Jordan Orange 2G&3G Swap and LTE Project Site Pre-install Checklist Site ID:
Pre-install date:
Pre-install start time:
/
/
Pre-install end time:
/
/
Subcontractor(signature): Name_________________ Identify ID__________________ Huawei SE (signature): Name_________________ employee ID__________________ before site pre-install: Subcontractor check if all tools prepared or not(Compass □,Site Master □,Mechanical Tilt test tool □, 1 Multimeter□,2M Impact tool□) 2 Subcontractor check the install environment.(ACBOX □, Cable tray □, install location □) 3 Subcontractor check the site equipment and materials are deliveried completely or not (based on DN). 4 Subcontractor check TSSR(WL and MW) and MW design document. Duration site pre-install:
Yes/No Yes □, No □ Yes □, No □ Yes □, No □ Yes □, No □ Yes/No
5 Subcontractor check the polarization of MW compare with MW design document
Yes □, No □
6 Subcontractor check the connectivity of MW (power cable ,IF cable ,grounding cable )
Yes □, No □
Subcontractor check the NE and link Configuration compare with MW design document(NE ID□IP□Name □,LLD□) Subcontractor check the temp_freq(7M bandwith) is avaiable base on the ODU scan. ( temp_freq<=8 85dBm) 7
Yes □, No □ Yes □, No □
10 Subcontractor check RSL reach the design (error:±3dbm).
Yes □, No □
11 Subcontractor complete current site MW commissioning
Yes □, No □
12
Subcontractor complete current site MW to aggregation MW commissioning, and confirm by HW OMC(transmission team ).
Yes □, No □
13
Subcontractor make sure BTS be installed at left,TP48200A cabinet be installed at right,make sure the door of cabinet can be opened normally
Yes □, No □
14 Subcontractor must pre-install new antenna behind existing antenna(if have free space)
Yes □, No □
15 Subcontractor check AISG cable connection is correct (From Antenna AISG IN Port to 3G RRU RET Port)
Yes □, No □
16
Subcontractor make sure jumper between feeder&RRU and antenna are not fixed with pole or bracket.( Benefit for new antenna change to plannning location)
Yes □, No □
17
Subcontractor check POWER cable be fixed well or not(RRU power cable □, AC power cable □, DCDU power cable □, battery cable □,grounding cable □)
Yes □, No □
(Scenario: TP48200A+BTS3900A) Subcontractor make sure 1*63A breaker connect to DCDU12A (for RFU), 18 1*63 breaker connect to DCDU12B(for RRU), 1*32 breker connect to DCDU12C(for BBU). 2*16A breaker connect to DCDU12B for RTN.
Yes □, No □
(Scenario: TP48200A Only) Subcontractor make sure 2*63A breaker connect to DCDU12B (for RRU and BBU), 2*16A breaker connect to DCDU12B for RTN.
Yes □, No □
20 Subcontractor make sure CPRI between BBU and RFU&RRU connection is right based on CPRI layout
Yes □, No □
21 Subcontractor check AC&DC is in the normal range(AC BOX ouput votalge□DCDU ouput votalge□)
Yes □, No □
22 Subcontractor check battery installation is right and confirm battery serial connection is ok
Yes □, No □
23 Subcontractor make sure UBBPd6 is installed at slot2,UBBPd3 is installed at slot3
Yes □, No □
24
Subcontractor make sure MRFU will be installed on correct slot (0,2,4 will be used on for 3 sectors;0,1,2,4 will be used for 4 sectors)
25
Subcontractor check CPRI connection from BBU to RFU(2G) and RRU(3G/4G) is right and the light of CPRI port is on
Yes □, No □
26
Subcontractor check cable from UMPT to MW IDU is connected (1. For RTN950, port 3 of EG4 board will be used 2. For RTN905, port GE3 will be used)
Yes □, No □
27
Subcontractor check monitor cable from the RS485/RS232 port (the lower one) on the SMU-02B board in TP48200A to COM_OUT port of BTS3900A is connected(cable used is ethernet cable)
Yes □, No □
28
Subcontractor check monitor cable from COM_IN of FMU board to MON 0 of UPEU board(located in BBU) is connected
Yes □, No □
29 Subcontractor check Water sensor/Lighting lamp/Temperature sensor/Smoke sensor installation is right
Yes □, No □
30 Subcontractor check jumper&feeder protection is sealed well(water proof)
Yes □, No □
31
Subcontractor check the label of cable is right( POWER cable□ CPRI cable□ Jumper cable□ Feeder cable □ Ethernet cable□)
Yes □, No □
32 Subcontractor should report ESN number(on left ear of the BBU) to OMC engineer
Yes □, No □
33 Subcontractor inform OMC wireless engineer to check transmission from HW BTS to BSC&RNC&MME is ok
Yes □, No □
After site pre-install: 34 Subcontractor inform OMC for commissioning
Yes □, No □
35 Subcontractor resolve site alarms with OMC engineer
Yes □, No □
Subcontractor verify enviroment monitor alarms with OMC engineer(□water sensor alarm□Temperature sensor alarm □Smoke sensor alarm □ door sensor alarm) 37 Subcontractor verify the light of lighting lamp is ok 36
Remark
Yes □, No □
9 Subcontractor check the the design Freq is avaiable base on the ODU scan.
19
Remark
Yes/No
Yes □, No □ Yes □, No □
38 Subcontractor check the site status with OMC engineer again
Yes □, No □
39 Subcontractor must finish site clean and take picture before leave site
Yes □, No □
Remark