146 Oh Tukang besi 0.146 Oh Pekerja 0.015 Oh Kepala Tukang Besi 0.001 Oh Mandor 1.000 Ls Alat Bantu + Accessories + Fabrikasi dll
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
23,741.67 16,375.00 100,000.00 75,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
SPL Memasang 1 M' Pipa BS Dia. 1 1/2" Medium A 2.430 1.100 M' Pipa BS 1 1/2" Medium A 0.194 Kg Cat meni 0.146 Oh Tukang besi 0.146 Oh Pekerja 0.015 Oh Kepala Tukang Besi 0.001 Oh Mandor 1.000 Ls Alat Bantu + Accessories + Fabrikasi dll
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
69,996.67 16,375.00 100,000.00 75,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
SPL
SPL Memasang 1 M' Pipa BS Dia. 2" Medium A 3.580 1.100 M' Pipa BS 2" Medium A 0.286 Kg Cat meni 0.215 Oh Tukang besi 0.215 Oh Pekerja 0.021 Oh Kepala Tukang Besi 0.001 Oh Mandor 1.000 Ls Alat Bantu + Accessories + Fabrikasi dll
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
94,875.00 16,375.00 100,000.00 75,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
SPL Memasang 1 M' Pipa BS Dia. 4" Medium A 8.470 1.100 M' Pipa BS 4" Medium A 0.678 Kg Cat meni 0.508 Oh Tukang besi 0.508 Oh Pekerja 0.051 Oh Kepala Tukang Besi 0.003 Oh Mandor 1.000 Ls Alat Bantu + Accessories + Fabrikasi dll
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
252,000.00 16,375.00 100,000.00 75,000.00 130,000.00 175,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
8,550,000.00 240,000.00 17,500.00
Rp Rp Rp Rp Rp Rp
SPL
2 M1 0.032 M3 0.480 Roll 0.200 Kg 1.000 Ls
PEK. PAGAR KAWAT DURI TINGGI 2.4 METER Kayu klas I (balok) untuk kuda-kuda @ Rp Kawat Duri 10 Kg @ Rp Paku biasa 2" - 5" @ Rp Upah Kerja
U/ 1 M1 Pek. Pagar Kawat Duri =
37,500.00 2,875.00 740.00 2,403.00 327,600.00 1,050.00 2,560.00 20,000.00 30,000.00 2,600.00 3,500.00 430,828.00
54,600.00 350.00 33,950.00 10,000.00 7,500.00 1,300.00 875.00 108,575.00
37,500.00 819,000.00 14,875.00 13,750.00 40,250.00 20,100.00 14,800.00 40,050.00 16,500.00 12,500.00 700,000.00 8,400.00 25,950.00 4,950.00 200,000.00 100,000.00 150,000.00 39,000.00 8,750.00 2,266,375.00
56,250.00 4,375.00 60,625.00
67,500.00 7,875.00 75,375.00
18,750.00 1,458.33 20,208.33
22,500.00 2,625.00 25,125.00
37,500.00 8,750.00 46,250.00
153,600.00 22,500.00 1,750.00 177,850.00
182,400.00 22,500.00 1,750.00 206,650.00
212,400.00 18,750.00 4,375.00 235,525.00
an DumpTruck)
175,000.00 107,250.00 60,500.00 71,500.00 50,000.00 150,000.00 3,195,184.97 2,074,100.81 24,000.00 5,907,535.77 37,389.47 GGUNAKAN BURUH) /orang - hari)
175,000.00 3,600,000.00 192,000.00 3,967,000.00 330,583.33 3,305.83 GGUNAKAN ALAT)
175,000.00 107,250.00 60,500.00 150,000.00 3,534,831.45 100,000.00 4,127,581.45 1,719.83 KAN ALAT)
187.50
319.29 4,792.78 54,009.58 59,309.15
200,400.00 187,450.00 69,680.00 150,000.00 45,000.00 7,800.00 13,125.00 673,455.00
200,400.00 55,296.00 58,500.00 39,000.00 5,070.00 6,825.00 365,091.00
77,000.00 30,532.50 12,462.00 45,000.00 20,000.00 2,600.00 5,250.00 192,844.50
77,000.00 25,530.00 13,668.00 45,000.00 20,000.00 2,600.00 5,250.00 189,048.00
38,500.00 16,525.50 5,360.00 22,500.00 10,000.00 1,300.00 2,625.00 96,810.50
38,500.00 13,225.00 5,762.00 22,500.00 10,000.00 1,300.00 2,625.00
93,912.00
38,500.00 11,132.00 6,030.00 22,500.00 10,000.00 1,300.00 2,625.00 92,087.00
8,942.40 3,082.00 15,000.00 15,000.00 1,950.00 1,750.00 45,724.40
5,961.60 3,484.00 15,000.00 15,000.00 1,950.00 1,750.00 43,145.60
575.00 1,742.00 4,275.00 38,000.00 4,940.00 525.00 50,057.00
3,737.50 11,250.00 10,000.00 1,300.00 1,400.00 27,687.50
10,505,000.00 21,875.00 12,500.00 450,000.00 2,000,000.00 260,000.00 52,500.00 13,301,875.00
402,000.00 6,250.00 75,000.00 250,000.00 32,500.00 8,750.00 774,500.00
241,200.00 3,750.00 60,000.00 200,000.00 26,000.00 7,000.00 537,950.00
121,250.00 525.00 6,250.00 92,000.00 45,000.00 200,000.00 26,000.00 5,250.00 496,275.00
121,250.00 525.00 6,250.00 92,000.00 123,200.00 45,000.00 250,000.00 32,500.00 5,250.00 675,975.00
284,050.00 91,865.71 197,580.00 53,750.00 123,750.00 27,500.00 3,640.00 14,525.00 796,660.71
264,500.00 94,402.86 203,117.78 50,000.00 90,000.00 20,000.00 2,600.00 10,500.00 735,120.63
374,900.00 80,342.86 203,513.33 53,750.00 123,750.00 27,500.00 3,640.00 14,525.00 881,921.19
426,650.00 73,788.57 207,073.33 53,750.00 123,750.00 27,500.00 3,640.00 14,525.00 930,676.90
441,600.00 73,154.29 205,491.11 53,750.00 123,750.00 27,500.00 3,640.00 14,525.00 943,410.40
466,900.00 72,308.57 202,920.00 53,750.00 123,750.00 27,500.00 3,640.00 14,525.00 965,293.57
