Fiber Intelligences Distribution Antenna System
In-Building Coverage with BTI’S FIDAS system Proposed Design for
Aditya kemang Village, Jakarta, Indonesia March, 2009
A Leading Provider for Smart Coverage and Enhancement Solutions for the Wireless Communication Industry Worldwide
What is FIDAS In-Building Solution?
Fiber Intelligences Distribution Antenna System
RF Signals are converted by Host Units (HU) into light Source and transported over fiber optical cables to the Remote units.
Light Signals are then converted back into RF signal by Remote Units (RU) units.
Single mode or Mutil Mode Fiber (to be requested) transmission for best performances
FIDAS can communicate up to 15km between HU and RU units.
RU to DAS System by existing Coaxial connections
‐
Note: Information and Material in this presentation is proprietary to BTI to BTI Group of Companies, Unauthorized Copying Unauthorized Copying or Use of Information and Material from this presentation without without written permission from BTI will be considered unlawful unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with with under the law of Singapore. BTI BTI reserved reserved the right to amend or made changes to the above information without prior advice.
Confidential
What is FIDAS In-Building Solution?
Fiber Intelligences Distribution Antenna System
RF Signals are converted by Host Units (HU) into light Source and transported over fiber optical cables to the Remote units.
Light Signals are then converted back into RF signal by Remote Units (RU) units.
Single mode or Mutil Mode Fiber (to be requested) transmission for best performances
FIDAS can communicate up to 15km between HU and RU units.
RU to DAS System by existing Coaxial connections
‐
Note: Information and Material in this presentation is proprietary to BTI to BTI Group of Companies, Unauthorized Copying Unauthorized Copying or Use of Information and Material from this presentation without without written permission from BTI will be considered unlawful unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with with under the law of Singapore. BTI BTI reserved reserved the right to amend or made changes to the above information without prior advice.
Confidential
BTI’s Solution – FIDAS System BTI’S
proposed FIDAS system in building coverage solution for Aditya kemang Village . ‐
This
is a hybrid DAS network system, a concept of maximizing of maximizing existing passive antenna system in the building which need to upgrade or mix & match active and passive system for new buildings. Achieved
cost efficiency, fast & easy installation, flexibility and networks scalability.
Note: Information and Material in this presentation is proprietary to BTI to BTI Group of Companies, Unauthorized Copying Unauthorized Copying or Use of Information and Material from this presentation without without written permission from BTI will be considered unlawful unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with with under the law of Singapore. BTI BTI reserved reserved the right to amend or made changes to the above information without prior advice. Confidential
FIDAS In-Building Coverage Design
Aditya kemang Village Note: Information and Material in this presentation is proprietary to BTI to BTI Group of Companies, Unauthorized Copying Unauthorized Copying or Use of Information and Material from this presentation without without written permission from BTI will be considered unlawful unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with with under the law of Singapore. BTI BTI reserved reserved the right to amend or made changes to the above information without prior advice. Confidential
P roposed Concepts: Conce pts:
The proposed In building Coverage design using BTI’S FIDAS system for Aditya kemang Village , use the existing DAS system with 100% active system to transport operator’s BTS signaling to mobile users
The following presentation intend to provide an idea to introduce the FIDAS system for in building coverage ,which supports multi operators, multi bands and multi carriers wireless communication network services.
