¿ Ru les Work with a valid work permit (PTW) required by the job
#,w
/
Pfw
Verify energy isolation before starting work
Obtain authorisation before overriding or disabling safety critical equipment
Obtain authorisation before entering
a
confined
space
Protect yourself against
a fall when working
at
height
€, Ef
\J
Use the correct personal protective equipment (PPE) when handling hazardous chemicals
before excavarion or entering
llliinr"thorisation Do not position yourself under a suspended load
Do not smoke outside designated areas or bring potential ignition sources into process areas without authorisation
Do not use your mobile phone/walkie-talkie while driving, follow the speed limit and use your seat belt
Rules
DãltrË
ZTGIIÑ
Work with a valid work permit (PTW) required by the job
Verify energy isolation before starting work
rw
Have you:
on the
Have you:
¡
Been. briefed ÞV, y.oyr^ supervisor requrrements ol the lobl
7
Ensured compliance to all requirements of the PTW?
safety
Been trained and are competent to carry out the job safely?
¿ v
Been briefed by your supervisor on the safety
,/
Checked that the PTW and relevant certificates such as physical isolation certificate, electrical isolation certificate and radiatior certificate have been approved?
ldentified the hazards and assessed the risks?
ur Putin place appropriate control and recovery measures?
requirements of ihe job?
,/ Checked that the risht piece of eouioment
machinery has been iölated, locked arid iagged?
or
7'
Communicated the permit and certificate requirements to your team members?
,/
ut
Displayed the permit and certificate at the place of work?
,/ Confirmed that all stored energy has been safely released?
u/ Obtained the right too.ls.and equipment and
ensured
Secured an individual relevant lockout box?
they are rn good condrtlonl
,r/ Obtained the correct .,/
Secured any, movable equipment or machinery that you are working on?
PPE
or department lock at the
for the job?
Been briefed on the emergency procedures?
7
Ensured that all guards a,nd s.afety systems are put back when wor[< rs completedl
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
PTW is a written and signed statement by an authorised person for work to be carried out under stated precautions. Reference: PTS 60.2001 - PETRONAS Croup Cuidelines for Permil to
lsolation of energy systems including mechanical, electrical, hydraulic,
Work System
thermal, chemical, pneumatic and ionising radiation. Refêrence: PTS 60.2117 - Energy lsolatiot-t Standard
Obtain authorisation before overriding or disabling safety critical equipment
Obtain authorisation before entering a confined space
Have you: Have you:
,/
Been briefed þy y.oyl supervisor on the safety requrrements ol the Jobl
..r/ Checked whether the risk assessment has been ' conducted and approved?
./ '
Obtained an approved certificate and valid PTW before overridiñg or disabling safety critical
equipment?
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
u/
Been briefed Þy your supervisor on the safety
requirements of the job?
¿ åJTtt,{39 confined space entry training and been _7 v Been certified medically entry?
fit for confined
space
¿ '
Obtained..g PTW go.mp[e,!e with confined space entry certificate and checklist?
¡
Been briefed on entry requirements?
.r/ '
Ensured ga.s tests are carried out prior to entry and as requiréd by the PTW? Registered with a competent stand-by person at the
entry porntl
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
Confined space is a space that is large enough for personnel to enter,
entl and is áot deiigned for normal or continuous occuDancv. Reference: PTS 60.2tbS - fntry lnto Confined Spaces has limited'or restricted means of
Refèrence; PTS 60.2212 - Bypassing of Safety Critical Equipment
Âq
Protect yourself against a fall when working at height
Use the correct personal protective equipment (PPE) when handling hazardous
chemicats
ø f
Have you:
Been briefed by your supervisor on the safety
requirements of
/
5!:Ël:1Jjtå:|!l"
ihe';ob?
Have you:
'
platform has proper guard rails and
Used only approved scaffoldingwith valid inspection
tag(
v-7
Secured your tools and equipment to prevent them I I from fallihg from height?
-/ '
Ensured three points of contact is maintained at all times when usÍng the ladder?
