Pearl GTL Project Shell Project No: HP-3000-QAT Project Document Number: T- 4.250.919
Purchase Order Number:
2MH127
Tag/Item Number(s):
N/A
Unit(s):
ASU
PCWBS:
Z
LINDE ENGINEERING
Contractor Project No: 5887
Project Rev.: C
Page 2 of 13
QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
G
C
05.01.09
As per Site Condition, Issued for Review
SK
EO
AG
IFR
F
C
18.12.08
As per Site Condition, Issued for Review
SK
EO
AG
IFR
E
B
08.10.08
Ready For Construction
SK
EO
AG
RFC
D
A
08.03.08
Ready For Construction
BR
UA
ZG
RFC
C
O
26.11.07
Issued for Company comments
BR
AU/MC
ZG
ICC
B
23.11.07
Issued for Review
BR
AU/MC
ZG
IFR
A
20.11.07
Issued for Internal Review Review
BR
AU/MC
ZG
IIR
Date
Description
GAMA Rev.
Project Rev
No.
No.
Prepared Checked Approved By By By
Status
ORIGINATOR ORIGINATOR
Document Title:
ITP FOR PAINTING AND COATING LINDEGINEERING AG Document No.
Contractor
Gama Qatar Co. W. L. L.
GAM
ITP
QAC
GTL
032
G
Org.
Doc. Type
Geogr. Area
Seq.
Code
Disc. Code
Rev. No
Project Document Number: T-4.250.919
No
LOC470 Vendor Code
Rev No: C
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
Test Frequency
1.0
METHOD STATEMENTS/PROCED STATEMENTS/PROCEDURES URES
1.1
Method Statements / Procedures Preparation
2.0 2.1
2.2
2.3
3.1
3.2
Acceptance Criteria
Responsible Party
Verifying Documents
S
X
C
Subcontractor Method Statements / Procedure
Project Requirements
QA/QC
T.4.305.119 T.4.250.916
H
R
R
Painting inspector
Calibration Test certificate
I
S
S
QA/QC
Calibration Test Certificates
I
S
S
Painting inspector
Qualification Certificates
I
R
R
H
R
R
CONTROL OF INSPECTION, MEASURING AND TESTING EQUIPMENT Blasting and Painting Standard practice and Once per shift Equipment Inspection safety Calibration of test instruments
Each Inspection
Coating personnel qualification.
DEP 30.48.00.31; T.13.376.799 DEP 30.48.00.31; T.13.376.799
User Manual of test Equipment manufacturer
Ability to blast and paint in accordance
Standard Practice and Safety
100%
Blaster Paint Applicator 3.0
Prior to start of activity
Reference Document
with manufacturer’s
A
technical data sheets
MATERIALS CERTIFICATES
Verification of Paints, Thinners, colors and Abrasives
100%
Storage and handling of Paints & Abrasives
DEP 30.48.00.31; T.13.376.799,MSD S Manufacturers Technical data sheet, certificates
T-4.250.900, T- 4.250.916
T.13.376.799 DEP 30.48.00.31
T-4.250.900, T- 4.250.916
Daily
Manufacturer’s
Painting inspector
MAR,MSDS GAM-QCR-QAC-GTL-051
Visual confirmation
I
S
S
Verifying Documents
S
X
C
Painting inspector
GAM-QCR-QAC-GTL-055 GAM-QCR-QAC-GTL-055
I
S
S
Painting inspector
GAM-QCR-QAC-GTL-055 GAM-QCR-QAC-GTL-055
I
W
W
Painting inspector
recommendation.
T-4.250.919 Rev. C
Page 4
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
4.0
1.1.1.1 INSPECTIONS
Test Frequency
Reference Document
Every 4hrs or weather change
T-4.250.900, T- 4.250.916
Acceptance Criteria
Responsible Party
Environmental Conditions Dry Bulb Temperature
4.1
Wet Bulb Temperature Relative Humidity
DEP30.48.00.31, T.13.376.799 Manufacturer’s
recommendation.
Substrate Temperature Air temperature of Compressed air Surface preparation prior to application of coating systems
4.2
Surface Profile and cleanliness Max. Time between end of blasting and application of primer (4 hrs.)
