GeoEng Co C onsultants SPEC IA IAL LIS IST TC IV IVIL IL AND GE GEOTEC HNIC NICA AL C ONS NSU ULTING ENG NGINEE INEER RS
C onc erns on Gr Groutin ing g in Soils
Dr Indrayogan Yogarajah GeoEng Co C ons nsult ulta ant nts s (S) Pt Pte Ltd
Scope of Presentation
•
Methods/Forms of grouting
•
Grouting fo for De Deep Ex Excavation
•
Effects of Grouting
•
Overcoming effects
•
Weed ou out so some mi misconceptions
Various forms of grouting – Jet grouting – Deep Soil Mixing – Deep Cement Mixing – Jet Mechanical Mixing – Wet Soil Mixing – Chemical grouting – Compaction grouting – Fissure grouting – In fill grouting GeoEng Co C onsultant nts s (S) Pte Ltd
Grouting – Grouting of soils is a process process of injecting a cementi cementitio tious us com compou pound/ nd/mix mixtur ture e into the gro ground und to to minim minimise ise one or more more of the following • Ingress Ingress of wate waterr (eg. (eg. Chemica Chemicall grouti grouting) ng) • Sti Stiffen ffening ing/str /streng engthe thenin ning g of soils (eg. (eg. Jet grouting, deep soil mixing, deep cement mixing etc.) • Lift Lifting ing of struct structure ures s (compac (compaction tion grou groutin ting) g) • Sea Sealin ling g of gaps gaps in rocks rocks (pe (perme rmeatio ation n grouting, fissure grouting)
Grouting • Soil fracturing • Soil str stre engt ngthe henin ning g • Soil compaction • Soil permeation
GeoEng Co C onsultant nts s (S) Pte Ltd
•
Seal Se alin ing g of of CBP CBP,, Ret Retai aini ning ng Wa Wall ll Se Serv rvic ice e Gap Gap
•
Soi oill im impr prov ovem emen entt fo for tun tunne nell lliing
•
Underpinning
Uses of Grouting • Improved soil base for excavations, especially in soft soils (most common use). - Improve overall stability - Reduce ground movements and subsidence - Reduce forces on retaining wall and strut loads
Improved soil
Grouting for Deep Excavation • High pressure grouting – Jet Grouting (JGP)
• Mixing only – – – –
Deep Soil Mixing (DSM) High PressureGrouting Deep Cement Mixing (DCM) Wet Soil Mixing (WSM) (WSM) Grout Mixed Piles (GMP) (GMP)
• Mixing and pressures
Mixing Methods
– Enhanced Grout Mixed Piles (EGMP) – Turbo Jet (TJ) – Jet Mechanical Mixing (JMM)
Grouting
RANGE RA NGE OF OF SOIL PARA PA RAMET METERS ERS FOR FOR VARIOUS GROUTING METHODS
Organic Clay Silt JGP DSM DCM WSM Enh_d GMP Turbo
GeoEng Co C onsultant nts s (S) Pte Ltd
Sand Gravel
Concerns of grouting • Desi sign gn Stage tage – – – Strength and Stiffness – Performance of grouting grouti ng methods – Behaviour of Earth Retaining Structures Structu res during Excavation
• Cons onstru truct ction ion Sta Stage ge – – – Quality of grouting – Heave/settlement and a nd lateral movements of the ground and/or Earth Retaining Structures – Performance of Earth Retaining Retain ing Structures during Excavation GeoEng Co C onsultant nts s (S) Pte Ltd
Jet Grouting
GeoEng Co C onsultant nts s (S) Pte Ltd
Overview • Jet Jet gro grout utin ing g use used d in in Sin Singa gapo pore re fo forr mor more e tha than n 20 20 years yea rs – exte extensi nsive ve expe experie rience nce.. We sho should uld not under-estimate local experience. experience . • Jet Jet grou groutt consi consist st of of high high pre press ssur ure e water water/gr /grou outt jets jets that “cuts” the soil by disinte disintegratin grating g the the soil soil matrix. The cut soil is mixed and partially replaced by the cement grout. As drill string is rotated and withdrawn, a column of cement mixed soil is formed. formed. GeoEng Co C onsultant nts s (S) Pte Ltd
Overview • Mech Mechan anic ical al pr prop oper erti ties es of of jet jet grou grouted ted so soilil is is much much like that of sedimentary rocks (e.g. mudstone, siltstone, sandstone depending of soil jet grouted). • To unde unders rsta tand nd and and app apply ly jet jet gro grout utin ing g - Good Good unde understa rstandi nding ng of soils soils - Knowle Knowledge dge of basic basic flui fluid d mecha mechanics nics - Knowle Knowledge dge of basic basic mechani mechanical cal engine engineeri ering ng
GeoEng Co C onsultant nts s (S) Pte Ltd
JET GROUTING PROCESS GeoEng Co C onsultant nts s (S) Pte Ltd
Jet Grout Pile
GeoEng Co C onsultant nts s (S) Pte Ltd
Jet Grout Pile
Variants of Jet Grouting
• 3 basic variants – Single tube/fluid – Double tube / fluid – Triple tube / fluid At present, double tube system is most widely used in Singapore.