474,950.00 71,991.43 201,931.11 53,750.00 123,750.00 27,500.00 3,640.00 14,525.00 972,037.54
115,500.00 3,150.00 5,250.00 7,000.00 910.00 700.00 132,510.00 13,251.00
131,000.00 5,250.00 350.00 39,000.00 26,000.00 3,380.00 4,550.00 209,530.00
65,500.00 5,250.00 350.00
39,000.00 26,000.00 3,380.00 4,550.00 144,030.00
147,375.00 5,250.00 350.00 39,000.00 26,000.00 3,380.00 4,550.00 225,905.00
73,687.50 5,250.00 350.00 39,000.00 26,000.00 3,380.00 4,550.00 152,217.50
131,000.00 7,000.00 700.00 68,250.00 45,500.00 60,000.00 49,500.00 33,000.00 4,290.00 5,775.00 405,015.00 65,500.00 7,000.00 700.00 34,125.00 22,750.00 30,000.00 49,500.00 33,000.00 4,290.00 5,775.00 252,640.00
131,000.00 7,000.00 700.00 81,900.00 45,500.00 60,000.00
49,500.00 33,000.00 4,290.00 5,775.00 418,665.00 65,500.00 7,000.00 700.00 40,950.00 22,750.00 30,000.00 49,500.00 33,000.00 4,290.00 5,775.00 259,465.00
131,000.00 7,000.00 700.00 68,250.00 45,500.00 180,000.00 49,500.00 33,000.00 4,290.00 5,775.00 525,015.00
65,500.00 7,000.00 700.00 34,125.00 22,750.00 90,000.00 49,500.00 33,000.00 4,290.00 5,775.00 312,640.00
98,250.00 7,000.00 700.00 91,000.00 45,500.00 90,000.00 70,000.00 49,500.00 33,000.00 4,290.00 5,775.00 495,015.00
49,125.00 7,000.00
700.00 45,500.00 22,750.00 45,000.00 35,000.00 49,500.00 33,000.00 4,290.00 5,775.00 297,640.00
98,250.00 7,000.00 525.00 68,250.00 45,500.00 60,000.00 49,500.00 33,000.00 4,290.00 5,775.00 372,090.00
49,125.00 7,000.00 525.00 34,125.00 22,750.00 30,000.00 49,500.00 33,000.00 4,290.00 5,775.00 236,090.00
256,000.00 11,250.00 7,500.00 1,040.00 1,400.00 277,190.00
102,500.00 9,200.00 4,288.00 30,000.00 20,000.00 2,600.00 350.00 168,938.00
88,740.00 3,500.00 15,000.00 10,000.00 1,300.00 175.00 118,715.00
44,550.00 875.00 18,750.00 15,000.00 1,950.00 2,275.00 83,400.00
68,000.00 20,000.00 9,000.00 6,000.00 780.00 1,050.00 104,830.00
37,350.00 25,000.00 11,250.00 7,000.00 1,040.00 1,050.00 82,690.00
63,000.00 1,050.00 157,500.00 7,500.00 10,000.00 1,300.00 8,750.00 5,000.00 254,100.00
13,125.00 11,250.00 5,000.00 650.00 1,400.00 31,425.00
72,750.00 175.00 45,000.00 80,000.00 10,400.00 5,250.00 213,575.00
20,020.00 2,365.00 7,500.00 5,000.00 650.00 875.00 36,410.00 ollow
28,000.00 3,750.00 20,052.08 135.00 400.00 11,500.00 50.00 5,250.00 70,000.00 910.00 2,100.00 142,147.08 Hollow
28,000.00 3,750.00 25,520.83 135.00 400.00 11,500.00 50.00 5,250.00 70,000.00 910.00 2,100.00 147,615.83
24,500.00 477,750.00 11,500.00 5,250.00 70,000.00 910.00 2,100.00 592,010.00
7,350.00 4,000.00 3,750.00 5,000.00 650.00 525.00 21,275.00
2,000,000.00 120,000.00 247,500.00 110,000.00 130.00 28,000.00 2,505,630.00
1,900,000.00 57,000.00 6,900.00 1,340.00 75,000.00 100,000.00 39,000.00 19,250.00 2,198,490.00
405,000.00 48,600.00 6,900.00 1,340.00 90,000.00 145,000.00 19,500.00 17,500.00 733,840.00
8,500,000.00 170,000.00 562.50 7,500.00 975.00 665.00 8,679,702.50
6,750.00 1,968.75 2,700.00 6,000.00 780.00 315.00 18,513.75
49,500.00 14,437.50 2,700.00 6,000.00 780.00 315.00 73,732.50 5,500.00 1,604.17 2,700.00 6,000.00 780.00 315.00 16,899.17
7,200.00 2,100.00 2,700.00 6,000.00 780.00 315.00 19,095.00
45,750.00 13,343.75 4,050.00 9,000.00 1,170.00 472.50 73,786.25 94,500.00 27,562.50 6,075.00 13,500.00 1,755.00 717.50 144,110.00
141,900.00 41,387.50 6,075.00 13,500.00 1,755.00 717.50 205,335.00
300,000.00 50,000.00 2,250.00 30,000.00 3,900.00 262.50 386,412.50
50,500.00 87.50 750.00 10,000.00 1,300.00 875.00 63,512.50
250,000.00 87.50 750.00 10,000.00 1,300.00 875.00 263,012.50
125,000.00 87.50 750.00 10,000.00 1,300.00 875.00 138,012.50 265,000.00 87.50 750.00 10,000.00
1,300.00 875.00 278,012.50 76,000.00 87.50 750.00 10,000.00 1,300.00 875.00 89,012.50
50,000.00 125,000.00 750.00 10,000.00 1,300.00 875.00 62,925.00 137,925.00
307,000.00 750.00 50,000.00 1,300.00 875.00 359,925.00
215,000.00 375.00 50,000.00 650.00 437.50 266,462.50
35,500.00 1,125.00 15,000.00 1,950.00 131.25 53,706.25
1,800,000.00 1,125.00 30,000.00 3,900.00 131.25 1,835,156.25
26,000.00 750.00 10,000.00 1,300.00 87.50 38,137.50
15,500.00 1,125.00 15,000.00 1,950.00 131.25
33,706.25
15,500.00 750.00 10,000.00 1,300.00 87.50 27,637.50
250,000.00 3,750.00 50,000.00 6,500.00 437.50 310,687.50
255,000.00 125,000.00 1,500.00 20,000.00 2,600.00 175.00 279,275.00 149,275.00
350,000.00 3,750.00 50,000.00 6,500.00 437.50 410,687.50
165,000.00 1,125.00 15,000.00 1,950.00 131.25 183,206.25
