TAKARAN SEMEN 1 M3 = 1250 Kg 1 Tong = 17 1 70 Kg = 17 1 70 : 40 = 17 170 : 50 1 M3 = 1250 : 170 = 1250 : 40 = 1250 : 50
= = = = =
4.250 3.400 7.353 31.250 25.000
Sak (@ 40 kg) Sa S ak (@ 50 kg) Tong PC Sa Sak (@ 40 kg) Sa Sak (@ 50 kg)
7.352941176
TAKARAN LAPISAN MATERIAL PER M3 - Pasir, tana tanah, h, batu kali, dan sirtu - Batu kosong
= =
1.200 M3 keadaan padat 1.100 M3 keadaan padat
= = = = = =
0.760 0.675 0.520 0.550 0.745 0.520
= = = = = = = =
0.450 0.008 1.000 0.018 0.012 0.008 0.350 0.009
TAKARAN SPESI BASAH PER M3 -
Semen PC Pasir pasang Kerikil Kapur batu Semen merah Kapur karang
TAKARAN SPESI PER PEKERJAAN -
Pa Pasangan pondasi batu kali Pa Pasangan batu kosong Beton cor & mortar Pl Plesteran bata tebal 15 mm Pl Plesteran bata tebal 10 mm Plesteran bata tebal 6 mm Pa Pasangan dinding bata Pl Plesteran dinding batu kali
M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3
TAKARAN PEREKAT/SPESI CAMPURAN SEMEN : PASIR -
Spesi campuran Spesi campuran Spesi campuran Spesi campuran Spesi campuran Spesi campuran Spesi campuran Spesi campuran Spesi campuran Sp Spesi campuran
1: 1: 1: 1: 1: 1: 1: 1: 1: 1:
1 2 3 4 5 6 7 8 9 10
= = = = = = = = = =
1.435 M3 M3 2.110 M3 2.790 M3 M3 3.460 M3 M3 4.135 M3 M3 4.810 M3 M3 5.485 M3 M3 6.160 M3 M3 6.835 M3 M3 7.510 M3 M3
TAKARAN KAYU 1 Ton = 450 inch (1" = 2,5 cm) Untuk panjang kayu = 4,8 m Untuk kayu ukuran 2" x 3" Harga kayu 2" x 3" = Rp.24.000,-/btg Setiap pemasangan 1 M3 diperlukan
1 Ton 1 Ton 1 Ton 1 M3 1.100
= 4 50 50 x (2,5/100) x (2,5/100) x 4,8 = 450 / (2 x 3) = Rp.24.000,- x 75 = Rp.1.800.000,- / 1,35 M3 kayu
TAKARAN BERAT BESI PER KG
6 mm 8 mm 10 mm 12 mm 14 mm 16 mm 19 mm 22 mm
= = = = = = = =
2,22 kg kg per 10 meter 4,00 kg kg per 10 meter 7,17 kg kg per 10 meter
8,92 kg 12,0 12,08 8 kg 15,8 15,83 3 kg 22,3 22,33 3 kg 29,8 29,83 3 kg
per 10 meter per per 10 mete meterr per per 10 mete meterr per per 10 mete meterr per per 10 mete meterr
= = = = = = = =
0,22 kg 0,40 kg 0,62 kg 0,90 kg 1,21 1,21 kg 1,58 1,58 kg 2,23 2,23 kg 2,98 2,98 kg
per meter per meter per meter per meter per per mete meterr per per mete meterr per per mete meterr per per mete meterr
= = = =
1.350 75.00 1,800,000.00 1,333,333.33
M3 Batang Ru Rupiah Ru Rupiah
PERHITUNGAN ANALISA BILL of QUANTITY (KAYU)
Anl. F.1
1 M3 Rangka plafond Semen Pasir
= =
1.00 x 2.00 x
Untuk 0,008 M3 beton diperlukan : Batu kali = 0.25 x Semen = 1/2,1100 x Pasir = 2/2,1100 x
1.100 = 0.000 = Perekat =
1.1000 M3 0.0000 M3 + 1.1000 M3
0.000 = 0.000 = 0.000 =
0.0000 M3 0.0000 M3 = 0.0000 M3
0.0000 Sak =
0.0000 Tong
PERHITUNGAN ANALISA BILL of QUANTITY (BETON)
Anl. G.2
1 M3 Lantai kerja pasangan batu kosong Batu kali
Anl. G.3
=
1.00 x
= =
1.00 x 2.00 x
Untuk 0,008 M3 beton diperlukan : Batu kali = 0.25 x Semen = 1/2,1100 x Pasir = 2/2,1100 x
= =
1.00 x 1.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/1,4350 x Pasir = 1/1,4350 x
= =
1.00 x 2.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/2,1100 x Pasir = 2/2,1100 x
= =
1.00 x 3.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/2,7900 x Pasir = 3/2,7900 x
= =
1.00 x 4.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/3,4600 x Pasir = 4/3,4600 x
0.760 = 0.675 = Perekat =