GeoEng Co C onsultant nts s (S) Pte Ltd
SINGLE,DOUBLE & TRIPLE FLUID/TUBE JET GROUTING
GeoEng Co C onsultant nts s (S) Pte Ltd
Typical Jet Grouting Parameters Singapore Experience Parameters
Unit
Single Tube
Double Tube
Triple Tube
Super J et
Flow Rates Water Jet
l/min
NA
NA
60 -120
NA
Grout Jet
l/min
60-70
60-200
80-160
600
cfm
NA
175-500
175-500
175-500
Water Jet
bars
NA
NA
350-400
NA
Grout Jet
bars
200-300
200-400
100-200
300-400
bars
NA
7 -12
7 -12
7 -12
W:C
0.9 0.9 - 1.4 1.4
0.9 0.9 - 1.4 1.4
0.8 0.8 - 1.0 1.0
2 - 2.5
Withdrawal Rate
min/m
varies
8 - 30
6 -1 2
16
Rotation Speed
rpm
5-10
5-10
8 -12
up to 2.5
up to 2.0
up to 4.5
Air Shroud Jet
Fluid pressures
Air Shroud Jet
Cement and Grout Water / cement
Lift ing Paramete Parameters rs
Size Size of Collum ns In Marine Clay
GeoEng Co C onsultant nts s (S) Pte Ltd
m
0.5 to 0.8
Jet Grouting • Diam Diamet eter er of colu column mns s for forme med d 1.0 1.0m m to to 4.5m 4.5m diameter • The The lar large ge diam diamet eter ers s are are form formed ed by high high grout flow. • Diam iameter eter of rods rods appr approx ox 90m 90mm to 120m 20mm
GeoEng Co C onsultant nts s (S) Pte Ltd
Believe • Stre Streng ngth th of Gr Grou outt co colu lumn mns s ca cann nnot ot be ascertained mathematically • Larg Large e dia diame mete ters rs = Lar Large ge pres pressu sure res s • Larg Large e pre press ssur ures es = Lar Large ge move moveme ment nts s • Larg Large e wall wall move moveme ment nts s = Dama Damage ge
GeoEng Co C onsultant nts s (S) Pte Ltd
Strength Design of Jet Grouted Marine Clay
• Most Most com commo monl nly y jet jet grou groute ted d soil soil in Sin Singa gapo pore re is is in marine clay. • Stre Strengt ngth h of of jet jet grout grouted ed marine marine clay clay can can be estima estimated ted by determining the various contents of clay soil, water and cement. • The The rela relativ tive e amoun amounts ts of of the the thre three e const constitu ituent ents s in the jet grout can be estimated by “mass balance”.
Refer: Lee Y. (1998) “ A Framework for the Design Singapor e Marin e Design of Jet Grout Piles in Singapore Singapore Clay ” ”. MEng Thesis, Civil Engineering, NUS. GeoEng Co C onsultant nts s (S) Pte Ltd
Believe • La Larg rge e dia diame mete ters rs = Lar Large ge pr pres essu sure res s • La Larg rge e pre press ssur ures es = Lar Large ge mo move veme ment nts s • La Larg rge e wa wallll mo move veme ment nts s = Da Dama mage ge • Stre Streng ngth th of Grou Groutt colu column mns s cann cannot ot be ascertained mathematically
GeoEng Co C onsultant nts s (S) Pte Ltd
Energy decay of submerged jets
PQ
no air shroud
air shrouded
Distance from nozzle
GeoEng Co C onsultant nts s (S) Pte Ltd
Jet Grouting • Wa Wate terr jet jet im impi pin nge on so soilil wa wallll.. • Po Pore re pr pres essur sure e inc incre rease ases s rap rapid idly ly in so soilil ma mass. ss. • Bond Bonds s bet betwe ween en soi soill par parti ticl cles es ov over ercom come e by by por pore e pressure. • Soi oill par parti ticl cle es disi disint nteg egra rate tes. s. • Ther Therefo efore re,, ease ease of di disi sint nteg egra ratio tion n dep depen ends ds on particle to particle bond.
