NEBOSH International General Certificate in Occupational Health and Safety
UNIT IGC3: HEALTH AND SAFETY PRACTICAL APPLICATION
Student Name: Mateen Ahmad khan Student Number: 00193850 Date of Submission: 6th August 2013
APPENDIX 1 IGC3 – The Health and Safety Practical Application Candidate and course provider declarations: For completion by the candidate: I declare that the work submitted for this practical application assessment ie. the completed observation sheets and the report to management, is my own work. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Name (Print)
Mateen Ahmad Khan
Signature Date
02-08-2013
For completion by a course provider representative (e.g. internal practical assessor): I declare that the work marked is identical to that received from the candidate. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Name (Print) Signature Date For completion by the course provider’s internal practical assessor: I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Name (Print) Signature Date
NB: This declaration must be completed in full, submitted and retained with the candidate’s script. If this declaration is not submitted the candidate’s result may be declared void.
APPENDIX 3 INTERNATIONAL GENERAL CERTIFICATE (2011 specification)
Assessor’s marking sheet
IGC3 – THE HEALTH AND SAFETY PRACTICAL APPLICATION Date of practical application 02-08-2013 Course provider number
Student number
Name of assessor Course provider name
00193850
Student name
Mateen Ahmad Khan
Maximum marks available
Criteria 1
Completion of observation sheets
1.1
Range and number of hazards/good practice
15
1.2
Identification of suitable control measures and timescales
15
2
Report - Introduction and Executive Summary
2.1
Introduction providing an overview of the chosen area
5
2.2
Executive summary
5
3
Report - Main findings of the inspection
3.1
Quality of interpretation of findings and clear references to strengths and weaknesses
3.2
Identification of possible breaches of international standards
5
3.3
Persuasiveness / conciseness / technical content
10
4
Report - Conclusions and Recommendations
4.1
Clear and concise conclusions which are clearly related to report findings and are effective in convincing management to take action
15
4.2
Recommendations which present realistic actions to improve health and safety in the chosen area
15
TOTAL MARKS
15
100
Assessor’s marks awarded
NEBOSH moderated marks (if different)
Outcome: PASS Date assessed
/
REFER (less than 60%)
(60% or more)
/
Assessor’s signature Date received by course provider
/
/
Date received by NEBOSH (if applicable)
/
/
Assessor’s additional comments on the practical application:
ASSESSED BY (name in block letters) The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.
NEBOSH USE ONLY NEBOSH Moderator’s comments:
APPENDIX 4 INTERNATIONAL GENERAL CERTIFICATE (2011 specification)
Candidate’s observation sheet
IGC3 – THE HEALTH AND SAFETY PRACTICAL APPLICATION Sheet number
5
of
16
Student name Mateen Ahmad Khan
Student number
Place inspected ROYAL CENTRINO(MUMBRA)
Date of inspection 02 / 08 / 2013
Observations Hazards and consequences
Control measures
00193850
Timescale
Immediate and longer-term actions
1) Security cabin and security available at entrance gate and personel details are taken which result in good practice.
Good practices need to be maintained Ongoing and it will prevent un-orthorised people monitoring. to enter the construction area.
2) No board for warning sign and emergency detail at the entrance of site can result problem to worker, customer and vernarable people in emergency.
a) Inform management for sign board requirement.
Immediate.
b) Sign board should be provided as early as possible.
1 Week.
c) Training and information to worker 1 Month. about signages. 3) No segregated pedestrian for people and chain supply vehicle found which can result in accident.
4) 2 workers found carrying heavy marbles manually on shoulder which me led to injuries, like back pain, muscles injury and cuts, burns and broken bones
5) CCTV camera not installed at fencing of site which can result in access of un-orthorised person, unorthorised activity and childrens
a) Asist a person for monitoring movement of material vehicle.
1 Day.
b) Segregate the pedestrian and chain supply vehicle.
1 Month.
a) Stop the activity and instruct him about hazards of manual handling.
Immediate.
b)Provide informations and instructions to worker related to manual handling 3 days techniques c) Avoid manual handling and start using mechanical equipment
3 Month.
a) Appoint person for monitoring.
3 Day.
b) Install CCTV camera at the site.
