BRIEF SCOPE OF WORK The brief scope of work comprises o f, but not limited to, the following: a. Design, supply, installation and commissioning of Integrated Building Management system comprising of the following: i. Building Automation system for HVAC Lower Side (AHU’s etc). Electrical Electrical System System (HT/LT) (HT/LT) includin including g DG operation, operation, Vertic Ver tical al Transpo Tra nsporta rtation tion (Lift Management) system and Water Management System ii. Integrated building management system including the IBMS software to integrate and monitor the following services from a central location Fire Detection & Alarm Public Address Access Control Closed Circuit Surveillance & Digital Video Recording Lighting Control Water Management Fire Fighting Iii The following system specific to the requirement of th e Data centre.: Gas based Fire Suppression systems. Water leak detection Smoke Detection Ultrasonic Pest Repellent system
CHECK LIST FOR BMS SUB-SECTION-1 INPUT AND OUTPUT SUMMARY FOR BAS. S l. NO
DESCRIPTION
FUNCTI ONS AI
1
Chiller ON/OFF command.
1 2
Chiller ON/OFF status.
3
Chiller Auto / Manual status.
5
D O
STA ALA CON CONTROL/ TUS RM TROL MONITORING
DDC TYPE - A (For chiller) Chillers: -
4
AO D I
LOCA TION
Chiller trip status.
AH U ROO Command from PC/DDC to the ch il le r M - 1 A T MCC panel. S EC From chiller panel O ND signal from A/M switch. FLO O R. signal from potential
free contact. Motorized Vavle ON/OFF Command
6
Motorized Vavle ON/OFF Status
7
Immersion type Temp sensor for In and out
signal from potential free contact.
Signal from Immersion type Temp sensor .
Primary Chilled Water PumpsPrimary Chilled Water pumps ON / OFF command.
Command from PC/DDC to the primary CHW Pumps panel.
Primary Chilled Water pumps ON / OFF Status.
Differential pressure switch.
10
Primary Chilled Water pumps Auto / Manual status.
signal from A/M switch.
11
Primary Chilled Water status.
signal from potential free contact.
8 9
12
pumps trip
Immersion type Flow switch
signal For dry run status
13 Secondary Chilled Water Pumps14 Secondary CHW pumps ON / OFF
Command from PC/DDC to the MCC panel.
Command. 15 Secondary CHW pumps ON / OFF status.
Differential pressure switch.
16 Secondary CHW pumps VFD speed Control.
Proportional signal from DDC to the VFD
17 Secondary CHW pumps VFD speed feedback. 18 Secondary CHW pumps trip status.
signal from VFD.
19 Secondary CHW pumps A/M status & Bypass status.
signal from A/M switch.
20 Immersion type Flow switch
signal for Dry Run status
21 Differential pressure Switch across the supply & return headers.(4 nos Pr
Signal from DP switch for flow.
VFD trip status .
Pump, 3 Nos Sec pump)
22 Differential pressure sensor across the common supply & return headers.
Differential pressure sensor. Pulse O/P from flow meter.
23 CHW flow measurement 24 MCC power supply status.
Command from PC/DDC to the MCC panel.
Total
2 TYPE - B ( For 1 NO AHU with VFD.) 4Nos
1 AHU ON/OFF Command. 2 3
1
AHU ON/OFF Status.
1
*
AHU Auto/Manual Status
1
*
1
*
4 Filter status. 5
7
*
RA Temparature status
CHW 2-Way Valve Control.
1
*
1
RE At local control F DD panel C At Auto / Manual LO switch CA DP switch TIO From N Temparature DR At local control
2 Way Valve
6 RA Rh status
From Rh sensor AWI
NG. with Actuator 8
Fire trip status.
From Fire Relay
Fire Damper On/Off Status
At local control panel
9 10 VFD speed control. 11
VFD speed refference.
12 VFD trip status. 13 14
At VFD Panel At VFD Panel At VFD Panel
Duct static pressure sensor.
Pressure sensor
VFD Bypass status.
At VFD Panel
Total
3
TYPE - C (3 Nos AHU's/CAHU with Starter ) - 2 Nos
1
AHU ON/OFF Command.
2
AHU ON/OFF Status.
3
AHU Auto/Manual Status
4
Filter status.
5
RA Temparature status
From Temparature
6
RA Rh status
From Rh sensor
6
CHW 2-Way Valve Control.
7
Fire trip status.
