Manual de Ingenieros de Proyectos de Plantas de Proceso
it is process management project in sugar industry which how to put various process in term of their various technical parameter as well as financial & operations term
Manual de Ingenieros de Proyectos de Plantas de Proceso
Full description
SPPM Notes - Cp7301 Software Process and Project Management NotesFull description
ADDC Check list for Drawing approval (Issued by ADDC Drawing section dept)Full description
Contoh Lembar PersetujuanFull description
PROFESSIONAL PRACTICE
PESHAWAR DEVELOPMENT AUTHORITY PROJECT APPROVAL APPROVAL PROCESS PROCESS
PCATP PCA TP Registered Architect
Architectural Design must be prepared by a PCATP PCATP registered Architect.
Architectural Architectu ral Submission Drawing Architectural Submission Submission drawing must include the following drawings; 1.
Plans of all the Floors including Porch Servant Quarter etc.
2.
Elevation (One Minimum)
3.
Section (One Minimum)
4.
Typical Foundation Detail
5.
Site Plan
6.
Key Plan
7.
Stairs Detail
8.
Schedule of openings (Door/ Window) Window)
9.
Schedule of Areas
10. Location of Septic tank and Under Ground Water Tank in the Master Plan
Set of Architectural Submission Drawings
The Owner must prepare four (04) Set of Architectural submission drawing on ammonia paper for submission to the the BCA BCA-- PD PDA A
Structural Drawings
If the building covered area exceeds 5000. SFt (commercial) (commerc ial) than Structural Drawings must be prepared by a PEC licensed Structural Engineer and submitted along with the Architectural Submission Drawings.
If the building covered area is less than 5000. SFt (commercial) (commerc ial) than only Architectural Submission Drawings prepared by a PCA PCATP TP registered Architect are required requi red to be submit submitted ted to the the BCA- PDA. For residential plans structure drawings are not compulsory.
Submissi Sub mission on of Drawin Drawing g to BCABCA- PDA
The complete set of Architectural Architectural submission drawings are required to be submitted to the Assistant Director, Director, Building Control Agency Agency in the PDA for scrutiny and approval.
Payment of Scrutiny & Approval Fee
The BCA BCA-- PDA issu issues es Bank Bank Chal Challan lan For Form m to the the Ow Owner ner for depositing of scrutiny and processing fee in the authorized bank (National Bank of Pakistan).
The Challan/ Challan/ receipt duly signed & stamped by the Bank Officer are attached with the Architectural Submission drawing and submitted to Assistant Director BCA- PDA
Site Ownership Verification by BCA- PDA
The Patw Patwari ari of BCABCA- PDA verifi verifies es the the ownersh ownership ip of the Site (Plot) by checking the revenue record.
Site Auth Authenti enticati cation on by Insp Inspecto ectorr BCA- PDA
The inspector of BCA- PDA visits the site and and verify the the actual location of the Site and prepares a free hand sketch in the form of a Key Plan.
Composition of the Scrutiny Committee
The Scrut Scrutiny iny comm committee ittee of the BCA- PDA inclu includes des the following officials
Assistant Assist ant Direct Director or BCABCA- PDA
Deputy Deput y Direct Director or BCA- PDA
Direct Dir ector or BCA BCA-- PDA
Scrutiny Scru tiny Comm Committe ittee e BCA- PDA
The scrutiny committee BCA BCA-- PD PDA A hold hold mee meeti ting ng onc once e every month and scrutinizes all the drawings submitted to the committee.
The scrutin scrutiny y committee committee BCABCA- PDA makes makes decision decision on each individual case. The applicant (Owner) is informed about the decision of the Scrutiny committee pertaining to the project.
Disapproval of Drawings
The scrut scrutiny iny commi committee ttee BCA- PDA intim intimates ates to the the Owner the observations/ shortcomings in the Architectural Submission Drawings and are returned to the Owner for rectification.
The revised Architectural Submission Submission Drawings are resubmitted by the Owner to the BCA- PDA for scrutiny and approval.
Approved Drawings The scrut scrutiny iny comm committee ittee BCA- PDA appro approves ves the Architectural Submission Submission Drawings submitted by the Client/ Owner (committee (committee is formed only for commercial cases). Residentiall cases are scrutinized and approved by Residentia Assistant Director and Deputy Director only. only.
Submission of Approved Drawings
The Client/ Owner submits the approved copies of the Architectural Drawings Drawings to the following organizations.
1. 2. 3. 4.
One Copy of approved Architectural Architectural Submission Drawing to BCA-PDA for record. One Copy of approved Architectural Architectural Submission Drawing to WSSP for water connection. One Copy of approved Architectural Architectural Submission Drawing to SNGPL for Gas connection. One Copy of approved Architectural Architectural Submission Drawing remains with the Owner for construction purpose.
Site Demarcation Pre- Construction Phsae
The BCA- PDA Inspec Inspector tor visit visitss the site for formal formal demarcation in the presence of the Client/ Owner Owner or his/her authorized representative.
Site Inspect Inspection ion by Inspect Inspector or from BCABCA- PDA
The BCABCA- PDA Inspect Inspector or periodic periodically ally visi visits ts the projec projectt site for an inspection visit during the construction phase of the building.
Building Buil ding Compl Completio etion n Certifica Certificate te to BCA- PDA
The Owner Owner submits on a prescribed form a Building Comple Com pletio tion n Cer Certif tifica icate te to BCABCA- PDA PDA..