Been briefed by your supervisor on the safety .7 v requirements of ihe';ob? and are competent to handle / '¡
|n"Så,Jjti"o
-/ '
Understood the safety data sheet (SDS), chemical gafgll^data sheet (CSDS) or material safety data sheet (MSDS) of the chemicals?
Read ald understood uz ' chemical handling?
the procedure for
Checke.d th" nearest-eye wash, emergency ' and 'r/ spill cleaning kit? '
safe
shower
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
Working at height means working above 2 metres. Reference; PTS 60.2104 - Working at Height .lE
Chemical handling is the safe operations of receiving, storing, discharging, transporting and disposing chemicals. Reference: PTS 60.1502 - Chentical Management Program ',4
Obtain authorisation before excavation or entering a trench
Have you:
u/
t position
L/
Have you:
Been. briefed ÞV. ygyr supervisor requrrements o1 the .¡obl
on the
safety
Checked for buried services and other hazards?
Checked that the issued PTW excavation certificate?
/ uz
is complete with
,/
Excavated manually usinq spades with wooden ,/ handles to. expose' burieð services before using Ensured a correct shoring system is put in place with appropriate underground þrotectioil meaöures?
rigid signs and barriers around
Provided safe access and egress trenches?
Checked that all lifting equipment have been tested and certified by authorities?
Checked that the load is within the safe working load of the lifting equipment?
the
to excavation
are ,/ Ensured confined space entry procedures a.pplied for excavatión of morê than ,l.5 metres
Ensured that th.e operator, rigger and signal man are competent and ceh¡fied?
Ensured a lifting plan has been prepared and the l!ft. is .assessed 6y a competent þers'on for critical lifting?
mechanical eqüipment?
excavat¡onl
Been briefed by your supervisor on the safety requirements of the job?
Obtained a PTW and lifting certificate?
Ensured eme.rgency plans and procedures have been put in plate?
Erected.
yourself under a suspended load
Checked that the tagline is attached to the load?
,/
Barricaded the area?
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
deepl
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job. Excavation ìs work that involves a man-made cut, cavitv, trench or depression in the earth's surface formed by earth removal'. Trench is a narrow excavation made below the surface of the ground. Rerferenc.e: PTS 60.21
l6 - f xcattation ,to
Lifting operations .are lifts. utilising all mechanical lifting devices such as cranes, hoists and chain blocks. Re-f-ere,-nce: Pl-S 60.2103 - Litting Ope:rations t1
Rules
Do not smoke outside designated areas or bring potential ignition sources into process areas without authorisation
Do not use your mobile phone/walkie-talkie while driving, follow the speed limit and use your seat belt
Have you:
Have you:
Been briefed ÞV. your supervisor on the safety
,/
,,/
Rectified or eliminated leaks immediately?
,r/ Completed the specified daily checks and ensured
u/
Ensured hot work permit is obtaìned and gas tests done betore carrying out hot work?
,r/ Checked that seat belts are available and worn by all
hot work permit before using enginedriven equipment, vehicles and any otheapotential ignition sources in process areas?
.,,/ Secured all materials and equipment carried by the vehicle?
,/
requirements of the job?
.,r/ Obtained
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
Been authorised to operate the vehicle and have valid driving licence?'
a
the vêhicle can be operated sáfely? occupants?
uz Adhered to all traffic regulations?
the vehicle is used for its intended
{
Ensured that purpose?
/
Ensured IheI your vehicle's engine is not left running unattended?
lf you are facing difficulty with any of the requirements, consult your supervisor before starting a job.
lgnition sources ìnclude mechanical sparks, fire, hot surfaces, auto ¡gnit¡on, pyrophoric materials, mechanical impact, friction, electrical eq u i p me nt an d e I ectrostatic. Re/þrence: PTS 60.2123 - lgnitìon -9o¿r¡ce Control
Driving is the operation of all types of roa owned, leased and hired vehicles and those Reterevrcer; PTS 60.2401 - LandTransportat Nlinintum Star¡darcls ancJ Key Perforntance 4E