0.7600 M3 0.6750 M3 + 1.4350 M3
0.1188 Sak =
0.0280 Tong
1.000 = 1.000 =
0.7000 M3 = 21.8750 Sak = 0.7000 M3
5.1470 Tong
0.760 = 0.675 = Perekat = 1.000 = 1.000 =
0.7600 M3 1.3500 M3 + 2.1100 M3 0.4700 M3 = 14.6875 Sak = 0.9500 M3
3.4560 Tong
0.760 = 0.675 = Perekat = 1.000 = 1.000 =
0.7600 M3 2.0300 M3 + 2.7900 M3 0.3600 M3 = 11.2500 Sak = 1.0800 M3
2.6470 Tong
0.760 = 0.675 = Perekat =
0.7600 M3 2.7000 M3 + 3.4600 M3
1.000 = 1.000 =
0.2900 M3 = 1.1600 M3
0.760 = 0.675 = Perekat =
0.7600 M3 3.3750 M3 + 4.1350 M3
1.000 = 1.000 =
0.2418 M3 = 1.2092 M3
0.760 = 0.675 = Perekat =
0.7600 M3 4.0500 M3 + 4.8100 M3
1.000 = 1.000 =
0.2079 M3 = 1.2474 M3
9.0625 Sak =
2.1320 Tong
7.5574 Sak =
1.7782 Tong
6.4969 Sak =
1.5287 Tong
1 M3 Perekat 1 : 5 (spesi = 1 M3) Semen Pasir
= =
1.00 x 5.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/2,7850 x Pasir = 5/2,7850 x
Anl. G.19b
0.2750 M3 0.0038 M3 = 0.0080 M3
1 M3 Perekat 1 : 4 (spesi = 1 M3) Semen Pasir
Anl. G.19a
1.100 = 0.008 = 0.008 =
1 M3 Perekat 1 : 3 (spesi = 1 M3) Semen Pasir
Anl. G.19
0.7600 M3 1.3500 M3 + 2.1100 M3
1 M3 Perekat 1 : 2 (spesi = 1 M3) Semen Pasir
Anl. G.16
0.760 = 0.675 = Perekat =
1 M3 Perekat 1 : 1 (spesi = 1 M3) Semen Pasir
Anl. G.14
1.1000 M3
1 M2 Pasangan batu kosong tebal 25 cm campuran 1 : 2 (spesi = 0,008 M3) Semen Pasir
Anl. G.13
1.100 =
1 M3 Perekat 1 : 6 (spesi = 1 M3) Semen Pasir
= =
1.00 x 6.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/2,7850 x Pasir = 6/2,7850 x
Anl. G.19c
1 M3 Perekat 1 : 7 (spesi = 1 M3) Semen Pasir
= =
1.00 x 7.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/2,7850 x Pasir = 7/2,7850 x
Anl. G.19d
= =
1.00 x 8.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/2,7850 x Pasir = 8/2,7850 x
= =
1.00 x 9.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/2,7850 x Pasir = 9/2,7850 x
= =
1.00 x 10.00 x
Untuk 0,008 M3 beton diperlukan : Semen = 1/2,7850 x Pasir = 10/2,7850 x
0.7600 M3 6.0750 M3 + 6.8350 M3
1.000 = 1.000 =
0.1463 M3 = 1.3168 M3
0.760 = 0.675 = Perekat =
0.7600 M3 6.7500 M3 + 7.5100 M3
1.000 = 1.000 =
0.1332 M3 = 1.3316 M3
1.1937 Tong
4.5721 Sak =
1.0758 Tong
4.1611 Sak =
0.9791 Tong
= = =
1.0000 x 0.2900 x 1.1600 x
1.200 = 0.450 = 0.450 =
1.2000 M3 0.1305 M3 = 0.5220 M3
4.0781 Sak =
0.9600 Tong
= = =
1.0000 x 0.2418 x 1.2092 x
1.100 = 0.450 = 0.450 =
1.1000 M3 0.1088 M3 = 0.5441 M3
3.4008 Sak =
0.8002 Tong
= = =
1.0000 x 0.4700 x 0.9500 x
1.200 = 0.450 = 0.450 =
1.2000 M3 0.2115 M3 = 0.4275 M3
6.6094 Sak =
1.5550 Tong
= = =
1.0000 x 0.3600 x 1.0800 x
1.200 = 0.450 = 0.450 =
1.2000 M3 0.1620 M3 = 0.4860 M3
5.0625 Sak =
1.1910 Tong
= = =
1.0000 x 0.2418 x 1.2092 x
450 = 0.350 = 0.350 =
450.000 Bh 0.0846 M3 = 0.4232 M3
2.6451 Sak =
0.6224 Tong
450.0000 Bh 0.1015 M3 = 0.4060 M3
3.1719 Sak =
0.7463 Tong
475.0000 Bh 0.1260 M3 = 0.3780 M3
3.9375 Sak =
0.9260 Tong
1 M3 Pasangan batu bata 1 : 4 (spesi = 0,35 M3) Batu bata Semen Pasir
Anl. G.33i
0.760 = 0.675 = Perekat =
5.0731 Sak =
1 M3 Pasangan batu bata 1 : 5 (spesi = 0,35 M3) Batu bata Semen Pasir
Anl. G.33h
0.1623 M3 = 1.2987 M3
1 M3 Pasangan batu kali 1 : 3 (spesi = 0,45 M3) Batu kali Semen Pasir
Anl. G.33h1
1.000 = 1.000 =
