How To Do Pile Driving With Percussion Method Posted by Harry Lee on April 15, 2009 at 8:26 pm · Under Pile Driving, Driving , Piling There are several types of pile driving method in the piling construction, type of pile driving method used is depending on the condition of soil and location of the site. However, different piling machine will be used with different pile driving methods too. The specification for pile driving mentioned below is generally recommended for pile driving of prestressed spun concrete piles by using percussion method . Engineers maybe required to modify some of the clauses to suit requirements of different site conditions.
How To Do Pile Driving With Percussion Method 1) Joints The bending strength of a joint between two lengths of pile shall be equal or more than the bending strength of the concrete shaft. When two lengths of pile are jointed, the end plates must bear over their complete areas. The two end plates are then welded along their entire periphery with weld size as specified.
Jetty & Seawater Intake for chemicals, chemicals, coal, coal, power plants, plants, marine marine terminals in Indonesia www.swijetty.com
Resonant Machines High Tech Concrete Recycling Global Leader-60% Leader-60% Less Job Costs www.resonantmachines.com
Sheet pile design program DeepXcav 2010 graphical graphical & powerful with structural design AISC, EC EC . deepexcavation.com
1.1 Welding of Joints All welding shall be carried out in accordance with the requirements of B.S.5135:1974 - Metal-Arc Welding of carbon and carbon-manganese steel. 1.2 Tests for Approval of Welders Welders shall be qualified in accordance with the requirementsof AWS Code D1.1. Only welders who pass the qualifying tests for the type of weld specified shall be employed on on the Works. 1.3 Examination of Welds Butt welds between the end plates of the joints shall be tested using magnetic particle or dye penetrant test methods. Copies of these test records and reports shall be furnished to the Engineer.
Where such examination reveals defects in the welds, the joints shall either be rejected or repaired. If repeat tests show the weld to be still defective, the joint shall be rejected. The defective weld shall be removed, replaced with a fresh weld and re-examined. For the purpose of this Clause, cracks, leaks, laminations, lack of complete fusion, undercutting or reduction in wall thickness adjacent to the weld shall constitute a defect .
2) Pile Driving by Using Percussion Method 2.1 Pile Hammers Shall be of size and type able to deliver consistently consistently an effective dynamic dynamic energy suitable suitable to the piles to be driven and the material into which they are to be driven. Hammers shall be provided with proper driving helmets suited for the piles. Any indication of collapse of hoses, tripping of hose lining or any erratic action of the hammer shall be cause for immediate shutdown until the problem has been corrected.
Pile hammers shall be operated at the full rated efficiency and capacity and in the manner specified by the manufacturer, except as directed otherwise by the Engineer, or noted herein below under Reductiono of Hammer Energy. Energy. When a steam or air hammer is used for driving any type of piles, both the volume and pressure of steam or air recommended by the manufacturer of the hammer shall be maintained at all times to ensure full energy of the driving blows. Before pile driving is started, the Piling Contractors shall provide written certification to the Engineer that the pile hammer, compressors and valves have been inspected and found to be in good working condition. 2.2 Reductiono of Hammer Energy When the pile is set in a pre-jetted or pre-drilled hole or when the point of a prestressed concrete pile is passing through soft soil so that there is little or no resistance to penetration of the pile, there is a possibility that longitudinal tensile stresses may be set up in the pile shaft by the elastic shock waves travelling up and down the pile. For such driving conditions, the length of stroke of the hammer shall be reduced. Failure of the piles due to longitudinal tensile stresses caused by excessive driving shall be the Contractor’s responsibility. 2.3 Pile Cushion Block The heads of all prestressed concrete cylinder piles shall be protected with a soft wood cushion block at least 15 cm thick to effectively and uniformly
http://pile-driving.com/how-to-do-pile-driving-with-percussion-method/
30/11/2010 15:48:47
How To Do Pile Driving With Percussion Method | Piling | Pile Driving | Piling Construction
2
distribute hammer blog energy. The block shall be composed of layers of 20mm hi-grade marine plywood or approved equal, and of such dimensions as to completely cover the concrete cross-section of the pile. The cushion block shall be inspected periodically during driving and no driving shall be done with a block that has been unduly worn and compressed with use. Cushion blocks must be replaced when compressed to 1/2 their original thickness, when badly worn or when burning. 2.4 Driving The piles shall be driven to the driving resistance or tip elevation as determined by the Engineer from pile load tests. The maximum allowable variation at the butt end of the pile shall be 150mm in any direction from the location shown on the Drawings or as directed by the Engineer. Any variation beyond these limits shall be allowed or rejected at the sole discretion of the Engineer.