GeoEng Co C onsultant nts s (S) Pte Ltd
High pressure water jet impact on marine clay sample : note the total disintegration i.e. no pieces of of intact clay (LeeYeong (LeeYeong 1998) GeoEng Co C onsultant nts s (S) Pte Ltd
WATER WATER JET “CUTS” SOIL (NOT PUSH) PUSH) GeoEng Co C onsultant nts s (S) Pte Ltd
CASE STUDY Diaphragm wall 1.2m thick Grout Grout thick thicknes ness s – 4m to 5m Cu= 300kPa E= 150 MPa
RL 103.5
Fill RL 86.5
RL 86.0 86.0 – JGP JGP top top
UMC F1/F2
LMC OA
GeoEng Co C onsultant nts s (S) Pte Ltd
RL 82.0 82.0 – JGP bottom bottom
TYPICAL SECTION
2
GeoEng Co C onsultant nts s (S) Pte Ltd
IW 3
IW 4
27th Dec 2007 IW 4
IW 3
2
Approx 6m width
Time v s Displacement Displacement 100
r e s t 0 e t n m e o m -100 0 n e i l c c l a -200 n p i s x i a d -300 M
30
60
-400
No of Days from 1st Dec IW 4
GeoEng Co C onsultant nts s (S) Pte Ltd
IW 3
90
27th Dec 2007 2
IW 4
IW 3
Approx 6m width
3rd Jan 2008
GeoEng Co C onsultant nts s (S) Pte Ltd
Inclinometer Records for IW3 and IW4
Tim Ti me v s Displa Displ acement cement Feb 1st
Jan 1st 100
r e s t t 0 e n m e o m-100 0 n e i l c c l a -200 n i p s -300 x i a d M
30
60
-400
No of days from fr om 1st 1st Dec Dec IW 4
IW 3
Introduction of relief wells GeoEng Co C onsultant nts s (S) Pte Ltd
7th Jan 2008 IW 3
GeoEng Co C onsultant nts s (S) Pte Ltd
IW 4
Inclinometer Records for IW3 and IW4
Time vs Displacement Feb 1st
Jan 1st 100
r e s t t 0 e n m e o m-100 0 n e i l c c a -200 n l i p x i s a d -300 M
30
60
-400
Time fr f r om 1st Dec IW 4
IW 3
Introduction of relief wells GeoEng Co C onsultant nts s (S) Pte Ltd
-400 400 -300 300 -200 200 -100 100
0
100 100 200 300 400
0
RL 103.5 5
10
Fill 15
RL 86.5
20
25 ) m (
RL 86.0 –
UMC
H 30 T P E D
F2
35
LMC
RL 82.0 –
40
45
OA
50
55
GeoEng Co C onsultant nts s (S) Pte Ltd 60
Typical wall movement mode
If annulus is not maintained
Discharge is minimised Causing increased ratio of soil to cement and water to cement
Drilling to the point Of Soil Improvement GeoEng Co C onsultant nts s (S) Pte Ltd
When soil improvement commen commence ce – slurry slurry is is discharged
Start of volume build up in cavity –causing heave or lateral disp
Flow of slurry out of casing
GeoEng Co C onsultant nts s (S) Pte Ltd
Jet Grouting • Grout out pr pressu essurres are are not not the the mai main n cau caus se of of wall movements. • Wall Wall move moveme ment nts s can can be be cont contro rolllled ed by allowing slurry to be discharged • Reli Relief ef well wells s at the the loca locati tion on of each each grou groutt point would be best • Cont Contro rolllled ed grou grouti ting ng volu volume me is requ requir ired ed
GeoEng Co C onsultant nts s (S) Pte Ltd
Jet Grouting • Avoid Avoid relie relieff wel wells ls away away from from the the poi point nt of installation • Reli Relief ef well wells s nee need d to to be be cle clean aned ed • If volu volume me of grou groutt is is mix mixed ed wit with h the the slur slurry ry,, the strength would be reduced • If prop proper er rel relief ief wells wells are are prov provid ided ed,, cha chanc nces es are the volume of cement can be reduced allowing some savings GeoEng Co C onsultant nts s (S) Pte Ltd
Grout Mixed Pile/ Deep Soil Mixing/ Deep Cement Mixing GeoEng Co C onsultant nts s (S) Pte Ltd
Grout Mix Pile
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
Grout Mix Pile
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
Grout Mix Pile
GeoEng Co C onsultant nts s (S) Pte Ltd
Grout Mix Pile
Grout Mix Pile
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
Typical three shaft system
GeoEng Co C onsultant nts s (S) Pte Ltd
