Engineering Manual V6
Installation of a PCS7 Project
Installation of a PCS7 Project
Content Installation of a PCS7 Project
1
General .................................................................................... .................................................................................................................... ................................ 3 Engineering Rules....................................................................................... Rules....................................................................................... 5 Installation of PCS7 ............................................................................................. ................................................................................................. .... 7 Installation of the CEMAT Software.........................................................................8 File Structure............................................................................................................9 Adaptation in in PCS7 for CEMAT.............................................................................10 Create a new PCS7 Project...................................................................................12 Hardware Configuration for a CEMAT PLC..............................................15 Configuration of a SIMATIC PC Station....................................................24 Configuration of the Network Connections Connections ...............................................27 Download for HW Configuration and Network Connections.....................32 Plant Structure definition........................................................................................34 PLC Configuration.................................................................................................. Configuration.................................................................................................. 37 Copy Standard Symbols Symbols and blocks into the PCS7 Project Project ..................... 37 Preparations for programming programming with the the CFC ............................................ 37 Copy the system chart into the PCS7 Project Project .......................................... 40 Loadable PLC-Program ............................................................................41 OS Configuration Configuration (Single-User System or or Server) ................................................ 42 Project Properties .....................................................................................42 OS Project Editor ......................................................................................43 Computer properties .................................................................................45 Tag Management......................................................................................47 General changes in the alarm logging......................................................48 Tag logging ...............................................................................................51 User Archives............................................................................................51 Add User rights .........................................................................................54 CEMAT specific preparations ...................................................................56 Preparation of the Template Template Pictures .......................................................56 Adaptations in the standard pictures pictures for the message system................. 57 General Screen structure..........................................................................61 Picture Tree ..............................................................................................62 OS Configuration Configuration (Server and Standby-Server) Standby-Server) ....................................................63 Server Project ...........................................................................................63 Standby-Server-Project.............................................................................63 Redundancy Redundancy Settings in the Server-Project.............................................. 64 OS Configuration (Client).......................................................................................65 OS Project Editor ......................................................................................65 Computer properties .................................................................................67 Tag Management......................................................................................69 Copyright Siemens AG. Alle Rechte vorbehalten. Ausgabe : 28.01.2004 N:\AUDASCCCP\Cemat\DOKU\V60\English\Engineering\03_PCS7_Project.DOC
3 -1
Installation of a PCS7 Project
Engineering Manual V6
Add User rights ......................................................................................... 70 CEMAT specific preparations ................................................................... 71 Adaptations in the standard pictures pictures for the message system................. system................. 72 Generating and and loading of of the Server Data........................................................... 77 Creating of the server data data in the Server Project ..................................... 77 Loading of the Server Server Data in a Client Project: ........................................ 78 Selection of a Preferred Server Server ................................................................ 79 Trigger for Action AcknowledgeHorn........................................................ AcknowledgeHorn........................................................ 80 Selection of area specific rights................................................................ rights................................................................ 81 Time Synchronization Synchronization ............................................................................................ 82 Time Synchronization Server ................................................................... 82 Time Synchronization Synchronization OS Client............................................................... 83 Project-Download .................................................................................................. 84 How to create a PDL Cache .................................................................................. 87 Restrictions for a Client.......................................................................................... 87
3-2
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
General This chapter describes the installation of a PCS7 project on the Engineering Station (ES) and covers all the required settings for CEMAT based on PCS7 V6. For general questions regarding PCS7 Engineering we refer to the Engineering Manual for PCS7 V6. These items are not included in the Engineering Manual for CEMAT. As the project structure will be different from Project Project to Project (depending (depending on project project size, number of objects, number of PLCs, Servers, OS Clients etc) this description can only be an example for one of many possible solutions. The description was made based on an Example-Project with the following configuration: 3 PLCs 1 Engineering Station 1 redundant Server-Pair 1 OS Client. To enable parallel Engineering and Runtime of the System we decided to create a Multproject Ce54_MP which Ce54_MP which contains 2 PCS7-Projects and a Library: Ce54_P1, Ce54_P1, including the PLC Stations and the ES Ce54_P2, Ce54_P2, including the redundant Server-Pair and the OS Client(s) Ce54_Lib, Ce54_Lib , the Project Library
Copyright Siemens AG. All Rights Reserved.
3-3
Installation of a PCS7 Project
Engineering Manual V6
The following screen shots show the Network Configuration of the Example Project. Network Configuration for Project1 (Ce54_P1)
Note: In our Example the Engineering Station has two Network Cards (1 internal CP and one 3COM) but no CP1613. In the Hardware Configuration of the PC only one Network Card of type IE General can be configured!
Network Configuration for Project2 (Ce54_P2)
3-4
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
To enable independent Engineering for the different PLCs, individual PCS7-Projects can be created for each Engineer. There can be as many solutions as Projects exist and one of the most important steps at the beginning of the Engineering is to define the suitable project structure which fits to your requirements.
Engineering Rules Before you start creating your own PCS7 Project please get familiar with the most important engineering rules in order to avoid double work:
-
-
-
-
-
-
The PC Names, OS Project Names and the Addresses (MAC Addresses, TCP/IP Addresses, PROFIBUS Addresses) Addresses) used in the description description have to be replaced by by your PC Names etc. But keep in Mind that the PC Names and OS Project names must not contain “_”. This sign is used as a Separator in the Server-Prefix and the System will not work if you use “_” in PC or OS-Project Name. All variable names names and function name must be used used exactly as it is mentioned mentioned in the description (including Capital/small letters). In PCS7 V6 the complete Engineering has to be done on the Engineering Station before the OS-Project is downloaded to the PCs. Don’t carry out any engineering step on the Server or OS Client itself. The only exception is the activation of the Time Synchronization for the Servers. If the Engineering Station has no CP1613, this selection is not possible on the ES and has to be carried out on the server itself. Don’t activate the OS-Project for Server on the Engineering Station if the Redundancy is already activated. On the Engineering Station the OS-Project can be activated in Simulation Mode with “Start OS Simulation”. In t his case the OS-Project is duplicated and the Copy is activated. Don’t forget to take a backup of the complete Project (or MultiProject) once in a while, especially before you carry out extensive “Cut” and “Paste” functions and also if more than one person is working on the project. Don’t forget to save the modifications you made in the CEMAT Standard part. (Function blocks, Config Files, Standard Pictures). In case of a CEMAT Update these data will be overwritten. Create a common Library for the project (based on the CEMAT Library) and make sure that everybody working for this project is using the same blocks. The time synchronization is very important for the Alarm logging and Tag logging system. Make sure that there is only one (redundant) time Server in the system and that all the Stations (PCs and PLCs) get the correct time. In PCS7 V6 the PLC has always GMT!!
Copyright Siemens AG. All Rights Reserved.
3-5
Installation of a PCS7 Project
Engineering Manual V6
The following description explains all steps for the installation and configuration of the PCS7 Project: For the Installation of PCS7 V6 see “Installation of PCS7” and the Engineering Manual of PCS7 V6 For the Installation of CEMAT see “Installation of the CEMAT Software” For the location of the CEMAT Software on your PC see “File Structure” For the additional settings on your PC which are required after the Installation of CEMAT see “Adaptations in PCS7 for CEMAT” For the creation of a PCS7 Project with PLCs and OS Stations (including Hardware Configuration and Network Configuration) see “Create a new PCS7 Project” For the definition of the plant structure see” Plant structure definition (Plant view and Process Object view)” For all the required settings in a CEMAT PLC see” PLC Configuration” For the Configuration of an OS Station for Single User System or a Server see “OS Configuration (Single User System or Server)” For additional Settings in Server and Standby-Server see “OS Configuration (Server and Standby-Server)” For the Configuration of an OS Client see “OS Configuration (OS Client)” For the creation of the Server Data see “Generating and loading of the Server Data)” For the Project Download to the OS Stations see “Project Download”
3-6
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Installation of PCS7 For each PC Station (ES, Server, Standby-Server and OS Client) the appropriate startup procedure must be carried out. Within this the operation system (Windows 2000 Server for SERVER and Standby-SERVER, Windows 2000 Professional for ES and OS Clients) will be installed on your PC. Please follow the instructions in PCS7 V6 description and the readme file which is delivered with the PCS7 CDs. Only a few additional remarks for the installation:
Language of the Operation System Make sure that all PC Stations are installed with the same operation system language (normally English or German).
Regional Settings Make sure that the regional settings of your PC are correct for the language you want to work with. In CEMAT the 24h time is needed.
Computer Name The character “_” is not allowed in the Computer name!
Screen Resolution The best screen resolution for the CEMAT Faceplates and Pictures is 1280x1024. 1280x1024. This is the recommended recommended selection, especially for Single Stations and for OS Clients.