1 M3 Pasangan batu kali 1 : 2 (spesi = 0,45 M3) Batu kali Semen Pasir
Anl. G.32m
0.7600 M3 5.4000 M3 + 6.1600 M3
1.3406 Tong
1 M3 Pasangan batu kali 1 : 5 (spesi = 0,45 M3) Batu kali Semen Pasir
Anl. G.32L
0.760 = 0.675 = Perekat =
5.6974 Sak =
1 M3 Pasangan batu kali 1 : 4 (spesi = 0,45 M3) Batu kali Semen Pasir
Anl. G.32h1
0.1823 M3 = 1.2762 M3
1 M3 Perekat 1 : 10 (spesi = 1 M3) Semen Pasir
Anl. G.32h
1.000 = 1.000 =
1 M3 Perekat 1 : 9 (spesi = 1 M3) Semen Pasir
Anl. G.19f
0.7600 M3 4.7250 M3 + 5.4850 M3
1 M3 Perekat 1 : 8 (spesi = 1 M3) Semen Pasir
Anl. G.19e
0.760 = 0.675 = Perekat =
= = =
1.0000 x 0.2900 x 1.1600 x
450 = 0.350 = 0.350 =
1 M3 Pasangan batu bata 1 : 3 (spesi = 0,35 M3) Batu bata Semen Pasir
= = =
1.0000 x 0.3600 x 1.0800 x
475 = 0.350 = 0.350 =
Anl. G.33m
1 M3 Pasangan batu bata 1 : 2 (spesi = 0,35 M3) Batu bata Semen Pasir
Anl. G.41
= = =
1.0000 x 0.4700 x 0.9500 x
450 = 0.350 = 0.350 =
= = =
1.00 x 2.00 x 3.00 x
0.760 0.675 0.520 Perekat
Untuk 1 M3 beton diperlukan : Semen = 1/3,6700 x Pasir = 2/3,6700 x Kerikil = 3/3,6700 x
= = =
1.00 x 1.50 x 2.50 x
0.760 0.675 0.520 Perekat
2.0000 Tong
M3 M3 M3 + M3
0.7600 1.0125 1.3000 3.0725
M3 M3 M3 + M3
0.3255 M3 = 10.1709 Sak = 0.4882 M3 0.8137 M3
2.3932 Tong
= = =
1.00 x 2.00 x 4.00 x
0.760 0.675 0.520 Perekat
= = = =
1.000 = 1.000 = 1.000 =
0.7600 1.3500 2.0800 4.1900
M3 M3 M3 + M3
0.2390 M3 = 0.4800 M3 0.9500 M3
7.4688 Sak =
1.7570 Tong
6.2500 Sak =
1.4710 Tong
5.3125 Sak =
1.2500 Tong
5.8125 Sak =
1.3677 Tong
0.2625 Sak =
0.0618 Tong
1 M3 Cor beton 1 : 2 ½ : 5 (spesi = 1 M3) Semen Pasir Kerikil
= = =
1.00 x 2.50 x 5.00 x
0.760 0.675 0.520 Perekat
Untuk 1 M3 beton diperlukan : Semen = 1/5,0475 x Pasir = 2½/5,0475 x Kerikil = 5/5,0475 x
= = = =
1.000 = 1.000 = 1.000 =
0.7600 1.6875 2.6000 5.0475
M3 M3 M3 + M3
0.2000 M3 = 0.5000 M3 1.0000 M3
1 M3 Cor beton 1 : 3 : 6 (spesi = 1 M3) Semen Pasir Kerikil
= = =
1.00 x 3.00 x 6.00 x
0.760 0.675 0.520 Perekat
Untuk 1 M3 beton diperlukan : Semen = 1/5,9050 x Pasir = 3/5,9050 x Kerikil = 6/5,9050 x
= = = =
1.000 = 1.000 = 1.000 =
0.7600 2.0250 3.1200 5.9050
M3 M3 M3 + M3
0.1700 M3 = 0.5000 M3 1.0000 M3
1 M3 Cor beton 1 : 3 : 5 (spesi = 1 M3) Semen Pasir Kerikil
= = =
1.00 x 3.00 x 5.00 x
Untuk 1 M3 beton diperlukan : Semen = 1/5,3850 x Pasir = 3/5,3850 x Kerikil = 5/5,3850 x
Anl. G.50g
= = = =
1.000 = 1.000 = 1.000 =
Untuk 1 M3 beton diperlukan : Semen = 1/4,1900 x Pasir = 2/4,1900 x Kerikil = 4/4,1900 x
Anl. G.44a
0.2720 M3 = 8.5000 Sak = 0.5400 M3 0.8200 `12345643234678-=
0.7600 1.3500 1.5600 3.6700
1 M3 Cor beton 1 : 2 : 4 (spesi = 1 M3) Semen Pasir Kerikil
Anl. G.44
= = = =
1.000 = 1.000 = 1.000 =
Untuk 1 M3 beton diperlukan : Semen = 1/3,0725 x Pasir = 1½/3,0725 x Kerikil = 2½/3,0725 x
Anl. G.43
1.2100 Tong
1 M3 Cor beton 1 : 1 ½ : 2 ½ (spesi = 1 M3) Semen Pasir Kerikil
Anl. G.42
5.1406 Sak =
1 M3 Cor beton 1 : 2 : 3 (spesi = 1 M3) Semen Pasir Kerikil
Anl. G.41a
450.0000 Bh 0.1645 M3 = 0.3325 M3
0.760 0.675 0.520 Perekat
= = = =
1.000 = 1.000 = 1.000 =
0.7600 2.0250 2.6000 5.3850
M3 M3 M3 + M3
0.1860 M3 = 0.5600 M3 0.9000 M3
1 M2 Plesteran batu bata 1 : 1 tebal 10 mm (spesi = 0,012 M3) Semen Pasir
= =
0.7000 x 0.7000 x
0.012 = 0.012 =
