Single Site Verification Checklist
Gen
Handover HSDPA
PS
Connection Mode
Idle Mode
Site ID: U1246 Site Name: New Site: Site Connected to RNC: Site Expansion: Site Expanded from: Site Migration: Site Migrated from RNC: Others: No. Activity/Process 1 Frequency and Scrambling Code correctly defined 2 Cell selection and reselection parameters are as planned ( SIB 3 ) 3 The LAC/RAC is correctly defined ( SIB 1 ) 4 The neighbor list and parameters are as planned ( SIB 11 ) 5 LA update proceduce is checked 6 Cell reselection from 3G to 2G is checked 7 Cell reselection from 2G to 3G is checked 8 MO-SMS and MT-SMS 9 CPICH_RSCP > -85 dBm near site 10 CPICH_EcIo > -8 dB near site 11 Mobile terminating calls and mobile originating calls for voice service is checked 12 The voice service quality is good by the engineer feeling 13 Mobile terminating calls and mobile originating calls for VP service is checked 14 The VP service quality is good by the engineer feeling 15 PS attach is checked 16 PS detach is checked 17 PS PDP activation and deactivation is checked 18 FTP Avg.DL throughput= 240 Kbit/sec(R99) 19 RA update proceduce is checked 20 Average Throughput = _810_
Kbit/sec
21 Soft handover for voice service to and from the 3G cells checked OK 22 Soft handover for VP service to and from the 3G cells checked OK 23 Soft handover for PS service to and from the 3G cells checked OK 24 Inter-system handover for voice service to the 2G cells checked OK 25 Installed antenna is of the planned type 26 Overall performance and coverage area as expected by a brief drive test
27 Antenna Swapping Test 28 DRD to 2nd Carrier Frequency upon HSDPA session initialization checked OK 29 2nd carrier Intra/Inter/InterRAT Handover is checked with neighbors checked 30 AMR call establishment on 1st carrier and on 2nd carrier if 1st carrier is congested(IF POSSIBLE) 31 After HSDPA session termination the UE reselection to 1st carrier 32 If possible, AMR call during ps-r99 session should be checked 33 If possible, AMR call during HSDPA session should be checked
Remarks (Further comments): EMTS Huawei Name/Signature: Name/Signature: Notes: If the item is OK, mark the '√' on the '□'; If the item is not OK, mark the '╳' on the '□'; If the item is not checked, mark the '∕' on the '□'.
√ √ √ √ √ √ √
√ √ √ √ √ √ √
Reminder Data Base Update Mapinfo Update
ostolic Church To: To RNC: PSC 184 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
PSC 185 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
√
√
√ √ √ √ √ √
√ √ √ √ √ √
Remarks
R99
□ □
√ √ √ √ √ √ √
√ √ √ √ √ √ √
USE PSC CODE distribution
NOT POSSIBLE
Date:
Optimization Engineer:
To be filled
Contact Number:
To be filled
Site Check Site Code
U1246
City Latitude
Abuja 9.04
Statut Site Verification SSV Status : Approved by :
(Approved / Not Approved) Name of EMTS staff
Site Drive Test Analysis Band
Mobile Originating Calls
Sect A
OK
Sect B
OK
Sect C
OK
Sect E
OK
Sect F
OK
Sect G
OK
Performances QoS CS CS Long Call Mobilty
Call Success
CS Short Call S1
Call Success
CS Short Call S2
Call Success
CS Short Call S3
Call Success
PS Activation/Deactivation Band
PDP Context Activation
Sect A
ok
Sect B
ok
Sect C
ok
Sect E
ok
Sect F
ok
Sect G
ok
Soft Handover Summary Number of Active Set Updates Event
Count
Cell Addition 1A
111
Cell Removal 1B
111
Cell Replacement 1C
11
RRC Setup Summary RRC Setup Count RRC Setup Suc Count RRC Setup Suc Ratio Average Setup Time Delay (ms)
Voice Test Summary Call Statistics Total Number of Calls Total Successful Call Setup Total Access Failures Total Drops Total Completed Calls Drops Call Rate (%) Call Setup Success Rate (%) Number of IntraFreqHHOFail Number of IntraFreqHHOSuc R99 IntraFreq HHO Success Rate (%) Number of InterFreqHHOFail Number of InterFreqHHOSuc R99 InterFreq HHO Success Rate (%) Handover From UTRAN (3G->2G) Cell Change Order From UTRAN Failure (3G->2G) Cell Change Order From UTRAN Success Rate (%) (3G->2G) Location Area Update Location Area Update Failure Location Area Update Failure Rate (%)