Deliverables for Handover From Network Roll out Project (NRP) to Network Operations PROJECT Team: Entity Name: Project Manager - RAN: NI Team leader: CME Project Mgr: SAQ Manager: Documentation Team Lead: CORE Planning:
Documents/ Deliverable RAN Site Documents PISM RFI Checklist Installation material’s list Approved DDD with redline RF antenna alignment report Site inventory report Commissioning Report Site Installation data Integration Report Site Stability Test RAN installation checklist Power installation checklist Outdoor DC Power and Alarm testing Site Photo Report Punchlist documents Radio Station License
Version: 1.1
Responsible provider
Status
Checked
Documents/ Deliverable Reference Document List and Operating Manuals Vendor Product Documentation Vendor BTS/eNb Quick user guide Vendor Antenna System User Manual BTS/eNb Implementation Check List BTS/eNb Implementation Check List BTS/eNb Work Instructions Third Party Documentation Site Specific Document List SAT Docs PAT Docs UAT Docs Functionality Test Acceptance Manual As Built - Architectural As Built -Site Location Map/Vicinity Map As Built -Perspective/Antenna configuration As Built - Site Layout Plan As Built - Site Elevation As Built - Main Panel Board Mounting Details As Built - Structural As Built - Antenna Mounting Bracket details/RRH mounting bracket details As Built - Electrical layout As Built - Single line diagram As built - Earthing line diagram Site Integration Certificate Provisional Acceptance Certificate Final Acceptance Certificate
Version: 1.1
Responsible provider
Status
Location
Remarks
TRS Supporting Documentation Checked
Documents/ Deliverable MW PISM RFI Checklist Site Installation Checklist MW Installation Material list Approved DDD Site Installation Drawing MW Inventory Report MW Installation Checklist (PAT) MW Commissioning Procedure Approved Link Budget Interference Check (PAT) BER Test Result (24 Hr) RFC2544 Test Result IPRAN MW Commissioning Snapshots MW Installation Photo Report Parameter Settings Radio Station License MW Punch List MW Commissioning Acceptance Form PAC FAC Soft Copy of all docs
Version: 1.1
Responsible provider
Status
Location
CORE Supporting Documentation Checked
Version: 1.1
Documents/ Deliverable Technical Site Survey Report As-built Floor Plan Installation Procedures, Checklist and Certificate of Completion Breaker Allocation and Voltage Test Site Connectivity Plan (port-level) Network Element Parameter data fill Commissioning Procedures, Checklist and Certificate of Completion Network Diagram (high-level) Integration Checklist and Certificate of Completion HW Configuration (Bayface) and Serial Numbers Logs and Test Reports Customer Punchlist and Rectification Site Photos NSN Electronic Documentation Site Connectivity Plan (port-level) SAT UAT HW Installed Base Inventory SW install base inventory Summaryof Minor alarms with
Responsible provider
Status
Location
recomm connection Network performance report User and Profiles ( command matrix list for all NE's) Completed project plan CORE Equipment Operations manual Status of security monitoring systems Core Network Plan document
CORE Network Document Network Elements Summary Sites & NE's naming Convention Design Requirements Network Elements BoM/BoQ HW/SW components Basic/Optional features Network Topology Sites Interconnect Trans Plan User Plane topology MSS/MGW Control Relationship Traffic Engineering Capacity Analysis Trunking/Signallin g and Routing IP Network Plan As Built - Architectural As Built -Site Location Map/Vicinity Map As Built - Site Layout Plan As Built - Main Panel Board Mounting Details Version: 1.1
As Built - Structural As Built - Electrical layout As Built - Single line diagram As built - Earthing line diagram Administration, Operation and Maintenance Guide
Software Configuration Management Plan Architectural and Network Diagram Installation/configurati on scripts (if applicable) Configuration files (if applicable) Troubleshooting tips (if applicable) Source code Design documents Alarm Manual User Guide Training Documentation Site Integration Certificate Provisional Acceptance Certificate Final Acceptance Certificate
CME Supporting Documentation Checked
Documents/ Deliverable Site Acquisition Request Form Site Acquisition Request Form (SARF) General Information (SAR & TSSR) Site Acquisition Report (SAR) Technical Site Survey Report (TSSR)
Version: 1.1
Responsible provider
Status
Location
