Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
BLASTING AND PAINTING PROCEDURE
FOR
ADANGA NORTH "A" PLATFORM OML 123
Status: AFC Page 1 of 24
Hazcon Nigeria Limited Document Title:
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 2 of 24
Hazcon Nigeria Limited Document Title:
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Status: AFC
Rev. Date:
Page 3 of 24
17/04/2011
REVISION DESCRIPTION SHEET
This sheet must be completed in detail, at each revision, once this document has been issued at revision 0. Details to include revision number, a description of the revision indicating paragraphs and pages that have been revised, together with the date and approved signature.
REVISION
DESCRIPTION
DATE
APPROVED BY
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
TABLE OF CONTENTS 1.0
GENERAL
2.0
INTRODUCTION
3.0
SCOPE
4.0
REFERENCES
5.0
DEFINITIONS
6.0
RESPONSIBILITIES
7.0
PROCEDURE 7.1 Safety 7.2 Safe Handling of Painted Structures 7.3 Paint Materials & Equipment
Status: AFC Page 4 of 24
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
7.6.9
Subsequent Paint Coats
7.7 Repair of Painting Defects 7.8 Control of Paint Thickness 7.9 Painting Inspection and Testing Equipment
8.0
7.10
System Color Code
7.11
Painting Schedule
ATTACHMENTS
Status: AFC Page 5 of 24
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
1.0
Status: AFC Page 6 of 24
GENERAL This procedure outlines the steps to be taken by HAZCON NIGERIA LIMITED to carry out painting work and maintenance of painting equipments.
2.0
INTRODUCTION The purpose of this procedure is to determine the general requirements of painting Work for ADANGA NORTH "A" PLATFORM OML 123 Project and to ensure that painting work is done in accordance with applicable specifications and standard.
3.0
SCOPE This procedure covers the minimum requirement for surface preparation, coating application, safe handling and inspection of both shop applied and site applied coatings on steel structures, other steel materials, etc.
Hazcon Nigeria Limited Document Title:
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
SSPC SP3
Status: AFC Page 7 of 24
power tool cleaning (steel structure painting manual chapter 2 surface preparation specs)
SSPC SP5
Joint surface preparation standard white metal blast cleaning (NACE No.1:1994 (steel structure painting manual chapter 2 surface preparation specs)
SSPC SP6
Joint surface preparation standard commercial blast cleaning (NACE No.3:1994 (steel structure painting manual chapter 2 surface preparation specs)
SSPC SP7
Joint surface preparation standard brush off blast cleaning (NACE No.4:1994 (steel structure painting manual chapter 2 surface preparation specs)
Hazcon Nigeria Limited Document Title:
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 8 of 24
WFT Wet film thickness: The thickness of uncured or w et paint or coating MDFT Minimum dry film thickness TDFT
Total Dry film thickness: The thickness of the total number of coatings specified.
6.0
RESPONSIBILITIES 6.1
Project Engineer He shall be responsible for implementation of activities including preparation of work, delivery of material, surface preparation, painting, etc.
6.2
QC Manager He shall be responsible for review of all request forms and report of examination, inspection and control of painting materials and procedures.
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 9 of 24
Safety data sheet and application instructions shall be the governing literature. And shall be made continuously available at the work place. Instructions on handling and storage shall be followed. Flammable products, thinners, etc, are to be stored away from combustible materials and all precautions taken to avoid creating fire hazards.
7.2
7.2.1
Safe Handling of Painted Structures
Painted structure shall be allowed to remain up to the minimum time required for dry to handle before lifting to another point by crane on any other means that may not cause damage.
7.2.2
During lifting of painted structure, the point for attachment of lifting rope or belt shall be protected with soft and dry rag or foam material to prevent the hard rope creating an unwanted impression or damage at that point.
Hazcon Nigeria Limited Document Title:
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
hauling and positioning of items for blasting and painting and storage of painted spools.
7.2.7
Any identification mark damaged during painting shall be restored before storage.
7.2.8 Painted spools shall be stacked on pallets or timber with soft padding and wedge supports.
7.3
Paint Materials & Equipment
7.3.1 Paint Materials
Status: AFC Page 10 of 24
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 11 of 24
storage, shall not be used. 7.3.7
Only grits shall be used for all blasting activities.