T-4.250.919 Rev. C
100%
T-4.250.900, T-4.250.916
T.13.376.799 DEP30.48.00.31 ISO 8501:SA 21/2 ISO 8501-1:SA 3 ISO 8504-2
Page 5
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
4.0
1.1.1.1 INSPECTIONS
Test Frequency
Reference Document
Every 4hrs or weather change
T-4.250.900, T- 4.250.916
Acceptance Criteria
Responsible Party
Verifying Documents
S
X
C
Painting inspector
GAM-QCR-QAC-GTL-055 GAM-QCR-QAC-GTL-055
I
S
S
Painting inspector
GAM-QCR-QAC-GTL-055 GAM-QCR-QAC-GTL-055
I
W
W
S
X
C
I
W
W
I
H
H
GAM-QCR-QAC-GTL-055
I
W
W
GAM-QCR-QAC-GTL-167
I
H
H
A
Environmental Conditions Dry Bulb Temperature
4.1
Wet Bulb Temperature Relative Humidity
DEP30.48.00.31, T.13.376.799 Manufacturer’s
recommendation.
Substrate Temperature Air temperature of Compressed air Surface preparation prior to application of coating systems
4.2
Surface Profile and cleanliness
T-4.250.900, T-4.250.916
100%
Max. Time between end of blasting and application of primer (4 hrs.)
T.13.376.799 DEP30.48.00.31 ISO 8501:SA 21/2 ISO 8501-1:SA 3 ISO 8504-2
T-4.250.919 Rev. C
Page 5
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
In process inspection of primer coat/first coat a ) Paint system verification 4.3
b ) Wet film thickness c) Dry Film Thickness d) Adhesion check (if applicable)
Test Frequency
Reference Document
T.13.376.799 a)100% b)100% c) Para 3.5.1
T-4.250.916, T-4.250.900
Acceptance Criteria
T.13.376.799Para 3.5 DEP30.48.00.31Para 6
Responsible Party
GAM-QCR-QAC-GTL-055
Painting inspector
Manufacturer’s
recommendation & ISO 2409, ASTM D4541
d) Para 3.5.3
GAM-QCR-QAC-GTL-167
T.13.376.799 a) Visual Inspection
4.4
In process inspection of intermediate coats & min. Time b/w the application of different coats
DEP30.48.00.31 T.13.376.799
b) wet Film Thickness 100% c)Dry film Thickness Para 3.5.1
T-4.250.900 T-4.250.916
Manufacturer’s
recommendation & ISO 2409, ASTM D4541
Painting Inspector
d) Adhesion check Para 3.5.3
T-4.250.919 Rev. C
Verifying Documents
Page 6
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
Test Frequency
In process inspection of primer coat/first coat a ) Paint system verification 4.3
b)100% c) Para 3.5.1
c) Dry Film Thickness
T.13.376.799Para 3.5 DEP30.48.00.31Para 6
T-4.250.916, T-4.250.900
Responsible Party
S
X
C
I
W
W
I
H
H
GAM-QCR-QAC-GTL-055
I
W
W
a) Visual Inspection
4.4
GAM-QCR-QAC-GTL-167
I
H
H
Verifying Documents
S
X
C
GAM-QCR-QAC-GTL-055
I
W
W
GAM-QCR-QAC-GTL-167
I
H
H
Painting Inspector
GAM-QCR-QAC-GTL-053 GAM-QCR-QAC-GTL-053
I
H
H
Painting Inspector
GAM-QCR-QAC-GTL-056 GAM-QCR-QAC-GTL-056
I
H
H
Painting Inspector
GAM.-QCR-QAC-GTL-05 GAM.-QCR-QAC-GTL-056 6
I
H
H
GAM-QCR-QAC-GTL-167
DEP30.48.00.31 T.13.376.799
b) wet Film Thickness 100% c)Dry film Thickness Para 3.5.1
A
Painting inspector
Manufacturer’s
T.13.376.799 In process inspection of intermediate coats & min. Time b/w the application of different coats
Verifying Documents
GAM-QCR-QAC-GTL-055
recommendation & ISO 2409, ASTM D4541
d) Para 3.5.3
d) Adhesion check (if applicable)
Acceptance Criteria
T.13.376.799 a)100%
b ) Wet film thickness
Reference Document
T-4.250.900 T-4.250.916
Manufacturer’s
recommendation & ISO 2409, ASTM D4541
Painting Inspector
d) Adhesion check Para 3.5.3
T-4.250.919 Rev. C
Page 6
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
Test Frequency
Reference Document
