SAP Note 41715 - Resetting batch level from material to plant level Note Language: Language: English
Version: 23 Validity:
Valid Since 25.10.2011
The displayed SAP Note is not up to date in the selected language /
Summary Symptom Error message CZ308 "This type of conversion is not yet implemented" is issued when you try to reset the batch level from material level or client level to plant level.
Other terms OMCT, OMCE
Reason and Prerequisites This function is not implemented in the standard system.
Solution We recommend that you remain at material level. Reason: 1.
If the the batc batch h level level is defi defined ned at plan plant t level level, , batch batch pro proper pertie ties s of a material batch of the same name are not transferred in case of cross-plant processes (see also Note 156299). In addition, it is possible for a batch of a material with the same name to have different characteristics (for example, shelf life expiration date) in different plants because there are two plant-specific batch master records. Take this into account in particular if batches are increasingly important and a continuous where-used list is required. Batch properties can only be synchronized using plant boarders at material level or client level.
2.
If you you want want a mater material ial to be be treat treated ed diff differe erentl ntly y regar regardin ding g batch batch management requirement in different plants, you can only do this at plant level. However, in this case, we recommend that you stay at material level and create a dummy batch in the plant in which you do not want batch management. All stock of the material is managed in this dummy batch. This has the advantage that the batch management requirement can be later introduced without any problems.
3.
With the With the SAP SAP produ products cts R/3 Ent Enterp erpris rise e 4.7, 4.7, APO APO 4.0 4.0 and and CRM CRM 4.0, 4.0, the batch is increasingly used in cross-system processes. Plant level is not supported in these cross-system processes.
However, if you want to restore plant level, take the following into account: Since this type of conversion is very complex, first carry it out in a test system. After the conversion, check all batch data randomly for consistency. Prior to a conversion in a productive system, we recommend that you inform SAP development (distribution list DESDFUNC) using REMOTE consulting or through your consultant of the following points: 1.
Is clas classi sifi fica cati tion on for for ba batc tche hes s be bein ing g us used ed? ?
11.02.2013
Pa g e 1 o f
3
SAP Note 41715 - Resetting batch level from material to plant level 2.
Is batch status management being used?
3.
Are long texts for batches being used?
4.
Is split valuation or individual batch valuation being used?
5.
Number of records for class type 023 in the table INOB
6.
Number of records for class type 023 in the table AUSP
7.
Number of records for class type 023 in the table KSSK
8.
Number of records in the table MCH1
9. Number of records in the table MCHA ======================================================================== This type of conversion can only be made as of Release 3.1I. Proceed as follows: 1.
For all releases lower than Release 4.5B, implement the corrections and the modification in the report RM07CHDX as described in the correction instructions.
2.
Implement the report ZCHTCUCH from the correction instructions.
3.
Run this report in the clients for which you want to reset batch level to plant level.
4.
Call transaction OMCT.
5.
Check whether the batch level for "Batch unique at plant level" is set.
6.
Implement Notes 821891, 944278, 950540 and 1091613 if you have not already done so (or you have not imported the corresponding Support Package).
7.
Execute the function "Batch Level -> Conversion".
8.
Define a plant for a plant view that may be missing.
9.
Always execute the report in the test mode first. Analyze the error log.
10.
If no errors occur,
11.
If you are working with batch long texts, first execute the report ZM07CHDX_TEXT in test mode.
you can execute the report in production mode.
Header Data Release Status: Released on: Master Language: Priority: 11.02.2013
Released for Customer 08.02.2013 08:25:33 German Recommendations/additional info Page 2 of
3
SAP Note 41715 - Resetting batch level from material to plant level Category: Primary Component:
Consulting LO-BM Batch Management
Valid Releases Software Component
Release
From Release
To Release
SAP_APPL
MERCURY
MERCURY
MERCURY
SAP_APPL
30
300
31I
SAP_APPL
40
40A
40B
SAP_APPL
45
45A
45B
SAP_APPL
46
46A
46B
SAP_APPL
46C
46C
46C
SAP_APPL
470
470
470
SAP_APPL
500
500
500
SAP_APPL
600
600
600
SAP_APPL
602
602
602
SAP_APPL
603
603
603
SAP_APPL
604
604
604
SAP_APPL
605
605
605
and Subsequent
Related Notes Number
Short Text
1474776
Data is not converted during conversion to plant level
1387713
OMCT: CZ314 or batch status management cannot be activated
950540
Batch level conversion: Message CZ 304
891902
FAQ: Batch level
821891
Short dump ABAPTSV_TNEW_PAGE_ALLOC_FAILED in prog RM07CHDX
Attributes Attribute
Value
Transaction codes
MCH1
Transaction codes
OMCE
Transaction codes
OMCT
Correction Instructions Correcti on Instruct ions
Valid from
Valid to
Software Component
Typ e *)
Reference Correction
Last Changed
80671
30D
40B
SAP_APPL
C
P30K051489
21.03.1999 03:51:46
80672
300
605
SAP_APPL
C
02.11.2010 20:53:14
*) C Correction, B Preprocessing, A Postprocessing, M Undefined Work
11.02.2013
Page 3 of
3