Power Options Switch off the Power saving system (for all Devices like Hard Disk, Monitor etc.) in BIOS and in the Control Panel
Installation of the software for PCS7 Please, always use the actual installation instructions, which are delivered with the PCS7 installation CD. In General the languages German and English must be installed. Additionally you can install the language for the corresponding country. The installation of the language of the individual systems in PCS7 is described in the document „Engineering with PCS7“.
Hardware definition with Commissioning Wizard When you start your PC the first time after installation of PCS7 the Commissioning Wizard will be started automatically in order to ask you for the Settings of the PC Station. Enter these settings according to the Hardware of your PC. The configuration can be checked under: Start Simatic SIMAITC NET Settings Configuration Console. For detail information refer to the PCS7 Manual “PC Configuration and Authorization”
Configuration Editor In the Configuration Editor add the WinCC Application according to the Station Type and give the correct Station Name.
Copyright Siemens AG. All Rights Reserved.
3-7
Installation of a PCS7 Project
Engineering Manual V6
Installation of the CEMAT Software The following procedure has to be carried out on all PC Stations (ES, SERVER and CLIENT): Start the delivered Setup Programs from the CD and follow the instructions on the screen. Installation directory: 'D:\CEM_V6\BIN'. Enter the key for project standard
000 = CEMAT 006 = Dyckerhoff 007 = Heidelberger Zement 024 = Bushehr 025 = Caima 026 = Alsen 028 = Rossi
Note: Don’t modify the destination directory from the default. To ensure that all CEMAT functions working correctly, CEMAT must be installed under D:\CEM_V6.
3-8
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
File Structure After running the Setup the CEMAT CEMAT specific files are located located in drive D, directory directory CEM_V6.
D:\Cem_V6 \Bin
CEMAT IndustrialX Controls
\Bitmaps
CEMAT V4 Bitmaps
\CAD
Location of CAD Files for Info-Dialog
\Config
Configuration Files
\Config_KCS
Configuration Files for KCS
\Docu
Documentation in PDF format
\Docu_KCS
Documentation for KCS in PDF format
\Documents
Location of Documents for Info-Dialog
\Sounds
Sound files for alarms
\Tools
Software Tools for CEMAT
\ua
User Archive default
\Video
Location of Video files for Info-Dialog
\WinCC \GraCS
CEMAT Standard pictures and bitmaps
\Library
WinCC project functions for CEMAT
\Pas
cyclical WinCC project functions for CEMAT
\Siemens
WinCC standard functions for CEMAT
The CEMAT libraries ILS_CEM and PRO_CEM (only available if project standard is not ‘000’) are installed in the PCS7 system directory and will be found after the installation under C:\….\Siemens\Step7\S7libs
Copyright Siemens AG. All Rights Reserved.
3-9
Installation of a PCS7 Project
Engineering Manual V6
Adaptation in PCS7 for CEMAT For all PC Stations (ES, SERVER and CLIENT) the following steps have to be carried out: 1.
Install the Fonts "wingdng3.ttf" "wingdng3.ttf" under under Control Control Panel -> Fonts -> "Install new Font“. Font“. You will find this fonts in directory "d:\cem_v6\tools\windng3.ttf"
2.
Copy all files files under under d:\Cem_v6\WinCC\Siem d:\Cem_v6\WinCC\Siemens ens to c:\….\Siemens c:\….\Siemens
3.
Adaptations in the Config-Files Config-Files (under (under D:\Cem_V6\Config) D:\Cem_V6\Config) should be carried out on on the Engineering Station and the transferred to all other Stations (SERVER and CLIENT). Make sure that all the modified Config-Files are saved additionally to a backup directory, because these files will be overwritten in case of a CEMAT Upgrade!
Open file C_Config.cfg carry out the following settings:
-
Under [DefaultSounds] define the Sound File for Alarm Sound: [DefaultSounds] ; This wave file will be played, if no ; special object sound file was found AlarmSound=Horn01.wav
Replace Horn01.wav by the sound you want hear in case on an alarm.
-
Under [AddintionalPrograms] [AddintionalPrograms] define the Documentation Reader (program which will be started pressing manual button in the Faceplates) and the Help Reader (program which will be started pressing help button in the faceplates): [AdditionalPrograms] ; This document reader will be started, if you pressed the manual button ;( via the 'C_DOC_READER' program) DOC_Reader=notepad.exe ; This reader will be started if you pressed the Help button ; E.g. Acrobat Reader: C:\\Program Files\\Adobe\\Acrobat 5.0\\Reader\\AcroRd32.exe ; ( Use for separator \\ not only \ ) HELP_Reader=C:\\Program Files\\Adobe\\Acrobat 5.0\\Reader\\AcroRd32.exe
Remark: Double-check the installation directory of Acrobat on your computer. This is different for different languages. Using Notepad as documentation reader the file name is sufficient, for other programs like Acrobat the complete path must be given.
3 - 10
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
-
Installation of a PCS7 Project
Under [ServerPrefix] define the allotted Server for each PLC. The server name must be identical with the definition under Server Data (WinCC-ProjectName_Se (WinCC-ProjectName_Server-PCName.) rver-PCName.) Example: [ServerPrefix] ;PLC No. = ProjectName_PCName ProjectName_PCName ;e.g.: 1=OS1_SRV1291 1=OSS61_SERV61 2=OSS61_SERV61 3=OSS61_SERV61 4= 5= 6= 7= 8= 9= 10= 11= 12= 13= 14= 15= 16= 17= 18= 19= 20=
In the example above the data from PLC01, PLC02 and PLC03 are displayed Those declarations are required for the f ollowing functions: - Acknowledgement of alarms by the means of the variable SYSPLCx on a Client - to build the list of servers for the plant (C_PlantSelection) - Opening of the „Info Dialog“ from the alarm-line.
Copyright Siemens AG. All Rights Reserved.
3 - 11
Installation of a PCS7 Project
Engineering Manual V6
Create a new PCS7 Project Define a directory where all the PCS7 projects will be stored in the future. We don’t recommend using the default directories under D:\SIEMENS\STEP7\S7Proj. D:\SIEMENS\STEP7\S7Proj. We recommend creating a separate directory on D drive. Use Options -> Customize to Customize to select the new directory under ‘Storage location for projects‘. Use directory D:\PROJECTS to save your PCS7 projects. If you use Multiprojects, create a Subfolder as Storage location for the Multiproject, e. g. Ce54_MP You can use the Wizard to create a new Project or Multiproject or you can create the Project or Multiproject manually. The wizard will create a Project Structure with Plant Hierarchy which you can modify or delete. In the following description the project is created manually: In the SIMATIC Manager create a new project using File -> New. Select Type Multiproject and and define the Project name. name. Check the Storage location (it location (it should be the Multiproject directory).
Confirm with OK
3 - 12
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Select the Multiproject in the SIMATIC Manager and use Multiproject -> Create in Multiproject to create the first Project within the Multiproject
Confirm with OK. Repeat this step for all your Projects.
Copyright Siemens AG. All Rights Reserved.
3 - 13
Installation of a PCS7 Project
Engineering Manual V6
Create the Project Library using the same method. For the storage location the Folder of the Multiproject Folder is used.
This library will be the Master Data Library for the Project. It should contain all Blocks and Typicals used in the Project (in the CFCs of each PLC-Program). To select the library as “Master” use Multiproject -> Set as Master Data Library .
Once the Projects are created you have to create the PLCs and the PC Stations according to the Hardware Configuration of your plant. New PCs/PLCs can be created either in the Component View of the SIMATIC Manager using right mouse button to Insert New Object or or in the Network Configuration.
3 - 14
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Hardware Configuration for a CEMAT PLC The following pages show the settings in the Hardware Configuration for a CEMAT PLC. The Screenshots in this description show the Properties of a CPU 416-3 DP and a CP443-1 in order to explain the required settings for CEMAT. Other CPUs or CPs may have slightly different Property windows. To avoid misunderstanding the most important CEMAT settings are mentioned below each screen shot.
Define AS Hardware Select from Hardware Catalog -> SIMATIC 400 -> RACK-400 the the Rack you want to use for your PLC and drop it to the sheet. Select a power supply, CPU and a CP according to your hardware configuration.
When dropping the CPU create a new PROFIBUS and connect it.
Copyright Siemens AG. All Rights Reserved.
3 - 15
Installation of a PCS7 Project
Engineering Manual V6
Settings in tab Start-up:
Under “Start-up after Power ON” Warm Restart must be selected
3 - 16
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Settings in tab Cycle/Clock Memory:
Enter the Scan Cycle Monitoring Time, minimum 2000ms. 2000ms. Enter the Minimum Scan Cycle Time of 100ms Select Clock Memory. The memory Byte must be 0
Copyright Siemens AG. All Rights Reserved.
3 - 17
Installation of a PCS7 Project
Engineering Manual V6
Settings in tab Memory:
These are the minimum values for Local Data per each priority class. You have to check the required local data after completing the user program and modify the local data values if necessary. Bigger CPUs probably have more memory for local data.
Please set the maximum Communication Communication Jobs to 1800 if the type of CPU allows this.