‐
‐
‐
‐
‐
The figures used in this presentation to describe the buildings all come from third party. A professional site survey and sites study should be done before deploy the IBC implementation. ‐
Note: Information and Material in this presentation is proprietary to BTI to BTI Group of Companies, Unauthorized Copying Unauthorized Copying or Use of Information and Material from this presentation without without written permission from BTI will be considered unlawful unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with with under the law of Singapore. BTI BTI reserved reserved the right to amend or made changes to the above information without prior advice. Confidential
Here is Aditya Kemang Village
Nos. of Building: Tower A,B,C,D,E,F,G, Parkia, Pengelola, V.K.Hotel, MALL,Sekolah ,Dehan lantai Parkia, R.serbaguna
Nos. of Floors: Totally 298
Nos. of Basement 3
Coverage area : Around 224,074 m2
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
ZONE Description ---- Buildings Distributing
Tower E PARKER Tower C
M
SEKOLAH/ LANTAIPARKIA
Tower F
A
L
L Tower G
Tower B HOTEL PENGELOLA
Tower D
Tower A
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
BUILDINGS
L(M)
W(M)
FLOORS
AREA per FLOOR
PARKIA
77.6
31.6
6.5
2452.16
TOWER A
28.76
36.57
43
1051.7532
TOWER B
33.2
27.6
46
916.32
TOWER C
41.6
27.4
46
1139.84
TOWER D
36.8
32.5
41
1196
PENGELOLA
26.8
30.5
2
817.4
K.V.MALL
232
56
5
12992
DEHAN LANTAI PARKIA
160
40
9.5
6400
HOTEL
17.2
70.7
18
1216.04
SEKOLAH
24
48
6
1152
TOWER E
10.1
72.3
7
730.23
TOWER E
22.1
69.3
18
1531.53
TOWER F
41.6
30
21
1248
TOWER G
61.1
19.1
25
1167.01
R.SERBAGUNA
1
BASEMENT 1
168
483
1
81144
BASEMENT 2
168
483
1
81144
BASEMENT 3
112
248
1
27776 Confidential
Operators Brief
OPERATORS/BRAND There will be 3 band wireless network (3G, CDMA800, TELKOMSEL DCS1800) provided by 8 operators (Telkomsel, XL XL,Indosat,HCPT,NTS,FLEXI,ESIA INDOSAT ,DCS1800). The total carries will be 12 HCPT currently in Aditya kemang NTS Village. FLEXI More carries will be used in future. The IBC system should ESIA be able to support the DCS1800 network expanding .
BAND
CARRIES
3G 3G 3G
5
3G 3G CDMA800 2 CDMA800 DCS1800
5
Confidential
Coverage System Overview
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Principle of the FIDAS solution Design
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Principle of the FIDAS solution Design
The is a multi –band wireless network.
The 3G(CDMA2000,WCDMA) signal has the lowest penetrate ability
In order to insure all bands Carries can be reached at a acceptable RX level in the buildings, take the 3G signal to be calculate factors.
The acceptable RX level of 3G set to be 85dbm ‐
Confidential
Principle of the IBC solution Design Coverage ERP Calculations
The target average coverage RX
85dbm
‐‐‐ ‐
Based on the space transmit model formula Ls=32.45+20logR(Km)+20logF(MHz) ,we can calculate the coverage radius of 3G omni antenna R (1 ) Po – Ls – L0 = P Po: antenna output power ( Without antenna gain) Based on the experience, the input power to omni antenna set to be 7dbm Ls: Power loss in space L0: Power block in the building P: The target coverage RX
‐‐‐‐
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
‐
Confidential
Main Kind Material Loss Normal brick wall
10db ~ 15db
Beton & Concrete wall
15db ~ 20db
Beton & Concrete Floor
10db~ 15db
Tunnel in Ceiling
1db ~ 8db
Lift
30 db
Human body
3db
Wooden furniture
3db ~ 6db
glass
5db ~ 8db
Confidential
•Considering the building structure features, assume the LO to be 17 db Bring all the values needed into the formula (1 ) 7 – 32.45 20logR 66.85 – 17 = 85 R ≈ 10 m, in order to a more ‐
‐
‐
‐
flexible calculation , we set R= 8 m •So the coverage area of 1 PCS omni antenna is 3.14*64 =200 m2 •And we can calculate the quantity of antennas each floor ,for instance, Floor 1 of Tower A is 1052 m2, the quantity of antenna is 1052/200 ≈ 6 Confidential
Principle of the IBC solution Design
In order to make a effective coverage margin , we divide the whole Aditya Kemang Village into 3 zones.