Acceptance Criteria
Responsible Party
T.13.376.799 a) Visual Inspection
4.5
In process inspection of final coat of film thickness, colour, coating system,
b) wet Film Thickness 100% c)Dry film Thickness Para 3.5.1
T-4.250.900 T-4.250.916
DEP30.48.00.31 T.13.376.799
Painting Inspector
Manufacturer’s
recommendation
d) Adhesion check Para 3.5.3
4.6
Wet sponge holiday testing (if applicable)
100%
T-4.250.900 T-4.250.916
4.7
Hot –Dip Galvanizing touch up
100%
T-4.250.900 T-4.250.916
100%
T-4.250.900 T-4.250.916
4.8
Inspection of repair / touch up of paintings /coatings. (Field joints of Above ground & buried carbon steel lines etc)
T-4.250.919 Rev. C
DEP30.48.00.31 T.13.376.799 Para 3.5.2 No holidays DEP30.48.00.31,D EP30.48.40.31,BS EN ISO 1461 (or) ASTM A 123 T.13.376.799 DEP30.48.00.31 Manufacturer’s
recommendation
Page 7
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
Test Frequency
Reference Document
Acceptance Criteria
Responsible Party
Verifying Documents
S
X
C
GAM-QCR-QAC-GTL-055
I
W
W
GAM-QCR-QAC-GTL-167
I
H
H
Painting Inspector
GAM-QCR-QAC-GTL-053 GAM-QCR-QAC-GTL-053
I
H
H
Painting Inspector
GAM-QCR-QAC-GTL-056 GAM-QCR-QAC-GTL-056
I
H
H
Painting Inspector
GAM.-QCR-QAC-GTL-05 GAM.-QCR-QAC-GTL-056 6
I
H
H
Verifying Documents
S
X
C
-
I
S
S
H
W
W
I
R
R
I
I
R
T.13.376.799
A
a) Visual Inspection
4.5
In process inspection of final coat of film thickness, colour, coating system,
b) wet Film Thickness 100% c)Dry film Thickness Para 3.5.1
DEP30.48.00.31 T.13.376.799
T-4.250.900 T-4.250.916
Painting Inspector
Manufacturer’s
recommendation
d) Adhesion check Para 3.5.3
4.6
Wet sponge holiday testing (if applicable)
100%
T-4.250.900 T-4.250.916
4.7
Hot –Dip Galvanizing touch up
100%
T-4.250.900 T-4.250.916
100%
T-4.250.900 T-4.250.916
4.8
Inspection of repair / touch up of paintings /coatings. (Field joints of Above ground & buried carbon steel lines etc)
DEP30.48.00.31 T.13.376.799 Para 3.5.2 No holidays DEP30.48.00.31,D EP30.48.40.31,BS EN ISO 1461 (or) ASTM A 123 T.13.376.799 DEP30.48.00.31 Manufacturer’s
recommendation
T-4.250.919 Rev. C
Page 7
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
4.9
Color coding and stenciling of identification on equipment / piping.
100%
T-4.250.928
4.10
Final Coating inspection & Punch Listing
100%
T-4.250.900 T-4.250.916
4.11
4.12
Flawless Start-up Initiative (FSI) - Cleanliness
Disposal of high risk wastes such as catalyst drums, chemical drums for first fill, paint cans
T-4.250.919 Rev. C
Test Frequency
Internal Cleaning
100%
Reference Document
T.13.377.360 Rev E & T.4.096.688 T.13.377.450-Construction waste Management Procedure
Acceptance Criteria
T.13.376.799 DEP30.48.00.31 Project Requirements T.13.376.799 DEP30.48.00.31 Visual confirmation No external materials inside the pipe & Internal Cleaning before lifting into Structure. Check & ensure in Hazard area ,flammable area any paint material
Responsible Party
Painting Inspector
Painting Inspector
Site Engineer
Painting Supervisor
Page 8
-
Visual
Visual
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-032
C2 ASU Construction Works
ITP FOR PAINTING AND COATING S. GAMA QATAR
X. CONTRACTOR QC
DATE: 05.01.2009 REV. G
C. COMPANY
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
4.9
Color coding and stenciling of identification on equipment / piping.