1 Month.
Observations Hazards and consequences
Control measures
Timescale
Immediate and longer-term actions
6) Coupling of concrete mixer a) Provide a tag which will indicate machine found unguarded which can danger to machine. result in entanglement, cut-off etc. b) Provide guard on coupling of machine. c) Maintenance of equipment and inspection to be done by competent person.
Immediate. 3 Day. 1 Month.
7) Found diesel fumes coming out a) Provide nose muffs and goggles to Immediate. from concrete mixer which result in worker nearby mixer. cancer to worker near by it, irritation of eyes, skin etc. b) Maintenance of diesel engine should 2 Week. be done when excessive smoke comes. c) Replace with new technological 6 Month. machines which generates low smoke 8) Knob of water proofing chemical container is found open after use which will expose to atmosphere and effect the environment and worker may inhale toxic chemicals.
a) Close the knob immediately and regular monitoring by supervisor.
Immediate.
b) Training and information should be 1 Month. provided to worker regarding good housekeeping and hazard associated with chemicals.
9) Electric wire of ply cutter machine a) Provide plug immediately. Immediate. found without plug can result in electric hazard. b) Maintenance and inspection should 1 Month. be done at regular intervals. 10) Found flammable chemical like a) All flammable chemicals to be kept 1 Day. duct bond, paints, adhesive and in designated area. thinner containers left on the ground floor of building no. 1A. b) All the empty containers must be 1 Week. disposed in chemical trash bin. c) Training and information should be 1 Month. provided on waste handling. 11) It was observed that lifting heavy a) Barricade the area immediately. Immediate. steel was in progress without rigger, without barricading the area. b) Provide temporary person as rigger. 1 Week. c) Demand for rigger to the organization.
1 Month.
Observations Hazards and consequences
12) An organizational culture of promoting continuous 12 hours shift for worker and technical supervisor noticed which may lead to stress, fatigue and violence at work.
Control measures
Timescale
Immediate and longer-term actions
a) Stop 12 hour shift for worker and reduce the timing to 8 hours.
1 Week.
b) Conduct a seminar regarding the organization culture and behavior related to health and safety.
1 Month.
c) Review the organization policy and 6 Month. incorporate shift pattern control in the policy to avoid violence at work. 13) Worker found exposed to excessive noise of concrete mixer. Continuous exposure to excessive noise may lead to noise induced hearing loss and tinnitus.
a) Worker working around the concrete 1 Day. mixer should strictly wear ear muffs and the supervisor should ensure it. b) Proper job rotation to worker should 1 Week. be provided to reduce the exposure of excessive noise. c) Built an acoustic enclosure around the mixer to restrict the noise.
6 Month
14) Fire safety system has been Good facilities and practice to be installed in building no. 1A, B, C, maintained. which eliminate the fire hazards and is good practices.
Ongoing monitoring.
15) Housekeeping of equipment and a) Arrange the tools equipment and tool is found poor and many hazards keep the room neat and clean. are noticed due to lack of arrangement of equipment storage and misuse of b) Conduct tool box talks and brief tools which may lead to slip, trip, about the hazards associated with the electrical shock, fire etc. work and the impact of housekeeping on controlling the hazards.
1 Day.
c) Recruit a housekeeping employee.
1 Week.
3 Month.
16) An excavated open and unsecured a) Fence the excavated area with 1 Day. trench of 2m depth is noticed in temporary barricaders. building no. 1A, B, C where lift has to be installed and it may result in b) Fence the excavated area with guard 1 Week. fall of object, people etc. rails or brick guards. c) Fit the lift at the agreed lime limit.
6 Month
Observations Hazards and consequences
Control measures Immediate and longer-term actions
17) Drill operator is exposed to a) Use shock absorption pad. vibration while fitting grill to window can result in hand arm vibration b) Provide job rotation which will syndrome, muscle pain, joint pain. prevent access exposure to vibration. c) Provide training inspection and supervision. 18) Worker found not wearing nose a) Use nose muffs. muffs while spray painting at building no. 1A,B,C as paint contain chemical, b) Training to worker of regarding thinner, tar which will result in health appropriate use of PPE and hazard of problem to worker by inhalation of point. toxic chemicals c) Can replace spray painting by dip painting by discussion with management in future. 19) Guardrails and toe board not provided on edge of 6th floor of building no. 2A, B, C which will result in fall hazard.