533,500.00 1,125.00 15,000.00 1,950.00 131.25 551,706.25
221,588.45 11,040.00 6,030.00 6,750.00 18,750.00 12,000.00 1,560.00 2,275.00 279,993.45
217,728.69 11,270.00 6,030.00 5,850.00 18,750.00 12,000.00 1,560.00 2,275.00 275,463.69
64,090.00 11,270.00 6,030.00 5,850.00 46,500.00 35,000.00 4,550.00 5,250.00 178,540.00
55,968.00 11,960.00 6,030.00 7,290.00 46,500.00 35,000.00 4,550.00 5,250.00 172,548.00
86,320.00 10,695.00 2,412.00 8,730.00 45,000.00 45,000.00 5,850.00 5,250.00 209,257.00
24,650.00 1,311.00 402.00 450.00 6,750.00 9,000.00 1,170.00 875.00 44,608.00
7,685.00 1,311.00 402.00 450.00 6,750.00 9,000.00 1,170.00 875.00 27,643.00
371,000.00 9,418.50 6,030.00 2,925.00 46,500.00 35,000.00 4,550.00 5,250.00 480,673.50
357,000.00 54,000.00 14,306.00 3,350.00 2,925.00 54,000.00 65,000.00 8,450.00 6,125.00 565,156.00
215,600.00 13,512.50 4,690.00 46,500.00 35,000.00 4,550.00 5,250.00 325,102.50
59,500.00 1,311.00 402.00 450.00 6,750.00 9,000.00 1,170.00 875.00 79,458.00
3,275.00 4,650.00 3,230.00 15,860.00 5,250.00 900.00 780.00 437.50 34,382.50
12,600.00 3,000.00 6,300.00 8,190.00 437.50 30,527.50
1,500.00 1,900.00 16,900.00 1,500.00 6,300.00 819.00 437.50 29,356.50
168,000.00 16,000.00 11,500.00 5,000.00 2,000.00 100,000.00 500.00 500.00 50,000.00 65,000.00 418,500.00
126,000.00 10,000.00 23,000.00 5,000.00 3,000.00 50,000.00 500.00 500.00 50,000.00 65,000.00 333,000.00
25,462.50 131,476.80 6,224.75 15,437.53 64,014.16 242,615.74
2,716,875.00 75,000.00 250,000.00 32,500.00 8,750.00 1,358,437.50 135,843.75 4,577,406.25
2,520,000.00 75,000.00 250,000.00 32,500.00 8,750.00 1,260,000.00 126,000.00
4,272,250.00
165,000.00 3,700.00 5,400.00 3,225.00 4,300.00 559.00 367.50 182,551.50
143,000.00 132,000.00 110,000.00 5,400.00 3,225.00 4,300.00 559.00 367.50 12,833.33 169,684.83 158,684.83 136,684.83
322,000.00 50,000.00 37,666.67 15,000.00 90,000.00 35,000.00 22,500.00 10,000.00 1,300.00 2,625.00 5,000.00 591,091.67
115,000.00 22,500.00 5,000.00 37,500.00 5,000.00 6,500.00 437.50 191,937.50
26,115.83 3,183.30 14,580.00 10,935.00 1,895.40 127.58 5,683.71 62,520.82
76,996.33 3,183.30 14,580.00 10,935.00 1,895.40 127.58 10,771.76 118,489.37
104,362.50 4,689.80 21,480.00 16,110.00 2,792.40 187.95 14,962.27 164,584.92
277,200.00 11,095.70 50,820.00 38,115.00 6,606.60 444.68 38,428.20 422,710.17
273,600.00 115,200.00 3,500.00 77,760.00 470,060.00 235,030.00
DAFTAR HARGA BAHAN DAN UPAH Tahun Anggaran 2013 I.
HARGA BAHAN
BAHAN BATU, PASIR, CIPPING DAN BATU MERAH Batu gunung Batu Kali Batu belah 7/10 Batu pecah 5/7 Pasir pasang Pasir beton Pasir beton (Kg) Pasir urug split/chipping 2-3 cm split/chipping 2-3 cm(Kg) Tanah Timbunan Krikil Krikil (Kg) Sirtu Batu merah Air
SAT 3 M M 3 M 3 M 3 M M Kg 3 M 3 M Kg 3 M 3 M Kg 3 M Bh Ltr
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
HARGA 167,000.00 152,000.00 237,000.00 256,000.00 134,000.00 148,000.00 105.71 128,000.00 267,000.00 197.78 152,000.00 277,000.00 205.19 177,000.00 550.00 250.00
BAHAN SEMEN Semen PC 50kg (zak) Semen Portland Semen PC 40 kg (zak) Semen Nat Semen Putih Semen warna
Zak Kg Zak Kg Zak Kg
Rp. Rp. Rp. Rp. Rp. Rp.
57,000.00 1,150.00 46,000.00 10,000.00 57,000.00 4,500.00
BAHAN BESI Besi beton polos Kawat beton Paku Biasa 1/2" - 1" Paku biasa 2" - 5" Paku asbes Paku beton Paku pancing Baja siku 40.40.4 Baja siku 50.50.5 Besi Hollow 3 x 3 Besi Hollow 4 x 4 Besi Hollow Galvanis 2/4 Besi Hollow Galvanis 4/4 Besi strip Paku sekrup 3,5" Paku sekrup 4"-6" Paku Sekrup + Mor + Pelapis Alumunium Composite Panel (PVDF) Pintu Aluminium Pintu PVC List Alluminium strip Srews/sekrup Kawat Duri 10 Kg Kawat Duri 8 Kg
Kg Kg Kg Kg Kg Dos Kg M M M M M M Kg Kg Kg Bh 2 M Bh Bh M Bh Roll Roll
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
11,000.00 21,000.00 17,500.00 17,500.00 21,500.00 27,500.00 27,000.00 25,166.67 37,666.67 18,500.00 22,500.00 7,000.00 12,500.00 12,500.00 21,500.00 31,000.00 2,500.00 280,000.00 960,000.00 258,000.00 7,000.00 1,000.00 240,000.00 188,000.00
BAHAN PLAPON Mulripleks 1.22 x 2.44 x 4 mm Multipleks 1.22 x 2.44 x 6 mm Multipleks 1.22 x 2.44 x 9 mm Gypsumboard 9 mm Calsyboard 6 mm Teakwood Uk. 90 x 220 x 4 mm Plywood Uk.90x220 cm Tebal 4 mm Lambrasering Aluminium L = 20 Cm
Lbr Lbr Lbr Lbr Lbr Lbr Lbr M
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
51,000.00 82,500.00 130,000.00 55,000.00 70,000.00 92,000.00 92,000.00 580,000.00
Lambrasering Aluminium L = 12 Cm Ramsel nails UB 888/400 Compoud Isolasi Gypsun
M Bh Kg Roll
2
Rp. Rp. Rp. Rp.