Assume that there is one BTS house in each Zone. The BTS of operators located in the BTS house and provide 3 BAND ( 3G, cdma800, DCS1800 ) wireless signal and 12 carries in all.
Confidential
Block Diagram BTS GROUP 1
BTS GROUP 2
BTS GROUP 3
ZONE 3 ZONE 2 ZONE 1
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
ZONE Description
Zone 1
Zone 2
1.
Tower A
1.
Basement1
2.
Tower B
2.
Basement2
3.
Tower C
3.
Basement3
4.
Tower D
4.
V.K.Mall
5.
PENGELOLA
BTS BTS GROUP GROUP 11
5.
PARKIA
BTS BTS GROUP GROUP 22
Zone 3 1.
DEHAN LANTAI PARKIA
2.
HOTEL
3.
Tower E,F,G
4.
R.serbaguna
5.
SEKOLAH BTS BTS GROUP GROUP 33
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
ZONE Description
---- Buildings Distributing
ZONE 1 ZONE 3
ZONE 2
Confidential
Architecture of the FIDAS solution
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Architecture of the FIDAS solution
ZONE
BTS
HU
RU
Zone1
BTS1
4
16
1018
Zone2
BTS2
4
15
1361
Zone3
BTS3
4
15
923
12
46
3302
TOTAL
OMNI ANTENNA
Confidential
ZONE
BUILDINGS
RU
HU
4
1
TOWER B
4
1
230
TOWER C
4
1
276
TOWER D
4
1
246
DEHAN LANTAI PARKIA
4
1
304
HOTEL
2
TOWER F
2
TOWER A PENGELOLA ZONE1
ZONE3
TOWER E R.SERBAGUNA
ZONE2
3
1
1
OMNI ANTENNA 258 8
108 147 172 6
TOWER G
3
SEKOLAH
1
BASEMENT 1
4
1
406
BASEMENT 2
4
1
406
BASEMENT 3
2
PARKIA
1
MALL
4
1
1 1
150 36
139 85 325 Confidential
Block Diagram ---- ZONE 1
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Equipment list for ZONE 1 ZONE
Estimated Antenna
Equipments
8
L1
66
L1 L11
RU012
66
L12
‐‐
L22
RU013
66
L23
‐‐
L33
RU014
60
L34
‐‐
L43
RU021
50
L1 L10
RU022
60
L11
‐‐
L22
RU023
60
L23
‐‐
L34
RU024
60
L35
‐‐
L46
RU031
60
L1 L10
RU032
72
L11
‐‐
L22
RU033
72
L23
‐‐
L34
RU034
72
L35
‐‐
L46
RU041
60
L1 L10
RU042
60
L11
‐‐
L20
RU043
60
L21
‐‐
L30
RU044
66
L31
‐‐
L41
RU011 HU01*1
HU02*1 ZONE 1
POI*1
HU03*1
HU04*1
TOTAL
POI*1
HU *4
Coverage Area
RU *16
‐‐
L2
PENGELOLA
‐‐
Tower A
‐‐
Tower B
‐‐
Tower C
‐‐
Tower D
1018 Confidential
Block Diagram ---- ZONE 2
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Equipment list for ZONE 2 ZONE
Estimated Antenna
Coverage Area
406
BASEMENT 1
406
BASEMENT 2
139
BASEMENT 3
RU073
85
PARIKA
RU081
65
L1
RU082
65
L2
RU083
65
L3
RU084
130
L4
Equipments RU051 HU05*1
RU052 RU053 RU054 RU061
HU06*1 ZONE 2
POI*1
RU062 RU063 RU064 RU071
HU07*1
HU08*1
TOTAL
POI*1
HU *4
RU072
RU *15
V.K.MALL ‐‐
L5
1361
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Block Diagram ---- ZONE 3
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Equipment list for ZONE 3 ZONE
HU09*1
HU10*1
ZONE 3
Estimated Antenna
Equipments
POI*1
RU091
64
P1
‐‐
P4
RU092
96
P5
‐‐
P10
RU093
64
P11
‐‐
P14
RU094
80
P15
‐‐
F19
RU101
60
L1
RU102
48
L11
RU103
77
L1
RU104
70
L12
6
L1
28
L1
‐‐
L7
RU112
72
L8
‐‐
L16
RU113
72
L17
RU121
48
L1
‐‐
L8
RU122
48
L9
‐‐
L16
RU123
54
L17
RU124
36
L1
RU111 HU11 *1
HU12 * 1
TOTAL
POI*1
HU *4
Coverage Area
RU *15
‐‐
L10
‐‐
‐‐
L18
L11
‐‐
L21
DEHAN LANTAI PARKIA
HOTEL
TOWER F R.SERBAGUNA
‐‐
‐‐
‐‐
TOWER E
L25
TOWER G
L25
L6
SEKOLAH
923 Confidential
Block Diagram
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
OMNI Antenna Location
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
BUILDINGS
L(M)
W(M)
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
PARKIA