0.0084 M3 = 0.0084 M3
Anl. G.50h
1 M2 Plesteran batu bata 1 : 2 tebal 10 mm (spesi = 0,012 M3) Semen Pasir
Anl. G.50h1
0.0085 M3 = 0.0171 M3
0.2644 Sak =
0.0622 Tong
= =
0.3600 x 1.0800 x
0.018 = 0.018 =
0.0065 M3 = 0.0194 M3
0.2031 Sak =
0.0480 Tong
= =
0.3600 x 1.0800 x
0.012 = 0.012 =
0.0043 M3 = 0.0130 M3
0.1344 Sak =
0.0316 Tong
= =
0.3600 x 1.0800 x
0.008 = 0.008 =
0.0029 M3 = 0.0086 M3
0.0906 Sak =
0.0213 Tong
= =
0.2900 x 1.1600 x
0.018 = 0.018 =
0.0052 M3 = 0.0209 M3
0.1625 Sak =
0.0380 Tong
= =
0.29 x 1.16 x
0.012 = 0.012 =
0.0035 M3 = 0.0139 M3
0.1088 Sak =
0.0256 Tong
= =
0.24 x 1.21 x
0.018 = 0.018 =
0.0044 M3 = 0.0218 M3
0.1360 Sak =
0.0320 Tong
= =
0.4700 x 0.9500 x
0.009 = 0.009 =
0.0042 M3 = 0.0086 M3
0.1313 Sak =
0.0310 Tong
0.0938 Sak =
0.0220 Tong
1 M2 Plesteran dinding batu kali 1 : 3 (spesi = 0,009 M3) Semen Pasir
Anl. G.67
0.018 = 0.018 =
1 M2 Plesteran dinding batu kali 1 : 2 (spesi = 0,009 M3) Semen Pasir
Anl. G.51c1
0.47 x 0.95 x
1 M2 Plesteran batu bata 1 : 5 tebal 15 mm (spesi = 0,018 M3) Semen Pasir
Anl. G.51c
= =
1 M2 Plesteran batu bata 1 : 4 tebal 10 mm (spesi = 0,012 M3) Semen Pasir
Anl. G.50q2
0.0410 Tong
1 M2 Plesteran batu bata 1 : 4 tebal 15 mm (spesi = 0,018 M3) Semen Pasir
Anl. G.50q1
0.1750 Sak =
1 M2 Plesteran lantai beton 1 : 3 tebal 6 mm (spesi = 0,008 M3) Semen Pasir
Anl. G.50q
0.0056 M3 = 0.0114 M3
1 M2 Plesteran batu bata 1 : 3 tebal 10 mm (spesi = 0,012 M3) Semen Pasir
Anl. G.50L
0.012 = 0.012 =
1 M2 Plesteran batu bata 1 : 3 tebal 15 mm (spesi = 0,018 M3) Semen Pasir
Anl. G.50k
0.4700 x 0.9500 x
1 M2 Plesteran batu bata 1 : 2 tebal 15 mm (spesi = 0,018 M3) Semen Pasir
Anl. G.50i
= =
= =
0.3600 x 1.0800 x
0.009 = 0.009 =
0.0030 M3 = 0.0097 M3
1 M2 Lantai beton 1 : 3 : 6 tebal 7 cm kemudian diplester 1 : 3 (spesi = 0,00 9 M3) 1 M2 Lantai beton 1 : 3 : 6 tebal 7 cm Semen = 0.0700 x Pasir = 0.0700 x Kerikil = 0.0700 x 1 M2 Plesteran 1 : 3 diperlukan : Semen = 0.3000 x Pasir = 1.0000 x Total bahan yang diperlukan : Semen Pasir Kerikil
diperlukan : 0.170 = 0.500 = 1.000 =
0.0119 M3 0.0350 M3 0.0700 M3
0.009 = 0.009 =
0.0027 M3 0.0090 M3 +
= = =
0.0146 M3 = 0.0440 M3 0.0700 M3
0.4563 Sak =
0.1070 Tong
TAKARAN KOEFISIEN UPAH PER PEKERJAAN PASANGAN BATU
Pondasi (A)
Trasraam (B)
Dinding (C)
Pekerja
3.6000
4.5000
6.0000
7.5000
1.5000
Mandor
0.1800
0.2250
0.3000
0.3750
0.0750
Tukang
1.2000
1.5000
2.0000
2.5000
-
Kep.tukang
0.1200
0.1500
0.2000
0.2500
-
Upah
Rollag (D)
Batu kosong
PLESTERAN PASANGAN BATU
Trasraam
Batu kali
Batu bata (15 mm)
Batu bata (10 mm)
Batu bata (6 mm)
Pekerja
5.0000
0.3600
0.4000
0.4000
0.3000
Mandor
0.1800
0.1800
0.0200
0.0200
0.0150
Tukang
0.5000
0.1200
0.2000
0.1500
0.1000
Kep.tukang
0.0500
0.0120
0.0200
0.0150
0.0100
Upah
PASANGAN KAYU
Kuda-kuda 7m ( M3 )
Kuda-kuda > 7m
Pintu/jendela panel ( M2 )
Pintu/jendela jalusi ( M2 )
Pintu/jendela kaca ( M2 )
Gording kayu
Pekerja
8.0000
12.0000
2.5000
3.0000
2.0000
6.0000
Mandor
0.4000
0.6000
0.1250
0.1500
0.1000
0.3000
Tukang
24.0000
36.0000
7.5000
9.0000
6.0000
18.0000
2.4000
3.6000
0.7500
0.9000
0.6000
1.8000
Upah
Kep.tukang
PASANGAN KAYU
Rangka atap genteng ( M2 )
Rangka atap seng ( M2 )
Kosen pintu/jendela ( M3 )