455,000.00 2,500.00 4,500.00 25,000.00
BAHAN KERAMIK Tegel keramik 40 x 40 cm (putih) Tegel keramik 30 x 30 cm (putih) Tegel keramik 20 x 20 cm (kasar) Tegel keramik 20 x 20 cm (putih) Tegel keramik 20 x 25 cm ( warna ) Tegel keramik 20 x 40 cm ( warna ) Tegel keramik 10 x 10 cm ( putih ) Tegel keramik Anti noda, T = 1 Cm, 60 x 60 Cm Tegel keramik Anti noda, T = 1 Cm, 20 x 60 Cm Tegel keramik 40 x 40 cm Tegel keramik 30 x 30 cm impresso Tegel keramik 20 x 20 cm kia Tegel keramik 20 x 25 cm kia Granit Lantai Type Starwhite, t = 2 cm Granit Dinding Type Starwhite, t = 2 cm Plint Granit Type Starwhite, t = 2 cm Plint Keramik 10 x 60 cm Plint Keramik 10 x 40 cm Batu Alam Undersheet
Bh Bh Bh Bh Bh Bh Bh Bh Bh Dos Dos Dos Dos M 2 M M M M 2 M
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
9,666.67 4,860.00 2,112.00 1,920.00 2,640.00 6,640.00 500.00 71,480.14 23,769.51 58,000.00 54,000.00 52,800.00 52,800.00 350,000.00 350,000.00 35,000.00 14,500.00 2,900.00 196,000.00
BAHAN ATAP Genteng keramik Natural Karet Pelapis Genteng Nok genteng keramik Natural Genteng metal Nok genteng Metal Long Spandek Type G550 AZ-100 T=0,4 mm, Lbr = 80 Cm Nok Long Spandek Type G550 AZ-100 T=0.4 mm Rangka Atap Baja Ringan Aluminium foil/sisalation single type Ancor / Seng Pelapis Genteng
Bh 2 M Bh Lbr Lbr 2 M M' M 2 M Rol
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
16,000.00 17,100.00 20,500.00 87,000.00 40,500.00 68,000.00 41,500.00 180,000.00 12,500.00 2,500,000.00
BAHAN SENG/ALUMINIUM Seng plat BJLS 0.30 Seng plat BJLS 0.28 Seng gelombang BWG 34 " BJLS 0.18 mm Seng gelombang BWG 33 " BJLS 0.22 mm Seng gelombang BWG 32 " BJLS 0.30 mm Seng gelombang BWG 28 " BJLS 0.35 mm Kusen Aluminium Warna 4" x 1 3/4" Bingkai Pintu Aluminium Warna 4" x 1 1/2" Bingkai Pintu / Rangka Partisi Aluminium Warna 3" x 1 1/2" Bingkai Jendela Aluminium Warna (2"x1") Alumunium Open Back 2,5 x 10 cm
Lbr Lbr Kaki Kaki Kaki Kaki M' M' M' M' M'
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
50,000.00 60,500.00 7,000.00 7,500.00 9,000.00 11,750.00 150,000.00 130,000.00 120,000.00 100,000.00 115,000.00
BAHAN KAYU Kayu klas I (balok) untuk kuda-kuda Kayu klas II (balok) Kayu klas II (papan) Kayu klas III (balok) Kayu klas III (papan) Kayu klas I (papan) listplank dan pintu/jendela Dolken kayu Ø8-10/400 cm Kayu klas I (balok) untuk kosen pintu/jendela HPL Uk. 120 x 240 Woodplank 2/20 x 4 M
M 3 M M 3 M 3 M 3 M Btg 3 M Lbr Lbr
3
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
8,550,000.00 4,550,000.00 4,850,000.00 2,800,000.00 3,275,000.00 10,050,000.00 30,000.00 9,550,000.00 176,000.00 60,000.00
BAHAN KUNCI, ENGSEL, GRENDEL DAN HAK ANGIN Kunci tanam biasa (2 x Slag) Kunci tanam silinder
Bh Bh
Rp. Rp.
307,000.00 215,000.00
Kunci selot Kunci selot biasa Kunci tanam biasa Flooring engsel Engsel pintu Kw.1 Engsel jendela Kw.1 Grendel jendela Kw.1 Kait angin Grendel tanam Door closer/espanyolet Door Holder Door stop
Bh Bh Bh Ps g Bh Bh Bh Bh Bh Bh Bh Bh
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
255,000.00 125,000.00 173,000.00 1,800,000.00 35,500.00 26,000.00 15,500.00 15,500.00 185,000.00 250,000.00 350,000.00 65,000.00
BAHAN KACA Kaca bening 3 mm Kaca bening 5 mm Kaca buram 5 mm Kaca Ryben 5mm Kaca Panasap 5mm Kaca nako lengkap teralis Pintu Kaca Tempered 12 mm
M M 2 M 2 M 2 M s et 2 M
2
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
98,000.00 105,000.00 110,000.00 150,000.00 485,000.00 350,000.00 1,250,000.00
BAHAN CAT Cat tembok Kw. 1 Cat tembok Kw. 2 C at S en g Cat kayu Cat Besi Minyak bekisting Cat meni Plamur tembok Lem kayu Residu Kertas amplas Dempul Minyak cat Cat dasar Cat W aterproofing Coating
Kg Kg Kg Kg Kg Ltr Kg Kg Kg Ltr Lbr Kg Kg Kg Ltr Ltr
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp R p. Rp. Rp. Rp.
65,000.00 31,000.00 78,000.00 61,000.00 61,000.00 3,500.00 16,375.00 15,000.00 12,500.00 6,400.00 5,000.00 31,000.00 31,000.00 19,000.00 115,000.00 35,000.00
BAHAN SANITASI Closet duduk Dudblok + Kran Shower Bath tub + Acs Closet jongkok Urinoir W astafel Keramik Floor drain Stainlees Roof drain Stainlees S ea l t a pe Kran air Biasa 1/2" - 3/4" Kran air ganda 1/2" - 3/4" Kran Shower Shower Tray + Acc Stop kran W ashbasin stainless stel W aterdrain + Accesoriss Reservoir stainless steel Kap. 1 M3 Tempat Sabun Dinding Saringan got
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh S et Bh Bh Bh Bh Bh Bh
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
2,000,000.00 8,500,000.00 230,000.00 1,900,000.00 405,000.00 50,000.00 125,000.00 3,500.00 50,500.00 250,000.00 125,000.00 265,000.00 76,000.00 300,000.00 50,000.00 4,000,000.00 90,000.00 50,000.00
BAHAN PIPA Pipa PVC AW 1/2'' Pipa PVC AW 1'' Pipa PVC AW 1 1/2'' Pipa PVC AW 3/4'' Pipa PVC 8'' (D)
M' M' M' M' M'
Rp. Rp. Rp. Rp. Rp.