Site Design and Variation Soil Investigation Report (for GF sites) Structural Analysis Report (for RT sites) Site Detail Design Package Variation Design Package Approved Variation Order (initial VO's) Approved Variation Order (additional VO's) Notice to Proceed Notice to Proceed (NTP) CME Results and Certificates Site Kick Off Meeting Report Tower Foundation Rebar Inspection Report Rebar Material Certificates (Mill Certificate) Tower Material Certificates (Mill, Welding & Galvanizing Certificate) Tower Foundation Concrete Pouring Request Concrete Test Certificate Rebar Test Certificate Pole / Tower Verticality and Twist Test Result Pole / Tower Bolt Torque Test Result Earthing System Test Result Field Density / Proctor Density test Results (for GF sites) Anchor Pull-out Test Certificate Non-destructive Test Result (for Schmidt Hammer Test, etc.) AC Power Distribution Test Result Certificate of Compliance - Antenna Support Structures, Foundation Certificate of Compliance -Electrical Installations Contractor CME Quality Assurance Checklist As Built Drawing and Photograph As Built Drawing Package As Built Photos Site Keys Hand-Over Receipt Site Keys Hand-Over Receipt (3 sets) Version: 1.1
Acceptance Certificates Provisional Acceptance (PAC) Checklist (signed) Provisional Acceptance (PAC) Checklist (closed ) Provisional Acceptance (PAC) Certificate Final CME Acceptance (CME FAC) Certificate Documentation Checklist CME Documentation Checklist (signed) Miscellaneous Documents and Correpondence OB Light Warranty Certiicate TVSS Certificate AC-1 Warranty Certificate Transformer Warranty Service Manual for Split Type Aircon Warranty Policy for Split Type Aircon Remote Control Manual Installation Manual User's Manual
Facilities Supporting Documentation Checked
Documents/ Deliverable
Responsible provider
Status
Location
Power System Information List of Power Elements PACU/ACU system information List of PACU/ACU Elements Alarm system configuration As built Plan Installation/Users manual Provisional Acceptance (PAC) Checklist (signed) Provisional Acceptance (PAC) Checklist (closed ) Provisional Acceptance (PAC) Certificate Final Acceptance FAC) Certificate
SAQ Supporting Documentation Checked
Documents/ Deliverable Property Documents
Version: 1.1
Responsible provider
Status
Location
(Mandatory) Transfer Certificate of Title (of land) Condominium Certificate of Title Tax Declaration (of the land) Tax Declaration (of the building) Tax Declaration (per Unit) Secretary's Certificate Board Resolution SEC Registration Articles of Incorporation By Laws Special Power of Attorney Segregation Plan Tax Clearance Tax Receipt Other Documentation (Optional) Deed of Conveyance Deed of Sale Deed of Donation Affidavit of Ownership Affidavit of disinterested person Certified true copies of Birth Certificate of heirs Death Certificates and Extra Judicial Settlement Bank Consent Right of Way Agreement Commercial Terms (CT) For Right of Way Agreement Pre-Construction Permits Neighbors Consent / Certificate of No Neighbors Barangay Clearance Barangay Resolution DAR Clearance CAAP Clearance DOH Clearance Zoning Certificate Locational Clearance Sangguniang Bayan Resolution Approved Installation Plan HOA (Home Owners Association) Clearance LLDA (Laguna Lake Development Authority) Clearance Philvocs & Receipt Certificate of NonCoverage HLURB Clearance Version: 1.1
SUP (Special Use Permit) Mechanical Permit Building Permit Electrical Permit Fencing Permit Sanitary Permit Permit to operate Genset Post-Construction Permits Certificate of Electrical Inspection Certificate of Fire Inspection Certificate of Completion Mayors Permit Electronics Permit Occupancy Permit Legal Documentation Commercial Terms Signed and Notarized Lease Contract AC Power Documnetation Approved AC Power Quotation AC Power Application AC Power Application Receipt AC Power Contract (with Power Company) Acceptance Certificates Final SAQ Acceptance (SAQ FAC) Certificate Documentation Checklist SAQ Documentation Checklist (signed) Lease Package Documentation Checklist (Signed) Pre-construction Permitting Documentation Checklist (signed) Post-construction Permitting Documentation Checklist (signed) Permanent AC Power Documents Checklist (signed) Miscellaneous and Correspondence Work Completion Certificate (WCC) Certificate of Conformity to Lease BIR Registration Certification of Existing Lease Agreement from Lot Owner Site Agreement Version: 1.1
Exemption Justification Form
Remote System Support and Security Checked
Documents/ Deliverable
Responsible provider
Status
Location
Specific application access granted? SDC setup done (Resolve, RAS, Testbed/Production access as applicable) Set the ticket routing for the products in Resolve and test the ticket routing Verify and test the remote connection to equipment. It should be available for Vendor technical support team, 3rd party (if applicable) Password Lists Contact Numbers of the Vendors Contact Numbers for 3rd Party Vendors Contact Numbers for PL Support contact for 3rd parties Remote access to production Remote access to preproduction
Project Supporting Documentation Checked
Documents/ Deliverable Project SITE Tracker Minutes of Project Meetings Project Action Registers Project Completion report Lessons learned and recommended improvements Open and closed Resolved tickets,
Version: 1.1
Responsible provider
Status
Location
Management escalations. Incident reports and RCA of all cases encountered during the project phase Bugs/issues list closed and still open during project NI to NOPS checklist Insurance Coverage