Kosen bentuk busur ( M3 )
Pekerja
0.1500
0.0150
12.0000
14.0000
1.3000
0.1400
Mandor
0.0075
0.0075
0.6000
0.7000
0.0650
0.0700
Upah
Pintu triplek Dinding partisi double triplek ( M2 ) ( M2 )
Tukang
0.1000
0.1000
36.0000
42.0000
4.0000
0.4000
Kep.tukang
0.0100
0.0100
3.6000
4.2000
0.4000
0.0400
Balok jembatan
Lantai jembatan
Papan cetakan
Lesplank / dinding papan ( M2 )
PASANGAN KAYU
Rangka plafond ( M3 )
Papan Rider ( M2 )
Pekerja
5.0000
0.2800
8.0000
0.2500
0.2000
0.2800
Mandor
0.2500
0.0140
0.4000
0.0125
0.0100
0.0140
Tukang
15.0000
0.8000
24.0000
0.7500
0.5000
0.8000
1.5000
0.0800
2.4000
0.0750
0.0500
0.0800
Upah
Kep.tukang
GALIAN DAN TIMBUNAN
Upah
Galian tanah biasa ( M3 )
Galian tanah keras ( M3 )
Mengangkut tanah 30m ( M3 )
Timbunan pasir ( M3 )
Pekerja
0.7500
1.0000
0.3300
0.3000
Mandor
0.0250
0.0330
0.0100
0.0100
Tukang
-
-
-
-
Kep.tukang
-
-
-
-
COR BETON
Beton Bertulang ( M3 )
Upah Pekerja
6.0000
Mandor
0.3000
Tukang
1.0000
Kep.tukang
0.1000
PASANGAN ATAP DAN RABUNG
Upah
Atap genteng
Atap seng / asbes
Rabung seng
Rabung genteng
Pekerja
0.2000
0.1000
0.0250
0.0400
Mandor
0.0100
0.0050
-
0.0020
Tukang
0.1000
0.2000
0.0250
0.0200
Kep.tukang
0.0100
0.0200
0.0025
0.0020
PASANGAN TALANG
Talang patahan seng
Talang seng ½ lingkaran
Pekerja
0.3500
0.3000
0.2250
Mandor
0.0175
0.0150
0.0110
Tukang
0.6000
0.5000
0.3750
Kep.tukang
0.0600
0.0500
0.0375
Upah
Pipa talang seng 12 cm
DAFTAR HARGA BAHAN DAN UPAH
A.
HARGA UPAH
No.
1 2 3 4
B.
Harga
Uraian Upah
Pekerja Mandor Tukang Kepala Tukang
Rp. Rp. Rp. Rp.
38,500 49,500 52,250 60,500
Satuan
Hari Hari Hari Hari
HARGA BAHAN
No.
1 2 3 4 5 6 7 8 9 10 11 12 12 12 13 13 14 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Harga
Uraian Bahan
Batu kerikil Semen PC @ 40 Kg Pasir pasang Pasir urug/timbun Tanah timbun Semen putih Kapur basah Besi beton Kawat beton Kayu Sembarang Kayu Meranti Papan Meranti Kayu Meranti Batu Kayu Damar Laut Papan Damar Laut Tripleks tebal 4 mm Tripleks Sungkai Paku biasa Batu bata merah Keramik 20 x 25 cm Keramik 30 x 30 cm Papan Damar Laut Atap seng BJLS Rabung seng BJLS Paku seng Kaca polos tebal 5 mm Cat tembok Cat kilat Tepung dempul Kertas pasir Minyak cat Closet jongkok Closet duduk Shower Urinoir Bak air Washtafel Septictank dan resapan Kran air Pipa air bersih dia. 1" Pipa air bersih dia. 3/4" Pipa air bersih dia. 2" Pipa air bersih dia. 3"
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
51,700
3,026,100 3,203,200 4,613,400 4,485,800 4,869,700 50,600 133,100 8,800
119,800
Satuan
M3 Sak M3 M3 M3 Sak Kg Kg Kg M3 M3 M3 M3 M3 M3 Lembar Lembar Kg Buah Kotak Kotak Lembar Lembar Lembar Buah M2 Peil (25 kg) Kg Kg Lembar Kg Buah Buah Buah Buah Buah Buah Set Buah Batang Batang Batang Batang
37 38 39 40 41 42
Lampu TL 36 Watt Lampu SL 25 Watt Stop kontak MCB 6 Amp Arde Hand Draying
Rp. Rp. Rp. Rp. Rp. Rp.
Titik Titik Titik Buah Set Buah
URAIAN ANALISA BAHAN DAN UPAH 1. Anl. A.1
2. Anl. A.2
3. Anl. A.3
4. Anl. A.18
1 M3 Galian tanah biasa Upah : 0.7500 Pekerja 0.0250 Mandor
@ Rp. @ Rp.
38,500.00 49,500.00 Jumlah Dibulatkan
= = = =
Rp. Rp. Rp. Rp.
28,875.00 1,237.50 + 30,112.50 30,113.00
1 M3 Galian tanah keras Upah : 1.0000 Pekerja 0.0330 Mandor
@ Rp. @ Rp.