5,625.00 6,000.00 13,333.33 4,583.33 202,500.00
Pipa PVC 6'' (D) Pipa PVC 4'' (D) Pipa PVC 3'' (D) Pipa PVC 2,5'' Pipa PVC 2'' (D) Pipa PVC Air Panas 1/2'' Pipa BS 1/2" Medium A Pipa BS 1 1/2" Medium A Pipa BS 2" Medium A Pipa BS 4" Medium A Lem pipa
M' M' M' M' M' M' M' M' M' M' Kl g
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
252,750.00 118,250.00 78,750.00 55,000.00 38,125.00 41,250.00 23,741.67 69,996.67 94,875.00 252,000.00 65,000.00
BAHAN LISTRIK Lampu Pijar 40 W att Lampu Pijar 15 W att Lampu Downlight Kecil Lampu Downlight Sedang Lampu Downlight Besar Lampu RM 2 x 36 W att Lampu RM 2 x 18 W att Lampu SL-E 15 W att Lampu SL-E 18 W att Lampu SL-E 23 W att Lampu Hias Exaust Fan Stop Kontak Kw. 1 Stop Kontak AC Kw. 1 Saklar Tunggal Kw. 1 Saklar Ganda Kw. 1 K l e m K ab e l N o. 10 Pipa Instalasi Listrik Inbow Dos Las Dop Isolasi T - Dos 5/8" Fitting Kabel NYM (2x2,5) mm Kabel NYM (3x2,5) mm MCB 6A Ex. Supran MCB 32A Ex. Supran Fuse Box Alat bantu
Bh Bh Bh Bh Bh S et S et Bh S et Bh S et S et Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M' M' Bh Bh Bh Ls
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
6,000.00 4,800.00 75,000.00 95,000.00 125,000.00 390,000.00 282,000.00 36,000.00 39,600.00 44,400.00 3,850,000.00 937,500.00 65,000.00 75,000.00 65,000.00 68,500.00 50 0. 0 0 11,500.00 5,000.00 5 0 0. 0 0 25,000.00 500.00 15,600.00 10,500.00 14,500.00 61,200.00 85,000.00 123,000.00 5,000.00
BAHAN LAIN - LAIN Spacer/formite/penjaga jarak bekisting Sielent GE / Dow Coming Non Asam Sektrup Fixer Stiffener Bracket steel Galfanized
Bh Tube Bh Bh Bh
Rp. Rp. Rp. Rp. Rp.
17,500.00 90,000.00 1,850.00 15,000.00 35,000.00
Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 100,000.00 130,000.00 130,000.00 130,000.00 130,000.00 130,000.00
II.
HARGA UPAH KERJA
Tukang kayu Tukang las Tukang Pipa Tukang gali Tukang batu Tukang besi Tukang cat Tukang listrik Kepala Tukang Kayu Kepala Tukang Batu Kepala Tukang Cat Kepala Tukang Listrik Kepala Tukang Pipa
Kepala Tukang Besi Mandor Pekerja
Oh Oh Oh
Rp. Rp. Rp.
130,000.00 175,000.00 75,000.00
PEMERINTAH PROVINSI SULAWESI BARAT DINAS PERKEBUNAN
REKAPITULASI ANGGARAN BIAYA (RAB)
PEMBANGUNAN GEDUNG KANTOR BARU DAN PERKEBUNAN BARU DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
LOKASI :
PROVINSI SULAWESI BARAT
TAHUN ANGGARAN 2011
Konsultan Perencana :
PEMERINTAH PROVINSI SULAWESI BARAT DINAS PERKEBUNAN
REKAPITULASI ANGGARAN BIAYA (RAB)
PEMBANGUNAN PERKEBUNAN BARU DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
LOKASI :
PROVINSI SULAWESI BARAT
TAHUN ANGGARAN 2011
Konsultan Perencana :
PEMERINTAH PROVINSI SULAWESI BARAT DINAS PERKEBUNAN
REKAPITULASI ANGGARAN BIAYA (RAB)
PEMBANGUNAN GEDUNG KANTOR BARU DINAS PERKEBUNAN PROVINSI SULAWESI BARAT
LOKASI :
PROVINSI SULAWESI BARAT
TAHUN ANGGARAN 2011
Konsultan Perencana :
RENCANA ANGGARAN BIAYA
TAHUN ANGGARAN 2014
Konsultan Perencana :
DINAS KESEHATAN KABUPATEN ENREKANG
REKAPITULASI ANGGARAN BIAYA (RAB)
Konsultan Perencana :
PEMERINTAH DAERAH KAB. ENREKANG
RENCANA ANGGARAN BIAYA (RAB)
Konsultan Perencana :
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN RUMAH JABATAN WAKIL KETUA DPRD KABUPATEN ENREKANG PEKERJAAN ANGGARAN
NO
: PEMB. RUJAB WAKIL KETUA DPRD SEBANYAK = 2 UNIT : 2010
JENIS
PEKERJAAN
HARGA
I
PEKERJAAN PERSIAPAN
Rp.
34,377,172.80
II
PEKERJAAN TANAH DAN PONDASI
Rp.
30,265,889.12
III
PEKERJAAN BETON (LANTAI I DAN II)
Rp.
345,330,990.41
IV
PEKERJAAN PASANGAN & PLESTERAN (LANTAI I)
Rp.
69,111,010.08
V
PEKERJAAN PASANGAN & PLESTERAN (LANTAI II)
Rp.
63,100,621.36
VI
PEKERJAAN PENGECATAN (LANTAI I)
Rp.
25,296,675.88
VII
PEKERJAAN PENGECATAN (LANTAI II)
Rp.
29,929,565.22
VIII
PEKERJAAN KERAMIK (LANTAI I)
Rp.
36,325,283.81
IX
PEKERJAAN KERAMIK (LANTAI II)
Rp.
24,666,876.50
X
PEK. KOSEN, PINTU & JENDELA (LANTAI I)
Rp.
18,018,635.30
XI
PEK. KOSEN, PINTU & JENDELA (LANTAI II)
Rp.
29,489,927.10
XII
PEKERJAAN PLAFOND (LANTAI I)
Rp.
17,533,899.58
XIII
PEKERJAAN PLAFOND (LANTAI II)
Rp.
21,976,759.06
XIV PEK. KONSTRUKSI KAP DAN ATAP
Rp.
65,998,460.00
XV
PEKERJAAN INSTALASI LISTRIK (LANTAI I)
Rp.
32,715,175.00
XVI PEKERJAAN INSTALASI LISTRIK (LANTAI II)
Rp.
22,024,725.00
XVII PEKERJAAN SANITASI (LANTAI I)
Rp.
48,214,865.83
XVIII PEKERJAAN SANITASI (LANTAI II)
Rp.
17,803,194.17
XIX PEKERJAAN LAIN-LAIN
Rp.
34,480,000.00
Rp.
966,659,726.21
Rp.