20) Ladder not tied to column while filling concrete can result in fall hazard as the height is above 8ft.
Timescale
1 Day. 1 Week. 1 Month.
Immediate. 1 Month.
3 Month.
a) Immediate protect edge by rope or temporary protection.
Immediate.
b) Provide guards and toe board as early as possible.
1 Week.
c) Discussion of importance of guard rail and its provision for further working.
1 Month.
a) Tie the ladder immediate.
Immediate.
b) Select good ladder.
1 Week.
c) Training to worker about work on ladder.
1 Month
21) Inadequate bracing which are not a) Provide adequate bracing and tie all 1 Day. properly tied found on scaffold of bracing and inspect it. building no 2A,B,C which can result 1Week. in collapse of scaffolds. b) Inspection of scaffold should be done at intervals. 1 Month. c) Training regarding scaffold inspection and fitting should be given to worker.
Observations Hazards and consequences
Control measures
Timescale
Immediate and longer-term actions
22) Arc is found while cutting of steel a) Provide fire extinguishers. 1 Day. and no fire extinguisher present in cutting area will lead to fire hazard. b) Training for use of fire extinguishers. 1 Week. c) Fire risk assessment should be done. 1 Month. Good practices need to be maintained 23) Verification of vehicle condition and it will prevent breakdowns and Ongoing by the driver before start up of accidents. monitoring. excavation noticed which is good practices and will prevent accidents. a) Provide adequate barricading to 1 Day. 24) No barricade provided around the prevent accidents. excavation area, personal working near to the pit and animal can fall into b) Sign ages of danger and excavation 1 Week. the pit. work attached near excavation. c) Conduct a talk with contractor.
1 Month.
a) Should display PTW immediately.
1 Day. 25) Excavation pit permit not displayed at excavation point. Hence b) Provide a copy of permit to work to worker may work by their own way each worker at excavation. which can result in accident or injury. 1 Week. c) Training to worker about excavation 1 Month. hazards. a) Should be clean immediate. 26) Contaminated ground with hazardous material and sewage pipe found can result in environmental hazard.
b) Land of excavation need to be checked before commence of work.
1 Day. 1 Week.
C) Provide training to work at excavation and hazard associated with 1 Month. it.
27) Worker found without PPE in excavation. As soil fungus may be present may lead to histoplasmosis.
a) Use appropriate PPE.
Immediate.
b) Health check-up of worker should be done.
1 Week.
c) Appropriate training should be given regarding PPE and hazard in soil.
1 Month.
Observations Hazards and consequences
Control measures
Timescale
Immediate and longer-term actions
28) Old computers are used in office a) Provide screen guard, rays absorber. 1 Day. which result in radiation and stress on eyes of worker. b) Replace monitor to new TFT screen. 1 Month. 29) Workstation of office is not design a) Provide break and worm exercises. as comfort of employee’s requirement. b) Re-design the work place. 30) First-aid kit in the office found with old and contaminated cottons, Band-Aids, kit content list was not updated and stock was not verified since 1 month. Use of such defects can increase risk of ill-health.it will prevent first-aider to prevent the deterioration of the injury.
a) Replace the outdated first-aid kits with new one.
1 Day. 6 Month.
2 Days.
b) Schedule a safety survey of first-aid kit an every Saturday of each week and 1 Week. update the check list of each kit. c) Provide basic training to the firstaider about the stock in kit.
1 Month.
31) Canteen facilities, toilet facilities, All welfare facilities and good practices Ongoing washing facilities, drinking facilities need to be maintained. monitoring. and changing room facilities are well maintained.