38,500.00 49,500.00 Jumlah Dibulatkan
= = = =
Rp. Rp. Rp. Rp.
38,500.00 1,633.50 + 40,133.50 40,134.00
1 M3 Angkut tanah max. 30 M' Upah : 0.3300 Pekerja 0.0100 Mandor
@ Rp. @ Rp.
38,500.00 49,500.00 Jumlah Dibulatkan
= = = =
Rp. Rp. Rp. Rp.
12,705.00 495.00 + 13,200.00 13,200.00
1 M3 Pasir urug Bahan : 1.2000 M3 Pasir urug
@ Rp.
51,700.00 =
Rp. Rp.
62,040.00 + 62,040.00
Upah : 0.3000 0.0100
@ Rp. @ Rp.
38,500.00 = 49,500.00 =
Rp. Rp. Rp. Rp. Rp.
11,550.00 495.00 + 12,045.00 74,085.00 74,085.00
3,026,100.00 = 8,800.00 =
Rp. Rp. Rp.
3,328,710.00 1,760.00 + 3,330,470.00
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
192,500.00 12,375.00 783,750.00 90,750.00 + 1,079,375.00 539,687.50 + 3,870,157.50 3,870,158.00
Pekerja Mandor
Jumlah = Dibulatkan = 5. Anl. F.1
5. Anl. F.1a
5. Anl. F.16
1 M3 Gantungan/Rangka plafond Bahan : 1.1000 M3 Broti Kayu Meranti 0.2000 Kg Paku biasa
@ Rp. @ Rp.
Upah : 5.0000 0.2500 15.0000 1.5000
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Upah dihitung = 1/2
x Rp.
1,079,375.00 = Jumlah = Dibulatkan =
1 M2 Piyan Papan Rider (STRIP) Bahan : 0.0200 M3 Kayu Meranti Batu 0.2000 Kg Paku biasa
@ Rp. @ Rp.
4,613,400.00 = 8,800.00 =
Rp. Rp. Rp.
92,268.00 1,760.00 + 94,028.00
Upah : 0.2800 0.0140 0.8000 0.0800
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
38,500.00 49,500.00 52,250.00 60,500.00
Upah dihitung = 2
x Rp.
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
10,780.00 693.00 41,800.00 4,840.00 + 58,113.00 116,226.00 + 210,254.00 210,254.00
Rp. Rp. Rp. Rp.
Rp. Rp. Rp. Rp.
= = = =
= = = =
58,113.00 = Jumlah = Dibulatkan =
1 M2 Rangka atap (pasang usuk dan reng untuk atap genteng dan sirap) Bahan : 0.0147 M3 Kayu Meranti @ Rp. 3,026,100.00 = Rp. 0.2500 Kg Paku biasa @ Rp. 8,800.00 = Rp. Rp. Upah : 0.1000 Pekerja @ Rp. 38,500.00 = Rp. 0.0050 Mandor @ Rp. 49,500.00 = Rp. 0.1000 Tukang @ Rp. 52,250.00 = Rp.
44,483.67 2,200.00 + 46,683.67 3,850.00 247.50 5,225.00
0.0100
Kepala tukang
@ Rp.
60,500.00 = Jumlah = Dibulatkan =
Rp. Rp. Rp. Rp.
605.00 + 9,927.50 56,611.17 56,611.00
5. Anl. F.16a
1 M2 Rangka atap genteng biasa/genteng semen (pasang usuk, reng dan gording) Bahan : 0.0250 M3 Kayu Meranti @ Rp. 3,026,100.00 = Rp. 75,652.50 0.1000 Kg Paku biasa @ Rp. 8,800.00 = Rp. 880.00 + Rp. 76,532.50 Upah : 0.1500 Pekerja @ Rp. 38,500.00 = Rp. 5,775.00 0.0075 Mandor @ Rp. 49,500.00 = Rp. 371.25 0.1000 Tukang @ Rp. 52,250.00 = Rp. 5,225.00 0.0100 Kepala tukang @ Rp. 60,500.00 = Rp. 605.00 + Rp. 11,976.25 Jumlah = Rp. 88,508.75 Dibulatkan = Rp. 88,509.00
5. Anl. F.19
1 M2 Rangka atap seng Bahan : 0.0110 M3 Kayu Meranti 0.1000 Kg Paku biasa
@ Rp. @ Rp.
Upah : 0.0150 0.0075 0.1000 0.0100
@ @ @ @
Pekerja Mandor Tukang Kepala tukang
Rp. Rp. Rp. Rp.
3,026,100.00 = 8,800.00 =
Rp. Rp. Rp.
33,287.10 880.00 + 34,167.10
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
577.50 371.25 5,225.00 605.00 + 6,778.75 40,945.85 40,946.00
4,869,700.00 = 8,800.00 =
Rp. Rp. Rp.
116,872.80 880.00 + 117,752.80
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
10,780.00 693.00 41,800.00 4,840.00 + 58,113.00 175,865.80 175,866.00
4,485,800.00 =
Rp. Rp.
4,934,380.00 + 4,934,380.00
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
308,000.00 19,800.00 1,254,000.00 145,200.00 + 1,727,000.00 863,500.00 + 5,797,880.00 5,797,880.00
4,485,800.00 =
Rp. Rp.