2 Way Valve with Actuator From Fire Relay
8
Fire Damper On/Off Status
At local control panel
9
Duct static pressure sensor.
Pressure sensor
Total
At local control panel
REF DDC At local control LOCA TION panel DRA At Auto / Manual W switch ING. DP switch
4
TYPE -D(4 Nos CAHU's with Starter )- 1 No
1
AHU ON/OFF Command.
2
AHU ON/OFF Status.
3
AHU Auto/Manual Status
4
Filter status.
5
RA Temparature status
From Temparature sensor
6
RA Rh status
From Rh sensor
6
CHW 2-Way Valve Control.
2 Way Valve with Actuator
7
Fire trip status.
From Fire Relay
8
Fire Damper On/Off Status
At local control panel
9
Duct static pressure sensor. Total
Pressure sensor
5
TYPE -E (22 Nos PAC )- 1 No
1
AHU ON/OFF Command.
At local control panel
REF DDC At local control LOCA TION panel DRA At Auto / Manual W switch ING. DP switch
At local control panel
PAC ROO M AT 1ST
At local control panel
PAC ROO M AT 1ST
Total
6
TYPE -F (7 Nos PAC )- 1 No
1
AHU ON/OFF Command.
Total
SUB-SECTION – 2
I/O SUMMARY SECTION I: I/O LIST FOR HT/LT ELECTRICAL MONITORING S.No DESCRIPTION DI AI STATUS ALARM CONTR LINK . OL SUBSTATIION FUNCTIONS 1. 0
11KV SWITCHGEAR SIGNALS (HPCL HT PANEL SIDE)
1. 1
11 KV INCOMING VCB 630A 350 MVA ON/OFF/Auto trip - functions I n c o m i n g H T voltage/current/frequency,pow er,M VA - Measurements
1.2
1.3 1.4
MICROPROCESSOR BASED RELAYS - Trip circuit UnHealthy MANUAL OPERATION STATUS 11 KV RECEIVING VCB 630A 350 MVA ON/OFF/trip - functions I n c o m i n g H T voltage/current/frequency,pow er,M VA - Measurements
1.5
MANUAL OPERATION STATUSon/off
1.6
MICROPROCESSOR BASED RELAYS - Trip circuit UnHealthy BATTERY CHARGER:
1.7
BATTERY CHARGER - Mains on/ DC supply on/fails
LOCATI ON
Signals SUBare STATION to be BLDGacquired HT from ROOM Circuit Breakers & Relays over serial interface. Electrical contractor shall make available CBs and relays with RS 485 port and MODBUS RTU PROTOC OL
1.8
BATTERY VOLTAGE Measurement
S.No DESCRIPTION . MAIN POWER CONTROL CENTER 2.0
433 V INCOMING FEEDERS For TRANSFORMERS
2.1
INCOMING 433 V 3200 AMPS ACBS
2.2
ON/OFF/Auto trip - functions
2.3
I n c o m i n g L T voltage/current/frequency,power, M VA - Measurements MICROPROCESSOR BASED RELAYS - Trip circuit UnHealthy
2.4
2.5
MANUAL OPERATION STATUS BUSCOUPLER: - 1 NO
2.6
BUS Coupler - On/off/trip
2.7
MANUAL OPERATION STATUS - On/off DG INCOMER feeders: - 2 NOS
2.8
DG INCOMER - ACBS On/off/trip
2.9
I n c o m i n g L T voltage/current/frequency, KW, kVA - Measurements
3.0
MICROPROCESSOR BASED RELAYS - Trip circuit UnHealthy MANUAL OPERATION STATUS-
3.1 4.0
UPS MONITORING
DI
AI STATUS ALARM CONTR LINK OL
LOCATI ON
Signals SUBare STATION to be BLDGacquired MPCC from ROOM Circuit Breakers & Relays over serial interface. Electrical contractor shall make available CBs and relays with RS 485 port and MODBUS RTU PROTOC OL
1.0
STATUS MONITORING, VOLTAGE, CURRENT, LOAD, BATTERY VOLTAGE ETC 6 NOS 200 AND 2 NOS 100 KVA UPS - Total around 80 soft points
S.No DESCRIPTION DI . 2.0 KW. Voltage, Amps from each * feeder through DATA Load manager meter - Total 28 feeder each 5 soft points = 140 soft points
3.0
RS 485 Ground port and floor MODBUS U P S RTU room PROTOC OL to be provided by UPS vendor AI STATUS ALARM CONTR LINK LOCATI OL ON RS 485 SUBport and STATION MODBUS BLDGRTU MPCC. PROTOC The O L to wiring be shall be provided takenout by and Electrical terminte vendor d at one AT common METER chamber LEVEL by electrical vendor.