APPENDIX 5 INTERNATIONAL GENERAL CERTIFICATE (2011 specification)
UNIT IGC3 – THE HEALTH AND SAFETY PRACTICAL APPLICAITON
Student number 00193850 Location ROYAL CENTRINO(MUMBRA)
Date of review 02
/ 08
/ 2013
Introduction including overview of area inspected and activities taking place:This inspection is carried out at "ROYAL CENTRINO" a construction site located in Mumbra, Maharashtra state, India on 02.07.2013. The site is famous for its construction of 14 story tower of 4 building considering of 3 wings A, B, C. The total site is spread over 14 acres of land. Building 1A, B, C is completed and finishing work is going on like painting, plumber, lift system etc. Building 2A, B, C is under construction and excavation is started for building 3A, B, C. Some of the areas inspected are:
Machinery used in construction. Site security and pedestrain. Excavation area. Welfare facilities. Work station office. Workers health and safety. PPE'S used by workers
The basic risk and hazardous activities that are found are work with machinery, manual handling, waste handling, excavation, scaffolds, painting, cutting, DSE work station, welfare activities etc.
APPENDIX 5 INTERNATIONAL GENERAL CERTIFICATE (2011 specification)
UNIT IGC3 – THE HEALTH AND SAFETY PRACTICAL APPLICAITON
Student number 00193850 Location ROYAL CENTRINO(MUMBRA)
Date of review 02
/ 08
/ 2013
Executive Summary:Organization has to focus on five main areas highlighted in this report to improve their health and safety performances. These are listed below in the order of priorities and importance. Detailed recommendations with timescale and approximate cost are explained in the recommendations of this report. 1. Pedestrian safety. Collision Risk of supply chain vehicle with pedestrians should be reduced by providing separate routes for both vehicles and pedestrians with appropriate lightings, humps on the road, and speed restrictions within the premises. 2. Machinery maintenance and monitoring. Machinery maintenance should be carried out as per planned preventative Maintenance schedules and the Entanglement and cutt-off hazards associated with the machineries should be identified and eliminated through the developments of safe system of works, periodic safety inspections and safety tours by the site supervisor. 3. Violence at work. Risk of violence's at workplace should be eliminated through the proper execution of disciplinary procedures, introduction of SAP system for proper documentations, prohibiting double shift work patterns of the organization. 4. Contractor Management. Selection of the contractor should be done through proper verification of the contractors Health and Safety policies, accident histories, past performances, Resources and infrastructural capabilities, enforcement actions, previous audit reports etc. Excavations made by the contractor should be secured and sealed immediately to prevent the fall off objects and fall off peoples. Appointed Site Manager should PlanCoordinate-Monitor the contractors work on regular basis to ensure the organizations safety compliances. 5. Fire safety. Risk of fire at work should be eliminated through providing proper fire extinguisher in cutting area. Finance required to purchase fire extinguisher is too less than the loses due to fire. It will prevent worker life and damage to material.
These improvement plans specified in this report will reduce the risk of accidents and ill-health. It will help the organization to prevent enforcement fines and penalties, reduce equipment and property damage, sick pay, absenteeism, cost associated with investigation etc.
APPENDIX 5 INTERNATIONAL GENERAL CERTIFICATE (2011 specification)
UNIT IGC3 – THE HEALTH AND SAFETY PRACTICAL APPLICAITON
Student number 00193850 Location ROYAL CENTRINO(MUMBRA)
Date of review
02/ 08 / 2013
Main findings of the inspection: 1. Non segregated pedestrian pathways and supply chain vehicle pathways elevates the risk level of collision of vehicle with pedestrians. Movements of people during heavy vehicle movements is dangerous. These represent possible breach of Occupational Health and Safety Act amended 16 June 1999 RTI 2007,3,11-entered into force 01.03.2007(44) Workstations, traffic routes and other areas or installations outdoors which are used or occupied by the employees in the course of their activity must be organized in such a way that pedestrians and vehicles can circulate safely. 2. Many machinery operation are under risk due to lack of supervision, poor inspection and ineffective Planed Preventative Maintenance. Coupling unguarded of concrete mixer machine can result in a dangerous situation and lead to entanglement and cut-off of hand of workers.
3. Visible and sample evidence about the risk of violence’s are found in many areas of construction because site supervisor and worker are working 12 hours shift. Risk of violence is high amongst worker as they are doing hard activities for long time. These represent possible breach of International Labor Organization convention No.189, Recommendation No.201, Domestic workers Recommendation, Members, in consultation with the most representative organizations of employers and workers and, where they exist, with organizations representative of domestic workers and those representative of employers of domestic workers, should take measures, such as to: Provide an adequate and appropriate system of inspection, consistent with Article 17 of the convention, and adequate penalties for violation of occupational safety and health laws and regulations.
