SAP123
Articles
Two-step movement Plant to Plant By Willem Hoek Within SAP Inventory Management, there are two methods how stock are moved between plants using a 2-step process: Stock Transport Orders (UB) Transfer Posting What does 2-step mean? Example: Lets assume stock is moving from Plant A (Storage Location 0001) to Plant B (storage location 0002). Two step means that two transactions will be used to move the stock. After the first transaction, stock has left plant A but it is not yet available at Plant B. Only after the second transaction is it available for use in Plant B. Some reasons for using 2-step movements (and not 1 step): Long time span between leaving Plant A and arriving at Plant B Need to control when goods leave plant A but not received at plant B Using Stock Transport Orders (STO) Steps: Create a Stock Transport Order (ME21N, Purchase Order doc type UB) Process Goods Issue against STO (MIGO > Goods Issue > PO) – movement type 351 Process Goods Receipt against STO (MIGO > Goods Receipt > PO) – movement type 101 The use of Planned Orders and Purchase Requisitions are optional.
Using Transfer Postings (TP) Steps: Process a Transfer Posting (MIGO > Transfer Posting) - movement type 303 Process Process a Transfer Transfer Posting (MIGO > Transfer Posting) - movement type 305 The Transfer Posting can be done with reference to a Reservation. Although this is not used a lot.
Similarities between Stock Transport Orders (STO) and Transfer Postings (TP) Both use transaction MIGO for both steps After fir st step, goods ar e already reflected in receiving plant and not available Differences between Stock Transport Orders (STO) and Transfer Postings (TP) Movement types are different 351 & 101 for STO 303 & 305 for TP Stock types at receiving plants are different - In Transfer (MARC-UMLMC) for TP - Stock in Transit (MARC-TRAME)for STO For STO, 351 and 101 is group together where for TP there is no link between 303 and 305 STO requires more transactions than TP STO must be configured for the sending plant / receiving plant where no plant specific configuration exists for TP STO is based on Stock Transport Order (type of Purchase Order). Where no purchasing document is used for TP STO can be initiated with a Planned Order or Purchase Requisition Planning (MRP) can be used to initiate movements, but only STO's
Configuration required to use STO
Config: MM > Purchasing > Purchase Order > Set up Stock Transport Order > Assign Document Type, One-Step Procedure, Underdelivery Tolerance Here the source plant, destination plant and allowed STO document type is specified. The post is based on SAP ECC6
Get my blog posts in your inbox! email address Subscribe
POPULAR POSTS SAP Finance Tables Split Valuation SAP MM Tables Loading Material Masters with LSMW Direct Input method Very basics of SAP External Service Management Setting up simple Release Procedure for Purchase Requisitions SAP SD Tables Change SAP documents -- tables CDHDR and CDPOS
1
1 Comment
ALPESH
•
very helpfull •
•
Website built by Willem Hoek SAP is a registered trademark of SAP AG - This website is not affiliated to SAP AG or any of its subsidiaries