3) Cutting Off and Capping Piles Tops of foundation piles shall be embedded in the concrete footing or pile cap for a minimum depth of 75mm (measured at center line of pile). When the top elevation of a pile is below the elevation of the bottom of the cap, the pile shall, if approved by the Engineer be built up from the butt of the pile to the elevatioon of the bottom of the cap by an approved method. The cuts shall be made accurately in clean, straight lines; care shall be exercised to avoid damaging the remaining pile and to ensure full bearing between the footings (or pilecaps) and piles. Bookmark
Related Articles What Is ICP Piles How To Produce Super Strength Pile (SS Pile) Procedure Of How To Drive A Pile AuGeo Piling System What Is Bored Piles
Permalink for How To Do Pile Driving With Percussion Method
Pile Driver www.dd-eng.com Sheet Pile Driver, Auger Vibro Hammer, Vibro Ripper
Icanda Corporation www.icanda.com Slurry Walls / Cutoff Walls Deep Foundation Specialist
Leave a Comment for How To Do Pile Driving With Percussion Method Name (required) E-mail required) URI
Submit Blog Comment
http://pile-driving.com/how-to-do-pile-driving-with-percussion-method/
30/11/2010 15:48:47
How To Do Pile Driving With Percussion Method | Piling | Pile Driving | Piling Construction
3
Ads by Google Steel Sheet Pile CFA Piles Piles 13 Types of Piling
K-E Persson AB Seamless steelpipes, Sheet Piles, Piling equipment, and much more! www.kepab.com
Detailing Software Antiseismic Technologies Static Dynamic Analysis Software www.pi.gr
Rock Drills Get Free Import Quotes Export Ready Suppliers From India IndiaMART.com/Industrial_ Plants
HKPC Rockin' regular percussion courses! ABRSM, Drum set, Parent & Child www.hkpercussion.com
Zueblin Cage Machines Auto-Reinforce Precast Products Concrete Pipes Piles Poles www.cagemachine.com
Categories AuGeo Piling System Bored Pile Deep Foundation ICP Pile Micropile Pile Driving Piling Piling Machine Retaining Wall Sheet Piling Super Strength Pile
Recent Piling Articles Structural Foundation - Retaining Wall and Bored Piles What Is ICP Piles AuGeo Piling System What Is Micropile Cold Formed Steel Sheet Piling How To Do Pile Driving With Percussion Method How To Drill Bored Pile What Is Bored Piles How To Produce Super Strength Pile (SS Pile)
http://pile-driving.com/how-to-do-pile-driving-with-percussion-method/
30/11/2010 15:48:47
How To Do Pile Driving With Percussion Method | Piling | Pile Driving | Piling Construction
4
How To Handle And Store Pile
Archives June 2009 May 2009 April 2009 March 2009
Popular Tag AuGeo Piling System Bored Pile
Bored Piles Bored Piling Bored Piling Machine Cast-In-Situ Concrete Cold Formed Steel
Extension Pile Ground Treatment ICP Piles Initial Pile Load Test Micropile Micro Pile Micro Piles Percussion Method Pile Pilecap
Construction
Concrete Pile Construction Deep Foundation
Pile Driving Pile Head Piles Piling Piling
Piling Contractor Piling Machine Precast Concrete Precast Concrete Pile Prestress Pile RC Square Pile Reinfored Concrete Retaining Wall
Sheet Pile Sheet
Piling Spun Pile SS Pile Steel Pile Structural Foundation Super St rength Pile Timber Pile
Blogroll Corrugated Drain Pipe Dock Pilings Vinyl Sheet Piling Google AdSense Almost Spring Theme with SEO by David Law, based on Almost Spring theme Piping Work | Concrete Curb | Piling | Pile Driving | Piling Construction
http://pile-driving.com/how-to-do-pile-driving-with-percussion-method/
30/11/2010 15:48:47