96,665,972.62
Real Cost
1 Unit
PPN 10% Total Cost
1 Unit
Rp.
1,063,325,698.83
Dibulatkan
1 Unit
Rp.
1,063,325,000.00
Untuk 2 Unit Rujab Wakil Ketua DPRD
Terbilang
2,126,650,000.00
: D e l ap a n r a t u s s e m b i l a n p u l u h j u t a s e r a t u s d u a p u l u h s a t u r i b u r u p i a h , -
Enrekang,
2010
Disetujui,
Konsultan Perencana CV. BAJIRUPA CONSULTANT
HADI BASALAMAH
BADARUDDIN, ST Direktur
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN RUMAH JABATAN WAKIL KETUA DPRD KABUPATEN ENREKANG PEKERJAAN ANGGARAN NO
: PEMB. RUJAB WAKIL KETUA DPRD SEBANYAK = 2 UNIT : 2010 URAIAN PEKERJAAN
I 1 2 3 4 5
PEK. PERSIAPAN Pengukuran + Bouplank Penyediaan P3K Pek. Direksi Keet Pek. Izin Mendirikan Bangunan (IMB) Pek. Jalan Masuk (Plat Duiker)
II 1 2 3 4 5
PEK.TANAH DAN PONDASI Pek. Galian Tanah Pondasi Urugan Tanah Pasir Urug Bawah Pondasi Pas. Batu Kosong Pas. Pondasi Batu Gunung
III
VOLUME
SAT
HARGA SAT.
JML. HARGA
1.00 1.00 12.00 0.78
Ls Ls M2 Ls M3
1,500,000.00 500,000.00 2,266,375.00 2,500,000.00 3,436,760.00
1,500,000.00 500,000.00 27,196,500.00 2,500,000.00 2,680,672.80 34,377,172.80
M3 M3 M3 M3 M3
90.72 50.84 2.76 5.93 17.23
60,625.00 206,650.00 177,850.00 365,091.00 673,455.00
5,499,778.75 10,505,259.40 490,154.60 2,165,719.81 11,604,976.56 30,265,889.12
1 2
PEK.BETON (LANTAI I & II) A. Pondasi Poer Pondasi Poer Lantai Kerja
2.98 0.96
M3 M3
4,268,249.72 735,120.63
12,732,188.93 702,959.11 13,435,148.04
1
B. Sloef Sloef 20/30
6.30
M3
4,838,336.34
30,481,518.94
1 2 3 4
C. Kolom Lantai I Stek Poer Kolom Utama 20/20 Kolom Praktis 15/15 Kolom Teras 20/50
1.50 2.28 1.45 1.52
M3 M3 M3 M3
8,434,911.90 8,434,911.90 7,081,583.38 6,654,051.90
12,652,367.86 19,231,599.14 10,293,081.45 10,114,158.90 52,291,207.34
1 2 3
D. Kolom Lantai II Kolom Utama 20/20 Kolom Praktis 15/15 Kolom Teras 20/50
2.56 1.44 1.80
M3 M3 M3
8,434,911.90 7,081,583.38 6,654,051.90
21,593,374.48 10,197,480.07 11,977,293.43 43,768,147.98
1 2 3
E. Balok Balok Anak Plat 25/20 Balok Utama Plat 20/30 Balok Praktis 15/15
3.00 5.04 0.59
M3 M3 M3
7,014,621.90 6,907,035.35 8,902,167.97
21,043,865.71 34,811,458.19 5,207,768.27 61,063,092.17
1 2
F. Plat Plat Lantai Beton T = 12 cm (LT. II) Plat Meja Beton
15.29 0.30
M3 M3
5,655,128.10 6,376,001.90
86,489,529.23 1,912,800.57 88,402,329.81
1 2 3
G. Ring Balok Ring Balok Praktis Ring Balok Teras Kuda - Kuda Beton
2.21 0.33 1.07
M3 M3 M3
6,840,780.35 6,880,533.35 6,840,780.35
15,083,920.68 2,236,173.34 7,346,998.10 24,667,092.12
NO
URAIAN PEKERJAAN
VOLUME
SAT
HARGA SAT.
JML. HARGA
1 2
H. Lesplank + Level Lesplank Beton Plat Level / Sunscreen
1.23 0.79
M3 M3
9,242,154.90 10,558,091.90
11,367,850.53 8,319,776.42 19,687,626.95
1
I. Tangga Pek. Tangga Utama
2.05
M3
5,626,744.90
11,534,827.05 11,534,827.05
Total IV 1 2 3 4 5 6 7 8
PEK. PASANGAN & PLESTERAN (LANTAI I) Pas. Batu Trasram Pas. Batu Biasa (1 : 5) Plesteran Trasram (1:4) Plesteran Biasa (1:5) Plesteran Beton (1:3) Pek. Profil Pek. Profil Kolom Teras Acian
V 1 2 3 4 5 6
PEK. PASANGAN & PLESTERAN (LANTAI II) Pas. Batu Biasa (1 : 5) Plesteran Biasa (1:5) Plesteran Beton (1:3) Pek. Profil Pek. Profil Kolom Teras Acian
VI 1 2 3 4 5 6 7
PEK. PENGECATAN (LANTAI I) Cat Tembok Ex. Cendana Cat Tembok Luar (Aquaseal) Cat Plafond Gibsum Cat List Plafond Gibsum Cat Pintu, Cat Kayu Kilap Cat Jendela, Cat Kayu Kilap Cat Kusen
VII 1 2 3 4 5 6 7 8 9 10 11
PEK. PENGECATAN (LANTAI II) Cat Tembok Ex. Cendana Cat Tembok Luar (Aquaseal) Cat Water Profing Plat Dan Talang Cat Plafond Gibsum (Dalam) Cat Plafond Luar Cat List Plafond Gibsum Residu Rangka Plafond Cat Kayu Kilap Cat Pintu, Cat Kayu Kilap Cat Jendela, Cat Kayu Kilap Cat Kusen
VIII 1 2 3 4 5 6
PEKERJAAN KERAMIK (LANTAI I) Timbunan Tanah Pasir Urug Bawah Lantai Rabat Beton Lantai Keramik 40/40 cm Lantai Keramik 20/20 cm Plint Keramik
345,330,990.41
69.16 151.66 138.38 439.22 10.51 12.87 2.00 588.11
M2 M2 M2 M2 M2 M1 Bh M2
93,912.00 92,087.00 45,724.40 43,145.60 45,724.40 125,000.00 2,500,000.00 27,687.50
6,494,953.92 13,965,914.42 6,327,342.47 18,950,410.43 480,426.27 1,608,750.00 5,000,000.00 16,283,212.56 69,111,010.08
228.56 457.10 67.25 13.91 2.00 524.35
M2 M2 M2 M1 Bh M2
92,087.00 43,145.60 45,724.40 125,000.00 1,500,000.00 27,687.50
21,047,404.72 19,721,853.76 3,074,783.00 1,738,750.00 3,000,000.00 14,517,829.88 63,100,621.36
529.96 58.14 103.00 77.14 3.00 7.00 59.00
M2 M2 M2 M1 Bh Bh M1
29,356.50 47,372.00 29,356.50 5,000.00 350,000.00 150,000.00 25,000.00
15,557,858.81 2,754,397.57 3,023,719.50 385,700.00 1,050,000.00 1,050,000.00 1,475,000.00 25,296,675.88
469.15 55.20 28.41 103.58 23.00 102.88 126.58 4.80 6.00 10.00 59.00
M2 M2 M2 M2 M2 M1 M2 M2 Bh Bh M1