4,934,380.00 + 4,934,380.00
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
462,000.00 29,700.00 1,881,000.00 217,800.00 + 2,590,500.00 1,295,250.00 + 6,229,630.00 6,229,630.00
= = = =
Jumlah = Dibulatkan = 5. Anl. F.21
1 M2 Papan listplank Bahan : 0.0240 M3 Papan Damar Laut 0.1000 Kg Paku biasa
@ Rp. @ Rp.
Upah : 0.2800 0.0140 0.8000 0.0800
@ @ @ @
Pekerja Mandor Tukang Kepala tukang
Rp. Rp. Rp. Rp.
= = = =
Jumlah = Dibulatkan = 5. Anl. F.22
5. Anl. F.27
1 M3 Kayu kuda-kuda Bahan : 1.1000 M3 Kayu Damar Laut
@ Rp.
Upah : 8.0000 0.4000 24.0000 2.4000
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Upah dihitung = 1/2
x Rp.
Rp. Rp. Rp. Rp.
1 M3 Kozen pintu/jendela tanpa jalusi Bahan : 1.1000 M3 Kayu Damar Laut @ Rp.
Upah : 12.0000 0.6000 36.0000 3.6000
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Rp. Rp. Rp. Rp.
Upah dihitung = 1/2
x Rp.
= = = =
1,727,000.00 = Jumlah = Dibulatkan =
= = = =
2,590,500.00 = Jumlah = Dibulatkan =
5. Anl. F.27a
1 M3 Kozen pintu/jendela dengan jalusi Bahan : 1.1000 M3 Kayu Damar Laut @ Rp. 0.0240 M3 Papan Meranti Batu @ Rp. 1.0000 M3 Paku biasa @ Rp.
Upah : 12.0000 0.6000 36.0000 3.6000
5. Anl. F.28
1 M2 Daun Bahan : 0.0125 1.0000 0.1000
Upah : 1.3000 0.0650 4.0000 0.4000
5. Anl. F.30a
1 M2 Daun Bahan : 0.0125 1.0000 0.2500
Upah : 1.3000 0.0650 4.0000 0.4000
5. Anl. F.33
@ @ @ @
Rp. Rp. Rp. Rp.
Upah dihitung = 1/2
x Rp.
Rp. Rp. Rp. Rp.
4,934,380.00 110,721.60 8,800.00 + 5,053,901.60
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
462,000.00 29,700.00 1,881,000.00 217,800.00 + 2,590,500.00 1,295,250.00 + 6,349,151.60 6,349,152.00
Rp. Rp.
4,934,380.00 + 4,934,380.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
539,000.00 34,650.00 2,194,500.00 254,100.00 + 3,022,250.00 1,511,125.00 + 6,445,505.00 6,445,505.00
3,026,100.00 = 50,600.00 = 8,800.00 =
Rp. Rp. Rp. Rp.
37,826.25 50,600.00 880.00 + 89,306.25
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
50,050.00 3,217.50 209,000.00 24,200.00 + 286,467.50 71,616.88 + 160,923.13 160,923.00
3,026,100.00 = 133,100.00 = 8,800.00 =
Rp. Rp. Rp. Rp.
37,826.25 133,100.00 2,200.00 + 173,126.25
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
50,050.00 3,217.50 209,000.00 24,200.00 + 286,467.50 143,233.75 + 316,360.00 316,360.00
= = = =
2,590,500.00 = Jumlah = Dibulatkan =
1 M3 Kozen yang berlobang cahaya berbentuk busur Bahan : 1.1000 M3 Kayu Damar Laut @ Rp. 4,485,800.00 =
Upah : 14.0000 0.7000 42.0000 4.2000
5. Anl. F.30
Pekerja Mandor Tukang Kepala tukang
4,485,800.00 = 4,613,400.00 = 8,800.00 =
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Rp. Rp. Rp. Rp.
Upah dihitung = 1/2
x Rp.
38,500.00 49,500.00 52,250.00 60,500.00
= = = =
3,022,250.00 = Jumlah = Dibulatkan =
pintu triplek 4 mm double rangka kayu Meranti
M3 Kayu Meranti Lbr Triplek 4 mm Kg Paku biasa
@ Rp. @ Rp. @ Rp.
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Rp. Rp. Rp. Rp.
Upah dihitung = 1/4
x Rp.
= = = =
286,467.50 = Jumlah = Dibulatkan =
pintu triplek Sungkai double rangka kayu Meranti
M3 Kayu Meranti Lbr Triplek Sungkai Kg Paku biasa
@ Rp. @ Rp. @ Rp.
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Rp. Rp. Rp. Rp.
Upah dihitung = 1/2
x Rp.
286,467.50 = Jumlah = Dibulatkan =
1 M2 Pintu/jendela panel : Bahan : 0.0440 M3 Kayu Meranti Batu
@ Rp.
4,613,400.00 =
Rp. Rp.
202,989.60 + 202,989.60
Upah : 2.5000 0.1250 7.5000 0.7500
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
38,500.00 49,500.00 52,250.00 60,500.00
Upah dihitung = 1/2
x Rp.
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
96,250.00 6,187.50 391,875.00 45,375.00 + 539,687.50 269,843.75 + 472,833.35 472,833.00
Rp. Rp. Rp. Rp.
= = = =
= = = =
539,687.50 = Jumlah = Dibulatkan =
5. Anl. F.34
5. Anl. F.36
1 M2 Pintu/jendela jalusi Bahan : 0.0640 M3 Kayu Meranti Batu 0.3187 Kg Paku biasa
@ Rp. @ Rp.