3 - 18
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Settings in tab Memory:
The PLC synchronization type should be “As Slave” Note: In PCS7 V6 the PLCs always work with GMT.
Copyright Siemens AG. All Rights Reserved.
3 - 19
Installation of a PCS7 Project
Engineering Manual V6
When dropping the CP443 connect the same to the Ethernet bus. If no Ethernet bus exists, create a new Ethernet bus and connect it to the CP443. Define the Ethernet Address for the PLC, e. g. 08.00.06.01.12.01 08.00.06.01.12.01 (MAC Address).
Properties for Ethernet interface:
3 - 20
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Under Options you have to activate the time-of-day synchronization:
In PCS7 V6 the PLCs always work with GMT.
Copyright Siemens AG. All Rights Reserved.
3 - 21
Installation of a PCS7 Project
Engineering Manual V6
Define the I/O Periphery and parameterize:
3 - 22
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Enter the properties for the analog input and analog outputs cards:
Save and Compile the hardware definitions and load it to the PLC.
Rename S7-Program Back in the SIMATIC Manager you see the elements of the Hardware Configuration (CPU, CP) under each PLC Station. Below this you find the Program Container for the elements. For better identification we recommend to rename the S7 Program Container for the CPU (e. g. P_PLC03).
Copyright Siemens AG. All Rights Reserved.
3 - 23
Installation of a PCS7 Project
Engineering Manual V6
Configuration of a SIMATIC PC Station The SIMATIC PC Stations (ES, Server, Standby-Server and Clients) have to be configured according to the Hardware of the PC. Select the appropriate WinCC Application. Select the CP for Industrial Ethernet according to the Hardware of your PC (e. g. CP1613 for the Process bus and IE General for the Terminal bus.) The Index must be the same as the Index in the Configuration Editor. In the Properties for each CP configure the right addresses (MAC Address; IP Address). Note: It is important to use exactly the same Configuration as it is defined with the commissioning wizard. The character “_” is not allowed in the Station names!
Example for the Configuration of a PCS7 Server or a Single-User Station:
When saving the HW Configuration the OS-Project for the station is created. For the Standby-Server use WinCC Application (stby) instead of WinCC Application. The rest is identical to the Server Configuration.
3 - 24
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Example for the Configuration of the Engineering Station:
When saving the HW Configuration the OS-Project for the ES is created. In this Example the Engineering Station has two CPs (one internal CP and one 3COM) but no CP1613. The second CP can not be defined in the Hardware Configuration of the PC Station (Only on CP of Type IE General is possible). Please consider that there are a few disadvantages if the Engineering Station has no CP1613: 1.
The Download Download of the Hardware Configuration Configuration to the Client can not not be carried carried out via Access Point “PC Internal”. In this case “TCP/IP” has to be be selected.
2.
The settings settings for Time Synchronization in the Server Server Project can not be edited edited on the Engineering Station. The settings must be carried out directly on the Server Station after the download of the OS-Project (only after complete download).
Copyright Siemens AG. All Rights Reserved.
3 - 25
Installation of a PCS7 Project
Engineering Manual V6
Example for the Configuration of an OS Client:
When saving the HW Configuration the OS-Project for the Client is created.
3 - 26
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Configuration of the Network Connections After all the Stations Stations are defined you have to configure configure the Network Connections Connections for the Communication Communication between the OS Stations and the PLCs and for the Communication between PLCs. The settings for the Network Connections between the PLCs are described in Chapter PLCPLC Communication. Communication. This description only refers to the communication between the OS Station and the PLCs. For each Connection between PLC and OS Station an S7-Connection must be configured. To define the connection, the CPs of the different Stations must be linked to an Ethernet Bus. The CP of the PLCs is linked via “Process bus” to the Server Stations. For the Process Communication Communication normally ISO Protocol is used. The OS Clients are linked via “Terminal bus” to the Server Stations. In this Network usually TCP/IP Protocol is used. In a complete Network this would look as follows: Example with 3 PLCs, 1 redundant Server-Pair, 1 ES and 3 OS Clients:
Client 01
Client 02
Client 03
Terminal
ES
Server
Server Standby
Process Bus
PLC01
PLC02
PLC03
In a Multiproject the Stations are often located in different Projects. Each Project has it’s Network Configuration which contains Ethernet Connections to Process bus or Terminal bus. To enable a Network Connections between different Network Configurations the Buses must be merged. In the SIMATIC Manager you will find the merge function if you select the Multiproject and use right mouse button option Multiproject Adjust Projects.
Copyright Siemens AG. All Rights Reserved.
3 - 27
Installation of a PCS7 Project
Engineering Manual V6
Select Ethernet and press Execute and the Window for Ind. Ethernet merge/unmerge will open and allow you to combine the Ethernet buses from different Networks.
Under Properties you will find the S7 Subnet ID:
3 - 28
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
After the Network is merged merged the Network Connections Connections between OS Stations and the PLCs can be defined.
Copyright Siemens AG. All Rights Reserved.
3 - 29
Installation of a PCS7 Project
Engineering Manual V6
To add the S7 connection, select the WinCC Application of the OS-Project or the CPU of the PLC and use right mouse button for selection of “Insert New Connection”.
Select the CPU of the PLC (or the WinCC Application of the OS) and press Apply. Save with ok.
3 - 30
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
We recommend to change the Connection identification for Local ID from S7 connection_1 into a more meaningful name, e. g. COM_PLC01. COM_PLC01. Note: The Connection identification for Local ID must be identical for the connection of all OSProjects to this PLC. Example: COM_PLC01 for the Communication to PLC1 COM_PLC02 for the Communication to PLC2 COM_PLC03 for the Communication to PLC3 etc. The name will be used as Connection Name in the OS Compile for “Named Connections”. Confirm the Settings with OK.
Enter the Network Connections between all the OS Stations (Server, Standby-Server and ES) and the PLCs.
Copyright Siemens AG. All Rights Reserved.
3 - 31
Installation of a PCS7 Project
Engineering Manual V6
Download for HW Configuration and Network Connections After the Station Configuration Configuration is finished finished and the Network Network Connections are are complete the Configuration Data has to be transferred to the PLCs and to the OS Stations. Before this can be done, a few preparations are required: In the SIMATIC Manager select the OS-Project for each Station and go to Object Properties
-
-
-
For the Engineering Station modify the OS-Project name For the Server modify the OS-Project name select the Path to the Target OS Computer select the Standby-OS The OS-Project for the Standby-Server gets r enamed automatically automatically when you select the Standby-OS in the Server Properties. select the Path to the Target OS Computer For the Clients modify the OS-Project name select the Path to the Target OS Computer
Note: Don’t use Underscore in OS-Project Names. This is not allowed!
Example for selection of the target OS:
3 - 32
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Download 1.
For the Download Download to the Stations always start with the Engineering Engineering Station. Station. The Network Network Configuration for the Engineering Station has to be exact in order to enable the Download to the PLCs and to the other PC Stations. Check the Configuration Editor to be sure that everything is configured correctly!
2.
Download the Hardware Configuration to the the PLCs.
3.
Download the Network Configuration to the PLCs
4.
Download the Configuration Configuration for the Server using Access Path “PC Internal” Check the Configuration Editor on the Server Station to be sure that the configuration is correct.
5.
Download the Configuration Configuration for the Standby-Server Standby-Server using using Access Path Path “PC Internal” Internal” Check the Configuration Editor on the Server Station to be sure that the configuration is correct.
6.
Download the Configuration for each Client. If the Engineering Station has no CP1613 you have to use Access Path “TCP/IP” for the Download of the Configuration to the Client. Check the Configuration Editor on the Client Station to be sure t hat the configuration is correct.
Copyright Siemens AG. All Rights Reserved.
3 - 33
Installation of a PCS7 Project
Engineering Manual V6
Plant Structure definition In the component view of the SIMATIC Manager the Stations were inserted and the plant configuration was defined. Now you have to use the plant view or the process object view of the SIMATIC Manager to structure the plant according to technological criteria. For the technological structure the plant designation system and the message philosophy are very important. Refer to point “Designation rules for CEMAT” in chapter 2 of this manual (Preparations). Example:
3 - 34
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
The names of the hierarchy folders f olders can be limited for maximum number of characters. The names can be included completely or partly for the designation system. The settings for max. number of hierarchy folders, max. number of characters, include in designation you will find if you select a hierarchy folder with the right mouse button and use Options -> Plant Hierarchy -> Customize.
For a Cement plant 3 hierarchy folders should be (more than) enough. The OS Area is used in CEMAT to filter the messages in the alarm line. In the Runtime you can select from which OS Area messages should be displayed. If you check the “Derive picture hierarchy on the plant hierarchy” check box, the OS picture hierarchy is derived entirely from the configured PH data. When it is subsequently transferred to the OS, any picture hierarchy configured in WinCC using the Picture Tree Manager is deleted and overwritten with the data generated in SIMATIC Manager.