77.6
31.6
6.5
13
85
Confidential
BUILDINGS
L(M)
W(M)
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
TOWER A
28.76
36.57
43
6
258 Confidential
BUILDINGS
L(M)
W(M)
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
TOWER B
33.2
27.6
46
5
230 Confidential
BUILDINGS TOWER C
L(M) 33.2
W(M) 27.6
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
46
5
230 Confidential
BUILDINGS TOWER D
L(M) 36.8
W(M) 32.5
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
41
6
246 Confidential
BUILDINGS PENGELOLA
L(M) 26.8
W(M) 30.5
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
2
4
8 Confidential
65 PCS
BUILDINGS MALL
L(M) 232
W(M) 56
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
5
65
325 Confidential
BUILDINGS DEHAN LANTAI PARKIA
L(M) 160
W(M) 40
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
9.5
32
304 Confidential
BUILDINGS HOTEL
L(M) 17.2
W(M) 70.7
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
18
6
108 Confidential
BUILDINGS SEKOLAH
L(M) 24
W(M) 48
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
6
6
36
Confidential
BUILDINGS TOWER E
L(M) 10.1
W(M) 72.3
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
7
4
28 Confidential
BUILDINGS TOWER E
L(M) 22.1
W(M) 69.3
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
18
8
144
Confidential
BUILDINGS TOWER F
L(M) 41.6
W(M) 30
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
21
7
147 Confidential
BUILDINGS TOWER G
L(M) 61.1
W(M) 19.1
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
25
6
150 Confidential
406 PCS
BUILDINGS BASEMENT 1
L(M) 168
W(M) 483
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
1
406
406
Confidential
406 PCS
BUILDINGS BASEMENT 2
L(M) 168
W(M) 483
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
1
406
406 Confidential
139 PCS
BUILDINGS BASEMENT 3
L(M) 112
W(M) 248
FLOORS
QUANTITY PER FLOOR
QUANTITY IN ALL
1
139
139
Confidential
Management Network
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Management Network
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice.
Confidential
Comprehensive System Management
Summary major alarms Summary minor alarms
Visual Alarm LED
GUI based local management (EMS)
Client/Server based remote supervision (NMS)
Device mapping Device info
Troubleshooting
Remote control & management via LAN or external dial-up modem
Map view
Optional
API for 3rd parties applications
Optional
Summary dry contact
Optional
Web based client
Optional
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential
Aims:BTI’S FIDAS Coverage Solution aims to provides • cost efficiency, fast & easy installation • flexibility and scalability • Supports multi band, multi system, multi carrier and multi operator ‐
‐
‐
‐
• Hybrid System able to work with both Active and Passive components
Note: Information and Material in this presentation is proprietary to BTI Group of Companies, Unauthorized Copying or Use of Information and Material from this presentation without written permission from BTI will be considered unlawful and BTI reserved the right to request compensation and unauthorized user will be dealt with under the law of Singapore. BTI reserved the right to amend or made changes to the above information without prior advice. Confidential