it can be used for the calculation of labour required as per the quantity of work the calculation is as per the specifications of Book: Estimating & Costing by B.N. Dutta
its a material requirement per cu.m.Full description
LABOUR WELFAREFull description
Labour LawFull description
labourFull description
naFull description
jhghjgFull description
Full description
Full description
Women in unorganised sectorFull description
weerFull description
Labour Law
labour law MCQ
contract attendance sheet formatFull description
LABOUR LAW,MCQ,ICSI,Full description
Capacitor CalculationFull description
Labour Output Constant in construction field
high risk case
Labour Law ProjectFull description
Labour ( Mazdoor ) Required For Different Works Sr. No.
Item
Beldars
Mazdoors
Bhisti
Mason
1
Excavation in Foundations,trenches etc. in ordinary soil including disposal up to 30 m and lift of 1.5 m
1/5.66
1/7.075
-
-
2
Refilling Excavated earth in foundation, plinth,etc. including consolidation in 15 cm layers
1/9.43
1/14.15
1/56.6
-
3
Disposal of surplus earth within a lead of 30 m
-
1/2.83
-
-
4
Laying P.C.C.
1/1.415
1/0.943
1/3.77
1/11.32
5
Laying R.C.C.
1/0.94
1/0.94
1/2.12
1/5.66
6
Centering and shuttering for flat surfaces
Carpenter 1/2.4
-
-
7
Reinforcement work R.C.C.
Blacksmith 1/100
-
-
8
Random Rubble masonry with blue stone in foundation
9
1 st class brickwork in 1 : 4 cement mortar in superstructure,partition wall, junction of roof,parapet walls, string course
1/2.4
1/100
1/0.94
1/1.415
1/11.32
1/0.94
-
1/0.629
1/5.66
1/1.258
10
Doors and Windows Frames
1/0.18
Carpenter 1/0.09
-
-
11
Pannelled,glazed,etc. shutters
1/0.019
Carpenter 1/0.005
-
-
12
Fixing 40 mm x 3 mm x 38 cm flat iron holdfasts
1/36
Blacksmith 1/36
-
1/36
13
Fixing 16 mm dia M.S.Rods
1/5.5
Blacksmith 1/16.5
Carpenter 1/8.25
-
14
4 cm thick cement concrete flooring laying ,mixing and finishing
1/10
1/13.33
1/40
1/8
15
12 mm thick plastering with any mortat
-
1/13.33
1/40
1/13.33
16
White washing or colour washing ( 3 Coat)
-
1/60
white washer 1/60
-
17
Painting two coats on wood or steel
-
1/5
Painter 1/3.33
-
Per Day
m3
m3
m3
m3
m3
m2
Kg.
m3
m3
m3 ( 4 door frames 7.5 cm x 10 cm ) of 1.2 m x 2.1 m size m3 ( 4 shutters 40 mm thick 2.0 m x 1.15 m )