BTS3900A (Ver.D) Installation Guide for Capacity Expansion(02)(PDF)-En
Description : Upgrade Oracle Forms to 11g version
ZTE C300 / C320 Upgrade GuideFull description
ZTE C300 / C320 Upgrade Guide
ZTE C300 / C320 Upgrade GuideDescrição completa
Apahe upgrdeFull description
dsssdsdsd
Full description
Full description
Upgrade guide
Curso de Ingles para auditores internos. Vocabulario esencial y contenido general de auditoria interna para la practica profesional.
Descripción: AS A PRIME CONTRACTOR FOR PROJECT LAND 106, BAE SYSTEMS AUSTRALIA WAS RESPONSIBLE FOR THE UPGRADE OF 433 AUSTRALIAN ARMY M113A1 VEHICLES TO AS4 STANDARDS, ENABLING ACTIVE SERVICE TO 2020 AND BEYOND.
Computer validation plansFull description
general questions for the review of internal medicine conceptsFull description
How to Upgrade UMPT
SAP UpgradeFull description
Full description
EASYBCDDescripción completa
especificación técnicaDescripción completa
BTS3900A site solution for 3G capacity upgrade and coverage improvement im provement
www.huawei.com
16 December 2013
HUAWEI TECHNOLOGIES CO., LTD.
Content •
Requirement
•
Cabinet Ver.B Upgrade to Ver.D
•
Dual RU Solution
Requirement 3G capacity upgrade •
3rd carrier
•
Channel upgrade (CE)
•
RU upgrade f1+f2@60w - dual RU - swap to WRFUd - swap to RRU3829
3G coverage improvement •
RU upgrade f1+f2@60w
Cabinet Ver.B Upgrade to Ver.D Prerequisites: sites •
Antenna system is reused. Ver.D cabinet located at same place
•
Power supply system is reused.
•
Upgrade power interface (input -48v) if require
•
Grounding system is reused.
•
Transmission system is reused.
•
Environment monitoring system is reused.
Scenario 1: BTS3900A(DC)&TMC11H Ver.B Upgrade to Ver.D
BTS3900A: 2*BBU+12*RFU (1*TMC11H+2*RFC) or 2*BBU+6*RFU+9RRU TMC11H: 2*BBU+12*RRU or 2*BBU+15*RRU(with OFD and ODM)
User space
9U
1*BBU,8U;2*BBU,6U
Power interface requirement
1*80A
4*80A max, according to configuration
Scenario 2: BTS3900 Ver.B Upgrade to Ver.D Power Distribution Capacity Improvement
Out of Service Upgrade
Cabinet Heat Dissipation Capacity
Improvement
Cabinet Asset Data Update
In Service Upgrade
Electronic Label Unit
BTS3900 Ver.A/B
Upgrade to Ver.D
Transmit power of RFU
1*80W or 2*40W
2*80W or 1*125W
Transmit power of RRU
/
2*60W
BBU
300W
650W
configuration
1*BBU+6*RFU
2*BBU+6*RFU +9*RRU
Power interface requirement
1*80A
4*80A max, according to configuration
Scenario 3: BTS3900L Ver.B Upgrade to Ver.D Power Distribution Capacity Improvement
Cabinet Heat Dissipation Capacity
Out of Service Upgrade
Improvement
Cabinet Asset Data Update
In Service Upgrade
BTS3900L Ver.B
Upgrade to Ver.D
Transmit power of RFU
1*80W or 2*40W
2*80W or 1*125W
Transmit power of RRU
/
2*60W
BBU
300W
650W
configuration
2*BBU+12*RFU
2*BBU+12*RFU+9*RRU
Power interface requirement
2*80A
6*80A max, according to configuration
1. Dual WRFU 2*60W Scenario 1#: 3G only
Scenario 1#: -3*WRFU -Data reconfiguration for 2*60W
Scenario 2#: UL+3G
(Space available for new cabinet)
Scenario 2#: -3*WRFU on BTS3900A Ver.B -New BTS3900A Ver.D + new BBU -Reuse jumper, transmission; new power input for Ver.D Cabinet -2G data reconfiguration as new site -3G data reconfiguration for 2*60W -Dismantle GTMUb?
2. Swap to WRFUd 2*60W –no space, no slot, no RRU Scenario 3#: UL+3G
Scenario 4#: UL+OL1+OL2+3G
Scenario 3#:
Scenario 4#:
-Upgrade to Ver.D -New WRFUd -3G data reconfiguration for 2*60W -Dismantle 3*WRFU
-Upgrade to Ver.D -New WRFUd -3G data reconfiguration for 2*60W -Dismantle 3*WRFU
3. Swap to RRU 2*60W Scenario 5#: UL+3G,
(Space available)
Scenario 6#: UL+3G ( No space available) Scenario 6#: -Upgrade to Ver.D -New DCDU-12B with new -48v -New 3*RRU3829 -3G data reconfiguration as new site -Dismantle 3*WRFU
Scenario 5#: -New DBS3900 Ver.D -New 3*RRU3829 -3G data reconfiguration as new site -Dismantle 3*WRFU+WMPT+1*WBBP
Scenario 7#: DBS3900 (to RRU3829)
Scenario 7#: -Upgrade to Ver.D -New 3*RRU3829 -3G data reconfiguration -New RRU power cable? -Dismantle 3*RRU3804