Transportation / Mobilization of Material & Equipment Preparatory Works – Manual Loading & Unloading for Paint Cans General Facilities Works – Blasting & Painting Equipment Blasting & Pai…Full description
MS for painting worksFull description
Sample QAP for Civil WorkFull description
asfdasfa
JOB HAZARD ANALYSIS PT TECHNIC (M)
HOW TO USE THIS FORM : 1) Crew performing task reviews ALL generic JHA considerations. 2) Review previous JHA update(s) for useful information which will help this task. 3) Create new JHA update with generic form and ALL considerations for this task. 4) Carry out task as per plan. If any conditions change ---STOP & RE-ASSESS. 5) File JHA update for future reference. WORK ACTIVITY
Installation/Facility Location Associated Work Permit Type Associated Work Permit Number Electrical Isolation Certificate Number Physical Isolation Certificate Number
POST WELD HEAT TREATMENT
Job Step 1
Description of Job Step Burn Pipes (PWHT)
Potential Hazards Fire source
Potential Impact
L
S
R
Control Measures
Fire, explosion
Presence of Fire, flammable gas. explosion
2
Housekeeping
Sparks from faulty equipment Leak of electric cables
Fire, explosion
Tripping hazard
Slips, body injury
2
3
3
Electrocution, fatality
1
2
2
JHA Cross-Reference Number
Previously approved work permit before starting work Keep flammable materials away from the work area Prepare a fire extinguisher Fire watch must be kept at the workplace during work (PWHT) is performed Make sure gas source have been closed Put the barricade/signage Changing the damaged equipment Make checks on all equipment used Change the damage electric cable Always check the cable use Only competent person are authorized to do the work Wear the proper PPE Clean all the unused material Put the barricade and signage
Recovery Measures
L
S
R
Result
1
2
2
Acceptable
1
1
1
Acceptable
Evacuate to safe area Immediately report incident to BOMBA