29,356.50 47,372.00 105,450.00 29,356.50 29,356.50 5,000.00 8,500.00 34,382.50 350,000.00 150,000.00 25,000.00
13,772,484.55 2,614,934.40 2,995,834.50 3,040,746.27 675,199.50 514,400.00 1,075,930.00 165,036.00 2,100,000.00 1,500,000.00 1,475,000.00 29,929,565.22
3.46 1.39 6.93 78.40 6.28 77.14
M3 M3 M2 M2 M2 M'
252,900.00 177,850.00 735,120.63 178,540.00 172,548.00 27,643.00
875,678.90 246,325.81 5,090,783.91 13,997,536.00 1,083,601.44 2,132,381.02
NO
URAIAN PEKERJAAN
7 8 9 10 11
Dinding Keramik 20/25 cm Keramik Meja Dapur Lantai Keramik Anak Tangga 40/40 cm Lantai Keramik Garasi 40/40 cm Garasi (Carport)
IX 1 2 3 4 5
PEKERJAAN KERAMIK (LANTAI II) Lantai Keramik 40/40 cm Lantai Keramik 20/20 cm Plint Keramik Dinding Keramik 20/25 cm Dinding Batu Alam Entrance
X 1 2 3 4 5 6 7 8 9 10 11 12 13 14
VOLUME
SAT
HARGA SAT.
JML. HARGA
24.60 14.07 8.22 14.25 14.50
M2 M2 M2 M2 M2
178,377.00 178,377.00 178,540.00 178,540.00 137,196.16
4,388,074.20 2,509,764.39 1,467,598.80 2,544,195.00 1,989,344.35 36,325,283.81
77.10 10.35 71.00 26.40 13.70 172.13
M2 M2 M' M2 M'
178,540.00 172,548.00 27,643.00 178,377.00 178,377.00
13,765,434.00 1,785,871.80 1,962,653.00 4,709,152.80 2,443,764.90 24,666,876.50
PEK. KOSEN, PINTU & JENDELA (LANTAI I) Kosen Kayu Kelas I (5/15) Daun Pintu Panil Bayam Daun Pintu Panil PVC Daun Jendela / Pintu Kaca Kaca Mati Rybend 5 mm Kaca Mati Buram 5 mm Engsel Pintu Biasa Engsel Jendela Hak Angin Kunci Pintu 2 x Putar Kunci Bulat KW1 Grendel Jendela / Pintu Kodok Grendel Tanam Samping (Pintu) Pek. Lubang Tembok Ventilasi
0.45 3.00 2.00 7.00 2.88 0.80 8.00 7.00 7.00 3.00 2.00 7.00 7.00
M3 Bh Bh Bh M2 M2 Psg Psg Psg Bh Bh Bh Psg Bh
13,301,875.00 850,000.00 325,000.00 550,000.00 132,085.00 142,085.00 53,706.25 38,137.50 33,706.25 359,925.00 266,462.50 27,637.50 23,500.00 250,000.00
5,985,843.75 2,550,000.00 650,000.00 3,850,000.00 380,404.80 113,668.00 429,650.00 266,962.50 235,943.75 1,079,775.00 532,925.00 193,462.50 0.00 1,750,000.00 18,018,635.30
XI 1 2 3 4 5 6 7 8 9 10 11 12 13 14
PEK. KOSEN, PINTU & JENDELA (LANTAI II) Kosen Kayu Kelas I (5/15) Daun Pintu Panil Bayam Daun Pintu Panil PVC Daun Jendela / Pintu Kaca Kaca Mati Rybend 5 mm Kaca Mati Buram 5 mm Engsel Pintu Biasa Engsel Jendela Hak Angin Kunci Pintu 2 x Putar Kunci Bulat KW1 Grendel Jendela / Pintu Kodok Grendel Tanam Samping (Pintu) Pek. Lubang Tembok Ventilasi
0.85 6.00 3.00 10.00 0.78 0.48 9.00 10.00 10.00 6.00 3.00 10.00 8.00
M3 Bh Bh Bh M2 M2 Psg Psg Psg Bh Bh Bh Psg Bh
13,301,875.00 850,000.00 325,000.00 550,000.00 132,085.00 142,085.00 53,706.25 38,137.50 33,706.25 359,925.00 266,462.50 27,637.50 23,500.00 250,000.00
11,306,593.75 5,100,000.00 975,000.00 5,500,000.00 103,026.30 68,200.80 483,356.25 381,375.00 337,062.50 2,159,550.00 799,387.50 276,375.00 0.00 2,000,000.00 29,489,927.10
XII 1 2
PEKERJAAN PLAFOND (LANTAI I) Plafond Gypsum Board Dalam + Rangka Hollow Profil Gypsum Type CA
103.00 77.14
M2 M1
142,147.08 37,500.00
14,641,149.58 2,892,750.00 17,533,899.58
XIII 1 2 3
PEKERJAAN PLAFOND (LANTAI II) Plafond Gypsum Board Dalam + Rangka Hollow Plafond Luar Kalsiboard + Rangka Hollow Profil Gypsum Type CA
103.58 23.00 102.88
M2 M2 M1
142,147.08 147,615.83 37,500.00
14,723,594.89 3,395,164.17 3,858,000.00 21,976,759.06
132.00 10.00
M2 M1
195,000.00 168,938.00
25,740,000.00 1,689,380.00
XIV PEK. KONSTRUKSI KAP DAN ATAP 1 Pek. Kuda-kuda Baja Ringan 2 Nok Atap Genteng Keramik
NO
3 4 5
URAIAN PEKERJAAN
Nok Atap Pas. Bt. Bata Atap Genteng Keramik Pek. Lesplank Woodplank
XV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
PEK. INSTALASI LISTRIK (LANTAI I) Titik Mata Lampu Titik Stop Kontak Titik Saklar Titik Saklar Ganda Titik Stop Kontak AC Titik Telepon Titik Televisi Saklar Tunggal Saklar Ganda Stop Kontak Stop Kontak AC Lampu Downlight 18 W Lampu Hias (R. Tamu) 500W Lampu Baret Lampu Meja (Tidur) Lampu Gantung (R. Makan) Lampu SL 18 W Fitting Lampu Alat Bantu + Panel MCB (5 grup), Dll Penyambungan Daya Listrik (1 Phase)
XVI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PEK. INSTALASI LISTRIK (LANTAI II) Titik Mata Lampu Titik Stop Kontak Titik Saklar Titik Saklar Ganda Titik Stop Kontak AC Titik Telepon Titik Televisi Saklar Tunggal Saklar Ganda Stop Kontak Stop Kontak AC Lampu Downlight 18 W Lampu Baret Lampu Meja (Tidur) Lampu SL 18 W Fitting Lampu
XVII 1 2 3 4 5 6 7 8 9 10 11 12
PEKERJAAN SANITASI (LANTAI I) Kloset Duduk Ex. TOTO/KIA (dud Blok) + Pasang Ember Penampungan Air Sementara Bath tub Km. Utama Kran Air (Ex. Parnekel) Stop Kran Kaca / Cermin Floor Drine Tempat Sabun Ex. Toto (11x11 cm) Washtafel Washbasin Pipa PVC Dia 65 mm (Air Kotor) Pipa PVC Dia 50 mm (Air Kotor)
VOLUME
SAT
HARGA SAT.