4. Competences of approved contractor did not comply with the health and safety standards as they did not demonstrate any visible commitment towards health and safety. Excavations made by an external contractor was not sealed and secured and it leads to the risk of fall of people, fall of objects etc.
These represents possible breach of ILO Occupational Safety and Health 2001 guidelines on occupational safety and health management system clause 3.10.5.2 (a) which states that arrangements for contractors working on site should include OSH criteria in procedures for evaluating and selecting contractors.
5. There are ignition sources like wood, ply, paints etc and cutting of steel is observed with no fire extinguisher present in that area. As arc is eliminated while cutting can result in huge fire which will tend in huge loss of material and lives.
This represents possible breach of ILO C-155 Article 16-2 states that Employer shall be required to ensure that so far as reasonably practicable, the chemical physical and biological substances and agents under their control without risk to health. Article 18 Employer shall be required to provide, where necessary, for measure to deal with emergencies and accidents, including first-aid arrangements without risk to health when the appropriate measure of protection are taken.
APPENDIX 5 INTERNATIONAL GENERAL CERTIFICATE (2011 specification)
UNIT IGC3 – THE HEALTH AND SAFETY PRACTICAL APPLICAITON
Student number 00193850 Location ROYAL CENTRINO(MUMBRA)
Date of review 02
/ 08
/ 2013
Conclusions:The construction activity, office premises and welfare facilities is fairly well running, the management demonstrates some visible examples of good health and safety practices at workplace. Some significant hazards are identified in this report which relates to machinery hazards that can cause entanglement and cut-off and electrical shock due to lack of supervision and poor planed preventative maintenance. Risk of violence due to poor work pattern and culture, collision of vehicle with people and improper selection of contractor. Action are recommended to be taken include the development of planed preventative maintenance, inspection, review of policies, development of safe system of work, development of permit to work, monitoring and supervision. Develop violence prevention programs over working, conduct contractor audit. This recommendation does not require any financial investments. Pedestrian pathway, machine guard, and fire extinguisher require little finance which may prevent future losses in term of direct and cost associated with accident. The report has identified several legal breaches of health and safety low, which, if left could lead to act by the enforcing authority. Many international occupational health and safety statutory and regulate bodies demand safe place of work, safe environment and equipments, safe system of work, training and supervisions and competent staffs to demonstrate a visible commitment by the employer towards health and safety. The recommendations in this report will help the organization to meet their legal obligations. Recommendations in this report will help the organization to prevent accidents which will help them prevent the direct and indirect losses. Direct costs are claimable, but indirect costs, which are not claimable, are generally 35% more than the direct costs. Management actions towards this report will improve the morale peoples associated with the company and it will help the organization to improve their business performances.
APPENDIX 5 INTERNATIONAL GENERAL CERTIFICATE (2011 specification)
UNIT IGC3 – THE HEALTH AND SAFETY PRACTICAL APPLICAITON
Student number 00193850 Location ROYAL CENTRINO(MUMBRA)
Date of review
02/ 08 / 2013
Recommendations: Recommendation
Likely resource
Priority
Review
implications Construct separate pathways for Estimated cost of pedestrians and vehicles with proper INR 500000/guardrails, cross point, safety warnings and speed limit to prevent collision of vehicles and pedestrians.
High
date 02/12/2013
Provide guard on concrete mixer and Estimated immediate cost strengthen the inspection and of INR 5000/supervision by technical supervisor to maintain the safe condition of machines and equipments.
High
08/09/2013
Implement SAP system, stop overworking of people and supervise the area. Update organization policy to eliminate violence behavior at workplace.
Estimated cost to improve Health and safety culture and behavior at workplace Is INR 100000/-
High
03/10/2013
A health and safety audit should be carried out prior to the approval of any contractor and the work should be monitored by site manager. Root cause of the unsecured excavation should be documented to prevent recurrences.
An estimated administrative cost of INR 50000/- per annum is required for the audit to be carried out by the health and safety committee of the organization
High
15/08/2013
High
10/08/2013
Provide an fire extinguisher in cutting Estimated immediate cost area which will eliminate fire hazards of INR 5000/-