DG set - ON/Off status, KW, Amps, Voltage, Frequency etc through PLC Approximately - 50 soft point
Total DI = DIGITAL INPUTS AI= ANALOG INPUTS
RS 485 SUBport and STATION MODBUS BLDGRTU MPCC PROTOC ROOM O L to be provided by Electrical vendor IN PLC PANEL
SECTION-II I/O LIST FOR /LT ELECTRICAL MONITERING S.No DESCRIPTION . 4.00
DI
AI
ALAR CONTRO LINK STATUS M L
433V OUTGOING FEEDERS On/off/Trip status LIFT FEEDER- 2NOS
4.10 FIRE HYDRANT PANEL--1 4.20
CHILLER NO.1 ,2,3, AND STAND BY FEEDER
4.30 CHILLER PUMPS PANEL - 2 NOS 4.40 WORKSTATION UPS- 2NOS 4.50 APFC PANEL - 2 NOS 4.60 SPARES- 4 NOS 4.70 SUBSTATIION PANEL 4.80 EMERGENCY LIGHTING FEEDER 4.90 AC PANELS- 5 NOS 5.00
LIGHTING AND POWER FEEDER 2NOS
5.10 UPS FEEDERS- 2NOS
Thorugh DDC controllers. BMS vendor to provide the controller along with wiring. Electrical vendor to provide the necessary Potential free contact in the each breakers. The wiring shall be taken out and terminated at one common chamber by electrical vendor
SECTION-III WATER MANAGEMENT SYSTEM I/O LIST FUNCTIONS S.No DESCRIPTION
1
Pump ON/OFF
2
P u m p trip,ON/OFF status
3
Linear levels for all the sumps and tanks
Total
AI DO AO STATUS ALARM CONTROL CONTROL/ LOCATION MONITORING
THROUGH UG SUMP DDC. AREA Local display AND shall be TERRACE provided OH TANK indicating water level and pumps status
SECTION-IV LIGHTING MANAGEMENT SYSTEM - I/O LIST Sr DESCRIPTION No.
FUNCTION DI AI DO AO STATU ALARM S
I
LIGHTING MANAGEMENT SYSTEM Controller-1
1
External Street Lighting & FACADE LIGHTING Lighting MCCB ON/OFF
CONTROL
CONTROL / MONITORI LOCATI NG ON
ON/OFF Contactor shall be provided by the Electrical vendor. Controllojng through DDC by BMS vendor
SUB STATIO SUB SUB STATIO N
Controller-2 - 6 sets 2 Incomer MCCB switch on/OFF at Ground floor, Second floor LSSB 3 Induvidual circuit ON/OFF controlls Each controller - 20 circuits
TOTAL
At floor level, At floor shall be level provided by the Electrical vendor. Controllojng through DDC by BMS vendor
SECTION-V FIRE FIGHTING PUMPS I/O LIST FUNCTION Sr.No DESCRIPTION DI
DO AI AO STATUS ALARM CONTROL CONROL /MONITORING
A) HYDRANT and SPRINKLER PUMPS: 1
2
JOCKEY PUMP: -1 NOS Pump Trip /ON/OFF Status HYDRANT PUMP:- 2NOS Pump Trip ON/OFF Status
3
SPRINLER PUMP STANDBY PUMP- 2 NOS Pump Trip/ ON/OFF Status TOTAL
Status monitoring through DDC. Suitable potential-free contacts shall be Made available by the Fire Fighting contractor
SECTION-VI I/O LIST FOR LIFTS
FUNCTION
Sr. DISCRIPTION SP DI NO 1
Monitor alarm bell status of lifts
2
Monitor Fireman's emergency operation status
3
Monitor operation of elevator in 'Attendant mode'
4
Monitor lift u n d e r inspection/test drive
5
Monitor lift under fire drive
6
Trip Alarm
7
ON/OFF Status
8
FLOOR LEVEL Status(each lift 3 levels= 2 nos x 3 levels) Total
CONTROL LOCAT /MONITORI ION NG AI DO AO STATU ALARM CONTRO S L For Lift monitoring machin through e room DDG. Potential free contacts shall be made available by Elevators supplier.