Some techno-economic analyses of specific Formaldehyde production processes. They include capital investment breakdown, raw materials consumed and operating costs. Available at www.intratec…Full description
feasibility study
this chapters is a feasibility study of recycling tires.Full description
chapter I
FeasibFull description
Charitable Institutions Related
ICCT
Full description
Internet Cafe
World Bank presentation to the Movement for a Liveable CebuFull description
NRW
Full description
Description complète
a feasibility study about selling longganissa
GUIDED BY : MS. JYOTI TRIVEDI PREPARED PREP ARED BY BY : RAVIN KHENGARBHAI GOHIL
MULTIPLE MULTIPLEXX- the word deals with several several entertainm entertainment ent programme programme in one particul particular ar source from one particular place. Study of all the norms Feasibility study: dealing with the market study , technical study and financial study of a particular project for means of their final profit
Definition: Study of a project dealing with the acceptability parameters considering the public demand and the use of multiplex keeping in mind profit of particular project Advantages of Market survey: - Whether project is feasible or not
- Feedback of public over a project - Involvement and interest of other agencies
Used to know the focus of particular project Market feasibility by means of 4 different studies Field work Desk based study Use of research and analytical techniques Information collection < Primary data collection < Secondary data collection Study of surrounding areas which helps the interest of nearby public -
To know about the multiplex rivals present in nearby area and with the help of that we can have following result: -- Demand & response of that particular multiplex -- Their profit margins
Primary data collection includes:
Study of Area Study of location Study of geological parameters Secondary data collection includes: -- Public demand -- Response of project from people
Definition: Study of a particular project by means of technical approach used to build up a multiplex Technical Study includes:
Area of multiplex Equipments and plants Materials consumed Technical arrangements Study of technical drawings Manpower/ resources
Advantages of technical study: -Output levels -Quantity of a project -Quality of project -Cost applicable -Respective prices of manpower, materials , equipments etc.
1.
Cost of project
2.
Means of finance
3.
Financial returns
Project Objective: To provide entertainment facilities to nearby residing people economically and effectively
Project Location
Located in highly posh area which can have the maximum utilization of multiple aspects with which it is built Land Area: 298 sq yard
Other facilities includes:
Shopping to provide foods and other accessories Shops for cold drinks and several other junk foods Separate smoking zones
Owner of City Gold: Architect Ashok Bansal
Location selected: Shyamal cross road behind Brand Factory Outlet Area Selection: Rich area, center of satellite and easy way of transportation from other areas
By means of not having any multiplexes nearby satellite area, the owner built this multiplex so that they can have maximum profit from the area
Public demand: Owner never collected feedback from public as he knew there are no other multiplexes in nearby area so they will make their profit
Type of foundation implemented
Beam details
Column details
Escape routes Means of transportation
2 lift (normal and fire lift) 2 stairs ( normal and fire escapes)
Auditorium Details
Nos- 6 Each having capacity of 124 Type of auditorium- slope, echo levels-normal, doors and windows-automatic closing system Seating arrangements-provided in slope, not in steps Distances for walk-1.5 m at both end sides and 1m in between
Sound system installed
watts Speakers- 12 no. Speakers position- 6 at top, 6 at middle out of which 4 are provided at each corner Distance between speakers- 5.5 m Picture screen details:
Screen size
Management systems:
Show timings: 7.30 am to 10.30 pm Entry/Exits: total 4 doors provided at each auditorium Parking facilities: -
Entry system Exit system Combined with Brand factory outlet parkings Capacity- 2 wheelers : 500 nos, 4 wheelers: 100 nos.
Other technical details:
-
Additional properties of project: -
Landscape provided at the entry Completely air conditioned system Fire safety facility provided at basement Refreshment zones provided at top floors Other activities: top floor
Cost of project:
land cost: 75-78 lacs Building cost: 50 lacs Plant and machineries: 30 lacs Technological aspects: 4 lacs Other assets : 43 lacs Marketing and advertising: 21 lacs Overall project cost: 2.4 crores
Means of finance: Owner
Agencies involved: -Radio mirchi, -Sonodyne, - Sony