100%
T-4.250.928
4.10
Final Coating inspection & Punch Listing
100%
T-4.250.900 T-4.250.916
4.11
4.12
Test Frequency
Flawless Start-up Initiative (FSI) - Cleanliness
Disposal of high risk wastes such as catalyst drums, chemical drums for first fill, paint cans
Internal Cleaning
Reference Document
T.13.377.360 Rev E & T.4.096.688 T.13.377.450-Construction waste Management Procedure
100%
Acceptance Criteria
T.13.376.799 DEP30.48.00.31 Project Requirements T.13.376.799 DEP30.48.00.31 Visual confirmation
Responsible Party
T-4.250.919 Rev. C
S
X
C
-
I
S
S
H
W
W
I
R
R
I
I
R
Painting Inspector
-
Painting Inspector
No external materials inside the pipe & Internal Cleaning before lifting into Structure. Check & ensure in Hazard area ,flammable area any paint material
Verifying Documents
Site Engineer
Visual
Painting Supervisor
Visual
Page 8
C2 ASU PEARL GTL PROJECT RAS LAFFAN INUSTRIAL CITY MAR (Material Acceptance Report) Project: QSGTL –PEARL GTL PROJECT
MAR No.:
Date:
Manufacturer: PO/Subcontract Number : Description of the Proposed Material: QTY:
No’s:
Note:
Involved Discipline:
Civil
□
Civil / Buildings □
□
Welding □
Instrumental □
Mech. / Piping □
Electrical □
Others
Mechanical
□
…………………..
Location & Usage of the Delivered Material:
A
C2 ASU PEARL GTL PROJECT RAS LAFFAN INUSTRIAL CITY MAR (Material Acceptance Report) Project: QSGTL –PEARL GTL PROJECT
MAR No.:
Date:
Manufacturer: PO/Subcontract Number : Description of the Proposed Material: QTY:
No’s:
Note:
□
Civil
Involved Discipline:
Civil / Buildings □
□
Welding □
Instrumental □
Mech. / Piping □
Electrical □
Others
Mechanical
□
…………………..
Location & Usage of the Delivered Material:
Applicable Specifications & Technical Details:
Yes □
Proposed material complies with applicable project specification Attachments:
Inspection Report □ Release Note
Mill Certificates □
□
Data Sheets
No □ Others □
□
Comments:
Carried out By y B d e t p e c c A
DATE
GAMA REP. VENDOR REP. LINDE REP. QSGTL REP.
GAM-QCR-QAC-GTL-051
C2 ASU PEARL GTL PROJECT
Q A A T A A R
RAS LAFFAN INDUSTRIAL CITY
NAME
SIGNATURE
C2 ASU PEARL GTL PROJECT
Q A A T A A R
RAS LAFFAN INDUSTRIAL CITY
PINHOLE & HOLIDAY TESTING REPORT
Subcontract Ref.:
Report No.
Item Description:
Inspection Date:
Item Location / Area:
Test Code No.:
System:
ITP No.:
Subsystem:
Ref.Drg./Doc.
Used Measuring and test equipment ref. (if applicable): HOLIDAY DETECTOR DETAILS Make: _________ Date
Identification No.: Pipe T.D.F.T Ident. No. Dia (inch) Microns
K.V.Range: KV Settings
H.D Result Damages Pinholes
Remarks:
ORGANIZATIONS THIRD PARTY REP.
y B dGAMA e t p e cLINDE c A
REP. REP.