Typical DSM/DCM/GMP parameters
• Single – double- triple-quadruple sh shafts • Diam Diamete eterr of of col colum umns ns up to 2000 2000mm mm per per sha shaft ft – leading to approx 3.5m2 treated area per 4 shaft configuration (0.8m per shaft) • Stre trengths up up to 1MPa in MC • Can Can be be use used d for for stif stifff soi soils ls – depe depend ndin ing g on on the the machine torque • Pres Pressur sures es appl applie ied d are are slig slightl htly y hig highe herr tha than n tha thatt required to over come the overburden pressures GeoEng Co C onsultant nts s (S) Pte Ltd
Typical DSM/DCM layout - four shafts
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
Enhanced GMP/ Jet & Mechanical Mixing
Enhanced GMP/JMM • Sim imililar ar to GM GMP P/D /DS SM/ M/D DCM • With With th the e addi additi tion on of of a jet jet noz nozzl zle e to ca cate terr for for larger diameter • A cro cross ss be betw twee een n the the je jett gro grout ut me meth thod od an and d the GMP/DSM/DCM methods • Us Used ed fo forr wid wide e ran range ged d of of soi soill typ types es
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
Jet Mechanical Mixing
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
GeoEng Co C onsultant nts s (S) Pte Ltd
TYPICAL EGMP/JMM LAYOUT
Diameter by Jet pressure Blade diameter
GeoEng Co C onsultant nts s (S) Pte Ltd
Concerns of grouting -DCM/DSM/EGMP/JMM sign gn Stage tage – • Desi – – Strength and Stiffness – Performance of grouting grouti ng methods – Behaviour of Earth Retaining Structures Structu res during Excavation
• Cons onstru truct ction ion Sta Stage ge – – – Quality of grout cores – Properties of soils which have been disturbed di sturbed – Heave and lateral movements mo vements of the Earth Retaining Structures GeoEng Co C onsultant nts s (S) Pte Ltd
Change of soil properties due to Deep Mixing Methods
CPT-1
QC (Mpa)
GL
0 0 1 2 3 4
Fill
5 6 7 8 9
UMC
) m ( h t p e D
10 11 12 13
F2
14
LMC
15 16 17
OA
18 19 20 21
GeoEng Co C onsultant nts s (S) Pte Ltd
2
4
6
8
10
Change of soil properties due to Deep Mixing Methods
CPT-5
QC (Mpa)
GL
0 0
2
Fill
4
6
8
MC
) m (
10
h t p e D
12
14
16
18
OA
GeoEng Co C onsultant nts s (S) Pte Ltd
20
5
10
15
20
25
DSM/DCM • Meth Method od of grou grouti ting ng can can caus cause e dist distur urba banc nce e to existing soil layers. • Wall Wall move moveme ment nts s coul could d be be larg larger er than than predicted if the lower strengths are not considered • Cont Contro rolle lled d gro grout uting ing at the the upp upper er laye layers rs may be required
GeoEng Co C onsultant nts s (S) Pte Ltd
DSM/DCM • More More analy analysi sis s and and test tests s req requi uire red d to to understand the sensitivity of the various grouting methods • Wall Wall stif stiffn fnes ess s may may be a var varia iati tion on that that needs to be considered • Mixi Mixing ng of soft soft clay clays s can can caus cause e it it to be remo remoul ulde ded d – sens sensit itiv ivit ity y of of Sin Singa gapo pore re Marine Clay is about 5. GeoEng Co C onsultant nts s (S) Pte Ltd
Concerns of grouting • Desi sign gn Stage tage – – – Str tre engt ngth h and Stiffness Stiff ness – Performance of grouting grouti ng methods – Behaviour of Earth Retaining Structures Structu res during Excavation
• Cons onstru truct ction ion Sta Stage ge – – – Quality of grouting cores – Heave and lateral movements mo vements of the Earth Retaining Structures – Performance of Earth Retaining Retain ing Structures during Excavation GeoEng Co C onsultant nts s (S) Pte Ltd
Corr orre ela lati tion on of o f SP SPT ‘N ‘N’’ wi with th UCS or Cu Cu