7.4
Equipment
7.4.1
All the equipment and material necessary to carry out cleaning, priming and painting work shall be suitable and adequate to produce the standard of surface preparation and paint application required by the specifications.
7.4.2
Compressed air supply used for blast cleaning shall be free from water and oil, adequate separators and traps shall be provided, installed in the coolest part of the system. They shall be emptied regularly to prevent carry over of water and oil.
7.4.3
All blasting and painting equipment shall be inspected and accepted prior to usage.
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 12 of 24
defective paint work shall be removed by Blast cleaning to sa2½ or SSPC-
SP10. of SIS 05.5900-1967 for blasting, also as recommended in manufacturers product data sheet. NOTE!!
Sa3- Blast cleaning to visually clean steel: The entire surface shall show the blast cleaning pattern and shall be uniformly bright clean bare steel. All parts of the surface shall be free of discoloring by rust, stain, mill scale, residues or other foreign mater. Sa2½ - Very thorough blast cleaning: The entire surface shall show the Blast cleaning pattern and at least 95% of the surface shall be bright clean bare steel. The surface may show some shadows, streaks or light discoloring, but these should be slight and distributed over the surface.
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
7.5.6
Status: AFC Page 13 of 24
Blast clean surfaces prepared to the required quality of cleanliness shall be referenced to the visual illustration in ISO 8501-1. Surface profile shall be continuously checked against surface comparator.
7.5.7
Manual and mechanical (power tool) cleaning shall only be carried out where blast cleaning is impractical and for repairs of paint defects or site welded areas. The surface cleanliness achieved shall satisfy ISO8504-3, grade st2 for manual and st3 for power tool cleaning. Only stainless steel wire brushes shall be used to abrade stainless steel surfaces. Brushes used to abrade carbon steel shall not be used to abrade stainless steel or other noble materials.
7.5.8
Surface Preparation of Stainless Steels, Galvanized steel and Non-ferrous metals shall be performed by solvent or steam cleaning with an alkaline detergent. Stainless Steel surface preparation/painting shall only be executed where it is specifically ie. if required for color coding purposes or other such
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Hazcon Nigeria Limited Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
7.6.3
Status: AFC Page 14 of 24
Mixing Paints shall be thoroughly mixed by rotating power tools or rolling rigs, until the solids are distributed equally throughout the container and two pack or multiple pack paint components shall be mixed in the proportions and in accordance
with
the
Paint
Manufacturer’s
instructions
and
recommendations. The mixed paint color shall exactly match with other prepared paints without deterioration such as setting, separation, gelling etc.
7.6.4 7.6.4.1
Paint Application Each layer of paint shall be allowed to dry for a period of time within the limits prescribed by the Paint Manufacturer.
7.6.4.2
Particular attention shall be paid to the painting of corners, edges, welds, etc, to ensure the specified minimum dry-film thickness is obtained and
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 15 of 24
over spray . The spray nozzle size shall be as specified in the paint manufactures application instruction. Spary equipment shall be regularly inspected for compliance with the above criteria.
7.6.6
Brush application: Brushing shall be executed in such a manner so that a smooth single coat, as near uniform in thickness as possible is obtained. There shall be no deep or detrimental residues brush marks and excessive brushing out will not be permitted. Brush application may be used under the following circumstances. l
When areas cannot be properly coated by spraying for any reason
l
For 'touch-up' or repairs to localized damaged or areas of incorrectly applied paint.
l
Where the Paint Manufacturer considers the coating material suitable for brush application.
7.6.7 Weather Conditions
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 16 of 24
sheet).
7.6.8
Primers
7.6.8.1
Within four hours after the surface has been cleaned (blasted, wire brushed, etc.) and before the surface has become chemically contaminated, or shows signs of significant discolouration, the first coat of primer shall be applied. This is of particular importance in dusty area, or where salt laden air, winds and humid conditions are encountered.
7.6.8.2
Prepared welding edges and surfaces within 50mm of welding shall be left unpainted or painted with an approved welding primer only.
7.6.8.3
The paint shall be applied so as to prevent having differential dry film thicknesses. "Dry spray" in particular shall be prevented.