JML. HARGA
26.40 132.00 24.00
M1 M2 M1
75,000.00 277,190.00 254,100.00
1,980,000.00 36,589,080.00 6,098,400.00 65,998,460.00
28.00 10.00 3.00 4.00 1.00 1.00 2.00 3.00 4.00 10.00 1.00 12.00 1.00 4.00 2.00 1.00 4.00 4.00 1.00 1,100.00
Ttk. Ttk Ttk Ttk Ttk Ttk Ttk Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Ls VA
418,500.00 333,000.00 199,025.00 199,025.00 333,000.00 343,400.00 343,400.00 65,000.00 68,500.00 65,000.00 75,000.00 96,000.00 2,000,000.00 250,000.00 125,000.00 1,750,000.00 85,000.00 15,000.00 5,000,000.00 1,968.00
11,718,000.00 3,330,000.00 597,075.00 796,100.00 333,000.00 343,400.00 686,800.00 195,000.00 274,000.00 650,000.00 75,000.00 1,152,000.00 2,000,000.00 1,000,000.00 250,000.00 1,750,000.00 340,000.00 60,000.00 5,000,000.00 2,164,800.00 32,715,175.00
26.00 8.00 6.00 4.00 3.00 1.00 4.00 6.00 4.00 8.00 1.00 12.00 6.00 2.00 6.00 6.00
Ttk. Ttk Ttk Ttk Ttk Ttk Ttk Bh Bh Bh Bh Bh Bh Bh Bh Bh
418,500.00 333,000.00 199,025.00 199,025.00 203,825.00 343,400.00 343,400.00 65,000.00 68,500.00 65,000.00 75,000.00 96,000.00 150,000.00 125,000.00 85,000.00 15,000.00
10,881,000.00 2,664,000.00 1,194,150.00 796,100.00 611,475.00 343,400.00 1,373,600.00 390,000.00 274,000.00 520,000.00 75,000.00 1,152,000.00 900,000.00 250,000.00 510,000.00 90,000.00 22,024,725.00
2.00 2.00 1.00 6.00 1.00 2.00 2.00 2.00 2.00 1.00 50.00 12.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh M1 M1
2,505,630.00 150,000.00 8,679,702.50 63,512.50 89,012.50 250,000.00 62,925.00 60,000.00 733,840.00 386,412.50 144,110.00 73,786.25
5,011,260.00 300,000.00 8,679,702.50 381,075.00 89,012.50 500,000.00 125,850.00 120,000.00 1,467,680.00 386,412.50 7,205,500.00 885,435.00
URAIAN PEKERJAAN
NO
VOLUME
SAT
Pipa PVC Dia 20 mm (Air Bersih) Pipa PVC Dia 15 mm (Air Bersih) Septictank Alat Bantu Instalasi Pemasukan Daya Air PAM Pompa Boster Ex Sango Grounding
32.00 12.00 1.00 1.00 1.00 1.00
M1 M1 Unit Ls Ls Unit Ls
16,899.17 18,513.75 5,000,000.00 1,500,000.00 2,500,000.00 800,000.00 15,000,000.00
540,773.33 222,165.00 5,000,000.00 1,500,000.00 0.00 800,000.00 15,000,000.00 48,214,865.83
XVIII 1 2 3 4 5 6 7 8 9 10 11 12
PEKERJAAN SANITASI (LANTAI II) Kloset Duduk Ex. TOTO/KIA (dud Blok) + Pasang Ember Penampungan Air Sementara Kran Air (Ex. Parnekel) Stop Kran Floor Drine Tempat Sabun Ex. Toto (11x11 cm) Pipa PVC Dia 65 mm (Air Kotor) Pipa PVC Dia 50 mm (Air Kotor) Pipa Gip Dia 20 mm (Air Bersih) Pipa Gip Dia 15 mm (Air Bersih) Alat Bantu Instalasi Bak Penampungan Air (Kap. 1M3)
3.00 3.00 5.00 2.00 4.00 3.00 18.00 4.00 22.00 8.00 1.00 1.00
Bh Bh Bh Bh Bh Bh M1 M1 M1 M1 Ls Bh
2,505,630.00 150,000.00 63,512.50 89,012.50 62,925.00 60,000.00 144,110.00 73,786.25 16,899.17 18,513.75 1,500,000.00 4,000,000.00
7,516,890.00 450,000.00 317,562.50 178,025.00 251,700.00 180,000.00 2,593,980.00 295,145.00 371,781.67 148,110.00 1,500,000.00 4,000,000.00 17,803,194.17
XIX 1 2 3 6 7 8
PEKERJAAN LAIN-LAIN Pek. Tangga kePenampungan Air Pek. Pagar Dan Kolom Pek. Pintu Pagar Pek. Pembersihan setelah Pembangunan Pek. Penangkal Petir Lengkap Realing Void dan Tangga
3.00 6.50 3.50 1.00 2.00 17.44
M1 M1 M2 Ls Unit M1
550,000.00 1,250,000.00 1,750,000.00 500,000.00 2,500,000.00 750,000.00
1,650,000.00 8,125,000.00 6,125,000.00 500,000.00 5,000,000.00 13,080,000.00 34,480,000.00
13 14 15 16 17 18 19
Real Cost
HARGA SAT.
Rp.
JML. HARGA
966,659,726.21
Renc Realsasi
0 0
5 5
10 15
15 20
20 22
25 25
30 27
40 38