TCG 2020 K Maintenance schedule
Maintenance Please note that the following maintenance schedule is a standard maintenance schedule.. ule A fixed definition of the maintenance intervals for all applications is not possible due to the various relations between ambient conditions, operating mode and quality of the fuels. A shortening of the given interval may be necessary under critical operating condition s. The normal maintenance plan is then to be adapted . Normally, the local operating conditio ns are already taken into account in the projection phase. Critical operating conditions are for example: -
contami cont aminati nation on of the the combus combustion tion gases gases by wear wear promotin promoting g constit constituent uents s such such as silisilicon, sulphur, chlorine, ...
-
Frequ Fr equent ent star starts ts,, e.g. e.g. less less than than 12 opera operati ting ng hour hours s per star startt
-
Mult ltip iple le em emer erge gen ncy sto stops ps
-
inc in cre reas ased ed lo load ad in th the e int intak ake e air air
Talk to your service partner if in doubt.
General This engine is built exclusively for the purpose set out in the scope of supply - defined by the equipment manufacturer (use for the intended purpose). Dependi ng on the purpose, the engine is identified by a performance code or a type of gas code which is embossed on the rating plate. The rating plate is described in detail in chapter 2. The maintenance schedule lists the measures for maintaining the nominal condition and thus operational safety of the engine with the corresponding intervals. When the specified interval or opera ting hours have been reached, or if necessary, the work specified in the maintenance schedule must be carried out. The activities are described on job cards. The job cards are listed in chapter 9. The operating manual contains the job cards up to the maintenance and service schedule E40. The workshop manual lists the job cards up to the maintenance and service schedule E70. z
The intervals specified in the maintenance schedule are maximum values and assume that installation, intended purpose and operating conditions comply with the specifications. It must be ensured that all running materials such as combustion gas, lube oil and coolant are of the prescribed quality.
It must be ensured especially that the gas quality meets the minimum require ments according to TR 0199 - 99 - 3017 to avoid avoid opera operating ting malfu malfunct nctions ions and/o and/orr prematur premature e engine engine wear. wear. z
The maintenance schedule only applies to the engine itself and the parts mounted on the engine. System parts must be serviced according to the times and instructions specified by the manufacturer. The appropriate information can be found in the manufacturer documents supplied.
z
The measures described must be carried out by technically skilled p ersonnel or authorized specialists. The competencies are listed in the maintenance and service schedule table.
OBJ_DOKU-17295-001.fm
7
© MWM GmbH 01/2009
5
TCG 2020 K Maintenance schedule
Maintenance and service schedules The operating hour-dependent maintenance measures are divided into maintenance and service schedules. All the listed measures are to be carried out carefully according to the maintenance schedule specifically defined for the engine. Please note that maintenance and service schedules may be added or omitted depending on the speed and gas group.
Maintenance and service schedules
Carried out by
E10
Due once after commissioning and after E60 and E70 respectively
Technically skilled personnel
E20
Daily inspection round
E30
Periodic maintenance (small scope)
E40
Periodic maintenance (medium scope)
E50
Periodic maintenance (extended scope)
E60
Intermediate overhaul
E70
General overhaul
Authorised specialists
Selection and installation A suitable maintenance schedule is allocated for the engine, depending on the speed and gas group. The maintenance plan consists of several sections: -
Maintenance measures
-
Data on the average service life of wear parts
-
Master copy for proof of execution
Plan in plenty of time when the the maintenance and service schedules are due in accordance with the engine's number of operating hours. Arrange in advance the anticipated date with your service partner. When making the appointment, inform him of any irregularities in the engine. If appropriate, draw up a maintenance contract with your service partner. All due maintenance measures, and any repair measures depending on the agreement, will then be planned and carried out properly by the service partner conformant as set out in the contract. Your local service partner will provide the details.
OBJ_DOKU-17295-001.fm
8
© MWM GmbH 01/2009
TCG 2020 K Maintenance schedule
Definition of tasks in the maintenance schedule Settings Setting torques, dimensions, pressures etc.; extra work may be necessary to renew components.
Draining Draining condensation for example.
Replacing Replacement of components, function blocks and liquids.
Reworking Material acceptance within the permissible tolerances to maintain a nominal condition.
Checks Checks according to criteria in the job card. If all criteria are not satisfied, the cause must be determined and the nominal condition reinstated.
Cleaning Cleaning by hand or machine (automatic), replacement of cleaning components (e.g. air filter) may be necessary.