Copyright Siemens AG. All Rights Reserved.
3 - 35
Installation of a PCS7 Project
Engineering Manual V6
Before a CFC or SFC can be inserted in the Plant View or the Process Object View the Hierarchy folder has to be assigned to a chart folder in a PLC. Before Pictures can be inserted in the Plant View the OS assignment is required. Select the hierarchy folder and open the object properties. Use tab PLC and OS assignment to select the chart folder for the assigned PLC and the assigned OS.
All Elements you add to this hierarchy hierarchy folder will be assigned assigned to this PLC/OS. PLC/OS. If you pass the Selected Assignments to the Lower-level Objects, the subordinated hierarchy folders get the same PLC/OS Assignment. Important: Always Important: Always use the Plant view or Process Object view for creating new elements (CFC, SFC, Pictures). If you create the elements in the component view, the plant assignation will be missing. Exception: Pictures which shall not appear in the overview must be assigned directly to the OS-Project (in the component view).
3 - 36
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
PLC Configuration Configuration Copy Standard Symbols and blocks into the PCS7 Project The CEMAT Standard Library ILS_CEM contains the S7 Program ILS_CEM, which has the Standard Symbols and the blocks for CEMAT, ILS_PTE and ILS. For project standards with key unequal to ‘000’ the library PRO_CEM contains the project specific blocks. (For project key = ‘ 000’ the library PRO_CEM does not exist.)
-
Copy first the symbols from ILS_CEM into the S7 Program Container of your PLC.
-
Copy all blocks from ILS_CEM into the block Container of your PLC.
-
Copy all blocks from PRO_CEM into the block container of your PLC (overwrite the existing blocks).
Preparations for programming with the CFC Select the CPU S7 Program (e. g. P_PLC03). The S7 Program contains Source Folder, Block Folder and Symbols. For PCS7 you have to insert one more folder for Charts using Insert New Object -> Chart folder . Select the Chart folder and insert a new object of type CFC. Define illegal Ranges for CFC blocks: With a double-click on CFC1 the CFC editor will open. Under Options -> Customize -> Compilation you Compilation you have to define the illegal ranges:
DB 1 FC 0
to to
999 1399
Copyright Siemens AG. All Rights Reserved.
3 - 37
Installation of a PCS7 Project
Engineering Manual V6
Copy the blocks for CEMAT, ILS and ILS_PTE into the chart folder: In the CFC-Editor go to Options -> Block types. types . Select the blocks from the offline block folder and copy it into the chart folder:
3 - 38
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
List of blocks, which have to be copied into the chart folder: Absolute
Symbol
Task
Absolute
Symbol
Task
FB1001
C_DRV_1D
OB1
FB1052
C_PLC_SEND
OB1
FB1002
C_DAMPER
OB1
FB1053
C_PLC_RECEIVE C_PLC_RECEIVE
OB1
FB1003
C_DRV_2D**) C_DRV_2D**)
OB1
FB1054
C_PLC_PLC
OB1/OB35
FB1004
C_ANNUNC
OB1
FB61
CTRL_PID
OB35*)
FB1005
C_ANNUN8
OB1
FB76
CTRL_S
OB35*)
FB1006
C_MEASUR
OB1
FC527
OB100_SYS1
OB100
FB1007
C_VALVE
OB1
FC528
OB1_SYS2
OB1
FB1009
C_ROUTE
OB1
FC529
OB35_SYS1
OB35 OB35
FB1010
C_GROUP
OB1
FC530
OB35_SYS2
OB35
FB1011
C_SILOP
OB1
FC1001
C_SPEEDM
OB35
FB1013
C_SELECT
OB1
FC1011
C_SPCNT
OB35
FB1015
C_COUNT
OB35
FC1017
C_MUX
OB1
FB1016
C_RUNNT
OB1
FC1088
C_PUSHBT
OB1
FB1020
C_FB_PLC
OB1
FC1102
OB1_SYS1
OB1
FB1026
C_MEAS_I
OB1
FC1103
C_OB1SY1
OB1
FB1031
C_DRV_S2**) C_DRV_S2**)
OB1
FC1018
C_ADAPT
OB1
FB1032
C_DAMP_S**) C_DAMP_S**)
OB1
*) This block can also be called from a different Task. **) The blocks C_DRV_2D, C_DRV_S2 and C_DAMP_S are not available for all Project Versions of CEMAT. Please check PRO_CEM library for availability of the blocks! After this close the CFC1 CFC1 and delete it.
Copyright Siemens AG. All Rights Reserved.
3 - 39
Installation of a PCS7 Project
Engineering Manual V6
Copy the system chart into the PCS7 Project In the chart folder of the CEMAT library ILS_CEM you will find the system chart SYSPLC00. This system chart is required once in each PLC.
First define in the plant view a hierarchy folder for the system chart. Then copy the system chart from the library into this hierarchy folder. Change the name of the system chart according to the PLC number (e. g. SYSPLC02). The system block C_PLC_PLC is only required, if the PLC-PLC-Coupling of CEMAT is used. In this case the CP-Address of the CP443 for Bus A and Bus B (e. g. 16372 and 16376) must be entered into the parameters BUS_A_AD and BUS_B_AD. Parameter PLC_NO must have the PLC-Number of the own PLC. The function block is called once in the restart (AS_RESTART) and once in OB1 (MAIN_TASK). For detailed description see chapter PLCPLC-Coupling.
3 - 40
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Loadable PLC-Program Once the configuration settings have been made in the system chart the PLC Program is loadable and executable. Warning: Warning: To start the PLC with the Programmer only Warm Restart is Restart is allowed!
After these steps you can start with the PLC Engineering. In chapter 6 of this manual manual “PLC Engineering” Engineering” you find some additional advises.
Copyright Siemens AG. All Rights Reserved.
3 - 41
Installation of a PCS7 Project
Engineering Manual V6
OS Configuration (Single-User System or Server) The WinCC Project (OS-Project) for the Single-User System or Server was already defined with the SIMATIC Manager or Network Configuration. The following settings have to be carried out in the OS-Project, which means you have to open WinCC. This can be done directly from the SIMATIC Manager through selection of the OS with right mouse button and Open Object of of from the Start Menu under Start -> Simatic -> WinCC -> WinCC Control Center 6.0 . Important: The Important: The following steps must be carried out from the beginning in the engineering language, which is used for the project. If you change the language afterwards the language dependent dependent setting have to be repeated. The language settings in SIMATIC Manager are not consistent with the settings for WinCC!!
Project Properties Adaptations for the the Project itself can be be carried out under under Properties. Folder “General” contains the Project Type. Generating a new OS-Project of type “WinCC Application“ automatically a “Multi-User Project” is created. In PCS7 V6 it is not required to change this setting to Single-User Project as the Engineering Station automatically has a Server Lincence. Note: If you still prefer to change this setting it is possible to select Type Single-User System. But: Don’t delete the startup list! In Folder “Update Cycles” the time values for the Update cycles are defined. The CEMAT Symbols generally use “User Cycle 1” or “Anwenderzyklus 1”. The default value of this is 2000ms. You have to adapt this value according to your requirement, e. g. 1000ms.
3 - 42
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
OS Project Editor With the OS Project Editor the following settings for the user interface are made: Tab
Function
Layout
Monitor Configuration and specification of buttons to enable the plant operator to switch between individual areas and servers.
Message Configuration
Settings for message lists and area assignments
Areas
Specification of areas areas that the plant plant operator can access access from the overview area.
Runtime Window
Definition of the maximum number of windows that can be opened when faceplates and curves are called.
Basic data
Selection of objects that are to be replaced after a change. The following objects can be selected: - Pictures - Faceplates - Scripts
General
- Settings for the OS Project Editor for the “Download Changes” function. Note that a complete download operation operation is required with the “complete configuration” setting. - Settings for the protocols that are replaced when the project editor is executed.
Copyright Siemens AG. All Rights Reserved.
3 - 43
Installation of a PCS7 Project
Engineering Manual V6
In Tab Layout choose the right r ight screen resolution. It may be SIMATIC Standard 1280*1024 for a Single-User Station or SIMATIC Server 1280*1024 for a Server. Also select the Number Number of horizontal and and vertical area keys under under Detail (Picture Tree) Tree) and the Monitor Configuration of your PC. Example for the Layout of a Single-User Station:
The settings in the other folders can be modified later.
3 - 44
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Computer properties The computer properties must be checked and adapted to the requirements of the plant. Most of the settings can probably not be entered at the beginning of the engineering and must be adapted later (sometimes after commissioning). Folder General shows the Computer Name and the Computer Type
Caution: The Computer Name for all OS Projects is the name of the Engineering Station. During the download of the OS-Project to the individual PCs the name is automatically replaced by the Name of the PC Station.
Copyright Siemens AG. All Rights Reserved.