• Occa Occasi sion onal ally ly we see see CPT CPT as a tes testt requirement. • CPT CPT can can only only pro provi vide de the the det deter ermi mina nati tion on of the top of grout layer – • Stre Streng ngth th of soil soil imp impro rove veme ment nt not not obtainable
GeoEng Co C onsultant nts s (S) Pte Ltd
Corr orre ela lati tion on of o f SP SPT ‘N ‘N’’ wi with th UCS or Cu Cu
• Very Very ofte often n we we see see SPT SPT and and Cori Coring ng test tests s to to be carried out in specifications • Core Core stre streng ngth th is comm common only ly ment mentio ione ned d but but not not ‘N’ ‘N’ value value to achie achieve ve • So con consu sult ltan ants ts/c /con ontr trac acto tors rs tre treat at it it as clay clay and use Cu= 5-6N • So to achi achiev eve e 300k 300kPa Pa,, we we need need nea nearl rly y SPT ‘N of 50 to 60 GeoEng Co C onsultant nts s (S) Pte Ltd
Cor orre rela lati tion on of o f SP SPT ‘N ‘N’’ wi with th UCS or Cu Plot of Cu to SPT 'N' Values Values of Jet Grouted Grouted Areas Areas 3
) 2 2.7 m m / 2.4 N ( u C 2.1 , h t g 1.8 n e r 1.5 t S r a 1.2 e h S 0.9 d e n 0.6 i a r d 0.3 n U
y = 0.0167x
0 0
20
40
60
SPT SPT 'N' Valu e
GeoEng Co C onsultant nts s (S) Pte Ltd
80
100
12 0
Correl Cor relati ation on of of SPT SPT ‘N’ ‘N’ wit with h UCS UCS or Cu • More More data data and and sta statis tisti tical cal anal analys ysis is need needed ed to be carried out to allow a better representation of SPT ‘N’ • SPT ‘N’ ‘N’ and and cori coring ng meth method ods s of obta obtain inin ing g strength have their own pit falls and data should be carefully analysed. • Care Care has has to to be be tak taken en to ensu ensure re that that the the soil soil type type is considered in any analytical model
GeoEng Co C onsultant nts s (S) Pte Ltd
Discussions • Grou Grouti ting ng of of soil soils s is still still cons consid ider ered ed an an Art Art as opposed to being a science • Grou Grouti ting ng in soil soils s see seems ms to be stil stilll the the domain of specialist sub contractors • Cons Consult ultan ants ts alwa always ys woul would d like like to leav leave e the the issues to the contractors GeoEng Co C onsultant nts s (S) Pte Ltd
Discussions • More More rese resear arch ch and and con consci scien enti tiou ous s gro grout utin ing g wor works ks is still required for more systematic grouting procedures to be developed • Jet Jet gro grouti uting ng is know known n to to cau cause se move moveme ment nts s to to earth retaining retaining structures structures – if not not done done correct correctly ly • soil soil mixi mixing ng meth method ods s rem remou ould lds s the the upp upper er soil soil layers and causes strength reduction and needs to be considered at design stage GeoEng Co C onsultant nts s (S) Pte Ltd
Moving Forward • More More need needs s to to be be don done e to to mit mitig igat ate e movements caused by JGP. This has to be part of the MS and trial test process • Pres Presen entt Adv Advis isor ory y not notes es requ requir ire e cri criti tica call control levels to be developed for grouting. How do we do that if we are unsure of the process? GeoEng Co C onsultant nts s (S) Pte Ltd
Moving Forward • For For all all gro grout utin ing g met metho hods ds,, more more data data collection still required for a better understanding of grouting strengths etc. • Cont Contra ract ctor ors s and and Cons Consul ulta tant nts s nee need d to to wor work k more closely to have a better understanding of the grouting methods
GeoEng Co C onsultant nts s (S) Pte Ltd
Th an k y o u
GeoEng Co C onsultant nts s (S) Pte Ltd