Visual inspection Visual inspection according to criteria in the job card. If all criteria are not satisfied, the cause must be determined and the nominal condition reinstated.
Overhauling Checking of function blocks; rework or renewal of components.
Maintenance Maintenance according to job card. Checking functions; reworking or renewal of components may be n ecessary.
Changing Changing lube oil for example
OBJ_DOKU-17295-001.fm
9
© MWM GmbH 01/2009
5
TCG 2020 K Maintenance schedule
Gas groups The maintenance intervals also depend on the quality of the combustion gases. The combustion gasses are divided into three gro ups according to their wear properties, for which the different normal maintenance plans are valid, also see Technical Bulletin 0199 99 - 3017. Gas group 1
Natural gas Pit gas Liquefied gas such as propane, LNG (liquefied natural gas) Wellhead gas (petroleum gas)
Gas group 2
Sewage gas Landfill gas Bio-gas
Gas group 3
All gases in which the concentration of every single po llutant gas component doe s not exceed 20% of the permissible limit value (see limit value list). e.g. bio-gas after a desulphurisation treatment
Maintenance interval If using combustion gases with a high pollutant load, the maintenance intervals (TBO/Time Between Overhaul) have to be reduced because of the high level of abrasion. To ensure the required tool life, the composition of the combustion gases must be determined at regular intervals by means of a comprehensive gas analysis. For more information, see Technical Bulletin 0199-99-3017. If necessary the maintenance intervals must be reduced accordingly.
OBJ_DOKU-17295-001.fm
10
© MWM GmbH 01/2009
TCG 2020 K Maintenance schedule 5-1
Maintenance schedule Valid for:
Engine type:
V12 and V16 engines
Speed:
n = 1500 rpm
Combustion gas :
Gas group 1
Performance abbreviations
ICN
Type of application:
Current generators
Maintenance measures E10 E20 E30 E40 E45 E50 E55 E60 E70 Description
d e i f i c e p s s a
h O 0 5 r e t f a x 1
) y l i a d ( s r u o h 4 2 y r e v e
h o 0 0 0 2 y r e v e r e t f a
h o 0 0 0 4 y r e v e r e t f a
h o 0 0 0 2 1 y r e v e r e t f a
h o 0 0 0 6 1 y r e v e r e t f a
h o 0 0 0 4 2 y r e v e r e t f a
h o 0 0 0 2 3 y r e v e r e t f a
h o 0 0 0 4 6 y r e v e r e t f a
In accordance with Technical Bulletin 0199 - 99 2105
Gas engines - lubricating oil Lube oil analysis, lube oil change, etc.
In accordance with Technical Bulletin 0199 - 99 2105
Renew lube oil filter cartridge
In accordance with Technical Bulletin 0199 - 99 2091
Engine coolant Engine coolant analysis, engine coolant change, etc.
In accordance with Technical Bulletin 0199 - 99 2116
Engine corrosion protection Engine corrosion protection, etc.
as required
Renew intake air cleaner - when low pressure limit value is reached (note maintenance indicator) - if damaged (leakage) - after 4000 oh at the latest
as required
Overhaul cylinder heads - when the max. valve clearance is reached (according to Chapter 8) - after 32000 oh at the latest Further information can be found in Appendix A
as required
Clean the engine
as required
Replace or recondition the starter
Monthly
Test run, if the engine was not run in operational readiness within a month
Monthly
Service the battery, if the engine was not run in operational readiness within a month
every 4 months
Carry out a gas analysis (according to Technical Bulletin 0199 - 99 - 3017)
every 6 months
Check engine coolant (according to Technical Bulletin 0199 - 99 - 2091)
every 6 months
Check pressure drop of the gas filter
OBJ_DOKU-17296-001.fm
11
© MWM GmbH 01/2009
5
TCG 2020 K Maintenance schedule 5-1
E10 E20 E30 E40 E45 E50 E55 E60 E70 Description
d e i f i c e p s s a
h O 0 5 r e t f a x 1
) y l i a d ( s r u o h 4 2 y r e v e
h o 0 0 0 2 y r e v e r e t f a
h o 0 0 0 4 y r e v e r e t f a
h o 0 0 0 2 1 y r e v e r e t f a
h o 0 0 0 6 1 y r e v e r e t f a
h o 0 0 0 4 2 y r e v e r e t f a
h o 0 0 0 2 3 y r e v e r e t f a
h o 0 0 0 4 6 y r e v e r e t f a
every 12 months
Check regulating devices, pressure setting and impermaebility of the gas control process
every 12 months
Replace gas filter insert
After every 24 months
Replace engine coolant
After maintenance work
Run-in the engine (after e.g. replacing pistons, cylinder liners, etc.)