Hazcon Nigeria Limited Document Title:
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
7.6.9.4
Status: AFC Page 17 of 24
Metal contact surfaces - i.e. bolted joints in structures should be painted with one full coat of the specified primer on both surfaces immediately before bolting up. Fretting surfaces where friction grip is required shall not be painted.
7.7
Repair of Painting Defects Areas of painted surfaces that have become damaged shall be removed back to bare metal and the exposed edge of the undamaged paint shall be feathered out with a hand tool to a gentle bevel overlap between repair painting and old painting to permit. The surface areas with inadequate coating thickness shall be thoroughly cleaned of any foreign material and, if necessary, abraded and additional compatible coats applied until they meet the required dry film thickness.
7.8
Control of Paint Thickness
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
7.8.6
7.9.1
Page 18 of 24
The acceptable DFT shall be as specified in the paint manufacturers application instruction and ADDAX Protective coating Specification
7.9
Status: AFC
(11-01Rev.3)
Painting Inspection and Testing Equipment All testing and inspection equipment shall be kept accurately calibrated at all times and shall be covered by current calibration certificate issued by the equipment manufacture or a recognized test laboratory. Inspection equipments shall include: (1). Surface profile comparator, for checking surface profile (2). Digital temperature& Humidity meter, for ambient temperature and relative humidity (3). Non contact thermometer, for substrate temperature (4). Dew point calculator, to determine the dew point (5). Electromagnetic thickness gauge (Elcometer) for dry film thickness
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 19 of 24
by client however in all instances the Paint Manufacturer's recommendations shall be adhered to in respect of maximum and minimum dry film thicknesses per coat.
8.0
ATTACHMENTS 1.
Daily Painting work/weather check sheet
2.
Dry film thickness check
3.
Paint aplication report
5.
Quality Control Inspection and Test Plan for Blasting and Painting
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Hazcon Nigeria Limited Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Status: AFC
Rev. Date:
Page 20 of 24
17/04/2011
1.
DAILY PAINTING WORK SHEET/WEATHER CHECK SHEET
DAILY PAINTING WORK SHEET/WEATHER
DATE…
CHECK SHEET REPORT……………….. Location:
Weather Condition:
Rain-Rn, Wind-wd, Snow-sw, Sun-sn, Cloudy-cy, Frost-fr
TIME READING Weather Ambient temperature ºC %Ambient Humidity %RH Dew point temperature (Dt) ºC Substrate temperature (St) ºC
8
9
10
11
12
13
14
15
16
17
18
Hazcon Nigeria Limited Document Title:
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Rev. Date: 17/04/2011
Status: AFC Page 21 of 24
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Status: AFC
Rev. Date:
Page 22 of 24
17/04/2011
REPORTS NO:
DRY FILM THICKNESS INSPECTION SHEET
DATE: Location:
Type of structure:
Method:
Equipt Serial No.
ITEM DESCRIPTION
st
1 Coat
st
nd
1 + 2 Coat
st
nd
1 +2 +3
rd
Coats
Hazcon Nigeria Limited
ADNA WHP TOPSIDE FABRICATION, STRUCTURAL & PIPING INTEGRATION PROJECT
Document Title:
Document Number:
01-165-HZN-13-PRO-0001
Rev.: 0
BLASTING AND PAINTING PROCEDURE
Status: AFC
Rev. Date: 17/04/2011
HAZCON Date
CLIENT Name
Sign
2. DRY FILM THICKNESS INSPECTION SHEET .
Page 23 of 24
Date
Name
Sign
Rev: 0 Page 24 of 24 15/10/2011
HAZCON NIGERIA LIMITED
Title
BLASTING AND PAINTING PROCEDURE ADANGA NORTH ’’A” PLATFORM
Doc.
HZN-ADNH-005
No.:
3.
PAINTING INSPECTION REPORT
REPORTS NO:
PAINTING INSPECTION REPORT
DATE: Item/Equipment Description Location: Surface preparation:
Report No.
Date: FILM TICKNESS µm
COATING
BRAND OF PAINT
BATCH NO.
NO. OF
Parts A/B
COATS
Date
Time
Weather
Wet
Dry Value
PRIME MID-COAT TOP-COAT Any specific problems encountered with/causes/solution: COMMENTS: HAZCON Date
CLIENT Name
Sign
Date
Name
Sign
No.