Upah : 3.0000 0.1500 9.0000 0.9000
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Upah dihitung = 1/2
x Rp.
5. Anl. F.37a
5. Anl. F.37b
Rp. Rp. Rp.
295,257.60 2,804.56 + 298,062.16
38,500.00 49,500.00 52,250.00 60,500.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
115,500.00 7,425.00 470,250.00 54,450.00 + 647,625.00 323,812.50 + 621,874.66 621,875.00
Rp. Rp. Rp.
161,469.00 119,800.00 + 281,269.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
77,000.00 4,950.00 313,500.00 36,300.00 + 431,750.00 215,875.00 + 497,144.00 497,144.00
= = = =
647,625.00 = Jumlah = Dibulatkan =
1 M2 Pintu/jendela kaca bingkai kayu Meranti Batu Bahan : 0.0350 M3 Kayu meranti batu @ Rp. 4,613,400.00 = 1.0000 M2 Kaca polos 5 mm @ Rp. 119,800.00 =
Upah : 2.0000 0.1000 6.0000 0.6000
5. Anl. F.37
Rp. Rp. Rp. Rp.
4,613,400.00 = 8,800.00 =
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Rp. Rp. Rp. Rp.
Upah dihitung = 1/2
x Rp.
431,750.00 = Jumlah = Dibulatkan =
1 M2 Dinding papan dilidah/alur Bahan : 0.0198 M3 Papan Meranti 0.2000 Kg Paku biasa
@ Rp. @ Rp.
3,203,200.00 = 8,800.00 =
Rp. Rp. Rp.
63,423.36 1,760.00 + 65,183.36
Upah : 0.2800 0.0140 0.8000 0.0800
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
38,500.00 49,500.00 52,250.00 60,500.00
Upah dihitung = 1/2
x Rp.
58,113.00 = Jumlah = Dibulatkan =
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
10,780.00 693.00 41,800.00 4,840.00 + 58,113.00 29,056.50 + 94,239.86 94,240.00
1 M2 Dinding papan susun sirih Bahan : 0.0120 M3 Papan Meranti 0.2000 Kg Paku biasa
@ Rp. @ Rp.
3,203,200.00 = 8,800.00 =
Rp. Rp. Rp.
38,438.40 1,760.00 + 40,198.40
Upah : 0.2800 0.0140 0.8000 0.0800
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
38,500.00 49,500.00 52,250.00 60,500.00
Upah dihitung = 1/2
x Rp.
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
10,780.00 693.00 41,800.00 4,840.00 + 58,113.00 29,056.50 + 69,254.90 69,255.00
Rp. Rp. Rp. Rp.
45,391.50 20,240.00 1,320.00 + 66,951.50
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
5,390.00 3,465.00 20,900.00 2,420.00 + 32,175.00 16,087.50 + 83,039.00
Rp. Rp. Rp. Rp.
Rp. Rp. Rp. Rp.
38,500.00 49,500.00 52,250.00 60,500.00
= = = =
= = = =
= = = =
58,113.00 = Jumlah = Dibulatkan =
1 M2 Dinding triplek 4 mm rangka kayu Meranti Bahan : 0.0150 M3 Kayu Meranti @ Rp. 3,026,100.00 = 0.4000 Lbr Triplek 4 mm @ Rp. 50,600.00 = 0.1500 Kg Paku biasa @ Rp. 8,800.00 =
Upah : 0.1400 0.0700 0.4000 0.0400
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Rp. Rp. Rp. Rp.
Upah dihitung = 1/2
x Rp.
38,500.00 49,500.00 52,250.00 60,500.00
= = = =
32,175.00 = Jumlah =
Dibulatkan = 5. Anl. F.37c
1 M2 Dinding double triplek 4 mm rangka kayu Meranti Bahan : 0.0150 M3 Kayu Meranti @ Rp. 3,026,100.00 = 0.8000 Lbr Triplek 4 mm @ Rp. 50,600.00 = 0.2000 Kg Paku biasa @ Rp. 8,800.00 =
Upah : 0.1400 0.0700 0.4000 0.0400
5. Anl. F.37d
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Rp. Rp. Rp. Rp.
Upah dihitung = 1/2
x Rp.
38,500.00 49,500.00 52,250.00 60,500.00
= = = =
32,175.00 = Jumlah = Dibulatkan =
1 M2 Dinding double triplek Sungkai rangka kayu Meranti Bahan : 0.0150 M3 Kayu Meranti @ Rp. 3,026,100.00 = 0.8000 Lbr Triplek Sungkai @ Rp. 133,100.00 = 0.2500 Kg Paku biasa @ Rp. 8,800.00 =
Upah : 0.1400 0.0700 0.4000 0.0400
Pekerja Mandor Tukang Kepala tukang
@ @ @ @
Rp. Rp. Rp. Rp.
38,500.00 49,500.00 52,250.00 60,500.00
= = = =
Jumlah = Dibulatkan =
Rp.
83,039.00
Rp. Rp. Rp. Rp.
45,391.50 40,480.00 1,760.00 + 87,631.50
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
5,390.00 3,465.00 20,900.00 2,420.00 + 32,175.00 16,087.50 + 103,719.00 103,719.00
Rp. Rp. Rp. Rp.
45,391.50 106,480.00 2,200.00 + 154,071.50
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
5,390.00 3,465.00 20,900.00 2,420.00 + 32,175.00 186,246.50 186,247.00