QSGTL or its PMC REP. GAM-QCR-QAC-GTL-053
DATE
NAME
SIGNATURE
Remarks
C2 ASU PEARL GT PROJECT RAS LAFFAN INDUSTRIAL CITY PAINTING INSPECTION REPORT
Q AA T AA R
Report No.: Item Description: System: Item Location / Area: Ref. DWG / Documents: Used Measuring and test equipment ref. (if applicable): Working Conditions Internal / External
Compr. Air Temp. Time (hrs.) Air WB ( C) DB Dew Point (O C) Relative Humidity % Metal Temp. (O C)
Inspection Date: Test Code No.: Subsystem: ITP No.: Paint Spec: Insp. Equipment Used
Identification #
1. Hygrometer 2. DP / RH Calculator 3. Temperature Gauge 4. Hypoder Hypodermic mic Needle Needle 5. Surface Profile Gauge 6. WFT Gauge 7. DFT Gauge
Surface Cleaning with fresh water SURFACE PREPARATION
PROFILE MEASUREMENT TAPE
From: ________________ ________________ hrs. hrs. To: ________________ hrs. hrs.
Grit Blasting Machine Sl.No. Nozzle Pressure Grit Type
Manual / Auto
PSIG
Wire Brushing Grade Surface Finish Surface Profile
Manual / Power mm Microns
*PAINT APPLICATION
From: ______________ ______________ hrs. Coating Manufacturer:
Paint:
Batch No.
Product/Coat
Primer
To: _______________ _______________ hrs.
Airless Spray Machine Sl. No. Total Mix Application Colour WFT DFT DFT Ratio Methods
Overcoat
Time
A. B.
Intermediate A. Coat B. Top Coat
A. B.
Further Inspection Required: Conducted : Corrective action if necessary: ORGANIZATIONS y B d e t p e c c A
DATE
NAME
THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL or its PMC REP.
*Priming application will be done within 4 hrs after surface preparation. GAM-QCR-QAC-GTL-055, GAM-QCR-QAC-GTL-05 5, Rev-1
SIGNATURE
C2 ASU PEARL GT PROJECT RAS LAFFAN INDUSTRIAL CITY REPAIR & TOUCHUP PAINTING INSPECTION REPORT
Q A A T A A R
System: Item Description: Item Location / Area: Subsystem: Ref. DWG / Documents: Used Measuring and test equipment ref. (if applicable): Working Conditions
Internal / External
Report No.: Inspection Date: Test Code No.: ITP No.: Paint Spec: Insp. Equipment Used
Identification #
1. Whirling Hygrometer Time (hrs.) Air WB O ( C) DB Dew Point (O C) Relative Humidity Metal Temp. (O C)
2. DP / RH Calculator Calculator 3. Temperature Gauge Gauge 4. WFT Gauge 5. DFT Gauge
SURFACE PREPARATION
From: ________________ To: ________________
Method of Cleaning
PAINT APPLICATION
From: ______________ ______________ hrs.
To: _______________ _______________ hrs.
Coating Manufacturer:
Paint:
Batch No.
Product/Coat
Airless Spray Machine Sl. No. Total Mix Application Colour WFT DFT DFT Ratio Methods
Overcoat
Time
A.
Primer
B.
Intermediate Top coat
A. B. A. B.
Remarks: Remarks:
ORGANIZATIONS y B d e t p e c c A
THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL or its PMC REP.
GAM-QCR-QAC-GTL-056, GAM-QCR-QAC-GTL-05 6, Rev-1
DATE
NAME
SIGNATURE
Q AA T AA R
C2 ASU PEARL GT PROJECT RAS LAFFAN INDUSTRIAL CITY ADHESION INSPECTION REPORT
Report No.: Item Description: System: Item Location / Area: Ref. DWG / Documents:
Inspection Date: Test Code No.: Subsystem: ITP No.: Paint Spec:
1. Type Of Inspection:-
2.Inspection Item:-
3.Inspection Results:-
4. Remarks:-
ORGANIZATIONS y B d e t p e c c A
THIRD PARTY REP. GAMA REP. LINDE REP. QSGTL or its PMC REP.
GAM-QCR-QAC-GTL-167
DATE
NAME
SIGNATURE