3 - 45
Installation of a PCS7 Project
Engineering Manual V6
Folder Startup shows the applications which are started after Activation of the Runtime System Under Additional Tasks/Applications Tasks/Applications you have to add the Scan_CS.exe to the Startup list. The application is located in Directory D:\CEM_V6\BIN. Scan_CS.exe should be called at the end.
Insert both, the Application and the working Directory and save with ok. Move the application to the last position.
3 - 46
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Tag Management Open the Tag Management and add the internal variables for CEMAT: Add new Group “CEMAT” Within this group add the f ollowing variables: Name
Data Type
update
C_VIEW_TAG_A
Binary
Computer-local update
C_VIEW_TAG_D
Binary
Computer-local update
C_AcknowledgeHorn C_AcknowledgeHorn
Unsigned 32-Bit Value
Project-wide update
For each Station of Type Single Station, Server or Standby-Server add one of the following Variable: Replace
by the station name, e. g. C_SERV11_AlarmSound. C_SERV11_AlarmSound. Name
Data Type
update
C__AlarmSoun C__AlarmSound d
Singed 16-Bit Value
Computer-local update
Note: For the computer name use exact characters (Capital letters!). Otherwise the function will not work.
Copyright Siemens AG. All Rights Reserved.
3 - 47
Installation of a PCS7 Project
Engineering Manual V6
General changes in the alarm logging Select the „Alarm Logging“ in the WinCC Explorer and use right r ight mouse button to open the alarm logging editor. Click on the plus symbol in front of Message blocks Select System Select System blocks - Use right mouse button to click on „Date“ and select properties - Change the following settings: Date: Four-Digit Day.Month.Year Day.Month.Year - Use right mouse button to click on „Time“ and select properties Time: H/M/S (deselect Milliseconds) Select User Select User text block - Use right mouse button to click on „Origin“ and select properties - Change the following settings: Change „Source“ to „Tag“ Length = 22
Flashing = off
- Use right mouse button to click on „Event“ and select properties - Change the following settings: Length = 20
Flashing = off
- Use right mouse button to click on „Free 1“ and select properties - Change the following settings: Change „Free 1“ to „Tag Comment“ Length = 42 - Use right mouse button to click on „Free 2“ and select properties - Change the following settings: Change „Free 2“ to „FCL“ (Fault class) Length = 2
Flashing = off
Select Process Select Process value blocks - Use right mouse button to click on „Process_Value_1“ and select properties - Change the following settings: Change „Process_Value_1“ to „Old value“ - Use right mouse button to click on „Process_Value_2“ and select properties - Change the following settings: Change „Process_Value_2“ „Process_Value_2“ to „New „ New value“
3 - 48
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Message classes and message types Click on the plus symbol in front of Message classes Change the settings for „Alarm“, „Warning“, „PLC Process Control System Messages“, „Process Message“, „Operator Input Messages“ according to the following table. - Use right mouse button to click on „Alarm“ and select properties Go to folder „General Information“ and select „Properties“ button to change the colors. Go to folder „Acknowledgement“ to change the acknowledge parameters. The colors and message types have to be changes as follows: Message Message class Type
Came in Text color
Alarm Warning
Process Message Operator Input Message
H L H L Proces Process s
white white
Background color red
blac black k
Went out Text color
Acknowledged Acknowledged Text color
black black
Background color green green
yell yellow ow
blac black k
gree green n
blac black k
white white
red red
black black
green green
black black
black
turquoise
black black
Back- Must be ground ackn. color pink pink yes yes ligh lightt yellow pink pink
Come in Flashing must be acknowl. yes yes off
yes
yes
off
yes yes
yes yes
off
no
no
off
The acknowledge philosophy philosophy for the message classes „Alarm“, „Warning“ and „Process message“ has to be configured as follows: -
Acknowledge Came Came In:
yes
-
Acknowledge Went Went Out:
no
-
Flashing on:
no
-
Only initial value:
no
-
Messages without status Went Out:
no
-
Separate Acknowledge key:
no
-
By means of single acknowledge: acknowledge:
yes
Copyright Siemens AG. All Rights Reserved.
3 - 49
Installation of a PCS7 Project
Engineering Manual V6
Settings for reload after power failure (short term archive) Under “Archive Configuration” -> “Message archive” use right mouse button to make the following settings for “Reload after power failure”:
Under “Archive Configuration” -> “Message Archive” -> “Properties” you have to configure the archive according to the requirements of your project:
Exit the alarm logging editor and save the changes.
3 - 50
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Tag logging For each measure which needs to be archived, in the process value archive an archive tag has to be created. How to create a process value archive and the archive tags is described in the engineering manual of PCS7 and not part of this description. For CEMAT some additional rules must be followed: -
The Archive name for all measures must be ProcessValueArchive .
-
To enable the direct call of measured value archive from the faceplate of the measure, it is necessary that the name of the archive tag exactly corresponds to the name of the process tag.
Caution: If the archive name of the name of the archive tag differs from the above mentioned mentioned rules, the CEMAT Faceplate will not be able to find the Archive data and the archive curve of the measure will not be shown. Make sure that the Tag name of the measure does not contain any illegal characters for archive variables! At this step it is probably probably more convenient, convenient, only to prepare prepare the process value value archive (Size of the archive, archiving duration, default values for archiving cycles.) and to configure the archive later, because at this moment no measures exist and therefore no archive variables can be created.
User Archives There are 2 user archives for CEMAT Functions. The user archive C_INFO contains C_INFO contains the object information (Info Database). The user archive C_DriveList contains C_DriveList contains the Group-Object-Lists (list of objects associated to a route or group).
Copyright Siemens AG. All Rights Reserved.
3 - 51
Installation of a PCS7 Project
Engineering Manual V6
How to create the user archive for the Info Database In directory D:\Cem_V6\ua you will find the default files for the Info Database. File C_INFO.uap contains the structure of the Info Database. The structure of the Info Database is as follows:
3 - 52
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Import the structure of the C_INFO and save: 1.
Open the User-Archive
2.
Import the the structure of the Info Database Database from C_INFO.uap
3.
Save the structure.
How to create the user archive for the Group-Object-List In directory D:\Cem_V6\ua you will find the default user archive for the Group-Object-List. File DriveList.uap contains the structure of the Group-Object-List. The data for Group-ObjectList are entered in r untime mode.
The structure of the Group-Object-List is as follows:
Import the structure of the C_DriveList and save: 1.
Open the User-Archive
2.
Import the the structure of the Info Database Database from C_INFO.uap
3.
Save the structure.
Copyright Siemens AG. All Rights Reserved.
3 - 53
Installation of a PCS7 Project
Engineering Manual V6
Add User rights In the WinCC Explorer click open the User Administrator and and add the rights from No. 18 t o No. 28 according to the following list:
Select the user specific rights.
3 - 54
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
The following table shows how the user rights are assigned to the Cemat Functions: No.
Comment
Function
1
User Administration
WinCC Function
2
Authorization for Area WinCC Function
3
System change
WinCC Function
4
Monitoring
WinCC Function
5
Process controlling
e. g. start and stop groups or drives, selection and deselecting of routes....
6
Higher Process controlling
e.g. Change of Controller modes Closed loop control/ open loop control, Internal/External
7
Report system
WinCC Function
8
Archive controlling
WinCC Function
18
Modify warning limits
Measuring value
19
Modify alarm limits
Measuring value
20
Modify Modify switching switching limits limits Measurin Measuring g value value
21
Controlle Controllerr Parameters Parameters Modificati Modification on of the Controlle Controllerr parameters parameters for TE_CTRL TE_CTRL and TE_VSLCT
22
Object parameters
Change process values and Release options in the diagnostic picture
23
System operations
Special Functions: e.g. Release Functions
24
Interlocking signals
Special Functions: e.g. Service for measuring value, non-interlocked single-start
25
Enter Recipe
Recipe
26
Read Recipe
Recipe
27
Modify Info-Dialog
Info-Dialog Tab 1-3 (Object data)
28
Object-Info Parameters
Info-Dialog Tab 4 (System settings)
Copyright Siemens AG. All Rights Reserved.
