In any processor the major units are Control Unit, ALU and Memory read write. Among these units the performance of any processor majorly depends on the time taken by the ALU to perform the s…Full description
Smart Grid, Functions Supported by a Smart Grid, Smart Grid and its need, Smart Grid to Smart Power, Technology used in Smart Grid, Reduction in power losses in Grids,Energy conservation tec…Full description
Smart Grid, Functions Supported by a Smart Grid, Smart Grid and its need, Smart Grid to Smart Power, Technology used in Smart Grid, Reduction in power losses in Grids,Energy conservation tec…Full description
weekly
Template of Weekly Progress Report ProjectFull description
Economic Progress report I created for my Macroeconomics 2 class, recieved 100% for the report. Hope it helps!
Weekly Progress Report June25
wala lang
civil, constructionFull description
Thesis Progress Report SampleFull description
Full description
Site Progress ReportFull description
Construction progress report
Falaj Al Qabail Interchange - Monthly Progress Report for February 2015
Full description
Final Year Progress Report Sample for Diploma StudentFull description
xcxcxcFull description
Full description
Daily MEP activity report
NEIE
SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I) (PACKAGE-I) To, Project Coordinator
1. Compaction of Base (water bound) for approach road in progress. 2. Concrete pouring of cable tre nch covers in progress. 3. Excavation of Equipment foundations in progress. (Zia Shafqat Ali) Asst.construction Manager
To Date
NEIE
SUBJECT: 220 KV NEW SUB STATION CHISHTIAN AND VEHARI SUB STATION EXT. PROJECT (PACKAGE-I) To, Project Coordinator
220/132 kV New Sub Station Chishtian
Contractor: NEIE
Daily Progress Report
Dated: 23/08/2013
220 kV Switch Yard Activities
Auto Transformer 160 MVA (2 Nos) Today
This Month
T o D at e
Low Level (Bus Gantry) (10 Nos) T od ay
This Month
T o D a te
High Level High Level (Line Gantry) (5 Nos) (Tower Gantry) (4 Nos) T od ay
This Month
T o D at e
T od ay
This Month
T o D at e
C.C.V.T Line (6 Nos) T od ay
This Month
T o D a te
Surge Arrestor (12 Nos) T od ay
This Month
T o D at e
Post Insulator (20 Nos) T od ay
This Month
To Date
Excavation
2.0
10.0
5.0
4.0
Lean Concrete
2.0
10.0
5.0
4.0
2.0
Pad Concrete
2.0
10.0
5.0
4.0
1.0
Pedestal
2.0
6.0
Backfilling Struc. Erection Struc.insp. Equip. Erec. Is ol at or (1 6 se ts)
1. PCC (1:4:8) of transformer way (200/250 m) Completed. 2. RCC Topping of transformer way 10 Nos Pannel (175/250 m) completed. 3. PCC (1:4:8) of path way 4 Nos. Pannel (60 m Completed). 4. RCC Concrete of path way 4 Nos. Pannel (60 m Completed). 5. Concrete pouring of culvert slab for transformer way (3/3 Nos) Completed. 6. Concrete pouring of Fire wall 4th lift (4 m) Completed.
zia shafqat ali Asst.Construction Manager
To Date
NEIE SUBJECT: 220 KV NEW GRID STATION CHISHTIAN AND VEHARI GRID STATION EXT. PROJECT ( PACKAGE-I) To,
Project Coordinator NEIE-AL-HUSSAIN Contractor: NEIE
Daily Progress Report Control House Building
Dated:23/08/2013
Descripition of Activities
Sr. No
Status
1
Sub Structure (Lean,Footing,Footing Beam, Brick Work, DPC’s, Columns up to plinth level,Plinth Beam & Backfilling under flooring)
Completed
2
Concrete Pouring of 1st Floor Roof Slab + Beams
Completed
3
Form work of 2nd roof Beams & slab
Completed
4
Cutting, Bending & fixing reinforcement of roof slab & Beams
Completed
5 6
Concrete Pouring of 2nd Floor Roof Slab + Beams Ground Floor Brick work of super structure
In progress
7
Concrete pad of Cable trench in 11 kV switch room
Completed
8
Form work of cable trench walls in A/C , D/C room
In progress
8
Preparation for Flooring
In progress
Completed
NOTE:
1. Fixing of fence frame & Cement plaster of switchyard fence wall column in progress.
(zia shafqat ali) Asst.Construction Manager
NEIE
SUBJECT: 220 KV VEHARI SUB STATION EXT. PROJECT (PACKAGE-I) To, Project Coordinator NEIE-AL-HUSSAIN
Daily Progress Report
Contractor: NEIE
Dated: 23/08/2013
220 kV Switch Yard Activities
Bus Gantry (2 Nos) Today
Line Gantry (4 Nos)
This To Date Today Month
Tower Gantry (2 Nos)
This To Date Today Month
C.C.V.T Line (2 Nos)
This To Date Today Month
Surge Arrestor (6 Nos)
This To Date Today Month
Post Insulator (10 Nos)
This To Date Today Month
This To Date Month
Excavation
2.0
4.0
2.0
6.0
6.0
6.0
6.0
9.0
Lean Concrete
2.0
4.0
2.0
6.0
6.0
6.0
6.0
9.0
9.0
Pad Concrete
2.0
4.0
2.0
6.0
6.0
9.0
9.0
2.0
Pedestal
2.0
3.0
9.0
4.0
Backfilling Struc. Erection Struc.insp. Equip. Erec. I sol ator (2 4 Nos .)