dB
MS for Underground Piping (HDPE) Rev. 4
MS for Underground Piping
dB
dB
db 9 dan db 25
pengertian konektor db9 dan db25
TRACCION HDPE
Descripción completa
Desesperanza Db
Desesperanza Db Venezuelan musicDescripción completa
Db Access
Descrição: Conhecendo o dbaccess
DB Listing
DB listFull description
Hdpe Catalogo
hdpeDescripción completa
HDPE buisverbindingen
pipaFull description
Hdpe Field
Procedimiento tuberia HDPEFull description
Underground HDPE
IT DB
200 CR+ companies
DB-2
IT database
DB-Aire.en.es
Manual Chiller DBDescripción completa
AndhaVeedu DB
novel
DB QA
Database ERDFull description
DB-9
IT database
DB-1
IT database
geomembrana hdpe
informacion geomenbrana hdpeDescripción completa
TUBERIAS HDPE
okis
HDPE Procedure
Ejercicio Db
DB-4
IT database
INSPECTION & TEST PLAN – ITP 007 – Rev 2 Inspection & Test Plan For:
FTB Encased HDPE Duct Bank
Section No:
Customer: Contract Number: 09.033 Project Name: ACR – 275 kV Transmission Line
ITP 007
From / To Station: Date:
Location: Operation or Stage of work Ref
Description
Characteristics
Stage / Frequency
Records
Acceptance Criteria
Inspection / Test Procedure
All task completed
Check documents
H
H
H
H
As ordered
Specification / Codes
Check against orders
X
V
V
W
Good practice.
Safe, secure and adequate protection
Visual inspection
X
Pre-start meeting records
OHS practice & regulation.
To authority requirement
Check WMS & JSA
W
W
W
Checklist
As per spec. Clause 5
As per drawing Specification / codes
Visual inspection & measure
X
Visual inspection
X
As per spec. Clause 7.2
As per spec.
Visual inspection
X
As per Australian standards AS 2033
Specification / codes
Check documents and Visual inspection
H
H
V
As per spec. Clause 10.3
As per drawing
Visual inspection
X
W
W
1
Preliminary activitiesSite Construction folder
Required approval obtained
Each work area
Approval documents
2
Incoming material inspection
Confirm to order
Each delivery
Check delivery docket
3
Material storage and protection
As specified
Each work area
4
Pre-start
Ready to commence work
Each work area
5
Trench Excavation
6
Shoring installation where applicable
Support trench walls
Each work area Each work area
7
Condition of working floor
For suitability
8
HDPE Pipe Electrofusion Welding
9
Pre-pour inspection
Task completion
OHS practice
Each work area Each work area
Each pour
Requirement / Standard / Specification As per contract, OHS practice & regulation
Welding Certificate & Procedure
T:\09.0033-ACR Project\900 QA\903 ITP & Check Lists\ITP\09.033-ITP 007-FTB HDPE DB Rev 2-15.06.10.Doc
Supervisor/ Workmen
Inspection QC LST Engineer
ENet
V
Page 1 of 2
W
INSPECTION & TEST PLAN – ITP 007 – Rev 2 Inspection & Test Plan For:
FTB Encased HDPE Duct Bank
Section No:
Customer: Contract Number: 09.033 Project Name: ACR – 275 kV Transmission Line
ITP 007
From / To Station: Date:
Location: Operation or Stage of work Ref
Description
Characteristics
Stage / Frequency
10
FTB - order/delivery
FTB design mix
Each work area
11
FTB placement in the trench
To specification
Each pour
12
13 14 15 16
Compressive strength test FTB Test cylinder Polymeric Cover Strip (PCS) installation FTB placement over Polymer cover strip Shoring removal where applicable
To specification
TR testing
To specification
3 test per section no greater than 200 linear metres 1 test per 50 m³ Each work area
Requirement / Standard / Specification As per spec. Clause 7.3 As per spec. Clause 7.3
Test certificate
As per WMS 09.033.001
Lab Test certificate
As per spec. Clause 7.5 As per drawing As per spec. Clause 7.5
Each work area
OHS practice As per spec. Clause 15
Soft marker tape installation
Warning tape
Each work area
18
Work completion
Site left neat & tidy
Each work area
H – Hold Points;
Delivery dockets
Each pour
17
W – Witness Point;
Records
.
As per spec.
Acceptance Criteria
Inspection / Test Procedure
Pre-approved & tested supplier As per drawing
Check documents and Visual inspection Correct placement to required dimension
To standards
NATA certified lab
W
V
V
0.8ºCm/W
Energex Lab
W
V
V
Visual inspection
X
W
W
Correct placement to required dimensions
X
Visual inspection
X
Visual inspection
X
Visual inspection
W
As per specification As per drawing Specification / codes As per drawing Completed to spec. Clean & tidy
X – Self Inspection by the Performer of Work;
T:\09.0033-ACR Project\900 QA\903 ITP & Check Lists\ITP\09.033-ITP 007-FTB HDPE DB Rev 2-15.06.10.Doc
Supervisor/ Workmen W
Inspection QC LST Engineer
ENet
V
X
W
V – Verification or Monitoring
Page 2 of 2
W
×
Report "09.033-ITP 007-FTB HDPE DB Rev 2-15.06.10"
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
×
Sign In
Email
Password
Remember me
Forgot password?
Sign In
Our partners will collect data and use cookies for ad personalization and measurement.
Learn how we and our ad partner Google, collect and use data
.
Agree & close