3 - 55
Installation of a PCS7 Project
Engineering Manual V6
CEMAT specific preparations Before you start with the generation of the process pictures you have to copy the CEMAT Functions in to your Project. These are Global Script Actions, Project Functions, Standard Pictures and Bitmaps. Please proceed as follows: - Close the WinCC Explorer - Copy the Global Scripts from 'D:\CEM_V6\WinCC\Library' into the PCS7 Project ...\wincproj\\Library'. - Copy the Global Scripts from 'D:\CEM_V6\WinCC\Pas' into the PCS7 Project ...\wincproj\\Pas'. Note: On PC Stations without message line (e. g. Server) you have to delete the file PlaySoundForAlarm.pas. - Copy from ''D:\CEM_V6\WinCC\GraCS' ''D:\CEM_V6\WinCC\GraCS' all Objects into the PCS7 Project ...'wincproj\GraCS' The following standard pictures contain adaptations for CEMAT. The existing pictures must be overwritten by the pictures from the CEM_V6 directory. @AlarmOneLine.pdl @AlarmOneLine.pdl @Buttons11.pdl @Buttons11.pdl @CSIGQuit.PDL @HornQuit.PDL
Alarm line Button keys1 Acknowledge fault function Acknowledge horn function
- Open the WinCC Project. - Open 'Global Script' selecting C-Editor and regenerate Header. (Menu Options -> Regenerate Header)
Preparation of the Template Pictures The picture @C_PCS7Typicals.pdl contains the default symbols for automatic generation of block icons from SIMATIC Manager. The picture @C_Template.pdl contains @C_Template.pdl contains the default symbols for manual connection in WinCC (using wizard). Both pictures have to be renamed before you adapt it to your project. (This also insures that in case of a CEMAT Update your modifications don’t get overwritten):
-
Open @C_PCS7Typicals.pdl @C_PCS7Typicals.pdl and save as @PCS7Typicals.pdl. The SIMATIC Manager always uses @PCS7Typicals.pdl as Template for automatic generation of block icons.
-
Open @C_Template.pdl and save as @Template.pdl.
Caution: For some of the project versions of CEMAT, modified symbols are required. These symbols you find on the right hand side of the template pictures. If you use a project version (Project key > 000) please check if special symbols are available! In this case, if you use the normal symbols, some functions are not guaranteed.
3 - 56
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Adaptations in the standard pictures for the message system For the acknowledge functions in CEMAT (acknowledge alarm, acknowledge horn) the pictures for alarm line and button keys were adapted. The pictures have been copied into your project in the step “ CEMAT specific preparations”. Dependent on your plant configuration and the message philosophy additional modifications have to be performed in these pictures. You must modify the acknowledge button function in the alarm line and the button keys to send the acknowledge signal of the relevant PLC. The following functions are available: AcknowledgeAlarm() AcknowledgeAlarm() AcknowledgeHorn() AcknowledgeHorn()
Acknowledge fault fault Acknowledge horn horn
Or C_AcknowledgeAlarm(,<“System C_AcknowledgeAlarm(,<“System chart“>) C_AcknowledgeHorn(,<“System C_AcknowledgeHorn(,<“System chart“>)
Acknowledge fault Acknowledge horn
The first two functions AcknowledgeAlarm and AcknowledgeAlarm and AcknowledgeHorn can AcknowledgeHorn can be used if the name of the plant view hierarchy folder is not included in the designation system. The function uses the variables of the System chart SYSPLCxx and therefore the PLC-No. must correspond with the number of the System chart. Example: AcknowledgeAlarm(13) AcknowledgeAlarm(13) and AcknowledgeHorn(13) AcknowledgeHorn(13) sends the the acknowledge signal to SYSPLC13.
The function C_AcknowledgeAlarm C_AcknowledgeAlarm und und C_AcknowledgeHorn must be used if the name of the plant view hierarchy folder is included in the designation system. You must add the name of the system chart to the function (including the name of the hierarchy folder). Example: The name of the Hierarchy folder „RM2“ is part of the designation system which means the system variables start with RM2/SYSPLC13....... The functions must be adapted as follows: C_AcknowledgeAlarm(13,“RM2/SYSPLC1 C_AcknowledgeAlarm(13,“RM2/SYSPLC13“) 3“) and C_AcknowledgeHorn(13,“RM2/SYSPLC13“)
Caution: There are different functions for Server and Client, which means the pictures, cannot be copied from the Server to the Client.
Copyright Siemens AG. All Rights Reserved.
3 - 57
Installation of a PCS7 Project
Engineering Manual V6
In the WinCC Explorer select the Graphics Designer and double-click on @AlarmOneLine.pdl.
- Select Button34 (Acknowledge button) - go to Properties, Register Event - Select Mouse and double-click on “Press left”
To acknowledge alarms and horn one additional line must be added per PLC:
Add code: AcknowledgeAlarm() AcknowledgeAlarm() or C_AcknowledgeAlarm(,<“System C_AcknowledgeAlarm(,<“System chart“>) - Select Button34 (Acknowledge button) - go to Properties, Register Event - Select Mouse and double-click on “Press right”
3 - 58
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
To acknowledge the horn one additional line must be added per PLC:
Add code: AcknowledgeHorn() AcknowledgeHorn() or C_AcknowledgeHorn(,<“System C_AcknowledgeHorn(,<“System chart“>)
Copyright Siemens AG. All Rights Reserved.
3 - 59
Installation of a PCS7 Project
Engineering Manual V6
In order to allow the acknowledgement of alarm and horn from the button keys the standard pictures for button keys have to be modified as well. @CSIGQuit.PDL @HornQuit.PDL
Acknowledge Fault Function Acknowledge Horn Function
In the WinCC Explorer select the Graphics Designer and double-click on @HornQuit.pdl.
- Select Button @Horn - go to Properties, Register Event. - Select Mouse and double-click on “Mouse Action”
To acknowledge the horn one line has t o be added per PLC:
Add code: AcknowledgeHorn() AcknowledgeHorn() or C_AcknowledgeHorn(,<“System C_AcknowledgeHorn(,<“System chart“>)
3 - 60
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Open Picture @CSIGQuit.pdl
- Select Button @CSIG - go to Properties, Register Event. - Select Mouse and double-click on “Mouse Action”
To acknowledge alarms and horn one additional line must be added per PLC:
Add code: AcknowledgeAlarm() AcknowledgeAlarm() or C_AcknowledgeAlarm(,<“System C_AcknowledgeAlarm(,<“System chart“>)
Caution: Don’t Caution: Don’t forget to save the modified standard pictures. If you have to run the OS Project Editor again the standard pictures will be overwritten.
General Screen structure The general screen structure was created from the OS Project Editor according to your settings. The start picture is always @screen.pdl The following PDLs are assigned to this @OVERVIEW1.pdl @OVERVIEW1.pdl as Overview range @1001.pdl as Working range @Buttons11.pdl @Buttons11.pdl as Buttons Please take care that any modification in these and other Standard PDLs has to be saved.
Copyright Siemens AG. All Rights Reserved.
3 - 61
Installation of a PCS7 Project
Engineering Manual V6
Picture Tree After the Process Pictures are are created in Plant Plant View or Process Object View View the Picture tree can be automatically created using OS Compile function. Any Picture Hierarchy configured in WinCC using the Picture Tree Manager is deleted and overwritten with the data generated in SIMATIC Manager. Note: If you want to insert a picture into the OS without appearing in the picture hierarchy in the Picture Tree Manager, then you must insert it into the component view, rather than the plant view. Further Information on this topic can be found in the PCS7 - Configuration Manual Engineering System and in the PCS7 - Configuration Manual Manual Operator Station. Information regarding the creation of Process Pictures for CEMAT you will find in chapter OS Engineering of this Manual. Example for a Picture tree:
3 - 62
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
OS Configuration (Server and Standby-Server) Standby-Server) Server Project The configuration of an OS as a Server-Project mainly corresponds with the Configuration of a Single-User System and it is therefore not described in detail. The differences between a Single-User Project and a Server-Project are as follows: 1.
On a PCS7 PCS7 Server with more than one Client it is not allowed allowed to display display process pictures. pictures. A different Layout Layout has to be selected selected in the OS Project Project Editor (PCS7 Server…) Server…) Sometimes also a different screen resolution is required (if the monitors are not able to handle the high resolution).
2.
For a Server, Server, which doesn’t doesn’t have an alarm line, delete file PlaySoundForAlarm.pas PlaySoundForAlarm.pas under under Global Scipts, C-Editor. If you delete this file in the Windows Explorer, don’t forget to regenerate Headers!
3.
Time Synchronization Make sure that there is only one (redundant) time master in the Network. Normally this should be the Server, that means the time synchronization has to be activated for the Server only. See also item Time Synchronization in this Manual.
4.
Redundancy Redundancy Settings The Redundancy has to be activated only in the Server Project. Caution: Never Activate the OS Project for the Server directly on the Engineering Station. For Testing the System we recommend to create a separate OS Project (Single-User Project) on the Engineering Station an to activate this.
Standby-Server-Project The Standby-Server-Project doesn’t contain any data. There is only a reference to the Master- Server-Project. No additional Settings required.
Copyright Siemens AG. All Rights Reserved.
3 - 63
Installation of a PCS7 Project
Engineering Manual V6
Redundancy Settings in the Server-Project After the Server-Project and and the Standby-Server-Project Standby-Server-Project are configured, configured, in the Server-Project Server-Project the corresponding Standby-Server-Project must be selected and the redundancy settings have to be performed.
3 - 64
1.
Select the Server-Project in the SIMATIC Manager Manager and and select in the Properties under Target OS and Standby-OS the corresponding Standby-OS.
2.
Open the Server-Project Server-Project and and carry out the redundancy settings: - Activate Redundancy Redundancy - Select the Redundant Partner Server. - Select the options according to your requirement.
