Lube oil system adalah sistem yang menyuplai oli untuk pelumasan bearing-bearing pada Gas TurbinFull description
This is a simple method statement for testing and flushing of sprinkler system in buildingsFull description
Description complète
cat
Cat Oil specifications
JOB SAFETY ANALYSIS ANALYSIS FOR HOT OIL FLUSHING
Date:
Prepared by: Rajesh
Project:
Operation / Process : Hot Oil Fls!in" S/No
1 "
)
OPERATION SE#UEN$E
a. Ens Ensure ure a val valid id work ork per permi mitt b. Refer Refer to Proced Procedure ure Chec Check k the the draw drawin in# # $ test test pac pack k line no identified accordance with the re%uirement *o selec selectt $ prepar prepare e all all the the &ot &ot 'il (lushin# e%uipment $ pipe fittin#s
POTENTIAL HA%AR&S / RIS'S
a. &ot 'il (lushin# of a wron# test pack line no a. Pipe (ittin# hose burst off+ injury other
$ONTROL (EASURES
A$TION BY
Client Rep !upervisor a. Check and ensure that the &ot 'il (lushin# is Client Rep carried on a correct test pack line no !upervisor a. !el !elec ectt the the ri#h ri#htt mate materi rial als s and and e%ui e%uipm pmen ent. t.
!upe !uperv rvis isor or
b. ,nauthori-ed entry of personnel
0
a. arricade testin# area at least 1 meter and !upervisor display warnin# si#n. b. &i#hli#ht in the /!CC *o pres pressur suri-e i-ed d pipe pipe lines lines to ") ") a. Eyes Eyes bod body y inju injury ry a. 4ear 4ear PPE PPE 2! 2!afet afety y #o## #o##lle+ !afe !afety ty &elm elmet+ et+ 4orker bar to check leaka#e2 1st !afety oots+ 'veralls3 inspection 3 b. rief workers on first aid precaution as stated in the 5!D! b. Personnel hit by flushin# a. Display warnin# si#nboardbarricade at least !upervisor medium 1 meter to keep the other personnel away. c. (ailure (ailure of pressure pressure #au#e #au#e a. ,se calibrate calibrated d pressure pressure #au#e. #au#e. !upervisor b. 4atchman to check and ensure not to over pressuri-ed
!i#nature: 6pproved by: !& 7im Rev 8
!i#nature: Reviewed by:
Pa#e 1 of "
JOB SAFETY ANALYSIS ANALYSIS FOR HOT OIL FLUSHING
9
*o fill fill the the (lus (lushin hin# # oil oil into into the the pipin# system 2full3
a. 7eaka#e and causin# floodin# onto the surroundin#
Contin Continue ue &ot 'il (lushi (lushin# n# till till the pipe lines are clear from debris
a. ,nauthori-ed entry of personnel
a. 7ine check prior to commencement of oil flushin#. b. !tandby diaphra#m pump to pump out the oil. c. Ensure containment tray and pump in #ood condition. d. !tandby oil absorbent to clean any spilla#e. a. &i#hli#ht in the /!CC and display warnin# si#nboardbarricade at least 1 meter.
b. Eyes Eyes bod body y inju injury ry
=
>
<
*o remove remove tempor temporary ary flan#es flan#es from the pipe lines after flushin#
a. 4ear 4ear PPE PPE 2Re 2Res spirat irator or ;<9+ <9+ !af !afety ety #o##l o##le e with side shield or (ull face shield3 a. Personn Personnel el contact contact with with 'il a. &i#hli#ht &i#hli#ht in the /!CC /!CC and display display warnin# warnin# si#nboardbarricade at least 1 meter b. 4ea 4ear PPE b. Eyes Eyes bod body y inju injury ry a. 4ear 4ear PPE PPE 2Re 2Res spirat irator or ;<9+ <9+ !af !afety ety #o##l o##le e with side shield or (ull face shield3
*o reinst reinstate ate the pipin# pipin# syste system. m. a. &and &and injur injury y by by impr imprope operr use of tools and material handlin# Revi Review ew loca locall cond condit itio ions ns