ANALISA SNI UNTUK PEKERJAAN RANGKA BAJA RINGAN DAN ATAP SPANDEK / METAL ROOF BANGUNAN RUMAH TINGGAL
1M2 PASANGAN ATAP SPANDECK ZINCALUME Bahan
Upah
Atap Spandek Zincalume
1,100 1,100
M2 M2
55.000
60.500
Screw Cteks 12-4 x 50
6,000
Bh Bh
1.200
7.200
Screw Cteks 10 x 16-16
2,000
Bh Bh
750
1.500
Pekerja
0,02
Oh Oh
43.000
645 645
Tukang atap
0,08
Oh Oh
62.750
4.706
Kepal a tukang
0,01
Oh Oh
72.500
580 580
Mandor
0,006
Oh Oh
75.000
450 450
JUMLAH
75.581
65.000
71.500
1M' PASANGAN NOK ZINCALUME Bahan
Upah
Nok Zincal um ume tebal 0,35 mm
1,100
M' M'
Screw Cteks 10 x 16-16
6,000
Bh Bh
750
Pekerja
0,02
Oh Oh
43.000
645 645
Tukang atap
0,08
Oh Oh
62.750
4.706
Kepal a tukang
0,01
Oh Oh
72.500
580 580
Mandor
0,006
Oh Oh
75.000
450 450
JUMLAH
77.881
1 M2 PASANG KUDA-KUDA KUDA-KU DA BAJA RINGAN + RENG UNTUK ATAP ASBES/SPANDE AS BES/SPANDEK K
Bahan
Upah
C- 75, 0.8
1,488
M'
14.500
21.576
C- 75, 0.6
2,232
M'
12.500
27.900
28,000
Bh
350 350
9.800
Dynabol t
1,600
Bh
3.500
5.600
Re ng
3,600
M'
7.000
25.200
Tal ang Jurai
0,124
M'
48.000
5.952
Pekerja
0,200
Oh
43.000
8.600
Tukang besi
0,450
Oh
62.750
28.238
Kepala tukang
0,010
Oh
72.500
725 725
Mandor
0,050
Oh
75.000
3.750
Baut ( Sre w dri ve r)
JUMLAH
137.341
1 M2 PASANG KUDA-KUDA KUDA-KU DA BAJA RINGAN + RENG UNTUK ATAP G ENTENG BIASA/METAL
Bahan
Upah
C- 75, 0.8
1,488
M'
14.500
21.576
C- 75, 0.6
2,232
M'
12.500
27.900
28,000
Bh
350 350
9.800
Dynabol t
1,600
Bh
3.500
5.600
Re ng
5,400
M'
7.000
37.800
Tal ang Jurai
0,124
M'
48.000
5.952
Pekerja
0,200
Oh
43.000
8.600
Tukang besi
0,450
Oh
62.750
28.238
Kepala tukang
0,010
Oh
72.500
725 725
Mandor
0,050
Oh
75.000
3.750
Baut ( Sre w dri ve r)
JUMLAH
149.941