This file included fuel consumption of construction machinery such as motor grader,vibratory roller,skid steer loader,Generator.....All values are got by actual construction site situations.Full description
Descripción completa
universiteti politeknik i tiranesFull description
Full description
Blanketing valve principleDescrição completa
Huawei RRU power consumption tables
CalFull description
Full description
Fabric consumption calculation for knitted itemsFull description
Instrument Air Consumption Calculation.docxFull description
Full description
Basis and Assumption
. The volume of the purged system is constant throughout the inerting/purging process. . Assume that the ideal gas law holds and that the temperature of the gas in the vessel is th . Assume that the composition of the gas is uniform throughout the purged system. . Assume that the composition of the species to be diluted in the purge gas is constant durin
Reference: Rolla, MO 65409-0249 .
ting/purging process. the gas in the vessel is the same throughout the inerting/purging process. e purged system. urge gas is constant during the purging process.
Inert Gas (Nitrogen) Consumption Nitrogen consumption is calculated based on batch purging (pressurized): Step: 1
Determine the purged system volume
50% volume of 3-Phase Separator + 50% Volume of Water Buffer Vessel + 20 design mar
Step: 2
3-Phase Separator Volume Water Buffer Vessel Volume
= =
70.7 43.6
m3 m3
Purge system volume
=
68.6
m3
Determine the number of cycle for batch purging operation: Initial Oxygen concentration Required Oxygen concentration Pressurized pressure Initial and Final pressure Nitrogen temperature
Step: 3
Step: 4
= = = = =
21 2 30 0 30
Required number of purging cycle =
3
% mol % mol psig psig °C
Determine required volume of Nitrogen per cycle Purged system volume No. of mole of Nitrogen Required volume of Nitrogen
= = =
68.6 m3 5628.0 kmol 126.1 Nm3
Total required volume of Nitrogen
=
378.2
Nm3
Determine required volume of Nitrogen at Nitrogen supply pressure Nitrogen supply pressure Nitrogen supply temperature Required volume of Nitrogen
= = =
Volume of Nitrogen per cyclinder = Required no. of Nitrogen cyclinder =
2640 30 2.32
psig °C m3
0.2 12
m3
essurized):
INPUT OUTPUT
er Buffer Vessel + 20 design margin to account for associated piping volume
(considering 50% of total volume + 10% margin to account on piping)
Inert Gas (Nitrogen) Consumption Nitrogen consumption is calculated based on batch purging (vacuum): Step: 1
Determine the purged system volume
50% volume of 3-Phase Separator + 50% Volume of Water Buffer Vessel + 20 design mar
Step: 2
3-Phase Separator Volume Water Buffer Vessel Volume
= =
70.7 43.6
m3 m3
Purge system volume
=
68.6
m3
Determine the number of cycle for batch purging operation: Initial Oxygen concentration Required Oxygen concentration Vacuum pressure Initial and Final pressure Nitrogen temperature
= = = = =
Required number of purging cycle = Step: 3
Step: 4
21 0.0021 -13.24 0 40
% mol % mol psig psig °C
4
Determine required volume of Nitrogen per cycle Purged system volume No. of mole of Nitrogen Required volume of Nitrogen
= = =
68.6 m3 2404.9 kmol 53.9 Nm3
Total required volume of Nitrogen
=
215.5
Nm3
Determine required volume of Nitrogen at Nitrogen supply pressure Nitrogen supply pressure Nitrogen supply temperature Required volume of Nitrogen
= = =
Volume of Nitrogen per cyclinder = Required no. of Nitrogen cyclinder =
2640 30 1.37
psig °C m3
0.2 7
m3
INPUT OUTPUT
er Buffer Vessel + 20 design margin to account for associated piping volume
(considering ATM)
per cycle
assumed ambient temperature
Inert Gas (Nitrogen) Consumption Nitrogen consumption is calculated based on continuous purging i.e. sweep through: Step: 1
Determine the purged system volume
50% volume of 3-Phase Separator + 50% Volume of Water Buffer Vessel + 20 design mar
Step: 2
Step: 3
3-Phase Separator Volume Water Buffer Vessel Volume
= =
70.7 43.6
m3 m3
Purge system volume
=
4.0
m3
Determine required volume of Nitrogen Initial Oxygen concentration Required Oxygen concentration Oxigen concentration in inert gas Mixing facgtor
= = = =
21 6 1 0.1
% mol % mol % mol
Required volume of Nitrogen
=
55.5
m3
Determine elapse time for purging Inert gas flowrate Elapse time
Step: 4
= =
120.00 m3/h 27.7 min
Determine required volume of Nitrogen at Nitrogen supply pressure Nitrogen supply pressure Nitrogen supply temperature Required volume of Nitrogen
= = =
Volume of Nitrogen per cyclinder = Required no. of Nitrogen cyclinder =
2640 30 0.31
psig °C m3
0.2 2
m3
ng i.e. sweep through:
INPUT OUTPUT
er Buffer Vessel + 20 design margin to account for associated piping volume