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
OS Configuration (Client) The following settings have to be performed in the OS-Project of each Client. Important: The Important: The following steps must be performed from the beginning in the engineering language, which is used for the project. If you change the language afterwards the language dependent dependent setting have to be performed again. The language settings in SIMATIC Manager are not consistent with the settings for WinCC!!
OS Project Editor With the OS Project Editor the following settings for the user interface are made: Tab
Function
Layout
Monitor Configuration and specification of buttons to enable the plant operator to switch between individual areas and servers.
Message Configuration
Settings for message lists and area assignments
Areas
Specification of areas areas that the plant plant operator can access access from the overview area.
Runtime Window
Definition of the maximum number of windows that can be opened when faceplates and curves are called.
Basic data
Selection of objects that are to be replaced after a change. The following objects can be selected: - Pictures - Faceplates - Scripts
General
- Settings for the OS Project Editor for the “Download Changes” function. Note that a complete download operation operation is required with the “complete configuration” setting. - Settings for the protocols that are replaced when the project editor is executed.
Copyright Siemens AG. All Rights Reserved.
3 - 65
Installation of a PCS7 Project
Engineering Manual V6
In Folder Layout choose the right screen resolution. It may be SIMATIC Standard 1280*1024 or SIMATIC Serverview 1280*1024 if Selection for Server is required. Also select the Number Number of horizontal and and vertical area keys and and the number number of Servers under Detail (Picture Tree) and the Monitor Configuration of your PC. Example for the Layout of an OS Client:
The settings in the other folders can be modified later.
3 - 66
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Computer properties The computer properties must be checked and adapted to the requirements of the plant. Most of the settings can probably not be entered at the beginning of the engineering and must be adapted later (sometimes after commissioning). Caution: The Computer Name for all OS Projects is the name of the Engineering Station. During the download of the OS-Project to the individual PCs the name is automatically replaced by the Name of the PC Station.
Folder General shows the Computer Name and the Computer Type
Copyright Siemens AG. All Rights Reserved.
3 - 67
Installation of a PCS7 Project
Engineering Manual V6
Folder Startup shows the applications which are started after Activation of the Runtime System Under Additional Tasks/Applications Tasks/Applications you have to add the Scan_CS.exe to the Startup list. The application is located in Directory D:\CEM_V6\BIN. Scan_CS.exe should be called at the end.
Insert both, the Application and the working Directory and save with ok. Move the application to the last position.
3 - 68
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Tag Management Open the Tag Management and add the internal variables for CEMAT: Add new Group “CEMAT” Within this group add the f ollowing variables: Name
Data Type
update
C_VIEW_TAG_A
Binary
Computer-local update
C_VIEW_TAG_D
Binary
Computer-local update
C_AcknowledgeHorn C_AcknowledgeHorn
Unsigned 32-Bit Value
Project-wide update
For each OS Client Station add one of the following Variable: Replace by the station name, e. g. C_CLIENT1_AlarmSound. C_CLIENT1_AlarmSound. Name
Data Type
update
C__AlarmSoun C__AlarmSound d
Singed 16-Bit Value
Computer-local update
Note: For the computer name use exact characters (Capital letters!). Otherwise the function will not work.
Copyright Siemens AG. All Rights Reserved.
3 - 69
Installation of a PCS7 Project
Engineering Manual V6
Add User rights In the WinCC Explorer click open the User Administrator and and add the rights from No. 18 t o No. 28 according to the following list:
Under OS Configuration (Single-User System) you find a table, which shows how the user rights are assigned to the Cemat Functions. The user rights related to specific areas can only be configured after the package is loaded.
3 - 70
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
CEMAT specific preparations - Close the WinCC Explorer - Copy the Global Scripts from 'D:\CEM_V6\WinCC\Library' into the PCS7 Project ...\wincproj\\Library'. - Copy the Global Scripts from 'D:\CEM_V6\WinCC\Pas' into the PCS7 Project ...\wincproj\\Pas'. - Copy from ''D:\CEM_V6\WinCC\G ''D:\CEM_V6\WinCC\GraCS' raCS' all Objects into the PCS7 Project ...'wincproj\GraCS' The following standard pictures contain adaptations for CEMAT. The existing pictures must be overwritten by the pictures from the CEM_V6 directory. @AreaButtons.PDL @AlarmOneLine.pdl @AlarmOneLine.pdl @Buttons11.pdl @Buttons11.pdl @CSIGQuit.PDL @HornQuit.PDL
Area Buttons Alarm line Button keys1 Acknowledge fault function Acknowledge horn function
- Open the WinCC Project - Open 'Global Script' selecting C-Editor and regenerate Header. (Menu Options -> Regenerate Header)
Copyright Siemens AG. All Rights Reserved.
3 - 71
Installation of a PCS7 Project
Engineering Manual V6
Adaptations in the standard pictures for the message system For the acknowledge functions in CEMAT (acknowledge alarm, acknowledge horn) the pictures for alarm line and button keys were adapted. The pictures have been copied into your project in the step “ CEMAT specific preparations”. Dependent on your plant configuration and the message philosophy additional modifications have to be performed in these pictures. You must modify the acknowledge button function in the alarm line and the button keys to send the acknowledge signal of the relevant PLC. The following functions are available: AcknowledgeAlarmFromMC() AcknowledgeAlarmFromMC() AcknowledgeHornFromMC() AcknowledgeHornFromMC()
Acknowledge fault fault Acknowledge horn horn
or C_AcknowledgeAlarmFromMC( C_AcknowledgeAlarmFromMC(,<“System ,<“System chart“>) C_AcknowledgeHornFromMC(,<“System C_AcknowledgeHornFromMC(,<“System chart“>)
Acknowledge fault Acknowledge horn
The first two functions AcknowledgeAlarmFromMC AcknowledgeAlarmFromMC and and AcknowledgeHornFromMC AcknowledgeHornFromMC can can be used if the name of the plant view hierarchy folder is not included in the designation designation system. The function uses the variables of the System chart SYSPLCxx and therefore the PLC-No. must correspond with the number of the System chart. Example: AcknowledgeAlarmFromMC(13) AcknowledgeAlarmFromMC(13) and AcknowledgeHornFro AcknowledgeHornFromMC(13) mMC(13) sends the acknowledge acknowledge signal to SYSPLC13.
The function C_AcknowledgeAlarmFromMC C_AcknowledgeAlarmFromMC und und C_AcknowledgeHornFromMC must be used if the name of the plant view hierarchy folder is included in the designation system. You must add the name of the system chart to the function (including the name of the hierarchy folder). Example: The name of the Hierarchy folder „RM2“ is part of the designation system which means the system variables start with RM2/SYSPLC13....... RM2/SYSPLC13....... The functions must be adapted as follows: C_AcknowledgeAlarmFromMC(13,“RM2 C_AcknowledgeAlarmFromMC(13,“RM2/SYSPLC13“) /SYSPLC13“) and C_AcknowledgeHornFromMC(13,“RM2/SYSPLC13“)
Caution: There are different functions for Server and Client, which means the pictures cannot be copied from the Server to the Client.
3 - 72
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
In the WinCC Explorer select the Graphics Designer and double-click on @AlarmOneLine.pdl.
- Select Button34 (Acknowledge button) - go to Properties, Register Event - Select Mouse and double-click on “Press left”
To acknowledge alarms and horn one additional line must be added per PLC:
Add code: AcknowledgeAlarmFromMC() AcknowledgeAlarmFromMC() or C_AcknowledgeAlarmFromMC( C_AcknowledgeAlarmFromMC(,<“System ,<“System chart“>) - Select Button34 (the only button in the picture) - go to Properties, Register Event - Select Mouse and double-click on “Press right”
Copyright Siemens AG. All Rights Reserved.
3 - 73
Installation of a PCS7 Project
Engineering Manual V6
To acknowledge the horn one additional line must be added per PLC:
Add code: AcknowledgeHornFromMC() AcknowledgeHornFromMC() or C_AcknowledgeHornFromMC(,<“System C_AcknowledgeHornFromMC(,<“System chart“>)
3 - 74
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
In order to allow the acknowledgement of alarm and horn from the button keys the standard pictures for button keys have to be modified as well. @CSIGQuit.PDL @HornQuit.PDL
Acknowledge Fault Function Acknowledge Horn Function
In the WinCC Explorer select the Graphics Designer and double-click on @HornQuit.pdl.
- Select Button @Horn - go to Properties, Register Event. - Select Mouse and double-click on “Mouse Action”
To acknowledge the horn one line has to be added per PLC:
Add code: AcknowledgeHornFromMC() AcknowledgeHornFromMC() or C_AcknowledgeHornFromMC(,<“Syste C_AcknowledgeHornFromMC(,<“System m chart“>)
Copyright Siemens AG. All Rights Reserved.