According to manufacturer specifications
Service the generator
According to manufacturer specifications
Service the clutch
According to manufacturer specifications
Service spring elements (underframe)
According to manufacturer specifications
Service intermediate gearbox - only 60 Hz applications
x
x
x
x
x
x
Test and function run
x
x
x
x
x
x
Check and set inlet and exhaust valve clearance
x
x
x
x
x
x
Check valve lag (cylinder head fitted)
x
Visual inspection of the system x
x
x
x
x
Maintaining the battery
x
x
x
x
x
Check throttle body
x
x
x
x
x
Check speed governor linkage
x
Check the spark plugs, renew if necessary x
x
x
x
Replace spark plugs
x
x
x
x
Check ignition time
x
x
x
x
Maintain crankcase breather (model UPF) - renew the outer filter (filter stage 2) every 4000 oh - renew the inner filter (filter stage 1) every 8000 oh
x
x
x
x
Auxiliary units test by TEM system
x
x
Check combustion chambers with endoscope
x
Check, clean turbocharger - Observe manufacturer's documentation x
Overhaul the exhaust gas turbocharger - Observe manufacturer's documentation
x
x
x
Check engine mounting
x
x
x
Check starter pinion and gear rim on the flywheel
x
x
x
Check exhaust line
x
Check mixture cooler (using a bore scope) x
OBJ_DOKU-17296-001.fm
x
Clean mixture cooler 12
© MWM GmbH 01/2009
TCG 2020 K Maintenance schedule 5-1
E10 E20 E30 E40 E45 E50 E55 E60 E70 Description
d e i f i c e p s s a
h O 0 5 r e t f a x 1
) y l i a d ( s r u o h 4 2 y r e v e
h o 0 0 0 2 y r e v e r e t f a
h o 0 0 0 4 y r e v e r e t f a
h o 0 0 0 2 1 y r e v e r e t f a
h o 0 0 0 6 1 y r e v e r e t f a
x
h o 0 0 0 4 2 y r e v e r e t f a
h o 0 0 0 2 3 y r e v e r e t f a
h o 0 0 0 4 6 y r e v e r e t f a
x
Cleaning the gas-air mixer x
x
Check rubber compensators x
Renew rubber compensators
x
x
Renew viscosity rotary vibration dampers
x
x
Check vibration dampers, hoses and flexible lines
x
x
Check fittings and control units on engine side
x
x
Check electric cabling, cable set plug and sensor system
x
Check crankshaft axial clearance
x
Check camshaft, axial clearance
x
Check small end bushings
x
x
Renew big end bearing
x
x
Renew cylinder liners
x
x
Check crankcase, collar rest of cylinder liners and water chambers
x
Check piston bolt
x
Renew piston rings
x
Check the piston
x
x
Renew pistons (complete)
x
Renew valve tappet
x
Visually check camshaft (camshaft installed) x
Check camshaft
x
Renew camshaft bearing
x
Renew valve actuator
x
OBJ_DOKU-17296-001.fm
Overhauling the gas-air mixer
Check conrod x
Renew connecting rods
x
Renew crankshaft sealing ring on the drive side
x
Renew crankshaft sealing ring on the free side
x
Check crankshaft
x
Renew main bearing and axial bearing or stop rings
x
Check and clean gear drive
x
Renew lubricating oil pump 13
© MWM GmbH 01/2009
5
TCG 2020 K Maintenance schedule 5-1
E10 E20 E30 E40 E45 E50 E55 E60 E70 Description
d e i f i c e p s s a
h O 0 5 r e t f a x 1
) y l i a d ( s r u o h 4 2 y r e v e
h o 0 0 0 2 y r e v e r e t f a
h o 0 0 0 4 y r e v e r e t f a
h o 0 0 0 2 1 y r e v e r e t f a
h o 0 0 0 6 1 y r e v e r e t f a
h o 0 0 0 4 2 y r e v e r e t f a
h o 0 0 0 2 3 y r e v e r e t f a
h o 0 0 0 4 6 y r e v e r e t f a
x
Renew lubricating oil pressure limiting valve
x
Renew exhaust gas compensators
x
Recondition actuator
All the filter elements of the crankcase breather must be renewed if coolant penetrates the lubricating oil system.
OBJ_DOKU-17296-001.fm
14
© MWM GmbH 01/2009