Agriculture - Industry - Marine Control Inspection Group (AIM Control) Worldwide is an independent inspection group acting globally and providing a complete range of inspection, quality good…Full description
inspection reportFull description
uuiiiiDescrição completa
Full description
Steam Plant Alalysis ReportFull description
Template for boiler inspection report
To check any incoming sample,Descrição completa
ship inspectionDescripción completa
Template for boiler inspection reportFull description
inspection
Scaff Ins.Full description
inspection
Full description
turbine, stem turbine, BHELtraining report, report, training report,steam turbine principles, turbine blades, material used in turbine, blading, glands, sealing of turbine, impulse effect, reaction...
inspection
Material Inspection Report (Steel) FormFull description
Concrete Batch Plant inspection Checklist
Full description
drums
steam
Feasibility report about : Steam Power PlantFull description
Lab Experiment Report
HRSG-1A STEAM DRUMS INSPECTION REPORT GT-1A3rd MI declared from 17-12-2012 to 21-12-2012. During 3rd Minor inspection of GT-1A, we inspected HP,IP,LP and Deaerator De aerator internals. During Deaerator inspection,it was observed that the deaerator inside some corrosion points at different locations were observed and their thei r photos were illustrated below. Remaining internals like perforated pegging steam header,condensate inlet nozzle,feed pumps suction nozzles,feed water recirculation lines and found no abnormality.
HP steam drum manway opened and internals like steam and water separators,demister pads,all the nozzles inside drum ,cbd and ibd lines,feed water supply pipe were inspected and found normal. At IBD nozzle area,some fin e sludge material was observed and that was removed and informed to Chemist. After completion of inspection, drum manway fixed with new gasket.
IP steam drum manway opened and internals like steam and water separators,demister pads,all the nozzles inside drum ,cbd and ibd lines,feed water supply pipe were inspected and found normal. After completion of inspe ction, drum manway fixed with new gasket.
LP steam drum manway opened and internals like steam and water separators,demister pads,all the nozzles inside drum ,cbd and ibd lines,feed water supply pipe were inspected and found normal. After completion of inspe ction, drum manway fixed with new gasket.