3 - 75
Installation of a PCS7 Project
Engineering Manual V6
Open Picture @CSIGQuit.pdl
- Select Button @CSIG - go to Properties, Register Event. - Select Mouse and double-click on “Mouse Action”
To acknowledge alarms and horn one additional line must be added per PLC:
Add code: AcknowledgeAlarmFromMC() AcknowledgeAlarmFromMC() or C_AcknowledgeAlarmFromMC(,< C_AcknowledgeAlarmFromMC(,<“System “System chart“>)
Caution: Don’t Caution: Don’t forget to save the modified standard pictures.
3 - 76
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Generating and loading of the Server Data To make the Server data available for the Client, a so-called package must be created in the Server-Project and loaded in the Client-Project. In PCS7 V6 the Server data is automatically created during compilation of OS-Date. Only the first time we will create the package manually manually in the Server Project and load it into all the OS Client Project in order to make the right settings:
Creating of the server data in the Server Project To create the package open the Server-Project on the Engineering Station and select from context menu „Server data“ the option „Cr eate...“ The physical name must match with t he Server-Name. The symbolic computer name is used as file name, e. g. OSS61_SERV61.pck. OSS61_SERV61.pck.
Once the package is created a message box appears. Confirm this with o. k. Close the Server-Project. The Server data gets automatically updated during compilation of the OS-Data.
Copyright Siemens AG. All Rights Reserved.
3 - 77
Installation of a PCS7 Project
Engineering Manual V6
Loading of the Server Data in a Client Project: To load a Server data into a Client, open the Client-Project on the Engineering Station and use context menu of Server data and select Menu option „Loading“. - In the "Open"-Dialog select the Server-Project and within that the computer name (in this case this is the name of the Engineering Station). There you find a folder “Packages”. - In the folder Packages select the package-file (.pck) and click on "open". The Serverdata will be copied into folder „packages“ and is available in the Client. To select the standard server, use context menu of Server data and select menu option Standard server... - Select the standard server for the components components Alarms, SSM and User Archive.
Once the Server data is loaded and configured the package gets automatically updated during compilation of the OS-Data.
3 - 78
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Selection of a Preferred Server To distribute the load for the servers uniformly it is useful to connect a part of the Clients to one Server and the other part to the Standby-Server. Therefore a Preferred Server must be configured under Serverdata -> Configure ... Example:
If the preferred Server is stopped the Client automatically switches to the Partner-Server. Once the preferred Server runs again, the Client automatically switches back to the preferred Server.
Copyright Siemens AG. All Rights Reserved.
3 - 79
Installation of a PCS7 Project
Engineering Manual V6
Trigger for Action AcknowledgeHorn After loading the package(s) the Global Global Script Action ‘AcknowledgeHorn.pas‘ ‘AcknowledgeHorn.pas‘ has to be adapted. Please follow the instructions: - Open the t he action ‘AcknowledgeHorn.pas‘.
For each Server install one new Trigger with cycle ‘upon change‘. Press right mouse button and select “Info / Trigger”
3 - 80
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Select the variable C_AcknowledgeHorn C_AcknowledgeHorn from the Tag Management of the corresponding Servers.
Selection of area specific rights Area specific rights can only be set after the Client knows the areas, areas, which means means it is only possible after the package was loaded. Consequently the area specific user rights must be set now. Open the User Administrator from the WinCC Explorer and select the area specific rights.
Copyright Siemens AG. All Rights Reserved.
3 - 81
Installation of a PCS7 Project
Engineering Manual V6
Time Synchronization Time Synchronization Server The following picture shows the settings for the time synchronization. synchronization. In this example the Server PCs (Primary and Standby) will be the time Master:
Note: If the Engineering Station has no CP1613 the Settings for Time Synchronization can not be carried out on the ES. The settings for the time Synchronization must be then be carried out on both Servers after the Download of the OS Project.
3 - 82
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
Time Synchronization OS Client The OS Client PC gets the time via Terminal Bus from the Time Master. In this example the Time Master is the Server:
Copyright Siemens AG. All Rights Reserved.
3 - 83
Installation of a PCS7 Project
Engineering Manual V6
Project-Download After new plant objects objects or pictures were added added and the function function has been been tested on the Engineering Station we want to update the Servers and the Client to make the new function available for the process. This requires a Project Download to the OS PCs. If there was no structural change and as long as an OS Compile for changes is possible the OS Stations can remain in Runtime mode during the Project Download. After a complete OS compilation the destination Project has to be deactivated during the Download procedure. Important: The modifications in the OS-Projects for t he Server, Standby-Server and Clients are never performed directly on the OS Stations. Any modification has to be carried out on the Engineering station and then being downloaded are different OS Stations. The update procedure can be performed manually (step by step) or automatically using the “Compile and Download Objects” Dialog in the SIMATIC Manager. Manual update procedure: 1.
3 - 84
Compile the PLC-Program (from CFC)
2.
Compile the OS Project(s) If you have an OS-Project for the ES and one for the Server you have to start the compilation for both OS-Projects. At the end of the the OS Compile procedure the Server Server Data is automatically automatically updated by the system and the updated package is automatically loaded into the Client Projects.
3.
Now you can carry out the Project-Download from the Engineering Engineering Station to the the Server Station. The Download is carried out fr om the SIMATIC Manager by selecting the OSProject and pressing Download Button.
4.
Wait for the the “Download “Download successfully completed” – Message before you continue.
5.
Now you can can carry out the the Project Download Download from the the Engineering Engineering Station to the StandbyStandbyServer Station. (Same procedure as for the Main Server).
6.
After the “Download successfully completed” completed” – Message the the Project Download is finished! finished!
7.
If it is necessary necessary to update update the Clients Clients as well (may (may not always be required), required), use the same procedure for each Client
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
“Make” Dialog: Compile and Download Objects:
The Picture shows the required Selection to update the Servers (Primary and Standby Server) and the Client. Note: Even if only the OS Project for Server is selected for Compilation and Download, the Standby-Server is getting updated as well. Update for the Client is not required.
Copyright Siemens AG. All Rights Reserved.
3 - 85
Installation of a PCS7 Project
Engineering Manual V6
Structural changes (e. g. a new variable was added for an existing object) require the stop of the Runtime System during the Project Download. This is still no problem because of redundant Servers but the Download Procedure is slightly different: 1.
To actualize actualiz e the Tag Management an OS Compile has to be performed. The OS Compile must be carried out into the OS-Projects of ES and Server. At the end of the the OS Compile procedure the Server Server Data is automatically automatically updated by the system and the updated package is automatically loaded into the Client Projects.
2.
After that you must close the the OS-Project on the Server Server Station. First close the WinCC WinCC Explorer (if it is not already closed) and second the Runtime. The Standby-Server will be MASTER, the Clients will be switched to the Standby-Server. Important: After closing the WinCC Project on the Server Station you have to wait for at least 2 minutes. During this time the project is still „used“.
3.
Now you can carry out the Project-Download from the Engineering Engineering Station to the the Server Station. The Server-Project on the Engineering Station must remain closed. The Download is carried out from the SIMATIC Manager.
4.
Wait for the the “Download “Download successfully completed” – Message before you continue.
5.
After both Servers Servers are running running again, the Redundancy Redundancy Manager Manager starts actualizing actualizing the Server data. If possible wait until the procedure is finished.
6.
Now you can close the OS-Project OS-Project on the the Standby Server Station. First First close the WinCC Explorer (if it is not already closed) and second the Runtime. The Server will be MASTER, the Clients will be switched to the Server. Important: After closing the WinCC Project on the Standby-Server Station you have to wait for at least 2 minutes. During this time the project is still „used“.
3 - 86
7.
Now you can carry out out the Project-Download from the Engineering Station to the Standby-Server Station. The Download is carried out from the SIMATIC Manager.
8.
After the “Download successfully completed” completed” – Message the the Project Download is finished! finished!
9.
If it is necessary necessary to update update the Clients Clients as well (may (may not always be required), required), use the same procedure for each Client.
Copyright Siemens AG. All Rights Reserved.
Engineering Manual V6
Installation of a PCS7 Project
How to create a PDL Cache To achieve shorter picture change times on a Client, the server pictures can be copied to the Client Station (PDL-Cache). On the Client Station under C:\Siemens\WinCC\Bin\PDLCache you have to create one directory per Server; where the t he directory name corresponds to the Server-Prefix-Name (WinCC-Projectname_ServerPC-Name). (WinCC-Projectname_ ServerPC-Name). Into this directory you have to copy all files from the GraCS directory of the specific Server.
Restrictions for a Client -
In case a new alarm appears, in the alarm-line, only the default sound (see C_Config.cfg) is played. Individual sounds (per message) are not possible! Restrictions within the plant selection from the alarm-line and with the object-browser. Those two functions pick their data from the relevant servers. In case that one or more servers are not available, Windows NT is waiting for 90 seconds. During this time the control and it’s mimic is „frozen“. If the operator tries to change mimics during this time, WinCC terminates with an access-fault. The operator has therefore to wait until the end of this 90s timeout. timeout.
Copyright Siemens AG. All Rights Reserved.